The document contains information about average excavation outputs for different machines and excavation depths in hours per cubic meter and cubic meters per hour. It also includes data on average deposition and compaction outputs for filling excavations and making up levels. Finally, it lists the excavation loading outputs into trucks in cubic meters per hour for two JCB models.
The document contains information about average excavation outputs for different machines and excavation depths in hours per cubic meter and cubic meters per hour. It also includes data on average deposition and compaction outputs for filling excavations and making up levels. Finally, it lists the excavation loading outputs into trucks in cubic meters per hour for two JCB models.
The document contains information about average excavation outputs for different machines and excavation depths in hours per cubic meter and cubic meters per hour. It also includes data on average deposition and compaction outputs for filling excavations and making up levels. Finally, it lists the excavation loading outputs into trucks in cubic meters per hour for two JCB models.
Average excavation outputs in hours/m³ and m³/hour
Average outputs - hrs/m³ Average outputs - m³/hr
EXCAVATION Small Medium Small Medium JCB JCB JCB JCB JCB JCB JCB JCB 3CX JS150 3CX JS150 3CX JS150 3CX JS150 Topsoil 0.30 0.20 0.20 0.15 3.33 5.00 5.00 6.67 Reduced levels ne 0.25 m 0.20 0.12 0.20 0.11 5.00 8.33 5.00 9.09 and basements ne 1.00 m 0.20 0.10 0.15 0.09 5.00 10.00 6.67 11.11 ne 2.00 m 0.20 0.10 0.15 0.08 5.00 10.00 6.67 12.50 Trenches/ pits ne 0.25 m 0.35 0.22 0.25 0.17 2.86 4.55 4.00 5.88 ne 1.00 m 0.25 0.22 0.20 0.14 4.00 4.55 5.00 7.14 ne 2.00 m 0.25 0.20 0.20 0.12 4.00 5.00 5.00 8.33
Average depositing and compacting outputs in hours/m³ and m³/hour
Deposition and Average outputs - hrs/m³ Average outputs - m³/hr
compaction of JCB 3CX & roller JCB JS150 & roller JCB 3CX & roller JCB JS150 & roller filling materials Small Medium Small Medium Small Medium Small Medium Filling to excavations ne 0.25 m 0.25 0.17 0.12 0.10 4.00 5.88 8.33 10.00 over 0.25 m 0.17 0.12 0.10 0.08 5.88 8.33 10.00 12.50 Making up levels ne 0.25 m 0.25 0.17 0.12 0.07 4.00 5.88 8.33 14.29 over 0.25 m 0.17 0.12 0.10 0.05 5.88 8.33 10.00 20.00 Blinding surfaces 0.33 0.20 0.25 0.20 3.03 5.00 4.00 5.00