7981m c/c
Exp. for Elevated Structure
SALIENT FEATURES OF THE BRIDGE DECK :
Square dimension
Span c/c of Exp. Joint = 29.798 m 27.00625
Exp. Gap = 44 mm 40
c/L of brg. c/L of exp. Joint = 0.827 m 0.75
Span c/c of brg. = 28.144 m 25.507
Overall span = 29.754 m 26.966
Overhang beyond c/L brg. = 0.805 m
Thickness of End Cross-Girder = 0.400 m
Thickness of Intermediate Cross-Girder = 0.300 m
Girder overhang beyond c/l brg = 0.500 m
Overall Length of Girder = 29.144 m
Skew Angle = 0.0 degree
3
Density of Concrete = 2.500 t/m
3
Density of Green Concrete = 2.600 t/m
Size of bearing = 0.800 x 0.800 m
(Long.) (Trans.)
0.150 0.150
ht1 0.150 0.067
0.200
0.200
Web Thickening
0.400
0.605 c/L
0.800 0.300
0.500
c/L P. brg
Web Thickening
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8
Dist. From c/L Permanent brg. (m) -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55
Dist. From face of girder (m) 0.00 0.15 0.50 0.70 2.39 2.00 4.02 3.50 7.54 11.05
Dist. From jacking point (m) -0.15 0.00 0.35 0.55 2.24 1.85 3.87 3.35 7.39 10.90
Dist. From c/L temp. brg. (m) 0.00 0.15 0.50 0.70 2.39 2.00 4.02 3.50 7.54 11.05
bw m 0.80 0.80 0.80 0.80 0.67 0.80 0.30 0.30 0.30 0.30
MATERIAL USED :
Grade of Reinforcement = Fe 550
fyk = 550 Mpa
Modulus of Elasticity Es = 200000 Mpa
Precast Beam = M 45
fck = 45
fcm = 55 MPa
Ecm = 34000 MPa
ANALYSES ASSUMPTION
Enviromental parameters
Relative humidity = 40 %
Exposure condition = Severe
TEMPERATURE
o
Coefficent of thermal expansion = 0.000012 / C
Creep
Cross-sectional Area Ac = 1.75 m2 (Composite Outer Girder at Mid Span Considered)
Perimeter in contact with atmosphere u = 9.33 m
Notational size ho 2Ac/u = 376 mm
f () = 1.71 (Refer Appendix B)
@ 1.88 *(Increased by 10% on the conservative side)
Ecm' = 11789 N/mm2
SERVICEABILITY LIMIT STATE :
Rare Combination
Max permissible Stress in Concrete = 0.48*fck = 21.6 Mpa
Max permissible tensile Stress in Concrete fctm = -3.28 Mpa (fctm ( mean tensile strength))
c/L Brg.
CRASH BARRIER 0.500
18.000
17.000
28.144
29.754
PLAN
18.000
0.220
0.900
2.000 3.500
Super-structure Cross-section
PROPERTY CALCULATION OF PRECAST BEAM :-
3
Density of concrete = 2.50 t/m
1.200 1.200
1 0.150 1 0.150
2 0.150 2 0.067
3
4 0.200
5 0.200
0.800 0.800
Section At unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.500 -0.350 0.000 0.200 1.887 1.500 3.518 3.000 7.036 10.554 14.072
web width bw m 0.800 0.800 0.800 0.800 0.671 0.800 0.300 0.300 0.300 0.300 0.300
Area A m2 1.673 1.673 1.673 1.673 1.487 1.673 0.953 0.953 0.953 0.953 0.953
IZZ m4 0.591 0.591 0.591 0.591 0.559 0.591 0.465 0.465 0.465 0.465 0.465
4
Iyy m 0.103 0.103 0.103 0.103 0.088 0.103 0.043 0.043 0.043 0.043 0.043
yb m 1.040 1.040 1.040 1.040 1.044 1.040 1.055 1.055 1.055 1.055 1.055
yt m 0.960 0.960 0.960 0.960 0.956 0.960 0.945 0.945 0.945 0.945 0.945
EFFECTIVE WIDTH CALCULATION :
lo = Min 28.1441
27.3441 + 1.887 */ (Effective depth assumed 0.85 times
of Overall depth)
lo = 28.1441 m
bef
bef1 bef2
3.75 b= 3.5
2 3.50
beff1,2 = 3.13441 m
beff = 3.5 m
beff1 = 3.18441 m
beff2 = 3.13441 m
beff = 3.75 m
PROPERTY CALCULATION OF COMPOSITE BEAM :
fcm = Mean value of concrete compressive strength
fcm = fck + 10 */ fcm & fck are in Mpa
A) OUTER GIRDER :
(Equivalent to Precast Beam grade) (Equivalent to Precast Beam grade)
3.75 @ 3.64 3.75 @ 3.64
2 0.150 2 0.150
3 0.150 3 0.067
4
2.220 2.220
0.300 2.000 2.000
4
5 0.200
6 0.200
0.800 0.800
Section at Mid Span Section at Support
B) INNER GIRDER :
(Equavelent to Precast Beam grade) (Equavelent to Precast Beam grade)
3.5 @ 3.40 3.5 @ 3.40
2 0.15 2 0.15
3 0.15 3 0.07
4
2.22 2.22
0.3 2 2
4
5 0.2
6 0.2
0.8 0.8
A) OUTER GIRDER :
(Equivalent to Precast Beam grade) (Equivalent to Precast Beam grade)
3.8 @ 3.64 3.75 @ 3.64
2 0.150 2 0.150
3 0.150 3 0.067
4
2.220 2.220
0.300 2.000 2.000
4
5 0.200
6 0.200
0.800 0.800
*/Section at support
Cg from top of deck = 0.834 m
Element B D A cgy' cgy'cg A*cgy'cg
Factor Nos.
No. m m m2 m m m3
1 1 3.644 0.220 1 0.802 0.110 0.724 0.580
2 1 0.200 0.150 2 0.060 0.295 0.539 0.032
3 0.5 0.200 0.067 2 0.013 0.392 0.441 0.006
4 1 0.800 0.614 1 0.491 0.527 0.307 0.151
*/Section at support
Cg from top of deck = 0.834 m
Element B D A cgy' cgy'cg A*cgy'cg
Factor Nos.
No. m m m2 m m m3
2 1 0.200 0.150 2 0.060 0.075 0.759 0.046
3 0.5 0.200 0.067 2 0.013 0.172 0.661 0.009
4 1 0.800 0.614 1 0.491 0.307 0.527 0.259
2 0.150 2 0.150
3 0.150 3 0.067
4
2.220 2.220
0.300 2.000 2.000
4
5 0.200
6 0.200
0.800 0.800
*/Section at support
Cg from top of deck = 0.850 m
Element B D A cgy' cgy'cg A*cgy'cg
Factor Nos.
No. m m m2 m m m3
1 1 3.401 0.220 1 0.748 0.11 0.740 0.55339
2 1 0.200 0.150 2 0.060 0.295 0.555 0.03327
3 0.5 0.200 0.067 2 0.0133 0.392 0.457 0.0061
4 1 0.800 0.630 1 0.504 0.535 0.315 0.15852
Precast Beam
4.183 t/m
2.381 t/m
c/L
Shear Force T 0.000 0.628 2.092 36.727 29.760 31.289 25.132 26.365 16.755 8.377 0.000
UDL over Girder (Inner Girder) = 2.002 t/m Weight on Outer Girder
UDL over Girder (Outer Girder) = 2.145 t/m Intermediate Diaphragm (1 nos) 2.3625 t
Shear Force T 1 2 2 31 27 28 24 25 16 9 1
Deck Slab & Intermediate Diaphragm Dead Load, Inner Girder
Support Reaction = 29.17 T
Section At Unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.5 -0.35 0 0.2 1.887 1.5 3.518013 3 7.03603 10.554 14.0721
Shear Force T 2.4 2.7 3.4 30.1 26.8 27.5 23.5 24.5 16.4 9.4 2.4
Precast Beam T 0 1 2 37 30 31 25 26 17 8 0
18.00
0.5 0 17 0 0.5
0.065 thick WC
2
Wearing coat = 0.200 t/m
0.00
Footpath weight = 0.000 t/m
0.0001
2
Footpath Live load = 0.308 t/m
= 0.000 t/m
Calculation of Wind Force
(A) WIND FORCES ON SUPERSTRUCTURE
WIND FORCE ON UNLOADED SPAN
2
Area of Superstr to be acted upon by wind force , A1 (Vert) = 536 m
Gust Factor, G = 2
Drag Coefficient, CD = 0.75
Height of the LL = 3 m
Height of crash barrier above deck slab = 1.1 m
Exposed height of the train = 1.9 m
Exposed area of the LL from left span = 56.62 m2
Design wind speed is VZ = 42.1 m/s
Wind pressure is PZ = 1.065 kN/m2
Therefore,
2
Area of Live load to be acted upon by wind force , A1 (Trans) = 56.62 m
2
Area of Superstr to be acted upon by wind force , A1 (Trans) = 98.93 m
Gust Factor, G = 2.0
Drag Coefficient, CD (For live load) = 1.20 (Cl. 209.3.6 - IRC:6)
Drag Coefficient, CD (For Superstr) = 1.95
2
Area of Superstr to be acted upon by wind force , A1 (Vert) = 536 m
Gust Factor, G = 2
Drag Coefficient, CD = 0.75
= 258 Tonne
Stressing Stages :
Stage 1
At Day 14 Strand N-1 Ap UTS
Cable No. 1 2 Nos. Nos mm2 T
No. of tendons 19 19 38 1.00 3751 698
% Jacking 100 100
Stage 2
At Day 28 Strands N-1 Ap UTS
Cable No. 3 4 Nos. Nos mm2 T
No. of tendons 19 19 38 1.00 3751 698
% Jacking 100 100
At Anchorage Location
Minimum c/c of cable = 0.260 m 19 T 13 Cables
Minimum c/L of cable to concrete edge = 0.198 m
Anchor plate dimension = 0.300 x 0.300
J1
c/L
Origin
14.572
Cable Vertical Profile
Linear Parabolic Linear
No.
Start End Start End Start End
m m m m m m
1 x 0 2 2 13.42 13.422 14.422
y 0.135 0.135 0.135 0.275 0.275 0.30
2 x 0 1 1 3 3 5 5 14.42
z -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.20
3 x 0 1 1 2 2 3 3 14.42
z 0 0 0 0 0 0 0 0.00
4 x 0 1 1 2 2 3 3 14.42
z 0 0 0 0 0 0 0 0.00
5 x 0 1 1 2 2 3 3 14.42
z 0 0 0 0 0 0 0 0.00
6 x 0 1 1 2 2 3 3 14.42
z 0 0 0 0 0 0 0 0.00
7 x 0 1 1 2 2 3 3 14.42
z 0 0 0 0 0 0 0 0.00
Geometric properties of cable profile
Vertical Profile Horizontal Profile
Cable No. : 1 Cable No. : 1
Vertical Profile Horizontal Profile
x (O) x(J1) y Curve x (O) x(J1) z Curve
14.42 0 0.3 14.42 0.00 0.2
13.42 1 0.275 Linear 5 9.42 0.2 Linear
2 12.42 0.135 Parab. 3 11.42 0.2 Rev.Parab.
0 14.42 0.135 Linear 1 13.42 0.2 Parab.
0 14.42 0.2 Linear
Total Poh 966.7 967.1 971.7 970.6 976.6 975.0 987.1 997.5 1006.0
Total Poh 44.9 44.9 40.1 41.7 33.7 35.8 20.0 6.1 0.0
Cable NO. 1
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
14.4221 0 0.300 0.0246 0 14.4221 0 0.2 0 0
13.4221 1 Linear 0.275 0.0246 0 0 13.4221 1 Linear 0.2 0 0 0
5 9.422 Parab. 0.145 0.0065 0.0181 0.0181 5 9.42205 Linear 0.2 0 0 0
3 11.422 Parab. 0.136 0.0022 0.0043 0.0224 3 11.4221 Rev.Parab. 0.2 0 0 0
2 12.422 Parab. 0.135 0 0.0022 0.0246 2 12.4221 Parab. 0.2 0 0 0
0 14.422 Linear 0.135 0 0.0000 0.0246 0 14.4221 Linear 0.2 0 0 0
Total = 15.424 m
= 111.186 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 14.42 m 6.33
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 268.054 244.314 11.8701
1 267.518 244.849 11.3345 11.6023
9.42205 262.241 250.127 6.0569 73.2357
11.4221 261.003 251.365 4.8190 10.8759
12.4221 260.386 251.982 4.2022 4.5106
14.4221 259.347 253.021 3.1627 7.3649
Total = 107.5893
Total Shaded area = 215.179
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne) rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 244.314 0.02458 0 244.2401 6.00499 0 267.973 6.58849 0
1 244.849 1 244.58 0.02458 0 244.7755 6.01815 0 267.973 6.58849 0
9.42205 250.127 8.42205 247.49 0.00646 0 250.1218 1.61519 0 268.048 1.73095 0
11.4221 251.365 2 250.75 0.00215 0 251.3644 0.54107 0 268.053 0.577 0
12.4221 251.982 1 251.67 0 0 251.9818 0 0 268.054 0 0
14.4221 253.021 2 252.50 0 0 253.0212 0 0 268.054 0 0
14.4221 253.021 0 253.02 0 0 253.0212 0 0 268.054 0 0
270.000 268.05
265.000
259.35
260.000
(Prestress)
259.35
260.000
(Prestress)
255.000
253.02
250.000
245.000
244.31
240.000 (x)
0 2 4 6 8 10 12 14 16
After Friction Loss After slip Loss
Cable NO. 2
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
14.4221 0 0.3000 0.0246 0.0000 14.4221 0 -0.2 0 0
13.4221 1 Linear 0.2754 0.0246 0.0000 0.0000 13.4221 1 Linear -0.2 0 0 0
5 9.42205 Parab. 0.1447 0.0065 0.0181 0.0181 5 9.42205 Linear -0.2 0 0 0
3 11.4221 Parab. 0.1361 0.0022 0.0043 0.0224 3 11.4221 Rev.Parab. -0.2 0 0 0
2 12.4221 Parab. 0.1350 0.0000 0.0022 0.0246 2 12.4221 Parab. -0.2 0 0 0
0 14.4221 Linear 0.1350 0.0000 0.0000 0.0246 0 14.4221 Linear -0.2 0 0 0
Total = 15.4235 m
= 111.186 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 14.4221 m 6.33
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 268.054 244.314 11.870
1 267.518 244.849 11.335 11.6023
9.42205 262.241 250.127 6.057 73.2357
11.4221 261.003 251.365 4.819 10.8759
12.4221 260.386 251.982 4.202 4.5106
14.4221 259.347 253.021 3.163 7.3649
Total = 107.5893
Total Shaded area = 215.179
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 244.314 0.02458 0.000 244.240 6.005 0 267.973 6.5885 0
1 244.849 1 244.58 0.02458 0.000 244.775 6.018 0 267.973 6.5885 0
9.42205 250.127 8.42205 247.49 0.00646 0.000 250.122 1.615 0 268.048 1.7310 0
11.4221 251.365 2 250.75 0.00215 0.000 251.364 0.541 0 268.053 0.5770 0
12.4221 251.982 1 251.67 0.00000 0.000 251.982 0.000 0 268.054 0 0
14.4221 253.021 2 252.50 0.00000 0.000 253.021 0.000 0 268.054 0 0
14.4221 253.021 0 253.02 0.00000 0.000 253.021 0.000 0 268.054 0 0
270.000
268.05
265.000
259.35
(Prestress)
260.000
255.000
253.02
(Prestress)
255.000
253.02
250.000
245.000
244.31
(x)
240.000
0 2 4 6 8 10 12 14 16
Total = 15.429 m
= 110.932 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 14.4221 m 2.180
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 268.054 245.843 11.106
1 267.518 246.378 10.570 10.838
11.4221 259.801 254.096 2.853 69.947
12.4221 259.072 254.824 2.124 2.488
12.4221 259.072 254.824 2.124 0.000
14.4221 258.038 255.859 1.090 3.214
Total = 86.487
Total Shaded area = 172.975
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 245.843 0.0543 0 245.480 13.351 0 267.658 14.5574 0
1 246.378 1 246.11 0.0543 0 246.015 13.380 0 267.658 14.5574 0
11.4221 254.096 10.4221 250.24 0.0048 0 254.093 1.210 0 268.051 1.27637 0
12.4221 254.824 1 254.46 0 0 254.824 0 0 268.054 0 0
12.4221 254.824 0 254.82 0 0 254.824 0 0 268.054 0 0
14.4221 255.859 2 255.34 0 0 255.859 0 0 268.054 0 0
14.4221 255.859 0 255.86 0 0 255.859 0 0 268.054 0 0
265
258.04
(Prestress)
260
255.86
255
255
250
245.84
245
(x)
240
0 2 4 6 8 10 12 14 16
Total = 15.439 m
= 110.71 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 14.4221 m 0.8101
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 268.054 244.617 11.719
1 267.518 245.152 11.183 11.451
11.4221 258.609 254.061 2.274 70.125
12.4221 257.770 254.901 1.434 1.854
12.4221 257.770 254.901 1.434 0.000
14.4221 256.741 255.930 0.405 1.839
Total = 85.269
Total Shaded area = 170.538
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 244.617 0.08399 0 243.7545 20.5216 0 267.109 22.4879 0
1 245.152 1 244.88 0.08399 0 244.2882 20.5666 0 267.109 22.4879 0
11.4221 254.061 10.4221 249.61 0.00737 0 254.0545 1.87259 0 268.047 1.97572 0
12.4221 254.901 1 254.48 0 0 254.9013 0 0 268.054 0 0
12.4221 254.901 0 254.90 0 0 254.9013 0 0 268.054 0 0
14.4221 255.930 2 255.42 0 0 255.9304 0 0 268.054 0 0
14.4221 255.930 0 255.93 0 0 255.9304 0 0 268.054 0 0
270 268.05
265
(Prestress)
260
256.74
(Prestress)
260
256.74
255 255.93
250
245 244.62
240 (x)
0 2 4 6 8 10 12 14 16
Total = 15.439 m
= 0.00 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 14.4221 m 1.6986
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 0 -1.6986 0.8493
1 0 -1.6986 0.8493 0.849279
11.4221 0 -1.6986 0.8493 8.851231
12.4221 0 -1.6986 0.8493 0.849279
12.4221 0 -1.6986 0.8493 0
14.4221 0 -1.6986 0.8493 1.698558
Total = 12.24835
Total Shaded area = 24.4967
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 -1.6986 0.08399 0 -1.69257 -0.1425 0 0 0 0
1 -1.6986 1 -1.70 0.08399 0 -1.69257 -0.1425 0 0 0 0
11.4221 -1.6986 10.4221 -1.70 0.00737 0 -1.69851 -0.0125 0 0 0 0
12.4221 -1.6986 1 -1.70 0 0 -1.69856 0 0 0 0 0
12.4221 -1.6986 0 -1.70 0 0 -1.69856 0 0 0 0 0
14.4221 -1.6986 2 -1.70 0 0 -1.69856 0 0 0 0 0
14.4221 -1.6986 0 -1.70 0 0 -1.69856 0 0 0 0 0
0.00 0.00
0
0 2 4 6 8 10 12 14 16
-1.70
(Prestress)
-1.70
(Prestress)
-1.70
(x)
-5
Total = 15.43907 m
= 0.000 mm
Calculation of Slip :
Slip allowable = 0 mm
Say slip travels up to > 14.4221 m 0.7344
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 0 -0.7344 0.3672
1 0 -0.7344 0.3672 0.367216
11.4221 0 -0.7344 0.3672 3.82714
12.4221 0 -0.7344 0.3672 0.367216
12.4221 0 -0.7344 0.3672 0
14.4221 0 -0.7344 0.3672 0.734431
Total = 5.296003
Total Shaded area = 10.592
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 -0.7344 0.08399 0 -0.73184 -0.0616 0 0 0 0
1 -0.7344 1 -0.73 0.08399 0 -0.73184 -0.0616 0 0 0 0
11.4221 -0.7344 10.4221 -0.73 0.00737 0 -0.73441 -0.0054 0 0 0 0
12.4221 -0.7344 1 -0.73 0 0 -0.73443 0 0 0 0 0
12.4221 -0.7344 0 -0.73 0 0 -0.73443 0 0 0 0 0
14.4221 -0.7344 2 -0.73 0 0 -0.73443 0 0 0 0 0
14.4221 -0.7344 0 -0.73 0 0 -0.73443 0 0 0 0 0
0 0.00 0.00
0 2 4 6 8 10 12 14 16
-0.73
-0.73
(Prestress)
-5 (x)
Cable NO. 7
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
14.4221 0 1.1 0.08399 0 14.4221 0 0 0 0
13.4221 1 Linear 1.0158 0.08399 0 0 13.4221 1 Linear 0 0 0 0
3 11.4221 Parab. 0.5387 0.00737 0.0766 0.0766 3 11.4221 Linear 0 0 0 0
2 12.4221 Parab. 0.535 0 0.0074 0.0840 2 12.4221 Rev.Parab. 0 0 0 0
2 12.4221 Parab. 0.535 0 0.0000 0.0840 2 12.4221 Rev.Parab. 0 0 0 0
0 14.4221 Linear 0.535 0 0.0000 0.0840 0 14.4221 Linear 0 0 0 0
Total = 15.439 m
= 0 mm
Calculation of Slip :
Slip allowable = 0 mm
Say slip travels up to > 14.4221 m 9.419802
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 Shaded Area
0 0 -9.4198 4.7099
1 0 -9.4198 4.7099 4.709901
11.4221 0 -9.4198 4.7099 49.08682
12.4221 0 -9.4198 4.7099 4.709901
12.4221 0 -9.4198 4.7099 0
14.4221 0 -9.4198 4.7099 9.419802
Total = 67.92643
Total Shaded area = 135.853
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 -9.4198 0.084 0 -9.3866 -0.7903 0 0 0 0
1 -9.4198 1 -9.42 0.084 0 -9.3866 -0.7903 0 0 0 0
11.4221 -9.4198 10.4221 -9.42 0.007 0 -9.41955 -0.0694 0 0 0 0
12.4221 -9.4198 1 -9.42 0 0 -9.4198 0 0 0 0 0
12.4221 -9.4198 0 -9.42 0 0 -9.4198 0 0 0 0 0
14.4221 -9.4198 2 -9.42 0 0 -9.4198 0 0 0 0 0
14.4221 -9.4198 0 -9.42 0 0 -9.4198 0 0 0 0 0
0 0.00 0.00
0 2 4 6 8 10 12 14 16
(Prestress)
-5
-9.42
-9.42
-10 (x)
Cable NO : 7
x(J1) Po(x) Poh(x) Pov(x)
m Tonne Tonne Tonne
0 0 0 0
1 0 0 0
11.4221 0 0 0
12.4221 0 0 0
12.4221 0 0 0
14.4221 0 0 0
14.4221 0 0 0
Summary of pre-stressing forces after friction & slip loss :
Cable NO : 1 Cable NO. 2 Cable NO : 3
x(J1) P1(x) P1h(x) P1v(x) x(J1) P1(x) P1h(x) P1v(x) x(J1) P1(x) P1h(x) P1v(x)
m Tonne Tonne Tonne m Tonne Tonne Tonne m Tonne Tonne Tonne
0 244.3 244.2 6.0 0 244.3 244.2 6.0 0 245.8 245.5 13.4
1 244.8 244.8 6.0 1 244.8 244.8 6.0 1 246.4 246.0 13.4
9.42205 250.1 250.1 1.6 9.42205 250.1 250.1 1.6 11.4221 254.1 254.1 1.2
11.4221 251.4 251.4 0.5 11.4221 251.4 251.4 0.5 12.4221 254.8 254.8 0.0
12.4221 252.0 252.0 0.0 12.4221 252.0 252.0 0.0 12.4221 254.8 254.8 0.0
14.4221 253.0 253.0 0.0 14.4221 253.0 253.0 0.0 14.4221 255.9 255.9 0.0
14.4221 253.0 253.0 0.0 14.4221 253.0 253.0 0.0 14.4221 255.9 255.9 0.0
Cable NO : 7
x(J1) P1(x) P1h(x) P1v(x)
m Tonne Tonne Tonne
0 -9.4198 -9.3866 -0.7903
1 -9.4198 -9.3866 -0.7903
11.4221 -9.4198 -9.4195 -0.0694
12.4221 -9.4198 -9.4198 0
12.4221 -9.4198 -9.4198 0
14.4221 -9.4198 -9.4198 0
14.4221 -9.4198 -9.4198 0
Pre-stress loss calculation from Stage I prestressing to Stage II prestressing :
Stage : 1
At day 14 Action : Prestressing of stage I cables
SECTION PROPERTIES
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Properties of Precast Section
Area m2 1.67 1.67 1.49 1.67 0.95 0.95 0.95 0.95 0.95
I gross m4 0.59 0.59 0.56 0.59 0.46 0.46 0.46 0.46 0.46
yb m 1.04 1.04 1.04 1.04 1.05 1.05 1.05 1.05 1.05
1 Tonne 267.973 267.973 267.984 267.981 267.999 267.994 268.03 268.052 268.054
2 Tonne 267.973 267.973 267.984 267.981 267.999 267.994 268.03 268.052 268.054
3 Tonne 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 Tonne 0 0 0 0 0 0 0 0 0
5 Tonne 0 0 0 0 0 0 0 0 0
Total (P1oh) Tonne 535.9 535.9 536.0 536.0 536.0 536.0 536.1 536.1 536.1
Weighted Average of pre-stress force Tonne 535.9 536.0 536.0 536.0 536.0 536.0 536.1 536.1
Forces after Friction & Slip Loss : (Horizontal Component)
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Cable- No.
1 Tonne 244.427 244.535 245.561 245.315 246.596 246.267 248.829 251.043 253.021
2 Tonne 244.427 244.535 245.561 245.315 246.596 246.267 248.829 251.043 253.021
3 Tonne 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 Tonne 0 0 0 0 0 0 0 0 0
5 Tonne 0 0 0 0 0 0 0 0 0
Total (F1h) Tonne 488.9 489.1 491.1 490.6 493.2 492.5 497.7 502.1 506.0
Eccen soffit m 0.29 0.29 0.25 0.26 0.21 0.22 0.16 0.14 0.135
Pre-stress loss Tonne 47.09 46.88 44.85 45.33 42.81 43.45 38.40 34.02 30.07
% Loss % 8.79 8.75 8.37 8.46 7.99 8.11 7.16 6.35 5.61
Prestressing force & their eccentricity from cg. of section of Stage I cables :
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Total (F1h) Tonne 488.85 489.07 491.12 490.63 493.19 492.53 497.66 502.09 506.04
eF m 0.75 0.75 0.80 0.78 0.84 0.83 0.89 0.92 0.920
eFc m 1.10 1.10 1.18 1.13 1.32 1.31 1.37 1.40 1.40
2
Modulus of Elasticity of concrete Ec = 31990.6 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
F1h = Horizontal component of pre-stressing force after friction & slip loss
eF = Eccentricity of pre-stressing force from cg. Precast section
eFc = Eccentricity of pre-stressing force from cg. Composite section
sc1 = Stress in Concrete at cg. of pre-stressing force. due to pre-stress
sc2 = Stress in Concrete at cg. of pre-stressing force, due to permanent loads at particular stage.
sc3 = Net stress in Concrete at cg. of pre-stressing force
MSWG = Bending Moment due to selfweight of girder at section x
Permanent Load stresses sc2 N/mm2 0.04 -0.19 -0.74 -0.65 -3.04 -2.79 -6.16 -6.42 -8.32
Net stress sc3 N/mm2 7.60 7.42 8.15 7.39 9.65 9.71 7.60 7.95 6.21
Average stress sc3 7.51 7.78 7.77 8.52 9.68 8.65 7.77 7.08
2
Weight average of concrete stresses at cg. of pre-stressing foce. sav. = 7.887 N/mm
Average loss in pre-stres force = 4.51 Tonne
Pre-stressing force at section after Elastic shortening loss
At day = 14
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
F1h' T 484.35 484.56 486.61 486.12 488.68 488.03 493.15 497.58 501.53
eF m 0.75 0.75 0.80 0.78 0.84 0.83 0.89 0.92 0.92
sc1 N/mm2 7.48 7.55 8.81 7.96 12.57 12.38 13.63 14.24 14.40
Permanent Load stresses sc2 N/mm2 0.04 -0.19 -0.74 -0.65 -3.04 -2.79 -6.16 -6.42 -8.32
Net stress sc3 N/mm2 7.527 7.354 8.063 7.315 9.531 9.591 7.476 7.820 6.084
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Crep loss from day 64 To day 92
Creep coefficent = 1.118
Concrete Modulus of elasticity at the time of loading = 31990.6 Mpa
Total Creep loss at day: 92 T 19.248 18.806 20.621 18.706 24.373 24.528 19.119 19.998 15.558
Additional loss from day 64 to day 92 T 2.237 2.185 2.396 2.174 2.832 2.850 2.222 2.324 1.808
Creep Loss :
For Stage-I cable, On account of Stage-I cable prestressing
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Stages
Creep loss from 14 To day 28 Tonne 11.77 11.50 12.60 11.43 14.90 14.99 11.69 12.22 9.51
Creep loss from 28 To day 35 Tonne 1.49 1.45 1.59 1.45 1.88 1.90 1.48 1.55 1.20
Creep loss from 35 To day 63 Tonne 3.66 3.58 3.92 3.56 4.64 4.67 3.64 3.80 2.96
Creep loss from 63 To day 64 Tonne 0.10 0.09 0.10 0.09 0.12 0.12 0.10 0.10 0.08
Creep loss from 64 To day 92 Tonne 2.24 2.19 2.40 2.17 2.83 2.85 2.22 2.32 1.81
Creep loss from 92 To day 36500 Tonne 20.11 19.65 21.55 19.55 25.47 25.63 19.98 20.90 16.26
Shrinkage Loss :
For Stage-I cable, On account of Stage-I cable prestressing
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Stages
Shrinkage loss from 14 To day 28 Tonne 1.87 1.87 1.87 1.87 1.87 1.87 1.87 1.87 1.87
Shrinkage loss from 28 To day 35 Tonne 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
Shrinkage loss from 35 To day 63 Tonne 2.57 2.57 2.57 2.57 2.57 2.57 2.57 2.57 2.57
Shrinkage loss from 63 To day 64 Tonne 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
Shrinkage loss from 64 To day 92 Tonne 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99
Shrinkage loss from 92 To day 36500 Tonne 19.50 19.50 19.50 19.50 19.50 19.50 19.50 19.50 19.50
Pre-Stress Loss Calculation after Stage II Prestressing :
Stage : 2
At day 28 Action : Prestressing of stage II cables
2
Modulus of Elasticity of pre-stressing steel Ep : 195000 N/mm
Section properties
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Properties of Precast Section
2
Area m 1.67 1.67 1.49 1.67 0.95 0.95 0.95 0.95 0.95
I gross m4 0.59 0.59 0.56 0.59 0.46 0.46 0.46 0.46 0.46
yb m 1.04 1.04 1.04 1.04 1.05 1.05 1.05 1.05 1.05
Properties of Composite Section
Area m2 2.48 2.48 2.29 2.48 1.75 1.75 1.75 1.75 1.75
I gross m4 1.22 1.22 1.15 1.22 0.95 0.95 0.95 0.95 0.95
yb m 1.39 1.39 1.43 1.39 1.54 1.54 1.54 1.54 1.54
Prestressing force & their eccentricity from cg. of section of Stage II cables :
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Total (F2h) Tonne 489.61 489.82 492.42 491.76 495.21 494.33 501.24 507.26 511.79
eF m 0.165 0.179 0.295 0.266 0.398 0.371 0.543 0.613 0.620
eFc m 0.511 0.525 0.676 0.613 0.881 0.853 1.025 1.095 1.102
2
Modulus of Elasticity of concrete Ec = 33000.0 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
Calculating Stress at the centroid of Ist stage cables due to II stage cables
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Length m 0.2 1.687 -0.387 2.01801 -0.518 4.03603 3.5180 3.5180
Forces Left in Ist stage cables at day 28
F1h" Tonne 413.76 414.44 417.22 417.46 418.84 417.51 430.30 437.95 448.00
eF m 0.748 0.753 0.797 0.784 0.841 0.831 0.893 0.917 0.920
B) Elastic shortining of IInd stage cables due to IInd stage cable stressing
At day 28
loss in pre-stres force = 0.5*Ep/Ec*sav.*(N-1)*As
N-1 = Total Nos. of stage II cable - 1 = 1.00 Nos
2
As = Area of one cable = 1875.49 mm
2
Modulus of Elasticity of concrete Ec = 33000.0 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
Calculating Stress at the centroid of IIst stage cables due to II stage cables
Sections c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Length 0.2 1.687 -0.387 2.01801 -0.518 4.03603 3.51801 3.5180
Forces Left in IIst stage cables after friction & slip loss at day 28
F2h Tonne 489.6 489.8 492.4 491.8 495.2 494.3 501.2 507.3 511.8
eF m 0.165 0.179 0.295 0.266 0.398 0.371 0.543 0.613 0.620
Pre-stressing force at section after Elastic shortining loss due to II stage cables
At day = 28
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.868 3.35 7.38603 10.904 14.422
Length m 0.2 1.687 -0.387 2.018 -0.518 4.03603 3.518 3.518
Forces In I -stage cables
F1h'' T 392.7 393.4 396.2 396.4 397.8 396.5 409.3 416.9 427.0
eF m 0.748 0.753 0.797 0.784 0.841 0.831 0.893 0.917 0.920
F1h'' avg. T 393.1 394.8 396.3 397.1 397.2 402.9 413.1 422.0
Weighted average of pre-stress force I stage cables = 408.665 tonne
Total stresses N/mm2 3.957 3.814 4.592 3.986 5.653 5.604 4.245 4.951 3.241
Total stresses N/mm2 3.133 3.118 3.766 3.278 5.391 5.350 4.626 5.060 3.922
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO SECOND STAGE
PRESTRESSING :
Total stress 6.436 6.262 6.808 6.190 7.734 7.802 5.739 6.113 4.547
Total concrete stresses at cg. Stage I cables after stgae II prestress applied (after ES loss taken place)
3.957 3.814 4.592 3.986 5.653 5.604 4.245 4.951 3.241
Net additional steress applied Mpa 3.912 4.006 5.334 4.636 8.695 8.395 10.403 11.369 11.558
Immidiate loses in stage I cables due to elastic shortening losses due to second stage pre-stressing
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Stages
At day 28 Elastic shortening Tonne 21.02 21.02 21.02 21.02 21.02 21.02 21.02 21.02 21.02
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO TRANSFER OF SUPER-
STRUCTURE AT PERMANENT BEARINGS.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 3751 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO TRANSFER OF SUPER-
STRUCTURE AT PERMANENT BEARINGS.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 3751 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Additional creep loss in stage II cables on account of Transfer of super-structure at permanent bearings. :
Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Stages
Creep loss from 63 To day 64 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 64 To day 92 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 92 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CALCULATION OF STRESS GAIN ON ACCOUNT OF PLACING OF SIDL :
Stage : 5
At day 64 Action : PLACING OF SIDL
Creep loss from 28 To day 35 Tonne 1.49 1.45 1.59 1.45 1.88 1.90 1.48 1.55 1.20
Stage I Creep loss from 35 To day 63 Tonne 3.66 3.58 3.92 3.56 4.64 4.67 3.64 3.80 2.96
cable Creep loss from 63 To day 64 Tonne 0.10 0.09 0.10 0.09 0.12 0.12 0.10 0.10 0.08
cables
Creep loss from 64 To day 92 Tonne 2.24 2.19 2.40 2.17 2.83 2.85 2.22 2.32 1.81
Creep loss from 92 To day 36500 Tonne 20.11 19.65 21.55 19.55 25.47 25.63 19.98 20.90 16.26
Creep loss from 28 To day 35 Tonne 4.23 4.34 5.77 5.02 9.41 9.09 11.26 12.30 12.51
Stage I Creep loss from 35 To day 63 Tonne 2.56 2.62 3.49 3.03 5.68 5.49 6.80 7.43 7.55
cable Creep loss from 63 To day 64 Tonne 0.06 0.06 0.08 0.07 0.12 0.12 0.15 0.16 0.16
II cables
Creep loss from 64 To day 92 Tonne 1.21 1.24 1.65 1.43 2.69 2.59 3.21 3.51 3.57
Creep loss from 92 To day 36500 Tonne 9.34 9.56 12.73 11.06 20.75 20.04 24.83 27.13 27.58
14 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Casting of Deck
28 To day 35 Tonne 0 0 0 0 0 0 0 0 0
Stage I Creep loss from 35 To day 63 Tonne 0.01 -0.20 -1.79 -2.29 -4.42 -2.19 -9.61 -11.57 -12.82
cable Creep loss from 63 To day 64 Tonne 0.00 0.00 -0.02 -0.02 -0.05 -0.02 -0.10 -0.12 -0.13
Creep loss from 64 To day 92 Tonne 0.00 -0.04 -0.38 -0.49 -0.95 -0.47 -2.06 -2.48 -2.75
slab
Creep loss from 92 To day 36500 Tonne 0.01 -0.31 -2.70 -3.45 -6.66 -3.31 -14.47 -17.43 -19.31
cable Creep loss from 63 To day 64 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bearings
Creep loss from 64 To day 92 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 92 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Creep loss Tonne 56.75 55.43 59.70 51.62 73.99 76.72 52.42 50.30 37.62
Relaxation loss from 28 To day 35 Tonne 0.72 0.72 0.73 0.73 0.74 0.74 0.79 0.84 0.88
Stage I Relaxation loss from 35 To day 63 Tonne 1.17 1.18 1.20 1.19 1.22 1.21 1.30 1.37 1.44
cable Relaxation loss from 63 To day 64 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
cables
Relaxation loss from 64 To day 92 Tonne 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
Relaxation loss from 92 To day 36500 Tonne 23.43 23.47 23.93 23.82 24.40 24.25 25.88 27.37 28.72
Total Relaxation loss Tonne 35.21 35.28 35.97 35.80 36.67 36.44 38.90 41.14 43.17
Shrinkage loss from 28 To day 35 Tonne 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
Stage I Shrinkage loss from 35 To day 63 Tonne 2.57 2.57 2.57 2.57 2.57 2.57 2.57 2.57 2.57
cable Shrinkage loss from 63 To day 64 Tonne 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
cables
Shrinkage loss from 64 To day 92 Tonne 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99
Shrinkage loss from 92 To day 36500 Tonne 19.50 19.50 19.50 19.50 19.50 19.50 19.50 19.50 19.50
Total Shrinkage loss Tonne 26.79 26.79 26.79 26.79 26.79 26.79 26.79 26.79 26.79
5) IMMIDIATE LOSES IN STAGE I CABLES DUE TO ELASTIC SHORTENING LOSSES DUE TO II STAGE PRE-STRESSING
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Stressing
Stage I At day 28 Elastic shortening Tonne 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0 21.0
of stage-II
cable
cables
Cr+ Rex+ Sh 14 To day 28 Tonne 23.49 23.24 24.55 23.33 27.04 27.07 24.45 25.61 23.47
ES due to stage II cables At day 28 Tonne 21.02 21.02 21.02 21.02 21.02 21.02 21.02 21.02 21.02
Cr+ Rex+ Sh 28 To day 35 Tonne 7.22 7.29 8.88 7.97 12.82 12.50 14.31 15.47 15.37
Stage I
cable Cr+ Rex+ Sh 35 To day 63 Tonne 9.97 9.74 9.38 8.06 9.69 11.74 4.69 3.61 1.70
Cr+ Rex+ Sh 63 To day 64 Tonne 0.23 0.23 0.24 0.22 0.28 0.30 0.23 0.22 0.19
Cr+ Rex+ Sh 64 To day 92 Tonne 5.46 5.30 5.21 4.78 5.71 5.25 2.95 1.89 0.79
Cr+ Rex+ Sh 92 To day 36500 Tonne 72.38 71.70 74.20 69.86 81.92 83.09 71.48 71.43 66.06
Total Shrinkage loss Tonne 191.37 189.91 192.83 185.08 205.79 208.93 182.04 177.78 163.18
CUMULATIVE LOSSES IN STAGE-I CABLES AT DIFFERENT STAGES :
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Fr+slip+ES of Stage I cable At day 14 51.60 51.39 49.36 49.84 47.31 47.96 42.91 38.53 34.57
Cr+ Rex+ Sh 14 To day 28 Tonne 75.09 74.63 73.90 73.17 74.35 75.03 67.36 64.14 58.04
ES due to stage II cables At day 28 Tonne 96.11 95.65 94.92 94.19 95.37 96.05 88.38 85.16 79.06
Cr+ Rex+ Sh 28 To day 35 Tonne 103.33 102.94 103.80 102.16 108.19 108.55 102.69 100.63 94.43
Stage I
cable Cr+ Rex+ Sh 35 To day 63 Tonne 113.30 112.67 113.18 110.22 117.88 120.29 107.38 104.23 96.13
Cr+ Rex+ Sh 63 To day 64 Tonne 113.53 112.90 113.42 110.44 118.16 120.59 107.61 104.46 96.32
Cr+ Rex+ Sh 64 To day 92 Tonne 118.99 118.20 118.64 115.22 123.86 125.84 110.56 106.35 97.12
Cr+ Rex+ Sh 92 To day 36500 Tonne 191.37 189.91 192.83 185.08 205.79 208.93 182.04 177.78 163.18
FORCES LEFT IN STAGE I CABLES AT DIFFERENT STAGES :
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Forces in stage I cables before Friction & slip loss before 14 Tonne 535.9 535.9 536.0 536.0 536.0 536.0 536.1 536.1 536.1
Eccentricity of cables from cg. of precast section 0.75 0.75 0.80 0.78 0.84 0.83 0.89 0.92 0.920
At day 14 P Tonne 484.3 484.6 486.6 486.1 488.7 488.0 493.2 497.6 501.5
M Tm 362.5 365.0 387.8 381.3 411.0 405.7 440.1 456.4 461.3
14 To day 28 P Tonne 460.9 461.3 462.1 462.8 461.6 461.0 468.7 472.0 478.1
M Tm 344.9 347.5 368.3 363.0 388.3 383.2 418.3 432.9 439.7
At day 28 P Tonne 439.8 440.3 441.0 441.8 440.6 439.9 447.7 450.9 457.0
M Tm 329.2 331.7 351.5 346.6 370.6 365.7 399.6 413.7 420.4
28 To day 35 P Tonne 432.6 433.0 432.2 433.8 427.8 427.4 433.4 435.5 441.7
M Tm 323.8 326.2 344.4 340.3 359.8 355.3 386.8 399.5 406.3
Stage I
cable 35 To day 63 P Tonne 422.6 423.3 422.8 425.7 418.1 415.7 428.7 431.9 440.0
M Tm 316.3 318.8 337.0 334.0 351.7 345.5 382.6 396.2 404.7
63 To day 64 P Tonne 422.4 423.0 422.5 425.5 417.8 415.4 428.5 431.6 439.8
M Tm 316.1 318.7 336.8 333.8 351.4 345.3 382.4 396.0 404.5
64 To day 92 P Tonne 417.0 417.7 417.3 420.7 412.1 410.1 425.5 429.8 439.0
M Tm 312.0 314.7 332.6 330.1 346.6 340.9 379.8 394.2 403.8
92 To day 36500 P Tonne 344.6 346.0 343.1 350.9 330.2 327.1 354.0 358.3 372.9
M Tm 257.9 260.7 273.5 275.3 277.7 271.9 316.0 328.7 343.0
STRESSES IN SECTION AT DIFFERENT STAGES DUE TO STAG-I PRE-STRESSING FORCES :
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Properties of precast section alone
Area m2 1.67 1.67 1.49 1.67 0.95 0.95 0.95 0.95 0.95
Ib m4 0.59 0.59 0.56 0.59 0.46 0.46 0.46 0.46 0.46
yb m 1.04 1.04 1.04 1.04 1.05 1.05 1.05 1.05 1.05
yt m 0.96 0.96 0.96 0.96 0.95 0.95 0.95 0.95 0.95
Stress at girder top At day 14 Mpa -2.99 -3.03 -3.37 -3.29 -3.23 -3.13 -3.78 -4.06 -4.12
Stress at girder bottom Mpa 9.27 9.31 10.52 9.61 14.46 14.34 15.17 15.59 15.74
Stress at girder top 14 To day 28 Mpa -2.85 -2.89 -3.20 -3.13 -3.05 -2.96 -3.59 -3.85 -3.93
Stress at girder bottom Mpa 8.82 8.87 9.99 9.15 13.66 13.54 14.42 14.79 15.00
Stresses at different sections at different stages
Stress at girder top At day 28 Mpa -2.72 -2.76 -3.05 -2.99 -2.91 -2.82 -3.43 -3.68 -3.76
Stress at girder bottom Mpa 8.42 8.46 9.53 8.73 13.04 12.92 13.77 14.13 14.34
Stress at girder top 28 To day 35 Mpa -2.67 -2.71 -2.99 -2.93 -2.83 -2.74 -3.32 -3.56 -3.63
Stress at girder bottom Mpa 8.28 8.32 9.34 8.58 12.66 12.56 13.33 13.64 13.86
Stage I
cable Stress at girder top 35 To day 63 Mpa -2.61 -2.65 -2.93 -2.88 -2.77 -2.67 -3.28 -3.53 -3.62
Stress at girder bottom Mpa 8.09 8.14 9.14 8.42 12.38 12.21 13.19 13.53 13.81
Stress at girder top 63 To day 64 Mpa -2.61 -2.65 -2.93 -2.88 -2.76 -2.66 -3.28 -3.53 -3.61
Stress at girder bottom Mpa 8.08 8.13 9.13 8.41 12.37 12.20 13.18 13.52 13.80
Stress at girder top 64 To day 92 Mpa -2.58 -2.61 -2.89 -2.85 -2.73 -2.63 -3.26 -3.51 -3.61
Stress at girder bottom Mpa 7.98 8.03 9.02 8.32 12.20 12.05 13.09 13.46 13.78
Stress at girder top 92 To day 36500 Mpa -2.13 -2.17 -2.38 -2.37 -2.18 -2.10 -2.71 -2.93 -3.06
Stress at girder bottom Mpa 6.59 6.65 7.42 6.94 9.77 9.61 10.89 11.23 11.70
SUMMARY OF LOSSES IN STAGE II CABLES :
1) CREEP LOSS :
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Creep loss from 14 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Stressing of stage-
Creep loss from 28 To day 35 Tonne 3.39 3.37 4.08 3.55 5.83 5.79 5.01 5.48 4.24
Stage II Creep loss from 35 To day 63 Tonne 2.05 2.04 2.46 2.14 3.52 3.50 3.02 3.31 2.56
cable Creep loss from 63 To day 64 Tonne 0.04 0.04 0.05 0.05 0.08 0.08 0.07 0.07 0.06
II cables
Creep loss from 64 To day 92 Tonne 0.97 0.96 1.16 1.01 1.67 1.65 1.43 1.56 1.21
Creep loss from 92 To day 36500 Tonne 7.48 7.44 8.99 7.82 12.87 12.77 11.04 12.08 9.36
14 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Casting of Deck
28 To day 35 Tonne 0 0 0 0 0 0 0 0 0
Stage II Creep loss from 35 To day 63 Tonne 0.00 -0.05 -0.66 -0.78 -2.09 -0.98 -5.84 -7.73 -8.64
cable Creep loss from 63 To day 64 Tonne 0.00 0.00 -0.01 -0.01 -0.02 -0.01 -0.06 -0.08 -0.09
Creep loss from 64 To day 92 Tonne 0.00 -0.01 -0.14 -0.17 -0.45 -0.21 -1.25 -1.66 -1.85
slab
Creep loss from 92 To day 36500 Tonne 0.00 -0.07 -1.00 -1.17 -3.15 -1.47 -8.81 -11.64 -13.01
cable Creep loss from 63 To day 64 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bearings
Creep loss from 64 To day 92 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 92 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Creep loss Tonne 13.92 13.59 14.20 11.91 16.63 18.02 -0.39 -6.07 -14.46
2) IMMIDIATE LOSES IN STAGE II CABLES DUE TO ELASTIC SHORTENING LOSSES DUE TO II STAGE PRE-STRESSING
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Stressing Friction & slip At day 28 Tonne 46.5 46.3 43.7 44.3 40.9 41.8 34.9 28.8 24.3
Stage II
of stage-II Elastic shortening 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2
cable
cables
Immediate loss Tonne 50.74 50.53 47.93 48.59 45.13 46.02 39.11 33.09 28.56
Relaxation loss from 28 To day 35 Tonne 9.10 9.11 9.34 9.28 9.67 9.56 10.45 11.24 11.85
Stage II Relaxation loss from 35 To day 63 Tonne 2.37 2.38 2.44 2.42 2.53 2.50 2.73 2.94 3.09
cable Relaxation loss from 63 To day 64 Tonne 0.06 0.06 0.06 0.06 0.06 0.06 0.07 0.07 0.07
II cables
Relaxation loss from 64 To day 92 Tonne 0.35 0.35 0.36 0.36 0.37 0.37 0.40 0.43 0.46
Relaxation loss from 92 To day 36500 Tonne 23.67 23.72 24.30 24.15 25.17 24.88 27.20 29.26 30.84
Total Relaxation loss Tonne 35.55 35.62 36.49 36.27 37.81 37.37 40.84 43.94 46.32
Shrinkage loss from 28 To day 35 Tonne 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
Stage II Shrinkage loss from 35 To day 63 Tonne 2.57 2.57 2.57 2.57 2.57 2.57 2.57 2.57 2.57
cable Shrinkage loss from 63 To day 64 Tonne 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
II cables
Shrinkage loss from 64 To day 92 Tonne 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99
Shrinkage loss from 92 To day 36500 Tonne 19.50 19.50 19.50 19.50 19.50 19.50 19.50 19.50 19.50
Total Shrinkage loss Tonne 24.92 24.92 24.92 24.92 24.92 24.92 24.92 24.92 24.92
LOSSES IN PRE-STRESS FORCE OF STAGE II CABLES AT DIFFERENT STAGES :
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
- At day 14
- 14 To day 28 Tonne
Fr+slip+ES of Stage II cable At day 28 Tonne 50.74 50.53 47.93 48.59 45.13 46.02 39.11 33.09 28.56
Cr+ Rex+ Sh 28 To day 35 Tonne 13.27 13.27 14.19 13.61 16.29 16.13 16.24 17.50 16.88
Stage II
cable Cr+ Rex+ Sh 35 To day 63 Tonne 6.99 6.94 6.81 6.36 6.52 7.58 2.47 1.08 -0.41
Cr+ Rex+ Sh 63 To day 64 Tonne 0.18 0.18 0.18 0.18 0.19 0.20 0.15 0.14 0.12
Cr+ Rex+ Sh 64 To day 92 Tonne 3.30 3.24 3.10 2.99 2.99 2.67 0.74 -0.41 -1.24
Cr+ Rex+ Sh 92 To day 36500 Tonne 50.65 50.51 51.33 49.97 53.37 53.72 45.78 44.47 41.43
Total Loss Tonne 125.13 124.66 123.54 121.69 124.50 126.32 104.49 95.88 85.34
- 14 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Fr+slip+ES of Stage II cable At day 28 Tonne 50.74 50.53 47.93 48.59 45.13 46.02 39.11 33.09 28.56
Cr+ Rex+ Sh 28 To day 35 Tonne 64.01 63.80 62.12 62.20 61.42 62.15 55.35 50.59 45.44
Stage II
cable Cr+ Rex+ Sh 35 To day 63 Tonne 71.00 70.73 68.93 68.56 67.95 69.74 57.83 51.67 45.02
Cr+ Rex+ Sh 63 To day 64 Tonne 71.18 70.91 69.11 68.73 68.14 69.94 57.98 51.82 45.14
Cr+ Rex+ Sh 64 To day 92 Tonne 74.48 74.16 72.21 71.73 71.13 72.61 58.72 51.41 43.91
Cr+ Rex+ Sh 92 To day 36500 Tonne 125.13 124.66 123.54 121.69 124.50 126.32 104.49 95.88 85.34
FORCES LEFT IN STAGE II CABLES AT DIFFERENT STAGES :
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Forces in stage II cables before Friction & slip loss before 28 Tonne 536.1 536.1 536.1 536.1 536.1 536.1 536.1 536.1 536.1
Eccentricity of cables from cg. of precast section m 0.165 0.179 0.295 0.266 0.398 0.371 0.543 0.613 0.620
At day 14 P Tonne
M Tm
14 To day 28 P Tonne
M Tm
Forces at different sections at different stages
At day 28 P Tonne 485.4 485.6 488.2 487.5 491.0 490.1 497.0 503.0 507.5
M Tm 79.9 86.7 143.8 129.8 195.5 181.6 269.9 308.3 314.6
28 To day 35 P Tonne 472.1 472.3 474.0 473.9 474.7 474.0 480.8 485.5 490.7
M Tm 77.8 84.3 139.6 126.2 189.0 175.6 261.1 297.5 304.1
Stage II
cable
35 To day 63 P Tonne 465.1 465.4 467.2 467.6 468.2 466.4 478.3 484.4 491.1
M Tm 76.6 83.1 137.6 124.5 186.4 172.8 259.7 296.9 304.4
63 To day 64 P Tonne 464.9 465.2 467.0 467.4 468.0 466.2 478.1 484.3 491.0
M Tm 76.6 83.1 137.5 124.5 186.4 172.8 259.6 296.8 304.3
64 To day 92 P Tonne 461.6 462.0 463.9 464.4 465.0 463.5 477.4 484.7 492.2
M Tm 76.0 82.5 136.6 123.7 185.2 171.8 259.2 297.0 305.1
92 To day 36500 P Tonne 411.0 411.4 412.6 414.4 411.6 409.8 431.6 440.2 450.8
M Tm 67.7 73.5 121.5 110.4 163.9 151.9 234.4 269.8 279.4
FORCES LEFT IN (I+ II) STAGE CABLES AT DIFFERENT STAGES :
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.868 3.35 7.38603 10.904 14.422
At day 14 P Tonne 484.35 484.56 486.61 486.12 488.68 488.03 493.15 497.58 501.53
M Tm 362.47 365.01 387.83 381.35 411.01 405.66 440.14 456.44 461.32
14 To day 28 P Tonne 460.85 461.32 462.07 462.79 461.65 460.96 468.70 471.96 478.07
M Tm 344.89 347.50 368.27 363.05 388.27 383.16 418.32 432.95 439.73
Forces at different sections at different stages
At day 28 P Tonne 925.20 925.88 929.23 929.29 931.60 930.03 944.68 953.96 964.59
M Tm 409.10 418.37 495.30 476.39 566.12 547.32 669.46 721.94 734.97
28 To day 35 P Tonne 904.71 905.32 906.16 907.71 902.49 901.39 914.13 921.00 932.35
M Tm 401.51 410.51 484.04 466.51 548.86 530.95 647.87 697.03 710.38
Stage (I+
II) cable
35 To day 63 P Tonne 887.76 888.65 889.97 893.29 886.28 882.07 906.96 916.31 931.06
M Tm 392.90 401.94 474.56 458.50 538.11 518.38 642.33 693.05 709.07
63 To day 64 P Tonne 887.34 888.24 889.54 892.90 885.80 881.56 906.59 915.94 930.75
M Tm 392.70 401.73 474.31 458.28 537.79 518.05 642.05 692.76 708.82
64 To day 92 P Tonne 878.58 879.70 881.23 885.13 877.11 873.65 902.89 914.46 931.19
M Tm 388.06 397.16 469.24 453.73 531.81 512.70 639.01 691.28 708.85
92 To day 36500 P Tonne 755.55 757.49 755.71 765.30 741.82 736.84 785.64 798.55 823.70
M Tm 325.56 334.13 394.99 385.62 441.65 423.72 550.36 598.50 622.41
Equivalent eccentricity from cg. of precast section m 0.431 0.441 0.523 0.504 0.595 0.575 0.701 0.749 0.756
Equivalent eccentricity from top of precast section m 1.391 1.401 1.479 1.464 1.541 1.520 1.646 1.695 1.701
Forces just after friction & slip Horizontal component T 966.7 967.1 971.7 970.6 976.6 975.0 987.1 997.5 1006.0
Forces just after friction & slip Vertical component T 44.92 44.94 40.14 41.66 33.75 35.78 19.96 6.12 0.00
Vertical component after all losses T 35.11 35.20 31.22 32.85 25.63 27.04 15.88 4.90 0.00
STRESSES IN SECTION AT DIFFERENT STAGES DUE TO II STAGE PRE-STRESSING FORCES :
Losses In ACTION Stresses at Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Properties of precast section alone
Area m2 1.67 1.67 1.49 1.67 0.95 0.95 0.95 0.95 0.95
Ib m4 0.59 0.59 0.56 0.59 0.46 0.46 0.46 0.46 0.46
yb m 1.04 1.04 1.04 1.04 1.05 1.05 1.05 1.05 1.05
yt m 0.96 0.96 0.96 0.96 0.95 0.95 0.95 0.95 0.95
Stress at girder top At day 14 Mpa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stress at girder bottom Mpa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stress at girder top 14 To day 28 Mpa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stress at girder bottom Mpa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stresses at different sections at different stages
Stress at girder top At day 28 Mpa 1.60 1.49 0.82 0.80 1.18 1.45 -0.27 -0.99 -1.07
Stress at girder bottom Mpa 4.31 4.43 5.97 5.20 9.59 9.27 11.35 12.28 12.47
Stress at girder top 28 To day 35 Mpa 1.56 1.45 0.80 0.78 1.14 1.40 -0.26 -0.96 -1.04
Stress at girder bottom Mpa 4.19 4.31 5.80 5.05 9.28 8.96 10.98 11.85 12.06
Stage II
cable Stress at girder top 35 To day 63 Mpa 1.54 1.43 0.79 0.77 1.12 1.38 -0.26 -0.95 -1.04
Stress at girder bottom Mpa 4.13 4.24 5.71 4.98 9.15 8.82 10.92 11.83 12.07
Stress at girder top 63 To day 64 Mpa 1.53 1.43 0.78 0.77 1.12 1.38 -0.26 -0.95 -1.04
Stress at girder bottom Mpa 4.13 4.24 5.71 4.98 9.14 8.82 10.92 11.82 12.06
Stress at girder top 64 To day 92 Mpa 1.52 1.42 0.78 0.77 1.11 1.37 -0.26 -0.96 -1.04
Stress at girder bottom Mpa 4.10 4.21 5.67 4.95 9.09 8.77 10.90 11.83 12.09
Stress at girder top 92 To day 36500 Mpa 1.36 1.27 0.69 0.68 0.99 1.21 -0.24 -0.87 -0.95
Stress at girder bottom Mpa 3.65 3.75 5.04 4.42 8.04 7.75 9.85 10.75 11.08
STRESSES IN SECTION AT DIFFERENT STAGES DUE TO (I + II) STAGE PRE-STRESSING FORCES :
Losses In ACTION Losess Type Sections Unit c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.35 0.55 2.237 1.85 3.86801 3.35 7.38603 10.904 14.422
Properties of precast section alone
Area m2 1.67 1.67 1.49 1.67 0.95 0.95 0.95 0.95 0.95
Ib m4 0.59 0.59 0.56 0.59 0.46 0.46 0.46 0.46 0.46
yb m 1.04 1.04 1.04 1.04 1.05 1.05 1.05 1.05 1.05
yt m 0.96 0.96 0.96 0.96 0.95 0.95 0.95 0.95 0.95
Stress at girder top At day 14 Mpa -2.99 -3.03 -3.37 -3.29 -3.23 -3.13 -3.78 -4.06 -4.12
Stress at girder bottom Mpa 9.27 9.31 10.52 9.61 14.46 14.34 15.17 15.59 15.74
Stress at girder top 14 To day 28 Mpa -2.85 -2.89 -3.20 -3.13 -3.05 -2.96 -3.59 -3.85 -3.93
Stress at girder bottom Mpa 8.82 8.87 9.99 9.15 13.66 13.54 14.42 14.79 15.00
Stresses at different sections at different stages
Stress at girder top At day 28 Mpa -1.11 -1.26 -2.23 -2.18 -1.74 -1.37 -3.70 -4.67 -4.83
Stress at girder bottom Mpa 12.72 12.89 15.50 13.93 22.64 22.19 25.12 26.41 26.82
Stress at girder top 28 To day 35 Mpa -1.11 -1.26 -2.20 -2.15 -1.69 -1.34 -3.59 -4.51 -4.67
Stress at girder bottom Mpa 12.47 12.63 15.14 13.63 21.94 21.52 24.31 25.50 25.92
Stage I+ II
cable Stress at girder top 35 To day 63 Mpa -1.08 -1.22 -2.14 -2.11 -1.64 -1.29 -3.55 -4.48 -4.65
Stress at girder bottom Mpa 12.21 12.38 14.85 13.40 21.52 21.03 24.11 25.36 25.88
Stress at girder top 63 To day 64 Mpa -1.07 -1.22 -2.14 -2.11 -1.64 -1.29 -3.55 -4.48 -4.65
Stress at girder bottom Mpa 12.21 12.37 14.84 13.39 21.51 21.02 24.10 25.35 25.87
Stress at girder top 64 To day 92 Mpa -1.05 -1.19 -2.11 -2.08 -1.61 -1.26 -3.52 -4.47 -4.65
Stress at girder bottom Mpa 12.07 12.24 14.69 13.27 21.28 20.81 23.99 25.30 25.87
Stress at girder top 92 To day 36500 Mpa -0.77 -0.90 -1.68 -1.69 -1.20 -0.89 -2.95 -3.79 -4.02
Stress at girder bottom Mpa 10.24 10.40 12.46 11.35 17.82 17.36 20.75 21.97 22.78
CHECK FOR OUTER/ INNER GIRDER
SUMMARY OF FORCES FOR LIVE LOAD (4 LANE LOADING):
Impact Factor For Live Load Lane Reduction Factor For Live Load
Class A Loading = 0.130 Class 3A = 10 %
Class 70 RW Loading = 0.130 Class 1A + 70 RW = 10 %
Moment applied at Beam section only Tm 0 -1 -5 34 179 215 438 317 865 946 1127
Moment applied at Composite section Tm 0 1 1 37 121 119 268 310 522 676 782
Section At Unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
Area of prestressing steel Ap mm2 7502 7502 7502 7502 7502 7502 7502 7502 7502
Cg. of prestressing force (from deck top) m 1.39 1.40 1.48 1.46 1.54 1.52 1.65 1.69 1.70
Comparing with Allowable Tensile Stress Uncracked Uncracked Uncracked Uncracked Uncracked Uncracked Cracked Cracked Cracked
Assuming Section Uncracked in Flexure
Vc1 = Ultimate design SF acting on the precast section alone
Vc1' = Net design shear force on precast section after deducting vertical component of pre-stress force
= Vc1 - 0.8*Vertical component of pre-stress force
*0.8 is the partial safety factor applied to prestress force
fctd = Allowable principle tensile stress = 1.533 Mpa
Shear Force at Precast section alone Vc1 Tonne 30.02 33.75 54.00 76.95 68.85 59.40 27.00 5.40
Vertical Component of prestress force Tonne 35.20 31.22 32.85 25.63 27.04 15.88 4.90 0.00
Vc1' Tonne 1.86 8.78 27.72 56.44 47.22 46.69 23.08 5.40
tS Mpa 0.01 0.07 0.18 0.72 0.60 0.59 0.29 0.07
Check tS ≤ fctd OK OK OK OK OK OK OK OK
Stress at composite centriod due to Moment at Precast section alone
Moment at precast section MPC 34 179 215 438 317 865 946 1127
Stress at composite centriod scm Mpa 0.20 1.22 1.26 4.55 3.29 8.98 9.82 11.70
Factored shear force VED Tonne 152 201 218 219 182 141 88 58
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Provide Minimum
Provide Minimum
Provide Minimum
Provide Minimum
Provide Minimum
Check
NA
NA
NA
Shear Capacity Assuming Section is Cracked :
Design Shear Resitance
0.33
VRdc = Max ( 0.12 k (80 r1 fck ) + 0.15 scp ) bw d ( IRC 112 / clause 10.3.2 (2) )
(nmin +0.15scp ) bw d
bw = 0.30 m 0.20
r1 = 0.00168 0.20
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
Prestressing Force after all losses Tonne 0.0 0.0 756 757 756 765 742 737 786 799 824
Area of precast section m2 0.00 0.00 1.67 1.67 1.49 1.67 0.95 0.95 0.95 0.95 0.95
2
Area of composite section m 0.00 0.00 2.48 2.48 2.29 2.48 1.75 1.75 1.75 1.75 1.75
bw m 0.80 0.80 0.80 0.80 0.67 0.80 0.30 0.30 0.30 0.30 0.30
2
Asl provided mm 1005 1005 1005 1005 1005 1005 1005 1005 1005 1005 1005
Factored shear force Tonne 0 152 201 218 219 182 141 88 58
Check
Shear Reinf.
Shear Reinf.
Shear Reinf.
Required
Required
Required
NA
NA
NA
NA
NA
NA
CHECK FOR SECTION MAXIMUM SHEAR CAPACITY :
Vccd = 0 T
Vtd = 0 T
'
VNS = VED -Vccd -Vtd
VNS = VED'
Variation of q 45
o
≥ q ≥ 21.80 o
Considering q = 45 o
for maximum shear capacity of section
VRdmax = acw * bw * z * n1 * fcd / ( cot q +tan q) ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
acw = 1
= 0.6
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
scp = NED/ Ac Mpa 5.08 4.57 7.79 7.74 8.25 8.38 8.65
acw 1.25 1.23 1.25 1.25 1.25 1.25 1.25
bw m 0.67 0.80 0.30 0.30 0.30 0.30 0.30
z m 1.63 1.61 1.69 1.67 1.79 1.84 1.85
VRdmax 1646 1909 764 754 811 833 836
Factored shear force VNS Tonne 201 218 219 182 141 88 58
Check OK OK OK OK OK OK OK
FINDING VALUE OF q AT DESIGN SECTIONS FOR DESIGN SHEAR REINFORCEMENT
VRdmax = VNS
-1
q = 0.5 sin [ 2*VNS / (acw * bw * z * v1 * fcd) ] ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
VNS T 200.65 217.85 219.08 181.81 140.83 87.65 58.30
bw m 0.67 0.80 0.30 0.30 0.30 0.30 0.30
d m 2.00 2.00 2.00 2.00 2.00 2.00 2.00
z m 1.63 1.61 1.69 1.67 1.79 1.84 1.85
q deg 7.06 6.60 17.51 14.41 10.16 6.07 4.01
q adopted deg 45 21.8 21.8 21.8 21.8 21.8 21.8
VNS = VRds = (Asw/s) *z *fywd *cotq ( IRC 112 / clause 10.3.3.2 Eq 10.7 )
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
VNS T 200.65 217.85 219.08 181.81 140.83 87.65 58.30
bw m 0.67 0.80 0.30 0.30 0.30 0.30 0.30
z m 1.63 1.61 1.69 1.67 1.79 1.84 1.85
qdesign deg 45.00 21.80 21.80 21.80 21.80 21.80 21.80
Asw/s mm2/m 3223 1413 1356 1139 821 497 330
Additional requirement (suspension reinf)
2
Asw,min /s mm /m 59 70 26 26 53 53 53
Provide Asw Legs nos 4 2 2 2 2 2 2
dia mm 12 12 12 12 12 12 12
spacing mm 100 100 100 100 200 200 200
Asw/s provide 4524 2262 2262 2262 1131 1131 1131
Check Ok/Revise OK OK OK OK OK OK OK
Check for Shear Capacity Inner Girder :
Design parameters
Grade of concrete fck = 45 Mpa
fcd = 0.447 *fck = 20.10 Mpa
Moment applied at Beam section only Tm 0 -1 -1 17 151 291 427 380 660 989 1163
Moment applied at Composite section Tm 0 1 1 71 189 213 414 363 605 793 782
Section At Unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
Area of prestressing steel Ap mm2 7502 7502 7502 7502 7502 7502 7502 7502 7502
Cg. of prestressing force (from deck top) m 1.39 1.40 1.48 1.46 1.54 1.52 1.65 1.69 1.70
Comparing with Allowable Tensile Stress Uncracked Uncracked Uncracked Uncracked Uncracked Uncracked Cracked Cracked Cracked
Shear Force at Precast section alone Vc1 Tonne 52.99 90.73 112.07 74.24 94.10 55.16 28.80 1.35
Vertical Component of prestress force Tonne 35.20 31.22 32.85 25.63 27.04 15.88 4.90 0.00
Vc1' Tonne 24.83 65.75 85.79 53.73 72.47 42.46 24.88 1.35
tS Mpa 0.16 0.49 0.57 0.68 0.92 0.54 0.32 0.02
Check tS ≤ fctd OK OK OK OK OK OK OK OK
Stress at composite centriod due to Moment at Precast section alone
Moment at precast section MPC 17 151 291 427 380 660 989 1163
Stress at composite centriod scm Mpa 0.10 1.03 1.71 4.43 3.94 6.85 10.26 12.07
Factored shear force VED Tonne 183 225 246 187 201 141 84 37
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Provide Minimum
Provide Minimum
Provide Minimum
Provide Minimum
Provide Minimum
Check
NA
NA
NA
Shear Capacity Assuming Section is Cracked :
Design Shear Resitance
VRdc = Max ( 0.12 k (80 r1 fck )0.33 + 0.15 scp ) bw d ( IRC 112 / clause 10.3.2 (2) )
(nmin +0.15scp ) bw d
3.64
k = Min 1 + √ 200/d d is depth in mm
2 1.20 0.22
= 1.316
0.15
0.15
r1 = Min Asl /bw d
0.02 0.225 2.22
0.30 1.30 2.00
Asl provided 16 f 5 Nos. NA
2
Asl provided = 1005 mm 0.125
bw = 0.30 m 0.20
r1 = 0.00168 0.20
bw m 0.80 0.80 0.80 0.80 0.67 0.80 0.30 0.30 0.30 0.30 0.30
Asl provided mm2 1005 1005 1005 1005 1005 1005 1005 1005 1005 1005 1005
Factored shear force Tonne 0 183 225 246 187 201 141 84 37
Shear Reinforcement
Provide Minimum
Check
Shear Reinf.
Shear Reinf.
Required
Required
NA
NA
NA
NA
NA
NA
CHECK FOR SECTION MAXIMUM SHEAR CAPACITY :
Vccd = 0 T
Vtd = 0 T
Variation of q 45
o
≥ q ≥ 21.80 o
Considering q = 45 o
for maximum shear capacity of section
VRdmax = acw * bw * z * n1 * fcd / ( cot q +tan q) ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
acw = 1
= 0.6
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
scp = NED/ Ac Mpa 5.08 4.57 7.79 7.74 8.25 8.38 8.65
acw 1.25 1.23 1.25 1.25 1.25 1.25 1.25
bw m 0.67 0.80 0.30 0.30 0.30 0.30 0.30
z m 1.63 1.61 1.69 1.67 1.79 1.84 1.85
VRdmax 1646 1909 764 754 811 833 836
Factored shear force VNS Tonne 225 246 187 201 141 84 37
Check OK OK OK OK OK OK OK
FINDING VALUE OF q AT DESIGN SECTIONS FOR DESIGN SHEAR REINFORCEMENT
VRdmax = VNS
q = 0.5 sin-1 [ 2*VNS / (acw * bw * z * v1 * fcd) ] ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
VNS T 224.58 245.92 186.74 201.25 141.16 84.35 37.35
bw m 0.67 0.80 0.30 0.30 0.30 0.30 0.30
d m 2.00 2.00 2.00 2.00 2.00 2.00 2.00
z m 1.63 1.61 1.69 1.67 1.79 1.84 1.85
q deg 7.92 7.46 14.64 16.12 10.18 5.84 2.56
q adopted deg 45 21.8 21.8 21.8 21.8 21.8 21.8
VNS = VRds = (Asw/s) *z *fywd *cotq ( IRC 112 / clause 10.3.3.2 Eq 10.7 )
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
VNS T 224.58 245.92 186.74 201.25 141.16 84.35 37.35
bw m 0.67 0.80 0.30 0.30 0.30 0.30 0.30
z m 1.63 1.61 1.69 1.67 1.79 1.84 1.85
qdesign deg 45.00 21.80 21.80 21.80 21.80 21.80 21.80
Asw/s mm2/m 3608 1595 1156 1261 823 479 211
Additional requirement (suspension reinf)
Asw,min /s mm2/m 59 70 26 26 53 53 53
Provide Asw Legs nos 4 2 2 2 2 2 2
dia mm 12 12 12 12 12 12 12
spacing mm 100 100 100 100 200 200 200
Asw/s provide 4524 2262 2262 2262 1131 1131 1131
Check Ok/Revise OK OK OK OK OK OK OK
CONTROL OF SHEAR WITHIN WEBS :
Concrete Tensile stress prior to cracking in biaxial state
fctb = (1 - 0.8 s3/fck) fctk,0.05
fck = 45 Mpa
fctk,0.05 = 2.30 Mpa
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
Area of prestressing steel Ap mm2 7501.96 7501.96 7501.96 7501.96 7501.96 7501.96 7501.96 7501.96 7501.96
Cg. of prestressing force (from deck top) m 1.39 1.40 1.48 1.46 1.54 1.52 1.65 1.69 1.70
Axial stress (due to pre stress) fx Mpa 4.53 5.08 4.57 7.79 7.74 8.25 8.38 8.65
*stresses due to bending are ignored
Maximum Principal stress
s3 (comp)= [fx/2 + 1/2 (fx2 + 4tv2)] Mpa 4.60 5.28 4.76 8.43 8.16 8.50 8.50 8.71
s1 (tens) = [fx/2 - 1/2 (fx2 + 4tv2)] Mpa -0.08 -0.20 -0.19 -0.64 -0.42 -0.25 -0.12 -0.07
fctb Mpa 2.11 2.08 2.11 1.96 1.97 1.95 1.95 1.94
reinforcement
reinforcement
reinforcement
reinforcement
reinforcement
reinforcement
reinforcement
reinforcement
Minmum
Minmum
Minmum
Minmum
Minmum
Minmum
Minmum
Minmum
Provide
Provide
Provide
Provide
Provide
Provide
Provide
Provide
Check s1 < fctb
Minimum Reinforcement Requirement For Crack Control
Section At unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
Reinforcement requirement in bottom flange
b 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
h considered 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
Act = b*h m2 75000 75000 75000 75000 75000 75000 75000 75000 75000
As,min web = r0s,min * Kc *Act mm2 571 571 571 571 571 571 571 571 571
2
Reinforcement provided (both face ) mm 905 905 905 905 905 905 905 905 905
Check OK OK OK OK OK OK OK OK OK
Total bottom flange width including bottom flange 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Nos of bar required at bottom 13 13 13 13 13 13 13 13 12
Section At unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
Reinforcement requirement in Top flange
b 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
h considered 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
Act = b*h m2 101250 101250 101250 101250 101250 101250 101250 101250 101250
0 2
As,min = r s,min * Kc *Act mm 770 770 770 770 770 770 770 770 770
vEdi = b VEd /z bi
bi = 1.2 m bi = 1.20
r = As /Ai
As = Area of reinforcement crossing the inter face
Ai = Interface area of joint
2
Ai = 1200000 mm Considering 1 m length
a = 90 deg
Section At unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
VED T 91.53 121.65 166.90 163.85 142.13 112.96 81.43 60.65 52.90
z m 1.549 1.627 1.612 1.688 1.668 1.794 1.843 1.849
2
vEdi N/mm 0.654 0.855 0.847 0.701 0.564 0.378 0.274 0.238
Legs nos 4 4 4 4 4 4 4 4
Provide Asw dia mm 12 12 12 12 12 12 12 12
spacing mm 100 100 100 100 100 200 200 200
Asw/s provide 4524 4524 4524 4524 4524 2262 2262 2262
Check As ≥ As,min OK OK OK OK OK OK OK OK
r 0.0038 0.0038 0.0038 0.0038 0.0038 0.0019 0.0019 0.0019
2
vRdi N/mm 1.082 1.082 1.082 1.082 1.082 0.541 0.541 0.541
Check vEDi ≤ vRdi OK OK OK OK OK OK OK OK
CHECK FOR SHEAR IN FLANGED PORTION: ( IRC 112 / clause 10.3.5)
o
Variation of qf 45 ≥ q ≥ 26.5 o
For compression flange
Section At unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
VED T 121.65 166.90 163.85 142.13 112.96 81.43 60.65 52.90
z m 1.55 1.63 1.61 1.69 1.67 1.79 1.84 1.85
vEd Mpa 3.57 4.66 4.62 3.83 3.08 2.06 1.50 1.30
vEdf Mpa 1.214 1.585 1.571 1.301 1.046 0.702 0.509 0.442
FINDING q f
qf = 0.5 sin-1 [ 2vEDf / n fcd ]
qf deg 7.53 9.93 9.83 8.09 6.48 4.32 3.13 2.72
Check OK/ REVISE qf < qfmax OK OK OK OK OK OK OK OK
Check OK/ REVISE vEDf < vEdf,max OK OK OK OK OK OK OK OK
REINFORCEMENT REQUIREMENT IN DECK FOR LONGITUDINAL SHEAR
Transverse reinforcement per unit length
Asf /sf = vEDf * hf / fyd cot qf
Section At unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
vEdf Mpa 1.21 1.59 1.57 1.30 1.05 0.70 0.51 0.44
qdesign deg 26.50 26.50 26.50 26.50 26.50 26.50 26.50 26.50
Asf /sf mm2/m 278 364 360 298 240 161 117 101
As there will be transverse bending will exist along with shear b/w precast beam & deck
Check for Minimum Requirement in transverse direction
Reinforcement requirement for transverse bending of deck
2
As, deck = 1500 mm /m ( Including Top & Bottom Both reinf)
dia mm 12 12 12 12 12 12 12 12 12
At Bottom spacing mm 100 100 100 100 100 100 100 100 100
As,trans 2471 2471 2471 2471 2471 2471 2471 2471 2471
0.15 0.15 Cu
0.15 0.07 xu lxu
0.20 Tu
0.20
0.800 0.800
Section At Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
Area of prestressing steel Ap mm2 7502 7502 7502 7502 7502 7502 7502 7502 7502
Cg. of prestressing force (from girder top) m 1.39 1.40 1.48 1.46 1.54 1.52 1.65 1.69 1.70
Cg. of prestressing force (from deck top) m 1.61 1.62 1.70 1.68 1.76 1.74 1.87 1.91 1.92
Total prestressing force T 756 757 756 765 742 737 786 799 824
Prestrain at cg. Of cables 0.0052 0.0052 0.0052 0.0052 0.0051 0.0050 0.0054 0.0055 0.0056
Strain at cg. of prestressing steel 0.028 0.028 0.029 0.029 0.031 0.030 0.033 0.034 0.034
Total strain at cg. of prestressing cables = prestrain + bending strain 0.033 0.033 0.035 0.034 0.036 0.035 0.038 0.039 0.039
Total tensile force fpd*Ap T 1056.2 1056.2 1056.2 1056.2 1056.2 1056.2 1056.2 1056.2 1056.2
Calculating Compression force
Area of compression force upto hfcd m2 0.5255 0.5255 0.5255 0.5255 0.5255 0.5255 0.5255 0.5255 0.5255
Total compression force = hfcd * Ac Tonne 1056.2 1056.2 1056.2 1056.2 1056.2 1056.2 1056.2 1056.2 1056.2
Total compression C - Total Tension T 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Check OK OK OK OK OK OK OK OK OK
Cg. of compression force below deck top m 0.0721 0.0721 0.0721 0.0721 0.0721 0.0721 0.0721 0.0721 0.0721
Lever arm b/w Tension & compression force m 1.539 1.549 1.627 1.612 1.688 1.668 1.794 1.843 1.849
Moment capacity Tm 1626 1636 1718 1703 1783 1762 1894 1946 1953
Factored moment at section Tm 0 0 300 334 706 627 1388 1622 1909
Check OK OK OK OK OK OK OK OK OK
STRESS CALCULATION DUE TO TEMPERATURE OUTER GIRDER:
Coefficient of thermal expansion = 1.2E-05
2
Ec = 34000 N/mm
2
Es = 200000 N/mm
f7 f7
0.2
f8
f8 f9 0.2
f9 -0.8
0.15 f10 0.2 f10 0.25
2.1 0.8 -6.6
x x x
e0 x SA - q x SAy = a x SAt
e0 x 1.938 - q x 1.2551 = 1E-05 x 7.580 ------------------- (1)
STRESSES AT
Dtop Dbottom Gtop Gbottom 4.55
Points Depth f ei = Ec ( at + yq - eo ) ytop 0.00 0.22 0.22 2.22
-2.02
mm N/mm2 Eigen stresses N/mm2 N/mm2 N/mm2 N/mm2
0 0
f1 0 4.55
f2 0.15 -0.82 4.55 -1.16 -1.16 1.97
f3 0.22 -1.16
f4 0.37 -1.88
f5 0.4 -2.02 Stresses at CG Of steel & outermost
f6 0.52 -1.82 steel is in steel
f7 1.82 0.43
f8 2.02 0.77 1.97
f9 2.07 0.86
f10 2.22 1.97
Positive temp. stress
2.22 0
x x x
e0 x SA - q x SAy = a x SAt
e0 x 1.791 - q x 1.206 = 1E-05 x -5.993 ------------------- (1)
STRESSES AT
Dtop Dbottom Gtop Gbottom -2.42
f7
f8
0.2
f7 -0.8
0.15 f8 f9 0.25
2.1 0.8 -6.6
e0 x SA - q x SAy = a x SAt
e0 x 2.475 - q x 2.0632 = 1E-05 x 7.272 ------------------- (1)
e0 x SA - q x SAy = a x SAt
e0 x 2.475 - q x 2.06342 = 1E-05 x -5.938 ------------------- (1)
Dtop 0.00 N/mm2 4.19 4.19 4.28 4.19 4.55 4.55 4.55 4.55 4.55
STRESSES
Dbottom 0.22 N/mm2 -1.40 -1.40 -1.34 -1.40 -1.16 -1.16 -1.16 -1.16 -1.16
Gtop 0.22 N/mm2 -1.40 -1.40 -1.34 -1.40 -1.16 -1.16 -1.16 -1.16 -1.16
N/mm2
AT
Gbottom 2.22 2.78 2.78 2.57 2.78 1.97 1.97 1.97 1.97 1.97
Dtop 0.00 N/mm2 -2.48 -2.48 -2.46 -2.48 -2.42 -2.42 -2.42 -2.42 -2.42
STRESSES
Dbottom 0.22 N/mm2 0.85 0.85 0.88 0.85 0.96 0.96 0.96 0.96 0.96
Gtop 0.22 N/mm2 0.85 0.85 0.88 0.85 0.96 0.96 0.96 0.96 0.96
AT
Ast_cg 2.22 N/mm2 -3.16 -3.16 -3.00 -3.16 -2.57 -2.57 -2.57 -2.57 -2.57
CALCULATING STRESSES DUE TO DIFFERENTIAL SHRINKAGE :
In PSC Girder From deck slab casting to transfer to Permamnent brg.
From day = 35 to day 63
ecs ,D (28 - 0) = 5.8E-05
ecs,P (63 - 35) = 3.5E-05
A m2 2.48 2.48 2.48 2.48 2.29 2.48 1.75 1.75 1.75 1.75 1.75
Composite section Izz m4 1.22 1.22 1.22 1.22 1.15 1.22 0.95 0.95 0.95 0.95 0.95
yt m 0.83 0.83 0.83 0.83 0.79 0.83 0.68 0.68 0.68 0.68 0.68
dcen m 0.72 0.72 0.72 0.72 0.68 0.72 0.57 0.57 0.57 0.57 0.57
Fs/Ac N/mm2 0.18 0.18 0.18 0.18 0.20 0.18 0.25 0.25 0.25 0.25 0.25
Mcs Fs*dcen Tm 32.32 32.32 32.32 32.32 30.58 32.32 25.59 25.59 25.59 25.59 25.59
Top N/mm2 0.22 0.22 0.22 0.22 0.21 0.22 0.18 0.18 0.18 0.18 0.18
due to Moment
Stress at fibers
deck
Component
Bottom N/mm2 0.16 0.16 0.16 0.16 0.15 0.16 0.12 0.12 0.12 0.12 0.12
Top N/mm2 0.16 0.16 0.16 0.16 0.15 0.16 0.12 0.12 0.12 0.12 0.12
Girder
Bottom N/mm2 -0.37 -0.37 -0.37 -0.37 -0.38 -0.37 -0.41 -0.41 -0.41 -0.41 -0.41
Net Stresses at deck/ bottom fibers
Section At unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Top N/mm2 0.00 -0.14 -0.14 -0.14 -0.14 -0.13 -0.14 -0.10 -0.10 -0.10 -0.10 -0.10
due to Moment
Stress at fibers
deck
Component
Bottom N/mm2 0.22 -0.20 -0.20 -0.20 -0.20 -0.19 -0.20 -0.16 -0.16 -0.16 -0.16 -0.16
Top N/mm2 0.22 0.34 0.34 0.34 0.34 0.35 0.34 0.38 0.38 0.38 0.38 0.38
Girder
Bottom N/mm2 2.22 -0.19 -0.19 -0.19 -0.19 -0.18 -0.19 -0.16 -0.16 -0.16 -0.16 -0.16
2.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-0.19 -0.16
Support Section Mid Span
A m2 2.48 2.48 2.48 2.48 2.29 2.48 1.75 1.75 1.75 1.75 1.75
Composite section Izz m4 1.22 1.22 1.22 1.22 1.15 1.22 0.95 0.95 0.95 0.95 0.95
yt m 0.83 0.83 0.83 0.83 0.79 0.83 0.68 0.68 0.68 0.68 0.68
dcen m 0.72 0.72 0.72 0.72 0.68 0.72 0.57 0.57 0.57 0.57 0.57
Fs/Ac N/mm2 0.18 0.18 0.18 0.18 0.20 0.18 0.26 0.26 0.26 0.26 0.26
Mcs Fs*dcen Tm 32.37 32.37 32.37 32.37 30.64 32.37 25.64 25.64 25.64 25.64 25.64
2
Top N/mm 0.22 0.22 0.22 0.22 0.21 0.22 0.18 0.18 0.18 0.18 0.18
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.16 0.16 0.16 0.16 0.15 0.16 0.12 0.12 0.12 0.12 0.12
2
Top N/mm 0.16 0.16 0.16 0.16 0.15 0.16 0.12 0.12 0.12 0.12 0.12
Girder 2
Bottom N/mm -0.37 -0.37 -0.37 -0.37 -0.38 -0.37 -0.41 -0.41 -0.41 -0.41 -0.41
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2
Top N/mm 0.00 -0.14 -0.14 -0.14 -0.14 -0.13 -0.14 -0.10 -0.10 -0.10 -0.10 -0.10
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.22 -0.20 -0.20 -0.20 -0.20 -0.19 -0.20 -0.16 -0.16 -0.16 -0.16 -0.16
Top N/mm2 0.22 0.34 0.34 0.34 0.34 0.35 0.34 0.38 0.38 0.38 0.38 0.38
Girder 2
Bottom N/mm 2.22 -0.19 -0.19 -0.19 -0.19 -0.19 -0.19 -0.16 -0.16 -0.16 -0.16 -0.16
2.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-0.19 -0.16
Support Section Mid Span
2
A m 2.48 2.48 2.48 2.48 2.29 2.48 1.75 1.75 1.75 1.75 1.75
Composite section 4
Izz m 1.22 1.22 1.22 1.22 1.15 1.22 0.95 0.95 0.95 0.95 0.95
yt m 0.83 0.83 0.83 0.83 0.79 0.83 0.68 0.68 0.68 0.68 0.68
dcen m 0.72 0.72 0.72 0.72 0.68 0.72 0.57 0.57 0.57 0.57 0.57
Fs/Ac N/mm2 0.18 0.18 0.18 0.18 0.19 0.18 0.25 0.25 0.25 0.25 0.25
Mcs Fs*dcen Tm 32.25 32.25 32.25 32.25 30.52 32.25 25.54 25.54 25.54 25.54 25.54
2
Top N/mm 0.22 0.22 0.22 0.22 0.21 0.22 0.18 0.18 0.18 0.18 0.18
due to Moment
Stress at fibers
deck
Component
Bottom N/mm2 0.16 0.16 0.16 0.16 0.15 0.16 0.12 0.12 0.12 0.12 0.12
Top N/mm2 0.16 0.16 0.16 0.16 0.15 0.16 0.12 0.12 0.12 0.12 0.12
Girder
Bottom N/mm2 -0.37 -0.37 -0.37 -0.37 -0.38 -0.37 -0.41 -0.41 -0.41 -0.41 -0.41
Net Stresses at deck/ bottom fibers
Section At unit Face Jacking c/L brg. Face deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.50 -0.35 0.00 0.20 1.89 1.50 3.52 3.00 7.04 10.55 14.07
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Top N/mm2 0.00 -0.14 -0.14 -0.14 -0.14 -0.13 -0.14 -0.10 -0.10 -0.10 -0.10 -0.10
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.22 -0.20 -0.20 -0.20 -0.20 -0.19 -0.20 -0.16 -0.16 -0.16 -0.16 -0.16
Top N/mm2 0.22 0.34 0.34 0.34 0.34 0.35 0.34 0.38 0.38 0.38 0.38 0.38
Girder
Bottom N/mm2 2.22 -0.19 -0.19 -0.19 -0.19 -0.18 -0.19 -0.16 -0.16 -0.16 -0.16 -0.16
2.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-0.19 -0.16
Support Section Mid Span
A m2 2.48 2.48 2.48 2.48 2.29 2.48 1.75 1.75 1.75 1.75 1.75
Composite section Izz m4 1.22 1.22 1.22 1.22 1.15 1.22 0.95 0.95 0.95 0.95 0.95
yt m 0.83 0.83 0.83 0.83 0.79 0.83 0.68 0.68 0.68 0.68 0.68
dcen m 0.72 0.72 0.72 0.72 0.68 0.72 0.57 0.57 0.57 0.57 0.57
Fs/Ac N/mm2 0.58 0.58 0.58 0.58 0.63 0.58 0.82 0.82 0.82 0.82 0.82
Mcs Fs*dcen Tm 104.26 104.26 104.26 104.26 98.66 104.26 82.55 82.55 82.55 82.55 82.55
Top N/mm2 0.72 0.72 0.72 0.72 0.68 0.72 0.59 0.59 0.59 0.59 0.59
due to Moment
Stress at fibers
deck
Component
Bottom N/mm2 0.53 0.53 0.53 0.53 0.49 0.53 0.40 0.40 0.40 0.40 0.40
Top N/mm2 0.53 0.53 0.53 0.53 0.49 0.53 0.40 0.40 0.40 0.40 0.40
Girder
Bottom N/mm2 -1.19 -1.19 -1.19 -1.19 -1.23 -1.19 -1.33 -1.33 -1.33 -1.33 -1.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Top N/mm2 0.00 -0.45 -0.45 -0.45 -0.45 -0.43 -0.45 -0.33 -0.33 -0.33 -0.33 -0.33
due to Moment
Stress at fibers
Deck
Component
Bottom N/mm2 0.22 -0.64 -0.64 -0.64 -0.64 -0.62 -0.64 -0.52 -0.52 -0.52 -0.52 -0.52
Top N/mm2 0.22 1.11 1.11 1.11 1.11 1.12 1.11 1.22 1.22 1.22 1.22 1.22
Girder
Bottom N/mm2 2.22 -0.61 -0.61 -0.61 -0.61 -0.60 -0.61 -0.51 -0.51 -0.51 -0.51 -0.51
2.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-0.61 -0.51
Support Section Mid Span
1.200
0.150
0.8
5 0.000 2.000
0.000
4
0.400
3
0.400
1 2
0.300
In IRC SP:105 reference made to Euro Code EC2- Annex J for checking of concrete stresses.
Calculation of Bursting Reinforcement :
Prism Dimensions (2
Ypo/Yo Fbrust/ Pk Fbrust
Cable No. Yo)
Vertically Laterally Vertically Laterally Vertically Laterally Vertically Laterally
1 500 400 0.380 0.475 0.236 0.200 90.608 76.786
2 500 400 0.380 0.475 0.236 0.200 90.608 76.786
3 400 800 0.475 0.238 0.200 0.206 76.786 79.026
4 400 800 0.475 0.238 0.200 0.206 76.786 79.026
5 400 800 0.475 0.238 0.200 0.206 76.786 79.026
6 400 800 0.475 0.238 0.200 0.206 76.786 79.026
fck = 45 Mpa
fck (cyl) = 36 Mpa
Permissible compressive stress behind anchorage = 0.6 x fck ,cyl = 21.6 Mpa
2
C X C' = 500 X 400 = 200000 mm
Pmax = 3766 kN
s1 = Pmax/C X C' = 18.8 Mpa OK
2
As = 1417 mm
Clear cover = 45 mm
Crack width = 0.25 mm under 0.85*UTS
Reinforcement stress limited to = 250 Mpa to avoid crack width check.
To avoid crack check, stresses in reinforcement can be restricted to 250 Mpa
2
As,revised 1416.82 X 478.5 / 250= 2712 mm
0.40
All the Girders are not supported on bearing and the reaction is not transferred to it directly. Hence, End Diaphragm is critical in service condition.
The reactions below the each girder due to SIDL & DL has been calculated with the help of STAAD.
Jack Up Condition :
Hogging Moment (Tm ) Sagging Moment (Tm ) Shear Force ( T )
Force due to Load Factor Load Factor Load Factor
nd nd
(At Beam. node) ULS SLS R SLS Q (At Beam. node) ULS SLS R SLS Q (At Beam. node) ULS SLS R SLS Q
DL 15 1.35 1 1 12 1.35 1 1 70 1.35 1 1
SIDL 6 1.35 1 1 5 1.35 1 1 20 1.35 1 1
Surfacing 8 1.75 1 1 5 1.75 1 1 10 1.75 1 1
Load comb.
fyk *z)
Ast, MED/z
MED b d xmax Check Ast min DFd z +DFD MRD/z
+DFD
Provided
2 2 2
Tm mm mm mm mm mm mm mm T m T Tm Tm/m
ULS Hogging 42 400 1958 2768 1147 91 UR, OK 1041 OK 1175 OK 70 850 119 113 132 OK
ULS Sagging 32 400 1958 3927 1147 130 UR, OK 779 OK 1175 OK 70 850 107 160 188 OK
N.A.
Ast, modular depth Comp Max C. Tensile Max T
Check Check
Load comb. M b d Provided
ratio (dc) INA stress Stress stress Stress
2
(tm/m) mm mm mm mm mm4 Mpa Mpa Mpa Mpa
SLS (QP Comb.) 29 400 1958 2768 17 386 1E+11 0.90 14.4 OK 63 400 OK
SLS (QP Comb.) 22 400 1958 3927 17 450 2E+11 0.60 14.4 OK 34 400 OK
smax =3.4c +
0.17 f /rPeff
hc,eff =Min [ 2.5 ( h
Aceff = hc,eff rpeff = x =neutral ae = ssc - kt fct,eff ( 1+ ae
Load comb. - d ) , ( h - x/3 ) , Asprovided ssc kt wk check
*b As/Ac,eff axis depth Es/Ecm' rP,eff ) / rP,eff ] /Es ,
h/2]
0.6ssc/Es ]
2 2
mm mm mm mm Mpa mm
k= Min [ 1 + 200/d ,
+0.15scp ) bw d ]
scp ) bw d , (nmin
Check
0.02 ]
Load comb. VED b bVED d bw Asl scp
2]
2*VNS / (acw *
q = 0.5 sin-1 [
bw * z * v1 *
z * n1 * fcd
acw * bw *
q adopted
Vrdmax =
fcd) ]
Load comb. VED bw d z =0.9d acw n1 Check
/2
rw,min*s *bw
√ fck ) / fyk
provide
Asw/s = VED / z Provide Asw
Asw/s
Load comb. VED bw z qdesign
Asw,min =
fywd cotq
cotq
Legs dia spacing
2
T m m deg mm2/m mm /m nos mm mm mm2/m Check T
0.30
Service Condition :
Hogging Moment (Tm ) Sagging Moment (Tm ) Shear Force ( T )
nd nd
Force due to Load Factor (At Beam. 92 2 Load Factor (At Beam. 91 2 Load Factor
(At Beam. nd node) ULS SLS R SLS Q node) ULS SLS R SLS Q node) ULS SLS R SLS Q
DL 0 1.35 1 1 6 1.35 1 1 3 1.35 1 1
SIDL 87 1.35 1 1 0 1 1 1 15 1.35 1 1
Surfacing 5 1.75 1 1 1 1.75 1 1 2 1.75 1 1
Live Load 5 1.50 1 0 103 1.00 1 0 128 1 1 0
Load comb.
Ast, MED/z
MED b d xmax Check Ast min DFd z +DFD MRD/z
+DFD
*z
Provided
2
Tm mm mm mm mm mm mm2 mm2 T m T Tm Tm/m
ULS Hogging 134 300 1958 4477 1147 148 UR, OK 2242 OK 881 OK 77.9 1246 185 267 214 OK
ULS Sagging 113 300 1958 3927 1147 130 UR, OK 1902 OK 881 OK 77.9 1246 169 234 188 OK
B) SLS STRESS CHECK
Rare Load Combination Formula used for calculation of stress
2 2
Ec,eq = Ecm*(MQP+MST) dc (depth of neutral axis) = -m*As + ( m * As + 2* m*As*b* d )
MST +(1+f)* MQP b
3 2
MST = MRARE -MQP INA (Transformed) = b *dc /3 + m* As *(d-dc)
m = Es/ Ec,eq
Compressive stress in concrete sc = MRARE* dc / INA
Quasi Permanent Load Combination Tensile stress in steel ss = m* MRARE* (d - dc ) / INA
m = Es / Ecm'
N.A.
M Ast, modular depth Comp Max C. Check Tensile Max T Check
Load comb. b d ratio (dc) INA stress Stress stress Stress
Provided
2
(tm/m) mm mm mm mm mm4 Mpa Mpa Mpa Mpa
SLS (QP Comb.) 92 300 1958 4477 17 476 2E+11 2.5 14.4 OK 130 400 OK
SLS (QP Comb.) 7 300 1958 3927 17 450 2E+11 0.2 14.4 OK 12 400 OK
smax =3.4c +
0.17 f /rPeff
hc,eff =Min [ 2.5 ( h
Aceff = rpeff = x =neutral ae = ssc - kt fct,eff ( 1+ ae
Load comb. - d ) , ( h - x/3 ) , Asprovided ssc kt wk check
hc,eff *b As/Ac,eff axis depth Es/Ecm' rP,eff ) / rP,eff ] /Es
h/2]
, 0.6ssc/Es ]
2 2
mm mm mm mm Mpa mm
k= Min [ 1 + 200/d ,
+0.15scp ) bw d ]
scp ) bw d , (nmin
Check
0.02 ]
Load comb. VED b bVED d bw Asl scp
2]
T T mm mm mm2 Mpa Tonne
ULS 155.80 1 155.80 1957.5 300 1.320 4476.77 0.0076 0.297 0 26.68
Provide shear reinf.
2*VNS / (acw * bw
* z * v1 * fcd) ]
Vrdmax = acw *
q = 0.5 sin-1 [
bw * z * n1 *
q adopted
fcd /2
Load comb. VED bw d z =0.9d acw n1 Check
T mm mm mm Tonne deg deg
provide
qdesign
Asw/s
Load comb. VED bw z
fck ) / fyk
fywd cotq
cotq
*bw
RH = 40 %
ho = 376 mm
Calculation of fo
fo = fRH b(fcm) b(to)
0.7
a1 = [ 43.75 / fcm ]
a2 = [ 43.75 / fcm ]0.2
b(fcm) = 18.78 / √fcm
b(to) = 1/ (0.1+ to0.2)
Loading age a1 a2 fRH b(fcm) b(to) fo
14 0.852 0.955 1.632 2.532 0.557 2.302
28 0.852 0.955 1.632 2.532 0.488 2.018
35 0.852 0.955 1.632 2.532 0.468 1.934
63 0.852 0.955 1.632 2.532 0.418 1.729
64 0.852 0.955 1.632 2.532 0.417 1.724
92 0.852 0.955 1.632 2.532 0.389 1.608
36500 0.852 0.955 1.632 2.532 0.121 0.499
18
bH = Min 1.5 [ 1+ (0.012 RH) ] ho +250 for fcm ≤ 35 Mpa
1500
Min 1.5 [ 1+ (0.012 RH)18 ] ho +250 a3 for fcm > 35 Mpa
1500* a3
0.5
a2 = [ 43.75 / fcm ]
Stages I II III IV V
Loading At age 14 28 35 63 64
fo 2.302 2.018 1.934 1.729 1.724
At age a2 bH b c( t , to) f (t, to) b c( t , to) f (t, to) b c( t , to) f (t, to) b c( t , to) f (t, to) b c( t , to) f (t, to)
days
RH = 40 %
2
Cross-sectional Area Ac = 0.81 m
Perimeter in contact with atmosphere u = 4.00 m
Notational size ho 2Ac/u = 404 mm
t = 36465 days
Calculation of fo
fo = fRH b(fcm) b(to)
0.7
a1 = [ 43.75 / fcm ] = 0.91076
a2 = [ 43.75 / fcm ]0.2 = 0.97365
b(fcm) = 18.78 / √fcm = 2.65589
b(to) = 1/ (0.1+ to0.2) = 0.42648
fRH = 1.69337
fo = 1.91805
fo = 1.918
a2 = 0.935
bH = 839.855
b c( t , to) = 0.993