Professional Documents
Culture Documents
Transporter : TBA
Port of Origin : JKT
Port of Destination :
Distances : TBA
Total Loads : TBA
Transporter : TBA
Port of Origin : TBA
Port of Destination : PUW, Wiriagar, Bintuni
Distances : TBA
Total Loads : TBA
35 140,22 617.000,00
Shipper
Location Origin : JKT
Transporter : TBA
Port of Origin : JKT
Port of :
Distances Total : TBA
Loads : TBA
2
3
4
5
Rig :
Type Contrac :
:
Depart : TBA
Duratio : 35 days
Speed : 30
47.68
6 Ton 9.125 m 2.200 m 2.375 m
PACKING LIST MATERIAL DRILLING KSO PETROENERGY UTAMA WIRIAGAR
1 Wellhead Assy single Completion, 9 5/8" 3000 psi x set 3 1.23 3.69 1.65 1.42
7" x 3 1/2" Tubing 3000psi ( PT. Saka Teknik)
2 Xmast Tree Single Completion, 3 1/8"-3M x 2 1/16"- set 3 1.5 4.5 2.05 1.52
3M, Double Arm and Master Gate ( PT. Saka Teknik)
4 Grey Container 20 ft with strip Red & Blue Dimensi unit 1 8 6.058 2.638
(PxLxT) :
6.058 x 2.638 x 3.091 meter ( DWWT container
PT. Swadaya Abdi Manunggal)
TOTAL
H m3
0.9 6.3261
2.1 19.6308
0.9 1.26
3.091 49.397283
2.591 38.267526
0.51 18.7272
0.34 41.616
0.24 79.488
0.18 59.8752
0.1 10
0.1 0.09
0.1 0.18
324.9
Rounding
No. Material Name Unit Size Qty. Weight per pallet (ton)
(sx/can/drum)
sak/can/drum Total Qty. (pallet)
Total Weight
(ton)
L W H L W H m3