You are on page 1of 48

CONE PENETRATION TEST

PROJECT : SOIL INVESTIGATION RECONSULT PROJECT PLN


LOCATION : BELOPA [S20]
BORING DEPTH : 3,4 m
GROUND WATER LEVEL : -1 FROM GROUND LEVEL
DATE : APRIL 2023
PISTON/CONE AREA RATIO (Apc) : 1
PISTON/SLEEVE AREA RATIO (Aps) : 0.13
Pembac.
Pembac. Perlawanan Perlawanan
Kedalama Pembac. Perlaw. Perlaw. Lf
Perlaw. Konus Geser Lokal
n Konus & geser Geser fs
Konus
Kw qc fs x 20
d Cw Tw (Tw-Cw) Cw.Apc. Kw.Aps.
(m) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm)
1 2 3 4 5 6 7
0.00 0 0 0.00 0.00 0.00 0.00
0.20 15 16 1.00 15.00 0.13 2.60
0.40 38 39 1.00 38.00 0.13 2.60
0.60 39 41 2.00 39.00 0.26 5.20
0.80 55 58 3.00 55.00 0.39 7.80
1.00 64 69 5.00 64.00 0.65 13.00
1.20 97 102 5.00 97.00 0.65 13.00
1.40 104 108 4.00 104.00 0.52 10.40
1.60 137 139 2.00 137.00 0.26 5.20
1.80 139 143 4.00 139.00 0.52 10.40
2.00 153 157 4.00 153.00 0.52 10.40
2.20 156 160 4.00 156.00 0.52 10.40
2.40 171 173 2.00 171.00 0.26 5.20
2.60 173 176 3.00 173.00 0.39 7.80
2.80 193 196 3.00 193.00 0.39 7.80
3.00 197 199 2.00 197.00 0.26 5.20
3.20 202 207 5.00 202.00 0.65 13.00
3.40 202 204 2.00 202.00 0.26 5.20
ket
Ac = 10.17 cm2 ≈ 10 cm2
Apl = 10.17 cm2 ≈ 10 cm2
apc (SNI 2008) 0.1333
GRAPHICS RESULT OF
ROJECT PLN PEKERJAAN : SOIL INVESTIGATION RECONSULT
NO. SONDIR : BELOPA [S20]
BORING DEPTH : 3,4 m

PISTON/SLEEVE AREA RATIO (Aps) : 0.13


Piston/Cone Area Ratio (Apc) = 1

Geseran
Total
Rf
(fs/qc) x 100 Perlawanan Konus (qc) kg/cm²
Tf 0 25 50 75 100 125 150 175 200
∑Lfi + Lfi+1 0.0

(kg/cm) (%)
8 9
0.00 0.000
2.60 0.867 0.5
5.20 0.342
10.40 0.667
18.20 0.709
31.20 1.016
1.0
44.20 0.670
54.60 0.500
59.80 0.190
70.20 0.374
Kedalaman (meter)

80.60 0.340 1.5

91.00 0.333
96.20 0.152
104.00 0.225
111.80 0.202 2.0
117.00 0.132
130.00 0.322
135.20 0.129

2.5

qc = kg/cm²
3.0

Tf = kg/cm

3.5

0 25 50 75 100 125 150 175 200 225


Geseran Total (Tf) kg/cm
Column B Column B
3.5

0 25 50 75 100 125 150 175 200 225


Geseran Total (Tf) kg/cm
Column B Column B
RAPHICS RESULT OF CPT
INVESTIGATION RECONSULT PROJECT PLN

Piston/Sleeve Area Ratio (Aps) = 0.1300

Perlawanan Banding Geser, Rf (%)


125 150 175 200 225 -2 -1 0 1 2 3
0

1
Kedalaman (meter)

25 150 175 200 225 250 -2 -1 0 1 2 3


Column B
Column B
Column B
25 150 175 200 225 250 -2 -1 0 1 2 3
Column B
Column B
Column B
CONE PENETRATION TEST
PROJECT : SOIL INVESTIGATION RECONSULT PROJECT PLN
LOCATION : BELOPA [S21]
BORING DEPTH :3 m
GROUND WATER LEVEL : -1 FROM GROUND LEVEL
DATE : APRIL 2023
PISTON/CONE AREA RATIO (Apc) : 1
PISTON/SLEEVE AREA RATIO (Aps) : 0.13
Pembac.
Pembac. Perlawanan Perlawanan
Kedalama Pembac. Perlaw. Perlaw. Lf
Perlaw. Konus Geser Lokal
n Konus & geser Geser fs
Konus
Kw qc fs x 20
d Cw Tw (Tw-Cw) Cw.Apc. Kw.Aps.
(m) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm)
1 2 3 4 5 6 7
0.00 0 0 0.00 0.00 0.00 0.00
0.20 16 17 1.00 16.00 0.13 2.60
0.40 40 43 3.00 40.00 0.39 7.80
0.60 41 45 4.00 41.00 0.52 10.40
0.80 58 59 1.00 58.00 0.13 2.60
1.00 61 65 4.00 61.00 0.52 10.40
1.20 92 93 1.00 92.00 0.13 2.60
1.40 102 105 3.00 102.00 0.39 7.80
1.60 136 139 3.00 136.00 0.39 7.80
1.80 139 143 4.00 139.00 0.52 10.40
2.00 158 159 1.00 158.00 0.13 2.60
2.20 162 166 4.00 162.00 0.52 10.40
2.40 185 187 2.00 185.00 0.26 5.20
2.60 189 193 4.00 189.00 0.52 10.40
2.80 200 205 5.00 200.00 0.65 13.00
3.00 200 202 2.00 200.00 0.26 5.20
ket
Ac = 10.17 cm2 ≈ 10 cm2
Apl = 10.17 cm2 ≈ 10 cm2
apc (SNI 2008) 0.1333
GRAPHICS RESULT OF
ROJECT PLN PEKERJAAN : SOIL INVESTIGATION RECONSULT
NO. SONDIR : BELOPA [S21]
BORING DEPTH :3 m

PISTON/SLEEVE AREA RATIO (Aps) : 0.13


Piston/Cone Area Ratio (Apc) = 1

Geseran
Total
Rf
(fs/qc) x 100 Perlawanan Konus (qc) kg/cm²
Tf 0 25 50 75 100 125 150 175 200
∑Lfi + Lfi+1 0.0

(kg/cm) (%)
8 9
0.00 0.000
2.60 0.813 0.5
10.40 0.975
20.80 1.268
23.40 0.224
33.80 0.852
1.0
36.40 0.141
44.20 0.382
52.00 0.287
62.40 0.374
Kedalaman (meter)

65.00 0.082 1.5

75.40 0.321
80.60 0.141
91.00 0.275
104.00 0.325 2.0
109.20 0.130

2.5

qc = kg/cm²
3.0

Tf = kg/cm

3.5

0 25 50 75 100 125 150 175 200 225


Geseran Total (Tf) kg/cm
Column B Column B
3.5

0 25 50 75 100 125 150 175 200 225


Geseran Total (Tf) kg/cm
Column B Column B
RAPHICS RESULT OF CPT
INVESTIGATION RECONSULT PROJECT PLN

Piston/Sleeve Area Ratio (Aps) = 0.1300

Perlawanan Banding Geser, Rf (%)


125 150 175 200 225 -2 -1 0 1 2 3
0

1
Kedalaman (meter)

25 150 175 200 225 250 -2 -1 0 1 2 3


Column B
Column B
Column B
25 150 175 200 225 250 -2 -1 0 1 2 3
Column B
Column B
Column B
CONE PENETRATION TEST
PROJECT : SOIL INVESTIGATION RECONSULT PROJECT PLN
LOCATION : BELOPA [S22]
BORING DEPTH : 5,6 m
GROUND WATER LEVEL : -1,2 M FROM GROUND LEVEL
DATE : JUNI 2021
PISTON/CONE AREA RATIO (Apc) : 1
PISTON/SLEEVE AREA RATIO (Aps) : 0.13
Pembac.
Pembac. Perlawanan Perlawanan
Kedalama Pembac. Perlaw. Perlaw. Lf
Perlaw. Konus Geser Lokal
n Konus & geser Geser fs
Konus
Kw qc fs x 20
d Cw Tw (Tw-Cw) Cw.Apc. Kw.Aps.
(m) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm)
1 2 3 4 5 6 7
0.00 0 0 0.00 0.00 0.00 0.00
0.20 15 16 1.00 15.00 0.13 2.60
0.40 22 23 1.00 22.00 0.13 2.60
0.60 41 44 3.00 41.00 0.39 7.80
0.80 43 46 3.00 43.00 0.39 7.80
1.00 60 62 2.00 60.00 0.26 5.20
1.20 62 65 3.00 62.00 0.39 7.80
1.40 83 87 4.00 83.00 0.52 10.40
1.60 90 95 5.00 90.00 0.65 13.00
1.80 92 97 5.00 92.00 0.65 13.00
2.00 103 105 2.00 103.00 0.26 5.20
2.20 104 107 3.00 104.00 0.39 7.80
2.40 114 118 4.00 114.00 0.52 10.40
2.60 122 125 3.00 122.00 0.39 7.80
2.80 123 128 5.00 123.00 0.65 13.00
3.00 137 140 3.00 137.00 0.39 7.80
3.20 138 141 3.00 138.00 0.39 7.80
3.40 153 157 4.00 153.00 0.52 10.40
3.60 156 160 4.00 156.00 0.52 10.40
3.80 157 162 5.00 157.00 0.65 13.00
4.00 169 174 5.00 169.00 0.65 13.00
4.20 172 175 3.00 172.00 0.39 7.80
4.40 186 187 1.00 186.00 0.13 2.60
4.60 187 189 2.00 187.00 0.26 5.20
4.80 193 194 1.00 193.00 0.13 2.60
5.00 194 196 2.00 194.00 0.26 5.20
5.20 201 204 3.00 201.00 0.39 7.80
5.40 205 210 5.00 205.00 0.65 13.00
5.60 205 207 2.00 205.00 0.26 5.20
ket
Ac = 10.17 cm2 ≈ 10 cm2
Apl = 10.17 cm2 ≈ 10 cm2
apc (SNI 2008) 0.1333
GRAPHICS RESULT OF
ROJECT PLN PEKERJAAN : SOIL INVESTIGATION RECONSULT
NO. SONDIR : BELOPA [S22]
BORING DEPTH : 5,6 m

PISTON/SLEEVE AREA RATIO (Aps) : 0.13


Piston/Cone Area Ratio (Apc) = 1

Geseran
Total
Rf
(fs/qc) x 100 Perlawanan Konus (qc) kg/cm²
Tf 0 25 50 75 100 125 150 175 200
0.0
∑Lfi + Lfi+1
(kg/cm) (%)
8 9
0.5
0.00 0.000
2.60 0.867
5.20 0.591 1.0
13.00 0.951
20.80 0.907
1.5
26.00 0.433
33.80 0.629
44.20 0.627 2.0
57.20 0.722
70.20 0.707
2.5
Kedalaman (meter)

75.40 0.252
83.20 0.375
93.60 0.456
3.0
101.40 0.320
114.40 0.528
122.20 0.285 3.5
130.00 0.283
140.40 0.340
4.0
150.80 0.333
163.80 0.414
176.80 0.385 4.5
184.60 0.227
187.20 0.070 qc = kg/cm²
192.40 0.139 5.0

195.00 0.067
200.20 0.134
5.5 Tf = kg/cm
208.00 0.194
221.00 0.317
226.20 0.127 6.0
0 25 50 75 100 125 150 175 200 225 250 275 300 32
Geseran Total (Tf) kg/cm
Column B Column B
5.5

6.0
0 25 50 75 100 125 150 175 200 225 250 275 300 32
Geseran Total (Tf) kg/cm
Column B Column B
RAPHICS RESULT OF CPT
INVESTIGATION RECONSULT PROJECT PLN

Piston/Sleeve Area Ratio (Aps) = 0.1300

Perlawanan Banding Geser, Rf (%)


125 150 175 200 225 -1 0 1 2
0

2
Kedalaman (meter)

6
5 200 225 250 275 300 325 350 -1 1 2
Column B
Column B Column B
6
5 200 225 250 275 300 325 350 -1 1 2
Perlawanan Geser
Column B
Lokal, fs (kg/cm²)
Column B Column B
CONE PENETRATION TEST
PROJECT : SOIL INVESTIGATION RECONSULT PROJECT PLN
LOCATION : BELOPA [S23]
BORING DEPTH : 3,8 m
GROUND WATER LEVEL : -1 M FROM GROUND LEVEL
DATE : APRIL 2023
PISTON/CONE AREA RATIO (Apc) : 1
PISTON/SLEEVE AREA RATIO (Aps) : 0.13
Pembac.
Pembac. Perlawanan Perlawanan
Kedalama Pembac. Perlaw. Perlaw. Lf
Perlaw. Konus Geser Lokal
n Konus & geser Geser fs
Konus
Kw qc fs x 20
d Cw Tw (Tw-Cw) Cw.Apc. Kw.Aps.
(m) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm)
1 2 3 4 5 6 7
0.00 0 0 0.00 0.00 0.00 0.00
0.20 16 17 1.00 16.00 0.13 2.60
0.40 48 51 3.00 48.00 0.39 7.80
0.60 53 54 1.00 53.00 0.13 2.60
0.80 68 72 4.00 68.00 0.52 10.40
1.00 71 74 3.00 71.00 0.39 7.80
1.20 89 95 6.00 89.00 0.78 15.60
1.40 92 98 6.00 92.00 0.78 15.60
1.60 105 108 3.00 105.00 0.39 7.80
1.80 111 113 2.00 111.00 0.26 5.20
2.00 117 122 5.00 117.00 0.65 13.00
2.20 140 145 5.00 140.00 0.65 13.00
2.40 143 146 3.00 143.00 0.39 7.80
2.60 146 151 5.00 146.00 0.65 13.00
2.80 157 162 5.00 157.00 0.65 13.00
3.00 158 162 4.00 158.00 0.52 10.40
3.20 175 180 5.00 175.00 0.65 13.00
3.40 183 188 5.00 183.00 0.65 13.00
3.60 204 209 5.00 204.00 0.65 13.00
3.80 204 206 2.00 204.00 0.26 5.20
ket
Ac = 10.17 cm2 ≈ 10 cm2
Apl = 10.17 cm2 ≈ 10 cm2
apc (SNI 2008) 0.1333
GRAPHICS RESULT OF
ROJECT PLN PEKERJAAN : SOIL INVESTIGATION RECONSULT
NO. SONDIR : BELOPA [S23]
BORING DEPTH : 3,8 m

PISTON/SLEEVE AREA RATIO (Aps) : 0.13


Piston/Cone Area Ratio (Apc) = 1

Geseran
Total
Rf
(fs/qc) x 100 Perlawanan Konus (qc) kg/cm²
Tf 0 25 50 75 100 125 150 175 200
0.0
∑Lfi + Lfi+1
(kg/cm) (%)
8 9
0.00 0.000
0.5
2.60 0.813
10.40 0.813
13.00 0.245
23.40 0.765
1.0
31.20 0.549
46.80 0.876
62.40 0.848
70.20 0.371
1.5
75.40 0.234
Kedalaman (meter)

88.40 0.556
101.40 0.464
109.20 0.273
2.0
122.20 0.445
135.20 0.414
145.60 0.329
158.60 0.371 2.5
171.60 0.355
184.60 0.319
189.80 0.127
3.0

qc = kg/cm²

3.5

Tf = kg/cm

4.0
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320
Geseran Total (Tf) kg/cm
Column B Column B
4.0
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320
Geseran Total (Tf) kg/cm
Column B Column B
RAPHICS RESULT OF CPT
INVESTIGATION RECONSULT PROJECT PLN

Piston/Sleeve Area Ratio (Aps) = 0.1300

Perlawanan Banding Geser, Rf (%)


125 150 175 200 225 -2 -1 0 1 2 3 4
0

1
Kedalaman (meter)

4
80 200 220 240 260 280 300 320 340 -2 -1 0 1 2 3 4
Column B
Column B Column B
4
80 200 220 240 260 280 300 320 340 -2 -1 0 1 2 3 4
Column B
Column B Column B
CONE PENETRATION TEST
PROJECT : SOIL INVESTIGATION RECONSULT PROJECT PLN
LOCATION : BELOPA [S24]
BORING DEPTH : 8,4 m
GROUND WATER LEVEL : -2 M FROM GROUND LEVEL
DATE : APRIL 2023
PISTON/CONE AREA RATIO (Apc) : 1
PISTON/SLEEVE AREA RATIO (Aps) : 0.13
Pembac.
Pembac. Perlawanan Perlawanan
Kedalama Pembac. Perlaw. Perlaw. Lf
Perlaw. Konus Geser Lokal
n Konus & geser Geser fs
Konus
Kw qc fs x 20
d Cw Tw (Tw-Cw) Cw.Apc. Kw.Aps.
(m) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm)
1 2 3 4 5 6 7
0.00 0 0 0.00 0.00 0.00 0.00
0.20 15 16 1.00 15.00 0.13 2.60
0.40 19 20 1.00 19.00 0.13 2.60
0.60 31 32 1.00 31.00 0.13 2.60
0.80 34 36 2.00 34.00 0.26 5.20
1.00 42 43 1.00 42.00 0.13 2.60
1.20 55 57 2.00 55.00 0.26 5.20
1.40 58 59 1.00 58.00 0.13 2.60
1.60 69 72 3.00 69.00 0.39 7.80
1.80 71 73 2.00 71.00 0.26 5.20
2.00 73 76 3.00 73.00 0.39 7.80
2.20 74 80 6.00 74.00 0.78 15.60
2.40 78 82 4.00 78.00 0.52 10.40
2.60 79 82 3.00 79.00 0.39 7.80
2.80 85 89 4.00 85.00 0.52 10.40
3.00 86 91 5.00 86.00 0.65 13.00
3.20 87 92 5.00 87.00 0.65 13.00
3.40 94 96 2.00 94.00 0.26 5.20
3.60 93 94 1.00 93.00 0.13 2.60
3.80 104 110 6.00 104.00 0.78 15.60
4.00 105 111 6.00 105.00 0.78 15.60
4.20 106 110 4.00 106.00 0.52 10.40
4.40 107 112 5.00 107.00 0.65 13.00
4.60 109 113 4.00 109.00 0.52 10.40
4.80 111 113 2.00 111.00 0.26 5.20
5.00 113 116 3.00 113.00 0.39 7.80
5.20 116 117 1.00 116.00 0.13 2.60
5.40 118 120 2.00 118.00 0.26 5.20
5.60 119 123 4.00 119.00 0.52 10.40
5.80 120 124 4.00 120.00 0.52 10.40
6.00 121 127 6.00 121.00 0.78 15.60
6.20 142 143 1.00 142.00 0.13 2.60
6.40 143 144 1.00 143.00 0.13 2.60
6.60 156 160 4.00 156.00 0.52 10.40
6.80 160 166 6.00 160.00 0.78 15.60
7.00 167 172 5.00 167.00 0.65 13.00
7.20 170 174 4.00 170.00 0.52 10.40
7.40 171 175 4.00 171.00 0.52 10.40
7.60 178 184 6.00 178.00 0.78 15.60
7.80 182 187 5.00 182.00 0.65 13.00
8.00 196 199 3.00 196.00 0.39 7.80
8.20 201 206 5.00 201.00 0.65 13.00
8.40 201 203 2.00 201.00 0.26 5.20

ket
Ac = 10.17 cm2 ≈ 10 cm2
Apl = 10.17 cm2 ≈ 10 cm2
apc (SNI 2008) 0.1333
GRAPHICS RESULT OF
ROJECT PLN PEKERJAAN : SOIL INVESTIGATION RECONSULT
NO. SONDIR : BELOPA [S24]
BORING DEPTH : 8,4 m

PISTON/SLEEVE AREA RATIO (Aps) : 0.13


Piston/Cone Area Ratio (Apc) = 1

Geseran
Total
Rf
(fs/qc) x 100 Perlawanan Konus (qc) kg/cm²
Tf 0 25 50 75 100 125 150 175 200
0.0
∑Lfi + Lfi+1
(kg/cm) (%)
0.5
8 9
0.00 0.000
1.0
2.60 0.867
5.20 0.684 1.5
7.80 0.419
13.00 0.765 2.0
15.60 0.310
20.80 0.473 2.5

23.40 0.224
3.0
31.20 0.565
36.40 0.366
3.5
Kedalaman (meter)

44.20 0.534
59.80 1.054 4.0
70.20 0.667
78.00 0.494 4.5
88.40 0.612
101.40 0.756 5.0
114.40 0.747
119.60 0.277 5.5

122.20 0.140
6.0
137.80 0.750
153.40 0.743
6.5
163.80 0.491
176.80 0.607 7.0 qc = kg/cm²
187.20 0.477
192.40 0.234 7.5
200.20 0.345
Tf = kg/cm
202.80 0.112 8.0

208.00 0.220
8.5
218.40 0.437
0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450
Geseran Total (Tf) kg/cm
Column B Column B
8.0

8.5

228.80 0.433 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450
Geseran Total (Tf) kg/cm
244.40 0.645
Column B Column B
247.00 0.092
249.60 0.091
260.00 0.333
275.60 0.488
288.60 0.389
299.00 0.306
309.40 0.304
325.00 0.438
322.40 0.357
332.80 0.199
335.40 0.323
338.00 0.129
RAPHICS RESULT OF CPT
INVESTIGATION RECONSULT PROJECT PLN

Piston/Sleeve Area Ratio (Aps) = 0.1300

Perlawanan Banding Geser, Rf (%)


125 150 175 200 225 -2 -1 1 2
0

3
Kedalaman (meter)

0 275 300 325 350 375 400 425 450 475 500 -2 -1 1 2
Column B
Column B Column B
8

0 275 300 325 350 375 400 425 450 475 500 -2 -1 1 2
Column B
Column B Column B
CONE PENETRATION TEST
PROJECT : SOIL INVESTIGATION RECONSULT PROJECT PLN
LOCATION : BELOPA [S26]
BORING DEPTH : 5,8 m
GROUND WATER LEVEL : -1,2 M FROM GROUND LEVEL
DATE : JUNI 2021
PISTON/CONE AREA RATIO (Apc) : 1
PISTON/SLEEVE AREA RATIO (Aps) : 0.13
Pembac.
Pembac. Perlawanan Perlawanan
Kedalama Pembac. Perlaw. Perlaw. Lf
Perlaw. Konus Geser Lokal
n Konus & geser Geser fs
Konus
Kw qc fs x 20
d Cw Tw (Tw-Cw) Cw.Apc. Kw.Aps.
(m) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm)
1 2 3 4 5 6 7
0.00 0 0 0.00 0.00 0.00 0.00
0.20 16 17 1.00 16.00 0.13 2.60
0.40 21 22 1.00 21.00 0.13 2.60
0.60 43 46 3.00 43.00 0.39 7.80
0.80 46 48 2.00 46.00 0.26 5.20
1.00 59 62 3.00 59.00 0.39 7.80
1.20 63 65 2.00 63.00 0.26 5.20
1.40 85 87 2.00 85.00 0.26 5.20
1.60 95 99 4.00 95.00 0.52 10.40
1.80 96 102 6.00 96.00 0.78 15.60
2.00 102 105 3.00 102.00 0.39 7.80
2.20 105 107 2.00 105.00 0.26 5.20
2.40 119 123 4.00 119.00 0.52 10.40
2.60 123 128 5.00 123.00 0.65 13.00
2.80 124 128 4.00 124.00 0.52 10.40
3.00 136 141 5.00 136.00 0.65 13.00
3.20 138 141 3.00 138.00 0.39 7.80
3.40 151 155 4.00 151.00 0.52 10.40
3.60 158 164 6.00 158.00 0.78 15.60
3.80 160 165 5.00 160.00 0.65 13.00
4.00 169 174 5.00 169.00 0.65 13.00
4.20 170 175 5.00 170.00 0.65 13.00
4.40 184 187 3.00 184.00 0.39 7.80
4.60 185 189 4.00 185.00 0.52 10.40
4.80 191 194 3.00 191.00 0.39 7.80
5.00 193 196 3.00 193.00 0.39 7.80
5.20 196 199 3.00 196.00 0.39 7.80
5.40 197 201 4.00 197.00 0.52 10.40
5.60 204 209 5.00 204.00 0.65 13.00
5.80 204 206 2.00 204.00 0.26 5.20

ket
Ac = 10.17 cm2 ≈ 10 cm2
Apl = 10.17 cm2 ≈ 10 cm2
apc (SNI 2008) 0.1333
GRAPHICS RESULT OF
ROJECT PLN PEKERJAAN : SOIL INVESTIGATION RECONSULT
NO. SONDIR : BELOPA [S26]
BORING DEPTH : 5,8 m

PISTON/SLEEVE AREA RATIO (Aps) : 0.13


Piston/Cone Area Ratio (Apc) = 1

Geseran
Total
Rf
(fs/qc) x 100 Perlawanan Konus (qc) kg/cm²
Tf 0 25 50 75 100 125 150 175 200
0.0
∑Lfi + Lfi+1
(kg/cm) (%)
8 9
0.5
0.00 0.000
2.60 0.813
5.20 0.619 1.0
13.00 0.907
18.20 0.565
1.5
26.00 0.661
31.20 0.413
36.40 0.306 2.0
46.80 0.547
62.40 0.813
2.5
Kedalaman (meter)

70.20 0.382
75.40 0.248
85.80 0.437
3.0
98.80 0.528
109.20 0.419
122.20 0.478 3.5
130.00 0.283
140.40 0.344
4.0
156.00 0.494
169.00 0.406
182.00 0.385 4.5
195.00 0.382
202.80 0.212 qc = kg/cm²
213.20 0.281 5.0

221.00 0.204
228.80 0.202
5.5 Tf = kg/cm
236.60 0.199
247.00 0.264
260.00 0.319 6.0
0 25 50 75 100 125 150 175 200 225 250 275 300 32
Geseran Total (Tf) kg/cm
Column B Column B
5.5

6.0
265.20 0.127 0 25 50 75 100 125 150 175 200 225 250 275 300 32
Geseran Total (Tf) kg/cm
Column B Column B
RAPHICS RESULT OF CPT
INVESTIGATION RECONSULT PROJECT PLN

Piston/Sleeve Area Ratio (Aps) = 0.1300

Perlawanan Banding Geser, Rf (%)


125 150 175 200 225 -1 0 1 2
0

2
Kedalaman (meter)

6
5 200 225 250 275 300 325 350 -1 1 2
Column B
Column B Column B
6
5 200 225 250 275 300 325 350 -1 1 2
Perlawanan Geser
Column B
Lokal, fs (kg/cm²)
Column B Column B
CONE PENETRATION TEST
PROJECT : SOIL INVESTIGATION RECONSULT PROJECT PLN
LOCATION : BELOPA [S27]
BORING DEPTH : 5,2 m
GROUND WATER LEVEL : -1,8 M FROM GROUND LEVEL
DATE : APRIL 2023
PISTON/CONE AREA RATIO (Apc) : 1
PISTON/SLEEVE AREA RATIO (Aps) : 0.13
Pembac.
Pembac. Perlawanan Perlawanan
Kedalama Pembac. Perlaw. Perlaw. Lf
Perlaw. Konus Geser Lokal
n Konus & geser Geser fs
Konus
Kw qc fs x 20
d Cw Tw (Tw-Cw) Cw.Apc. Kw.Aps.
(m) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm)
1 2 3 4 5 6 7
0.00 0 0 0.00 0.00 0.00 0.00
0.20 16 17 1.00 16.00 0.13 2.60
0.40 23 24 1.00 23.00 0.13 2.60
0.60 46 48 2.00 46.00 0.26 5.20
0.80 48 50 2.00 48.00 0.26 5.20
1.00 62 65 3.00 62.00 0.39 7.80
1.20 64 66 2.00 64.00 0.26 5.20
1.40 66 69 3.00 66.00 0.39 7.80
1.60 74 76 2.00 74.00 0.26 5.20
1.80 75 79 4.00 75.00 0.52 10.40
2.00 87 92 5.00 87.00 0.65 13.00
2.20 89 93 4.00 89.00 0.52 10.40
2.40 97 101 4.00 97.00 0.52 10.40
2.60 101 103 2.00 101.00 0.26 5.20
2.80 121 124 3.00 121.00 0.39 7.80
3.00 123 126 3.00 123.00 0.39 7.80
3.20 135 137 2.00 135.00 0.26 5.20
3.40 136 139 3.00 136.00 0.39 7.80
3.60 143 148 5.00 143.00 0.65 13.00
3.80 147 152 5.00 147.00 0.65 13.00
4.00 163 169 6.00 163.00 0.78 15.60
4.20 164 168 4.00 164.00 0.52 10.40
4.40 178 179 1.00 178.00 0.13 2.60
4.60 179 180 1.00 179.00 0.13 2.60
4.80 190 195 5.00 190.00 0.65 13.00
5.00 200 205 5.00 200.00 0.65 13.00
5.20 200 202 2.00 200.00 0.26 5.20
ket
Ac = 10.17 cm2 ≈ 10 cm2 0.28
Apl = 10.17 cm2 ≈ 10 cm2
apc (SNI 2008) 0.1333
GRAPHICS RESULT OF
ROJECT PLN PEKERJAAN : SOIL INVESTIGATION RECONSULT
NO. SONDIR : BELOPA [S27]
BORING DEPTH : 5,2 m

PISTON/SLEEVE AREA RATIO (Aps) : 0.13


Piston/Cone Area Ratio (Apc) = 1

Geseran
Total
Rf
(fs/qc) x 100 Perlawanan Konus (qc) kg/cm²
Tf 0 25 50 75 100 125 150 175 200
0.0
∑Lfi + Lfi+1
(kg/cm) (%)
8 9
0.5
0.00 0.000
2.60 0.813
5.20 0.565
1.0
10.40 0.565
15.60 0.542
23.40 0.629
1.5
28.60 0.406
36.40 0.591
41.60 0.351
2.0
52.00 0.693
Kedalaman (meter)

65.00 0.747
75.40 0.584 2.5
85.80 0.536
91.00 0.257
98.80 0.322 3.0
106.60 0.317
111.80 0.193
119.60 0.287 3.5
132.60 0.455
145.60 0.442
161.20 0.479 4.0
171.60 0.317
174.20 0.073 qc = kg/cm²
176.80 0.073 4.5

189.80 0.342
202.80 0.325
5.0 Tf = kg/cm
208.00 0.130

0 25 50 75 100 125 150 175 200 225 250 275

Geseran Total (Tf) kg/cm

Column B Column B
5.0

0 25 50 75 100 125 150 175 200 225 250 275

Geseran Total (Tf) kg/cm

Column B Column B
RAPHICS RESULT OF CPT
INVESTIGATION RECONSULT PROJECT PLN

Piston/Sleeve Area Ratio (Aps) = 0.1300

Perlawanan Banding Geser, Rf (%)


125 150 175 200 225 -2 -1 0 1 2
0

2
Kedalaman (meter)

0 175 200 225 250 275 300 -1 0 1

Column B
Column B Column B
5

0 175 200 225 250 275 300 -1 0 1


Perlawanan Geser Lokal, fs (kg/cm²)
Column B
Column B Column B
CONE PENETRATION TEST
PROJECT : SOIL INVESTIGATION RECONSULT PROJECT PLN
LOCATION : BELOPA [S33]
BORING DEPTH : 5,2 m
GROUND WATER LEVEL : -1 M FROM GROUND LEVEL
DATE : APRIL 2023
PISTON/CONE AREA RATIO (Apc) : 1
PISTON/SLEEVE AREA RATIO (Aps) : 0.13
Pembac.
Pembac. Perlawanan Perlawanan
Kedalama Pembac. Perlaw. Perlaw. Lf
Perlaw. Konus Geser Lokal
n Konus & geser Geser fs
Konus
Kw qc fs x 20
d Cw Tw (Tw-Cw) Cw.Apc. Kw.Aps.
(m) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm)
1 2 3 4 5 6 7
0.00 0 0 0.00 0.00 0.00 0.00
0.20 16 17 1.00 16.00 0.13 2.60
0.40 22 23 1.00 22.00 0.13 2.60
0.60 37 39 2.00 37.00 0.26 5.20
0.80 39 41 2.00 39.00 0.26 5.20
1.00 52 53 1.00 52.00 0.13 2.60
1.20 66 69 3.00 66.00 0.39 7.80
1.40 68 71 3.00 68.00 0.39 7.80
1.60 74 76 2.00 74.00 0.26 5.20
1.80 75 79 4.00 75.00 0.52 10.40
2.00 86 92 6.00 86.00 0.78 15.60
2.20 87 93 6.00 87.00 0.78 15.60
2.40 99 101 2.00 99.00 0.26 5.20
2.60 104 105 1.00 104.00 0.13 2.60
2.80 118 124 6.00 118.00 0.78 15.60
3.00 125 126 1.00 125.00 0.13 2.60
3.20 127 132 5.00 127.00 0.65 13.00
3.40 128 134 6.00 128.00 0.78 15.60
3.60 147 148 1.00 147.00 0.13 2.60
3.80 150 154 4.00 150.00 0.52 10.40
4.00 153 156 3.00 153.00 0.39 7.80
4.20 159 165 6.00 159.00 0.78 15.60
4.40 182 185 3.00 182.00 0.39 7.80
4.60 187 192 5.00 187.00 0.65 13.00
4.80 192 198 6.00 192.00 0.78 15.60
5.00 203 208 5.00 203.00 0.65 13.00
5.20 203 205 2.00 203.00 0.26 5.20
ket
Ac = 10.17 cm2 ≈ 10 cm2 0.28
Apl = 10.17 cm2 ≈ 10 cm2
apc (SNI 2008) 0.1333
GRAPHICS RESULT OF
ROJECT PLN PEKERJAAN : SOIL INVESTIGATION RECONSULT
NO. SONDIR : BELOPA [S33]
BORING DEPTH : 5,2 m

PISTON/SLEEVE AREA RATIO (Aps) : 0.13


Piston/Cone Area Ratio (Apc) = 1

Geseran
Total
Rf
(fs/qc) x 100 Perlawanan Konus (qc) kg/cm²
Tf 0 25 50 75 100 125 150 175 200
0.0
∑Lfi + Lfi+1
(kg/cm) (%)
8 9
0.5
0.00 0.000
2.60 0.813
5.20 0.591
1.0
10.40 0.703
15.60 0.667
18.20 0.250
1.5
26.00 0.591
33.80 0.574
39.00 0.351
2.0
49.40 0.693
Kedalaman (meter)

65.00 0.907
80.60 0.897 2.5
85.80 0.263
88.40 0.125
104.00 0.661 3.0
106.60 0.104
119.60 0.512
135.20 0.609 3.5
137.80 0.088
148.20 0.347
156.00 0.255 4.0
171.60 0.491
179.40 0.214 qc = kg/cm²
192.40 0.348 4.5

208.00 0.406
221.00 0.320
5.0 Tf = kg/cm
226.20 0.128

0 25 50 75 100 125 150 175 200 225 250 275

Geseran Total (Tf) kg/cm

Column B Column B
5.0

0 25 50 75 100 125 150 175 200 225 250 275

Geseran Total (Tf) kg/cm

Column B Column B
RAPHICS RESULT OF CPT
INVESTIGATION RECONSULT PROJECT PLN

Piston/Sleeve Area Ratio (Aps) = 0.1300

Perlawanan Banding Geser, Rf (%)


125 150 175 200 225 -2 -1 0 1 2
0

2
Kedalaman (meter)

0 175 200 225 250 275 300 -1 0 1

Column B
Column B Column B
5

0 175 200 225 250 275 300 -1 0 1


Perlawanan Geser Lokal, fs (kg/cm²)
Column B
Column B Column B

You might also like