BILL OF QUANTITY

PROJECT TITEL :
WORKSHOP
NO ITEM VOLUME SATUAN HARGA SATUAN

I WORKSHOP 12 x 24

I.1 MOB and DEMOB 1.00 LS 350,000,000.00


Temporary Facility 1.00 LS 75,000,000.00
I.2 Pondasi Cakar Ayam 1 x 1 x 0,5 m ( 15 Titik )
( Pedestal 0,3 x 0,3 x 1 m )
2.1 Galian Tanah Pondasi 17.28 M3 218,400.00
2.2 Pancang Ulin 10/10x2,5 Mtr ( 5 Ea / Titik ) 100.00 Titik 53,040.00
2.3 Urugan Pasir 5 cm 1.44 M3 124,800.00
2.4 Lean Concrete 5 cm 1.44 M3 1,310,400.00
2.5 Pembesian Ø 16 mm 3,057.14 KG 10,920.00
2.6 Bekisting Plywood 9 mm 57.60 M2 53,040.00
2.7 Anchore Bolt M19 x 500 mm 80.00 EA 218,400.00
2.8 Cor Concrete K225 11.09 M3 1,996,800.00
I.3 Sloof 0,2x0,3x152 m
3.1 Pembesian Ø 16 x Ø 10 mm 4,128.57 KG 10,920.00
3.2 Bekisting Plywood 9 mm 65.14 M2 53,040.00
3.3 Cor Concrete K225 6.51 M3 1,996,800.00
I.4 Kolom H Bean 250 ( Paintung Jotun 60u )
4.1 Base Plate Th. 16 x 300 x 300 mm 20.00 EA 561,600.00
4.2 Kolom H Bean 250 mm x 6000 mm 17.86 EA 11,501,568.00
4.3 Top Plate Th. 16 x 300 x 300 mm 20.00 EA 561,600.00
I.5 Gording WF 200 ( Painting Jotun 60u ) 99.29 M 1,916,928.00
I.6 Kuda Kuda WF 300 ( Painting Jotun 60u ) 4.29 Unit 50,319,360.00
I.7 Purlin Lip Chanel 200 ( Painting Jotun 60u ) 324.29 M1 479,232.00
I.8 Tali Angin Roundbar 19 & Sag Rod 560.71 M1 191,568.00
I.9 Atap Galvalum 1,2 mm
9.1 Atap Galvalum 1,2 mm 400.00 M2 146,640.00
9.2 Bumbungan 30.00 M1 43,680.00
9.3 Listplank GRC & Painting 92.00 M1 165,360.00
9.4 Galvalum Penutup Kuda Kuda 36.00 M2 146,640.00
I.10 Talang air Pipa PVC 6" ( Include L-Blow ) 48.00 M1 53,040.00
I.11 Drainase 0,5 x 0,6 x 158 m
11.1 Galian Tanah 72.23 M3 218,400.00
11.2 Urugan Pasir 5 cm 3.95 M3 124,800.00
11.3 Lean Concrete 5 cm 3.95 M3 1,310,400.00
11.4 Precast Concrete K 225 ( 0,5 x 0,6 x 2 m ) 79.00 Unit 2,246,400.00
11.5 Finishing 1.00 LS 16,900,000.00
I.12 Lantai 0,20 x 26 x 28 m
12.1 Urugan Tanah & Pemadatan 208.00 M3 156,000.00
12.2 Urugan Pasir 5 cm 36.40 M3 124,800.00
BILL OF QUANTITY
PROJECT TITEL :
WORKSHOP
NO ITEM VOLUME SATUAN HARGA SATUAN

12.3 Lean Concrete 5 cm 36.40 M3 1,310,400.00


12.4 Wire Mash M8 x 2,1 ( 2 Layer ) 1,456.00 M2 202,800.00
12.5 Bekisting 15.43 M2 53,040.00
12.6 Cor Concrete K225 99.71 M3 1,996,800.00
I.13 Inspection Pit 1,5 x 1,5 x 11 M
13.1 Galian Tanah 29.14 M3 218,400.00
13.2 Pasangan Dinding Batako & Plesteran 192.00 M2 424,320.00
13.3 Tangga Concrete K 150 1.00 LS 9,360,000.00
13.4 Cor Lantai ( Concrete K 150 ) 1.18 M3 1,310,400.00
I.14 Instalasi Listrik Workshop Area
14.1 Lampu Mercury 500 Watt ( Include Cable & Saklar ) 6.00 Titik 6,115,200.00
14.2 Stop Kontak 5.71 Titik 99,840.00
14.3 Control Panel ( Complite ) 1.00 Unit 12,480,000.00

TOTAL
PEMBULATAN
ILL OF QUANTITY

TOTAL

350,000,000.00
75,000,000.00

3,773,952.00
5,304,000.00
179,712.00
1,886,976.00
33,383,968.80
3,055,104.00
17,472,000.00
22,144,512.00

45,083,984.40
3,455,025.60
12,999,168.00

11,232,000.00
205,418,004.48
11,232,000.00
190,331,781.12
215,870,054.40
155,410,145.28
107,414,093.28

58,656,000.00
1,310,400.00
15,213,120.00
5,279,040.00
2,545,920.00

15,775,032.00
492,960.00
5,176,080.00
177,465,600.00
16,900,000.00

32,448,000.00
4,542,720.00
ILL OF QUANTITY

TOTAL

47,698,560.00
295,276,800.00
818,407.20
199,100,928.00

6,364,176.00
81,469,440.00
9,360,000.00
1,546,272.00

36,691,200.00
570,086.40
12,480,000.00

2,497,827,222.96
2,497,800,000.00