40km of
Nonavinakere tank in Tiptur taluk, tumkur District
500 f
c
d
250 b
e
a
415
` 450
Unit weight of concrete = 2.50 t/m3
Lever Moment (t-
Sl No Load Calculation Area(m2) Weight (t)
arm(m) m)
a (0.45-0.05)x0.415 0.166 0.415 0.225 0.093
b 1/2x(0.5+0.25+0.415)x0.05 0.029 0.073 0.033 0.002
c (0.5+0.25)x0.175 0.131 0.328 0.138 0.045
d 0.25x0.05 0.013 0.031 0.250 0.008
e 1/2x0.25x0.175 0.022 0.055 0.333 0.018
f 1/2x0.5x0.05 0.013 0.031 0.242 0.008
g 0.050 0.138 0.007
Total 0.373 0.983 0.181
Say 1.000 t/m
weight of friction slab
equ. Live loadsurcarge equal to 1.20m ht of earth as
per IRC code
Pressure due to live load S.C.=
P1 =ka x1.20x 2.00= 0.800 t/sqm
A3
0.85m
0.30m
B3 D=0.30m
3.00m
3.00m
Water face w3 Earth face
w1
3.00m
0.30m
C3 c w2 Slab D=0.30m
0.30m d
3.00m
3.00m
D3 D=0.30m
3.00m
0.75m
0.30m
DESIGN:-
Input properties:-
1) Soil properties:-
a) Density of earth (saturated) = 2.00t/cum
b) Angle of friction =30 0 OR 0.52 Rad
c) SBC of soil =14.00t/Sqm
d) Co-Eff of friction between soil & Concrete =0.50
e) Value of c for c and Øsoil is =5.00t/Sqm
0.333 For vertical face on earth side.
Ka=
Say
=0.333
2) Concrete:- M-25 Steel Fe500
C=83Kg/Sqcm t=2400kg/sqcm
Thickness of base 3.00/12= 0.25m
:. Provide the thickness of base slab at stm 0.30m
Thickness of slab at edge of base slab= 0.30m
Design of head wall stem:- A3 to B3
Disturbing moments:-
0.38x 100000
=6.46cm
Effective depth required d= 9.10x100
0.2x100x31.00
= =6.20sqcm
100
Distribute for both side ie, for one side =1/2x6.20= 3.10 sqcm
Span/250= 3.40mm
Span/depth= 2.83333333
As per Cl 23.2 c & d for % steel 0.18 multiplying factor= 1.4x1.01= 1.414
2.93x 100000
=17.13cm
Effective depth required d= 10x100
2.93x100000
Area of steel required Ast= = 5.72 sqcm
2400x0.89x24.0
Since the wall is fixed at top to the first shelf and bottom at second
shelf,the stem wall is designed as slab fixed at both end with
triangular load. 3.00m
Moment=
Mbc=-FL/15= -0.77t-m
Mcb=-FL/10=-1.15t-m
M at x =Fl/23.32at (1-3^0.2)l from C=0.49t-m
Consider M max= 1.15t-m
1.15x 100000
=11.25cm
Effective thickness required t= 9.10x100
0.12x100x25.50
= =3.06sqcm
100
10mm tor spacing= 0.79x 1000 =256.7 mm
3.06
Provide 10 Tor @ 200 mm C/C on both faces .
Span/250= 12.00mm
0.85m
Deflection=-Fl^3/382EI =0.161 mm < 12.00 mm :.OK
F= 11.52t/m 115200N
L= 3000.00mm 2.93t-m
E= 22361Mpa B3 0.38t-m 0.00t-m
I= 2250000000 -0.77t-m
1.65t-m
SF= 2.69t 26880N
3.00m
Shear stress=V/bd= 26880.00 =0.09N/sqmm
1000x300.00
3.00m
0.49t-m
0.245h2
C3 -1.15t-m
B M Diagram
Check for stresses on wall:
The vertical stem is of RCC wall continued furthe below with shelfs. Therefore it is fixed at bottom of shelf and
continueous further down, and there will not be chances of over turning and sliding. But the following calculation is
carried out to confirm that the stabilising forces are predominent over the destabilising forces.
Horizontal force at top of slab= Fh1= 3.84t/m
Disturbing moments:-
Since the shelf at level B is designed as propped cantilever slab, there will not be any surcharge
effect on the soil between point B and C. But considering the additional safety a surcarge 1t/sqm
is considered for design.
a) Pressure due to live load S.C.= 1.00t/Sqm
4.69x 100000
=22.70cm
Effective depth required d= 9.10x100
4.69x100000
Area of steel required Ast= = 9.15 sqcm
2400x0.89x24.0
:.Spacing of reinforcement bar dia 12 Tor = 1.13x 1000
=123.6 mm
9.15
:.Provide12.00Tor @ 120 mm C/C on both faces
Distribution reinforcement =0.12% of gross sectional area.
0.12x100x28.00
= =3.36sqcm
100
10mm tor spacing= 0.79x 1000 =233.8 mm
3.36
Provide 10 Tor @ 200 mm C/C on both faces .
Deflection:- Span/250 or 20mm which ever is less
Span/250= 8.80mm 2.64t-m 4.69t-m
Span/D= 7.33mm 2.20m
Deflection=-Fl^3/384EI =0.000 mm <7.33mm :. Ok
F= 17.05t/m 170500N
L= 2200.00mm 7.50t
E= 22361Mpa
I= 8.8733E+11 9.80t
SF= 9.80t SFD
Shear stress=V/bd= 0.33N/sqmm
Within permissible limits:.OK
Total horizontal Force=
LL Surcharge=
1.000 x 1.00 x3.00 = 3.00t/m
Due to EP above slab
2.0 /2 x 1.00 x3.00 = 3.00t/m
Due to EP below slab and above second
2.0 /2 x 1.00 x3.00 = 3.00t/m
Total force/m width= 8.99t/m
Deduct the friction force between RCC slab and soil
17.050 x 1.00 x0.50 = 8.525
Net tensile force to be resisted 0.47t/m
The steel required against Tension due to EP & LL Surchage to hold the stem by pressure relief shelf.
Since the shelf at C2 is designed as propped cantilever slab to take load coming on to the slab/shelf ,the
earth pressure above ths shelf is not considered for designing the stem wall below the level of shelf slab,
but reaction due to support of slab on to the stem wall is cinsidered.
Earth pressure from bottom of shelf slab to the second shelf
b) level and an additional height of 3.0m is considered for
safety purpose=P4= 13.72t
Since the stem wall is fixed at the first shelf and bottom at second
shelf,the stem wall is designed as slab fixed at both end with
triangular load. 3.00m
0.245h2
D2 -1.80t-m
B M Diagram
Check for stresses on wall:
P= 23.67t A= 0.30sq m Eccentricity e=M/P= 0.076 m
M= 1.80t-m Z= 0.015 e is with in half width of stem.Therefore the memberwill behave
as a compression member.
Pmax= 198.900833 t/sqm <650t/sqm for M20
Pmin= 77.1158333 t/sqm Both are compressive
The vertical stem is of RCC wall continued furthe below with shelfs. Therefore it is fixed at bottom of shelf and
continueous further down, and there will not be chances of over turning and sliding. But the following calculation is
carried out to confirm that the stabilising forces are predominent over the destabilising forces.
Horizontal force at top of slab= Fh1= 9.84t/m Moment disturbing = 11.76 t-m