Span(m)- 20
Specifcation Used -ERA Bridge Design Manual 2002/AASHTO LRFD BridgeDesign Spec.1998
P in =
Lane Load 72.5
the Transverse KN
Direction
2
= 9.30 KN/m
2
Wearing Surface = 0.25 KN/m
1.2.1 Concrete:
Type Of Concrete: C-30
3
Density of Concrete γc= 24.00 KN/m
'
Ec =0.043*γc*SQRT(fc )=
Ec = 27691.466 Mpa
-1 -
1.2.2 Reinforcement:
f shear =φ = 0.9
b= 0.85
Modulus of rupture=fr=0.63sqrt(fc')
3.450652
= MPa Eq.9.50
Z in Eq. 9.5 = 30000 KPa
For bar Diam>=20mm
-2 -
2.0 Preliminary Dimensions
CRWW
t t min D.H
web width a c
TYPICAL CROSS-SECTION
Take t= 0.22
Fillets=0.1*0.1 b/n Girders and Deck
Minimum overhang Slab Depth=L/10= 0.145 m Perendicular
-3-
3.0 Deck Slab Design
3.1.1 Design of
I) Analysis
W3
W4
-4-
b) Truck Load
b= 1000.0 mm
2
d 104.5 mm as= 201.1 mm
as= 113.1 mm2
cover= 50 mm
Spacing= 158.4 mm
-5-
Number of bars per meter width= 6.314 psc use 7 bars
Then provide Φ16 and Φ12 Bars C/C-140 (mm) at top of overhang slab
72.50KN 72.50KN
0.70 1.80
-6-
The following results were obtained from the analysis result
-7-
Summary of Maximum Moments
LiveLoad+IM
MLL-VE= 28.8 KNm/m
MDneg=1.25(MDL-ve)+1.75(MLL-ve)55.16 KNm/m
MDpost=1.25(MDL+ve)+1.75(MLL+ve)
52.38 KNm/m
Determination of top
b= 1000.0 mm
d=√(Mu/(0.2244f'cb)= 90.52 mm
dprovided= 162 mm
Bar diam= 16 mm
Depth is Aduquate
fy= 276 Mpa
Reinforcement
a=Asfy/0.85f'cb
a=As/76.99
a= 13.14 -4.2E+02
ρmin=0.03f'c/fy= 0.0033
2
As=ρbd= 1428.6 mm
Spacing= 140.7 mm
-8-
Provide Φ16 Bars C/C -140 mm as top reinforcment at interior parts of deck
2
Mu=0.85Φf'c*a*b*(d-a/2)= 0.2244 f'cbd
b= 1000.0 mm
d=√(Mu/(0.2244f'cb)= 88.22 mm
dprovided= 187 mm
Bar diam= 16 mm
Depth is Aduquate
fy= 276 Mpa
Reinforcement
a=Asfy/0.85f'cb
a=As/76.99
a= 15.49 1.6E+01
ρmin=0.03f'c/fy= 0.003261
Spacing= 170.9 mm
Distribution Reinforcement
-9-
2
As= 922.89 mm
- 10 -
4.0 Ananlysis and Design of Girders
4.10 Load
W3
W4
Ra Rb
b)Interior Girder
Dead Load of the Highly Loaded Interior girder is considered
2.6
w1
w2
0.22
-9 -
Total= 25.84 KN/m
Dead Load of Diaphragm= P1= 13.05 KN P2= 13.05 KN
W= 25.84 KN/m
Ra Rb
Distribution factors for lane loads, wheel and tandum axle loads,
According to section 7.5.1 of ERA's bridge design manual live loads shall be distributed to girders based
on lever rule.
a)Exterior Girder
8.10
8.10
-10 -
B) Interior Girder
1.20
1.05 1.80 1.80 0.80
Lane Loading
Exterior Girder
3.00
W=3.1KN/m
1.00
3.00 3.00
1.00 1.00
-11 -
B) Interior Girder
3.00
1.10 W=3.1KN/m 1.10
3.00 3.00
Distributed lane load including multiple presence factor shall be computed as follows.
The two lane load case governs the design, Ri= 8.06 KN/m
Dead Loads
Exterior Girder- We= 32.93 P1= 6.53 P2= 6.53
-12 -
4.20 Analysis for Moment and Shear
4.2.1 Shear and Moment due to dead load
a)Exterior Girder
Ra S Rb
Ra=Rb=P1+P2/2+WS/2= 348.92 KN
a) Interior Girder
Ra S Rb
-13 -
P1=P3= 13.05 KN S= 20.60 m
Ra=Rb=P1+P2/2+WS/2= 285.69 KN
XY/L
X Y
Case 1
M(x)=72.5XY/L+72.5X(Y-4.3)/L+17.5x(Y-8.6)/L
M(x)=72.5XY/L*(2.24-6.38/Y)
M(X)=P*C1 P= 72.5
C1=XY/L*(2.24-6.38/Y)
Case2
M(X)=72.5XY/L+72.5Y/L*(X-4.3)
M(X)=72.5XY/L(2.24-4.3/X-1.038/Y)
M(x)=P*C2 P=72.50
C2=XY/L(2.24-4.3/X-1.038/Y)
-14 -
Influence Line For maximum shear force
Y/L
-X/L
X Y
4.3 4.3
v(x)=72.5Y/L+72.5*(Y-4.30)/L+17.5*(Y-8.6)/L
V(x)=72.5Y/L(2.24-6.38/Y)
V(x)=P*C3 P=72.50
C3=Y/L(2.24-6.38/Y)
XY/L
X Y
1.2 Load case 1
M(x)=55*XY/L+55*(Y-1.2)/L
M(X)=55*XY/L(2-1.2/Y)
M(x)=P*C4 P=72.50
C4=55/72.50XY/L(2-1.2/Y)
IL for Shear
Y/L
-X/L
X Y
1.2
V(x)=55*Y/L+55*(Y-1.2/Y)
V(X)=55*Y/L(*(2-1.2/Y)
V(x)=P*C5 P=72.50
C5=55/72.5*Y/L*(2-1.2/Y)
Comparison shall be mase between track loading and tandem loading to determine the design
Moment and shear due to live load.
-15 -
Coefficients for Bending moment
X Y C1 C2 C3 C4 C5 CmaxM CmaxV
Maximum moment and shear due to live load considering 33% impact.
VLL+IM=1.33*DfCmaxV*P Df_exeterior=1.985
-16 -
4.2.4 Shear and moment due to lane loading
Load factors 1.25 and 1.75 are used as per strength I limit state Load combination requirement
-17 -
Bending Moment Diagram MT int MT ext
7000.00
6000.00
5000.00
Moment(KNm)
4000.00
3000.00
2000.00
1000.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12
Distance(m)
1200.0
1000.0
Shear Force(KN)
800.0
600.0
400.0
200.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0
Distance(m)
-18 -
5.1 Design of Girders for Bending Moment
a) Exterior Girder
S/8= 2.58 m
6t+0.5bw= 1.51 m
Width of overhang= 1.45 m
S/4= 5.15 m
12ts+bw= 3.02 m
Girder spacing= 2.6 m
b= 2.75 m
D= 1.45 m
2.75
1.45 0.22
0.096
0.07
0.083 0.083
0.083
2
Mu=0.85Φf'c*a*b*(d-a/2)= 0.2244 f'cbd
b= 2750.0 mm
d=√(Mu/(0.2244f'cb)= 560.4 mm
cover= 50 mm
dprovided= 1134.80 mm
Depth is Aduquate
No. of bar 4 6 8 10 12 14 16 18 20
Y 0.071 0.102 0.118 0.1468 0.166 0.193 0.214 0.254 0.265
Maximum Bending moment for design from Strenght I combination 5812.811 KNm
21
Section capacity and Reinforcement
2
Trail No. of bar Y(m) As(m ) d(m) a(mm) Remark Mu(KNm)
1 4 0.071 0.003216991 1.379 18.4 Rec 1586.417
2 6 0.102 0.004825486 1.348 27.5 Rec 2317.804
3 8 0.118 0.006433982 1.332 36.7 Rec 3042.720
4 10 0.1468 0.008042477 1.303 45.9 Rec 3706.733
5 12 0.166 0.009650973 1.284 55.1 Rec 4365.434
6 14 0.193 0.011259468 1.257 64.2 Rec 4964.969
7 16 0.214 0.012867964 1.236 73.4 Rec 5555.717
8 18 0.254 0.0144765 1.196 82.6 Rec 6015.728
The section capacity for 18 bars is = 6015.7283 KNm > 5812.8109 KNm
Use 18 diam 32 bars OK!
b) Interior Girder
b= 2.60 m
D= 1.45 m
2.6
1.45
Depth of section is adequate as the exterior B.M is greater than the interior!
d=D-Y Mu=Φasfy(d-a/2)
a=Asfy/0.85f'cb
2
Trail No. of bar Y(m) As(m ) d(m) a(mm) Remark MCap(KNm)
1 4 0.071 0.003217 1.379 19.4 Rec 1585.804
2 6 0.102 0.004825 1.348 29.1 Rec 2316.425
3 8 0.118 0.006434 1.332 38.8 Rec 3040.268
4 10 0.1468 0.008042 1.303 48.5 Rec 3702.902
5 12 0.166 0.009651 1.284 58.2 Rec 4359.917
6 14 0.193 0.011259 1.257 67.9 Rec 4957.460
7 16 0.214 0.012868 1.236 77.6 Rec 5545.909
8 18 0.254 0.014476 1.196 87.3 Rec 6003.315
The section capacity is calculated as
Mu=Φasfy(d-a/2) = 6003.31 KNm 16 diam 32 satisfy but
5.20 Checking for Steel Ratios, Reinf. Distribution and Servicablity Requirements
22
5.2.2 Minimum Steel Ratio,
For components containing no prestessing steel the minimum reinforcement provision shall considered
satisfied if
ρmin>=0.03f'c/fy 0.002250
In T-beam where the web is in tension determination of steel ration shall be based on the width of the web
Number of bars extending through out the span =1/3of total number of bars 6.0
2
K=ρn+0.5(t/d) /(ρn+(t/d))= 0.1138
2 3
j=6-6(t/d)+2(t/d) -(t/d) /(6-3(t/d))= 0.9100
2
fmin=Mmin/Asjd= 91.28 N/mm
2
ff=145-0.33*fmin+55(r/h)= 131.38 N/mm
1
8.10
2 2 2
1.28
0.38
Area Y AY
1 1.782 1.34 2.38788 Ybar= 1.021 m
2 1.4022 0.615 0.862353
Total 3.184 3.25
23
24.18 115.87
4
Ig= 0.5964 m 1.927153
501.41 121.03
Loads
Live load-Four times track load
The super structure is analayised for the above load using STAAD(struactural software)
the maximum dead load and live load defelection are taken from the software output.
Using a load factor for live load and dead load service limit state as 1.3 and 1.0 respectively.The
dyanmic impact allowance for this case is taken as 33% of live load.
Accordingly,
Dead Load defelection= 2.589 cm at center of span
Total= 3.841 cm
At least one third the postive moment reinforcement should be extended in to supports
Reinforcement shall be extended beyond it is no longer needed to resist flexure for a length
equal to the maximum of the followings.
Ldb=0.02Abfy/sqrt(f'c)= 1174.7 mm
2bd=2*3.2 6.4 cm
24
Standard Hooked-Bar
d=12db
a=4db/63mm Min
b=4db
db= 32 mm
a= 128 mm 6 21 2.575 17.575
b= 128 mm 7.5 21 2.575 16.075
d= 384 mm 9.5 21 2.575 14.075
11.5 21 2.575 12.075
half circle= 402.12 mm 14 21 2.575 9.575
18 21 2.575 5.575
C= 530.12 mm
Revised a= 201.1
Revised C= 585.1 mm
2
No of bars As(m ) Y(ext) Y(int) deff_ext deff_int a(ex) a(int) Mcap(ex) Mcap(int)
18 0.01447646 0.2544 0.2544 1.196 1.196 82.6 87.3 6015.73 6003.31
16 0.01286796 0.214 0.214 1.236 1.236 73.4 77.6 5555.72 5545.91
14 0.01125947 0.193 0.193 1.257 1.257 64.2 67.9 4964.97 4957.46
12 0.00965097 0.166 0.166 1.284 1.284 55.1 58.2 4365.43 4359.92
10 0.00804248 0.1468 0.1468 1.303 1.303 45.9 48.5 3706.73 3702.90
8 0.00643398 0.118 0.118 1.332 1.332 36.7 38.8 3042.72 3040.27
6 0.00482549 0.102 0.102 1.348 1.348 27.5 29.1 2317.80 2316.42
4 0.00321699 0.071 0.071 1.379 1.379 18.4 19.4 1586.42 1585.80
Exterior Girder
Actual Moment Moment cap. Bar length
x(m) (KN-m/m) No bar (KN-m/m) (m) Bar symbol No
0.000 0.00 6 2317.80 22.114 G&G1 6
1.030 1163.66
2.060 2194.03 8 3042.72 17.575 G2 &G3 2
3.090 3091.10 10 3706.73 16.075 G4 & G5 2
4.120 3854.87 12 4365.43 14.075 G6 & G7 2
5.150 4485.35 14 4964.97 12.075 G8 & G9 2
6.180 4982.53
7.210 5346.42 16 5555.72 9.575 G10 & G11 2
8.240 5577.01 18 6015.73 5.575 G12 & G13 2
8.755 5642.31
9.270 5687.33
9.785 5766.73
10.300 5812.81
25
Interior Girder
x(m) Actual Moment No bar Moment cap. Bar length Bar symbol No
0.000 0.00 6 2316.42 22.214 G 6
1.030 1059.43
2.060 1997.77 8 3040.27 17.58 G1 2
3.090 2815.02 10 3702.90 16.08 G2 2
4.120 3511.17 12 4359.92 14.08 G3 2
5.150 4086.22 14 4957.46 12.08 G4 2
6.180 4540.19
7.210 4873.05 16 5545.91 9.58 G5 2
8.240 5084.82 18 6003.31 5.58 G6 2
8.755 5145.30
9.270 5187.62
9.785 5262.63
10.300 5307.37
2
Take Ask= 435.6 mm /m
2
Usung Diam 12 a= 113.10 mm
spacing = 259.6 m
26
6.0 Design of Girder for shear
Vc=bvdv*0.083B*sqrt(f'c)=
ΦVc= 358.937 KN
Vs=Vu-ΦVc= Vu-320.75=
Av=0.083*bvS/fy*sqrt(f'c)
Max.spacing=s=Avfy/(0.083*bv*sqrt(f'c)
Smax= 361.4 mm
0.1f'cdv*bv= 1315.92 KN
Shear reinforcement ranges for the sections of the girder is computed as follows
The maximum shear forces of the girder are used for design
27
Correction factor for shear due to obtuse support=r= 1.0 +0.2*(Lt3/Kg)tanθ= 1