You are on page 1of 71

RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN POSKESDES CIHAWUK


TAHUN ANGGARAN 2021
LOKASI : DESA CIHAWUK KEC. KERTASARI KABUPATEN BANDUNG

HARGA SAT JUMLAH


NO URAIAN PEKERJAAN VOLUME SATUAN
Rp. Rp.

I PEKERJAAN PERSIAPAN
1 Pengukuran kembali site & Pas. Bouwplank 38.50 M1 58,201.00 2,240,738.50
2 Pek. Papan Nama Proyek 1.00 LS 200,000.00 200,000.00
3 Biaya Adm & Dokumentasi 1.00 LS 300,000.00 300,000.00
4 Mobilisasi & demobilisasi material 1.00 LS 300,000.00 300,000.00
5 Air dan listrik kerja 1.00 LS 500,000.00 500,000.00
6 Perlengkapan K3 1.00 LS 300,000.00 300,000.00
JUMLAH 3,840,738.50
II PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah pondasi Setempat dan Menerus 30.80 M3 52,712.00 1,623,529.60
2 Urugan Tanah kembali bekas galian 10.27 M3 25,267.00 259,381.93
3 Pas. Pondasi Batu Kali 1 PC: 5 PS 22.00 M3 625,856.00 13,768,832.00
4 Pas. Bata saluran gravel 1 PC: 3 PS 35.22 M2 110,770.00 3,901,319.40
JUMLAH 19,553,062.93
IIIPEKERJAAN BETON
1 Pas. Kolom K1 15/25( 4D12, dia 8 - 20 ) K 175 0.26 M3 4,058,273.00 1,034,859.62
2 Pas. Sloof S1 15/20( 4D12, dia 8 - 20 ) K 175 2.64 M3 3,974,548.00 10,492,806.72
3 Pas. Beton Meja Dapur dan ruang alat t 10 cm 0.22 M3 2,530,008.00 561,661.78
4 Pas. Kolom Beton Praktis K2 12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 1.47 M3 4,794,097.00 7,041,569.67
5 Pas. Balok Lintel 12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 0.58 M3 4,794,097.00 2,761,399.87
6 Pas beton topi k 175 0.58 M3 2,530,008.00 1,476,259.67
7 Pas. Ring Balok RB 15/20 ( 4 dia 10 + dia 8 - 20 ) K 175 2.64 M3 4,552,393.00 12,018,317.52
JUMLAH 35,386,874.84
IV PEKERJAAN DINDING
1 Pas. Bata merah bata 1Pc : 5 Ps 232.89 M2 110,770.00 25,797,225.30
2 Pek. Plesteran 1 Pc : 5 Ps ; tebal 15 mm 357.66 M2 52,701.00 18,848,776.15
3 Pek. Acian Dinding 357.66 M2 42,295.00 15,127,018.23
4 Pek Ban banan t=10 cm 18.00 m1 25,575.00 460,350.00
5 Pek Batu andesit lapis coating 12.60 m2 222,800.00 2,807,280.00
6 Pek. kamprot halus coating 10.82 m2 41,939.00 453,570.29
7 Pas hospital plint Mulya Ruang KIA 25.72 m1 116,868.00 3,005,844.96
8 Pek. Dinding Keramik putih KM/WC/KIA/MEJA 20/25 ex Mulia 34.90 M2 202,048.00 7,051,475.20
9 Pek. Dinding Keramik putih R.MELAHIRKAN 20/25 ex Mulia 22.00 M2 202,048.00 4,445,056.00
10 Pek. Dinding Keramik putih R.PERIKSA 20/25 ex Mulia 18.31 M2 202,048.00 3,700,004.00
11 Pek. Dinding Keramik putih R.NIPAS 20/25 ex Mulia 20.31 M2 202,048.00 4,104,100.00
JUMLAH 85,800,700.13

V PEKERJAAN ATAP
1 Pas. Rangka Atap Baja Ringan C t=100.75 mm SNI 163.93 M2 126,500.00 20,737,443.54
2 Pas. Atap genteng Bitumen Onduline 163.93 M2 101,888.00 16,702,740.30
3 Pas. Nok atap standar bitumen Onduline 28.82 m1 148,729.00 4,286,369.78
4 Pas listplang grc t=20cm 62.40 m1 28,644.00 1,787,385.60
5 Pas ampig GRC 2.79 m2 54,914.00 153,210.06
6 Pas. Talang Patah zincalum 5.70 M1 96,492.00 550,004.40
JUMLAH 44,217,153.68
VI PEKERJAAN LANTAI
1 Urugan pasir bawah Lantai T = 5cm 5.11 M3 148,258.00 757,320.40
2 Pas. Lantai granit Uk.60/60 polish 96.02 m2 238,900.00 22,939,178.00
3 Pas. Lantai Keramik non slip untuk KM/WC Mulia 20/20 cm 6.14 M2 206,800.00 1,270,269.00
4 Pas. Adukan beton Tumbuk RAM/ Rabat T = 7 cm 1 Pc : 3 Ps : 5 2.64 M3 754,365.00 1,993,937.57
5 Pas. Gravel dia.20 cm+ pasangan bata 58.70 M1 169,700.00 9,961,390.00
JUMLAH 36,922,094.96
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp. Rp.
VII PEKERJAAN KUSEN
1 Pas. Kusen Alumunium 4" warna + Pintu Type P2 1.00 UNIT 2,093,268.00 2,093,268.00
2 Pas. Kusen Alumunium 4" warna + Pintu Type P1 5.00 UNIT 1,629,541.00 8,147,705.00
3 Pas. Kusen Alumunium 4" warna + Pintu Type P2a 2.00 UNIT 2,033,956.00 4,067,912.00
4 Pas. Kusen Alumunium 4" warna + Pintu Type P3 WC 3.00 UNIT 1,029,675.00 3,089,025.00
4 Pas. Kusen Alumunium 4" warna + Pintu PG 1.00 UNIT 1,754,101.00 1,754,101.00
5 Pas. Kusen Alumunium 4" warna+ Jendela Type J2 1.00 UNIT 2,670,275.00 2,670,275.00
6 Pas. Kusen Alumunium + Jendela Type J1 5.00 UNIT 1,793,994.00 8,969,970.00
7 Pas. Kusen Alumunium Type BV1 7.00 UNIT 344,136.00 2,408,952.00
8 Pas. Kusen Alumunium Type BV2 2.00 UNIT 563,325.00 1,126,650.00
9 Pas stiker sunblast 12.84 m2 122,146.00 1,568,354.64
JUMLAH 35,896,212.64

VIII PEKERJAAN PLAFOND


1 Pas. Rangka langit-langit Rangka Hollow zincalum 131.60 M2 40,452.00 5,323,483.20
2 Pas. Langit-langit plapon PVC putih polos 131.60 M2 28,300.00 3,724,280.00
3 Pas. List PVC polos 216.88 m1 6,407.00 1,389,550.16
JUMLAH 10,437,313.36
X PEKERJAAN PENGECATAN
1 Pengecatan bidang tembok VINILEX 357.66 M2 33,305.00 11,911,699.77
2 Pengecatan listpalng grc 12.48 M2 45,969.00 573,693.12
JUMLAH 12,485,392.90
XI PEKERJAAN SANITASI
1 Pas. Floordrain lokal Stainless 3.00 BH 192,115.00 576,345.00
2 Pas. Kloset Jongkok Porselen Standard lengkap putih INA 1.00 BH 605,495.00 605,495.00
3 Pas. Kloset Duduk Porselen Standard lengkap putih INA 2.00 BH 1,822,348.00 3,644,696.00
4 Pas. Jet shower kloset 2.00 BH 186,615.00 373,230.00
5 Pas. Kran stainless, dia 1/2" 3.00 BH 87,711.00 263,133.00
6 Pas. Bak cuci piring Stainless Steel Standard 1 Lubang+ kran 2.00 BH 397,118.00 794,236.00
7 Pas Pegangan tangan kamar mandi 3.00 BH 800,000.00 2,400,000.00
8 Pas. Wastafel lengkap + cermin Type LW 230 TOTO 3.00 BH 1,291,455.00 3,874,365.00
9 Pas. Wastafel lengkap + kran air standar covid 19 1.00 BH 1,261,315.00 1,261,315.00
9 Pas. Water heater gas + instalasi 2.00 unit 1,793,000.00 3,586,000.00
10 Pas. Kran air hot and cool 1.00 bh 373,711.00 373,711.00
11 Pek. Instalasi air bersih 1.00 ls 550,000.00 550,000.00
12 Pek. Instalasi air kotor 1.00 ls 550,000.00 550,000.00
JUMLAH 18,852,526.00
XII PEKERJAAN LISTRIK
1 Penyambungan kembali listrik existing 1.00 ls 500,000.00 500,000.00
2 Pas. MCB 1.00 BH 170,500.00 170,500.00
3 Pek. Instalasi Titik Lampu 22.00 TTK 165,000.00 3,630,000.00
4 Pek. Instalasi Stop Kontak 9.00 TTK 165,000.00 1,485,000.00
5 Pas. Lampu LED Panel 10.5 watt SNI 22.00 BH 70,400.00 1,548,800.00
6 Pas. Saklar tunggal SNI BROCO 7.00 BH 22,000.00 154,000.00
7 Pas Stop kontak SNI BROCO 9.00 TTK 22,000.00 198,000.00
8 Pas. Saklar double SNI "BROCO" 4.00 BH 26,400.00 105,600.00
7,791,900.00
XIII PEKERJAAN LAIN-LAIN
1 Pas. Plat Deker t = 15 cm 0.27 M3 3,919,700.00 1,058,319.00
2 Pas Septictank Biofil BF 04 terpasang 2.00 unit 6,176,200.00 12,352,400.00
3 Pas Pompa 125 watt SHIMIZU 1.00 bh 522,500.00 522,500.00
4 Pek penyambungan air bersih dari mata air 1.00 ls 750,000.00 750,000.00
5 Pas TowerAir dari besi siku 50.50.5 + Pondasi, T= 3 M' 1.00 unit 1,100,000.00 1,100,000.00
6 Pas Water Tank KAP. 500 LTR EXCEL 1.00 bh 1,650,000.00 1,650,000.00
7 Pas. Hurup Timbul Galvanis "POSKESDES CIHAWUK"T=15 CM 1.00 LS 300,000.00 300,000.00
8 Pembersihan bekas pekerjaan 1.00 LS 320,000.00 320,000.00
JUMLAH 18,053,219.00
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp. Rp.

REKAPITULASI
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN POSKESDES CIHAWUK
TAHUN ANGGARAN 2021
LOKASI : DESA CIHAWUK KEC. KERTASARI KABUPATEN BANDUNG

JUMLAH
NO URAIAN
Rp.

I PEKERJAAN PERSIAPAN 3,840,738.50

II PEKERJAAN TANAH DAN PONDASI 19,553,062.93

III PEKERJAAN BETON 35,386,874.84

IV PEKERJAAN DINDING 85,800,700.13

VI PEKERJAAN ATAP 44,217,153.68

VII PEKERJAAN LANTAI 36,922,094.96

VIII PEKERJAAN KUSEN 35,896,212.64

IX PEKERJAAN PLAFOND 10,437,313.36

X PEKERJAAN PENGECATAN 12,485,392.90

XI PEKERJAAN SANITASI 18,852,526.00

XII PEKERJAAN LISTRIK 7,791,900.00

XIII PEKERJAAN LAIN-LAIN 18,053,219.00

REAL COST 329,237,188.93

PPN 10 % 32,923,718.89

JUMLAH 362,160,907.82
TOTAL (DIBULATKAN) 362,160,000.00

Terbilang : Tiga Ratus Enam Puluh Dua Juta Seratus Enam Puluh Ribu Rupiah
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN BANGUNAN GEDUNG NEGARA

JUMLAH HARGA
NO. URAIAN JENIS PEKERJAAN BAHAN + UPAH
Rp.
1 2 3
A DAFTAR HARGA SATUAN PEKERJAAN BANGUNAN
1 1M' PENGUKURAN DAN PEMASANGAN BOUWPLANK 58,201.00
2 1M2 PAPAN NAMA PROYEK -
3 1M3 GALIAN TANAH BIASA KEDALAMAN 1 M' 52,712.00
4 1M3 GALIAN TANAH BIASA KEDALAMAN 2 M' 69,212.00
5 1M3 URUGAN TANAH KEMBALI 25,267.00
6 1M3 PEMADATAN TANAH TIAP 20 CM, TANAH DARI LUAR LOKASI 111,361.00
7 1M3 URUGAN PASIR 148,258.00
8 1M3 MEMBUAT BETON TUMBUK CAMP. 1 PC : 3 PS : 5 KR 749,144.00
9 1M3 MEMBUAT BETON BERTULANG ( TANPA BESI ) CAMP. 1 PC : 2 PS : 3 KR 1,084,402.00
10 1KG PEMBESIAN DENGAN BESI POLOS 10,321.00
11 1KG PEMBESIAN DENGAN BESI URIL 10,783.00
12 1M2 PAS. BEKISTING PAPAN UTK SLOOF 153,859.00
13 1M2 PAS. BEKISTING PAPAN UTK KOLOM 225,009.00
14 1M2 PAS. BEKISTING PAPAN UTK KOLOM STRUKTUR/ BEBAS 308,609.00
15 1M2 PAS. BEKISTING PAPAN UTK BALOK BETON 240,497.00
16 1M2 PAS. BEKISTING PAPAN UTK BALOK STRUKTUR 324,097.00
17 1M2 PAS. BEKISTING PAPAN UTK PONDASI 145,609.00
18 1M3 PAS. PONDASI BATU KOSONG / AANSTAMPING 311,058.00
19 1M3 PAS. PONDASI BATU KALI 1 : 5 sni 2008 625,856.00
20 1M2 PAS. LANTAI KERAMIK NON SLIP UK. 20 x 20 CM 206,800.00
21 1M2 PAS. DINDING KERAMIK PUTIH POLOS UK. 20 x 25 CM 202,048.00
22 1M2 PAS. LANTAI KERAMIK UKURAN 40 x 40 CM POLOS 225,841.00
23 1M2 PAS. DINDING GRANIT TILE 60X60 CM POLISH 238,900.00
24 1M2 PAS. DINDING BATU ALAM ANDESIT 222,800.00
25 1 M2 MENDEMPUL DAN MENGGOSOK BIDANG KAYU 15,320.00
26 1 M2 MENDEMPUL DAN MENGGOSOK BIDANG TEMBOK 12,664.00
27 1M2 PAS. BATA MERAH TRASRAAM TEBAL 1/2 BATA 1 PC : 3 PS 115,434.00
28 1M2 PAS. BATA MERAH TEBAL 1/2 BATA 1 PC : 4 PS ( SK SNI T-03-1991-03 ) 112,574.00
29 1M2 PAS. BATA MERAH TEBAL 1/2 BATA 1 PC : 5 PS 110,770.00
30 1M2 PLESTERAN DINDING TRASRAAM 1 PC : 3 PS + ACIAN, T = 15 MM 54,780.00
31 1M2 PLESTERAN DINDING BIASA 1 PC : 5 PS + ACIAN, T = 15 MM 52,701.00
32 1 BUAH BAK KONTROL DARI PAS. BATA UK. 30 x 30 x 35 CM 670,297.00
33 1 UNIT PEK. SEPTICTANK uk. 2,50 x 1,50 x 2,00 M -
34 1 UNIT PEK. SEPTICTANK uk. 2,00 x 1,50 x 1,50 M -
35 1 M2 PAS. PINTU DOUBLE ALUMUNIUM, RANGKA ALUMUNIUM 576,895.00
36 1 M2 PAS. PINTU PLYWOOD 4 MM DAN SENG PLAT RANGKA KAYU BORNEO 754,523.00
37 1 M2 PAS. PINTU / JENDELA KACA, ALUMUNIUM 573,000.00
38 1 M2 PAS. KACA POLOS 5 MM + KARET 150,049.00
39 1 BH PAS. ENGSEL PINTU UNION BESAR 43,899.00
40 1 PSG PAS. ESPAGNOLET 91,165.00
41 1 M2 RANGKA ATAP BAJA RINGAN SNI 0.75 MM 126,500.00
42 1 M2 MEMASANG ATAP onduline 101,888.00
43 1 M1 Nok standar onduline RED 148,729.00
44 1 M1 MEMASANG TALANG PATAHAN ATAP 96,492.00
45 1 M1 PAS. LISTPLANK (8 mm/ 20 cm ) KALSIBOARD 28,644.00
46 1 M2 PAS. RANGKA LANGIT-LANGIT BESI HOLLOW 40,452.00
47 1 M2 PAS. LANGIT-LANGIT GYPSUMP 9MM 47,473.00
48 1 M2 PAS. LANGIT-LANGIT KALSIBOARD 3.5 MM 54,914.00
49 1 M2 PENGECATAN BIDANG KAYU BARU 43,440.00
50 1 M2 PELABURAN BIDANG KAYU BARU 58,760.00
1 2 3
51 1 M2 PENGECATAN BIDANG TEMBOK BARU DGN CAT VINILEX 33,305.00
52 1 M2 PELABURAN BIDANG TEMBOK BARU 45,969.00
53 PAS. 1 BUAH CLOSET DUDUK INA, WARNA LENGKAP ( SK SNI Edisi Rev. 2003 ) 1,822,348.00
54 PAS. 1 BUAH WASTAFEL LENGKAP + CERMIN ( SK SNI Edisi Rev. 2003 ) 1,291,455.00
55 PAS. 1 BUAH BAK MANDI FIBERGLASS KAP 0,30 M3 ( SK SNI Edisi Rev. 2003 ) 1,099,296.00
56 PAS. 1 M' PIPA PVC TYPE AW, DIA 1/2" ( SK SNI Edisi Rev. 2003 ) 25,040.00
57 PAS. 1 M' PIPA PVC TYPE AW, DIA 3/4" ( SK SNI Edisi Rev. 2003 ) 27,598.00
58 PAS. 1 M' PIPA PVC TYPE AW, DIA 2 1/2" ( SK SNI Edisi Rev. 2003 ) 82,210.00
59 PAS. 1 M' PIPA PVC TYPE AW, DIA 4" ( SK SNI Edisi Rev. 2003 ) 161,154.00
60 PAS. 1 BUAH BAK CUCI PIRING STAINLESS STEEL STANDARD 1 LUBANG ( SK SNI Edisi Rev. 2003 ) 397,118.00
61 PAS. 1 BH KRAN TEMBOK LOKAL DIA 1/2" ATAU 3/4" ( SK SNI Edisi Rev. 2003 ) 87,711.00
62 PAS. 1 BH KRAN TEMBOK HOT & COOL LOKAL DIA 1/2" ATAU 3/4" ( SK SNI Edisi Rev. 2003 ) 373,711.00
63 PAS. 1 BH FLOOR DRAIN ( SK SNI Edisi Rev. 2003 ) 192,115.00
64 PAS. 1 BH JETWASHER ( SK SNI Edisi Rev. 2003 ) 186,615.00
65 1 M2 PEK. WATERPROOFING 36,905.00
66 1 M' PAS. SALURAN GREVEL 1/2 DIA 20 CM + PASANGAN 169,700.00
67 1 BH PAS. MCB 1 PHASE 170,500.00
68 1 BH PAS. MCB 3 PHASE 284,900.00
69 INSTALASI TITIK LAMPU / STOP KONTAK 165,000.00
70 1 BH SAKLAR TUNGGAL 22,000.00
71 1 BH SAKLAR DOBLE 26,400.00
72 1 BH STOP KONTAK 22,000.00
73 1 BH LAMPU LED 10 WATT 70,400.00
74 1 BH PAS WATER TANK KAP. 500 LTR 1,650,000.00
75 1 UNIT POMPA AIR 125 WATT 522,500.00
76 1 UNIT TOWER AIR DARI BESI SIKU 50.50.5 + PONDASI, TINGGI 3 M' 1,100,000.00
77 1 M3 PEK. BONGKARAN DINDING BATA ( analisa BOW ) 123,000.00
78 1 M1 PAS. LIST GYPSUMP C7 25,113.00
79 PAS. 1 BUAH CLOSET JONGKOK INA 605,495.00
80 1 m1 Pasang hospital Plint keramik , 116,868.00
81 1 m² Acian PC 42,295.00
82 1 m² Plesteran Kamprot/Ciprat halus ( 1 PC ; 2 PSR ) 41,939.00
83 1 m¹ Plesteran Profilan Ban-Nan h = 10 cm 25,575.00
84 1 m2 Plafon UPVC t=12mm 28,300.00
85 1 m3 Buang tanah galian sejauh 15 m 39,800.00
86 1 Unit Pas Biofil BF 04 6,176,200.00
87 1 M3 PLAT Dekker t = 15 cm 3,919,700.00
88 1 m' Pasang list PVC 6,407.00
89 1 m2 ORNAMEN BESI HOLLOW -
90 Pas Waterheater dan gas melon 1,793,000.00
91 1 M' PAS. SALURAN GREVEL 1/2 DIA 20 CM + PASANGAN 169,700.00

B DAFTAR HARGA SATUAN PEKERJAAN BETON


1 MEMBUAT BETON SITE MIX K 100 754,365.00
2 PEK. BETON SLOOF S1 15/20, TUl. ( 4 D 12 + dia 8 - 20 ) 3,974,548.00
3 PEK. BETON KOLOM K1 15/25, TUL. = 180 KG. ( 4 D 12, dia 8 - 20 ) 4,058,273.00
3 PEK. BETON KOLOM / RINGBALK PRAKTIS 12/12, TUL. = 177.766 KG. ( 4 dia 8 + dia 8 - 20 ) 4,794,097.00
4 PEK. BETON KOLOM K3 20/20, TUL. = 144 KG. ( 4 D 12+ dia 8 - 20 ) 4,887,259.00
6 PEK. BETON PLAT T = 10 CM, TUL. = 100 KG. 2,530,008.00
7 PEK. BETON BALOK RB 15/20, TUL. = 180 KG. ( 4 D 12, dia 8 - 20 ) 4,552,393.00
1 2 3
C DAFTAR HARGA SATUAN PEKERJAAN KUSEN
1 KUSEN ALUMUNIUM 4" 125,500.00
2 DAUN PINTU DOUBLE ALUMUNIUM TYPE P2 75 * 210 ( 2 DAUN ) 271,047.00
3 DAUN PINTU DOUBLE ALUMUNIUM TYPE P1 90 * 210 ( 1 DAUN ) 331,842.00
4 DAUN PINTU ALUMUNIUM TYPE P3 70 * 200 ( 1 DAUN ) WC 260,734.00
5 DAUN JENDELA J1 529,937.00
6 KUSEN ALUMUNIUM + PINTU TYPE P1 90 * 250 1,629,541.00
7 KUSEN ALUMUNIUM + PINTU TYPE P2 2,093,268.00
8 KUSEN ALUMUNIUM + PINTU TYPE P3 75 * 200 ( 1 DAUN ) 1,029,675.00
9 KUSEN ALUMUNIUM + PINTU TYPE PG 1,754,101.00
10 KUSEN ALUMUNIUM + TYPE BV1 - 75 * 40 344,136.00
11 KUSEN ALUMUNIUM + JENDELA TYPE J1 -75*175 ( 1 DAUN) 1,793,994.00
12 KUSEN ALUMUNIUM + JENDELA TYPE J2 - 175 x 145 ( 2 DAUN ) 2,670,275.00
13 KUSEN ALUMUNIUM + TYPE BV2 - 563,325.00
14 KUSEN ALUMUNIUM + PINTU TYPE P2A 2,033,956.00
15 1 M2 Pas. Sticker Sunblast 122,146.00
DAFTAR ANALISA HARGA SATUAN KUSEN, PINTU & JENDELA

HARGA SATUAN JUMLAH HARGA JUMLAH HARGA


NO. URAIAN JENIS PEKERJAAN SAT. KOEFF. BAHAN / UPAH BAHAN UPAH BAHAN + UPAH
Rp. Rp. Rp.
1 2 3 4 5 6 7 8
1 1M' KUSEN ALUMUNIUM 4" ###
- Kusen Alumunium U 100.50.6 m1 1.0000 110,000.00 110,000 -
- Silent kusen (1/2 cm) m' 2.0000 5,000.00 10,000
- Upah Stel + Pabrikasi kusen alumn unit 0.1000 55,000.00 5,500 -
Jumlah 120,000.00 5,500.00 125,500.00
Dibulatkan 125,500.00
2 1 UNIT DAUN PINTU DOUBLE ALUMUNIUM TYPE P2 75 * 210 ( 2 DAUN ) ###
- Pintu Alumunium 75 x 220 cm m2 1.5750 95,000.00 149,625 -
- kaca 5 mm m2 1.1564 105,000.00 121,422 -
Jumlah 271,047.00 - 271,047.00
Dibulatkan 271,047.00
3 1 UNIT DAUN PINTU DOUBLE ALUMUNIUM TYPE P1 90 * 210 ( 1 DAUN ) ###
- Pintu Alumunium 90 x 220 cm m2 1.8900 95,000.00 179,550 -
- kaca 5 mm m2 1.4504 105,000.00 152,292 -
Jumlah 331,842.00 - 331,842.00
Dibulatkan 331,842.00
4 1 UNIT DAUN PINTU ALUMUNIUM TYPE P3 70 * 200 ( 1 DAUN ) WC ###
- Pintu Alumunium 70 x 200 cm m2 1.4000 95,000.00 133,000 -
- spanrell alumunium m2 1.1564 1,500.00 1,735 -
- kaca 5 mm Type S m2 1.2000 105,000.00 126,000
Jumlah 260,734.60 - 260,734.60
Dibulatkan 260,734.00
5 1 UNIT DAUN JENDELA J1 ###
- Rangka Daun Jendela Alumunium m' 3.9000 95,000.00 370,500 -
- Silicon Sealant Polyuretan m' 3.9000 5,000.00 19,500
- Gasket m' 3.9000 2,125.00 8,288
- Kaca bening 5 mm m2 0.3300 105,000.00 34,650
- Raambuncis 119 bh 1.0000 12,000.00 12,000
- Engsel casement Andenberg 24" ps 1.0000 85,000.00 85,000
Jumlah 529,937.50 - 529,937.50
Dibulatkan 529,937.00
6 1 UNIT KUSEN ALUMUNIUM + PINTU TYPE P1 90 * 250 ###
- Daun Pintu Type P1 bh 1.0000 331,842.00 331,842 -
- KACA 5 MM M2 0.3000 105,000.00 31,500
- Kusen Alumunium m' 6.8000 125,500.00 853,400 -
- Lockset 40mm ROYAL ALUMI 775 DB set 1.0000 35,000.00 35,000
- Engsel Pintu Alumn. bh 6.0000 38,000.00 228,000
- Upah Stel unit 0.0500 33,184.20 1,659
Jumlah 1,481,401.21 - 1,481,401.21
Keuntungan Maksimal 10 % 148,140.12
Jumlah 1,629,541.33
Dibulatkan 1,629,541.00
7 1 UNIT KUSEN ALUMUNIUM + PINTU TYPE P2 ###
- Daun Pintu Type P2 bh 2.0000 260,734.00 521,468 -
- KACA 5 MM M2 0.6000 105,000.00 63,000
- Kusen Alumunium m' 8.4000 125,500.00 1,054,200 -
- Lockset 40mm ROYAL ALUMI 775 DB set 1.0000 35,000.00 35,000
- Engsel Pintu Alumn. bh 6.0000 38,000.00 228,000
- Upah Stel unit 0.0500 26,073.40 1,304
Jumlah 1,902,971.67 - 1,902,971.67
Keuntungan Maksimal 10 % 190,297.17
Jumlah 2,093,268.84
Dibulatkan 2,093,268.00
8 1 UNIT KUSEN ALUMUNIUM + PINTU TYPE P3 75 * 200 ( 1 DAUN ) ###
- Daun Pintu Type P3 bh 1.0000 158,775.00 158,775 -
- Kusen Alumunium m' 5.0000 125,500.00 627,500 -
- Lockset 40mm ROYAL ALUMI 775 DB set 1.0000 35,000.00 35,000
- Engsel Pintu Alumn. bh 3.0000 38,000.00 114,000
- Upah Stel unit 0.0500 15,877.50 794
Jumlah 936,068.88 - 936,068.88
Keuntungan Maksimal 10 % 93,606.89
Jumlah 1,029,675.76
Dibulatkan 1,029,675.00
1 2 3 4 5 6 7 8
9 1 UNIT KUSEN ALUMUNIUM + PINTU TYPE PG ###
- Daun Pintu Type P4 bh 1.0000 260,734.00 260,734 -
- KACA 5 MM m2 0.6000 105,000.00 63,000
- Kusen Alumunium m' 5.2000 125,500.00 652,600 -
- Lockset 40mm ROYAL ALUMI 775 DB set 1.0000 35,000.00 35,000
- Rel marathon bh 1.0000 582,000.00 582,000
- Upah Stel unit 0.0500 26,073.40 1,304
Jumlah 1,594,637.67 - 1,594,637.67
Keuntungan Maksimal 10 % 159,463.77
Jumlah 1,754,101.44
Dibulatkan 1,754,101.00
10 1 UNIT KUSEN ALUMUNIUM + TYPE BV1 - 75 * 40 ###
- Kusen Alumunium m' 2.3000 125,500.00 288,650 -
- Kaca bening 5 mm M2 0.2275 105,000.00 23,887
- Upah Stel unit 0.0250 12,550.00 314
Jumlah 312,851.25 - 312,851.25
Keuntungan Maksimal 10 % 31,285.13
Jumlah 344,136.38
Dibulatkan 344,136.00
11 1 UNIT KUSEN ALUMUNIUM + JENDELA TYPE J1 -75*175 ( 1 DAUN) ###
- Daun Jendela J1 bh 1.0000 569,743.00 569,743
- Kusen Alumunium m' 5.7500 125,500.00 721,625 -
- Silicon Sealant Polyuretan m' 5.7500 5,000.00 28,750
- Gasket m' 11.5000 2,125.00 24,438
- Kaca Polos 5 mm m2 2.7000 105,000.00 283,500
- Upah Stel unit 0.0500 56,974.30 2,849
Jumlah 1,630,904.22 - 1,630,904.22
Keuntungan Maksimal 10 % 163,090.42
Jumlah 1,793,994.64
Dibulatkan 1,793,994.00
12 1 UNIT KUSEN ALUMUNIUM + JENDELA TYPE J2 - 175 x 145 ( 2 DAUN ) ###
- Daun Jendela J2 uk 150 x 75 bh 2.0000 609,837.00 1,219,674
- Kusen Alumunium m' 9.6000 125,500.00 1,204,800 -
- Upah Stel unit 0.0500 60,983.70 3,049
Jumlah 2,427,523.19 - 2,427,523.19
Keuntungan Maksimal 10 % 242,752.32
Jumlah 2,670,275.50
Dibulatkan 2,670,275.00
13 1 UNIT KUSEN ALUMUNIUM + TYPE BV2 -
- Kusen Alumunium m' 3.6000 125,500.00 451,800 -
- Kaca Polos 5 mm M2 0.4000 105,000.00 42,000
- Silicon Sealant Polyuretan m' 3.6000 5,000.00 18,000
- Upah Stel unit 0.0250 12,550.00 314
Jumlah 512,113.75 - 512,113.75
Keuntungan Maksimal 10 % 51,211.38
Jumlah 563,325.13
Dibulatkan 563,325.00
14 1 UNIT KUSEN ALUMUNIUM + PINTU TYPE P2A
- Daun Pintu Type P1 bh 1.0000 331,842.00 331,842 -
- Daun Pintu Type P1A bh 1.0000 94,050.00 94,050
- KACA 5 MM M2 0.3000 105,000.00 31,500
- Kusen Alumunium m' 8.0000 125,500.00 1,004,000 -
- Lockset 40mm ROYAL ALUMI 775 DB set 1.0000 158,000.00 158,000
- Engsel Pintu Alumn. bh 6.0000 38,000.00 228,000
- Upah Stel unit 0.0500 33,184.20 1,659
Jumlah 1,849,051.21 - 1,849,051.21
Keuntungan Maksimal 10 % 184,905.12
Jumlah 2,033,956.33
Dibulatkan 2,033,956.00
15 1 UNIT DAUN PINTU ALUMUNIUM TYPE P3 75 * 200 ( 1 DAUN ) WC
- Pintu Alumunium 75 x 200 cm m2 1.6500 95,000.00 156,750 -
- spanrell alumunium m2 1.3500 1,500.00 2,025 -
Jumlah 158,775.00 - 158,775.00
Dibulatkan 158,775.00
DAFTAR HARGA SATUAN PEKERJAAN BETON BERTULANG

NO. URAIAN JENIS PEKERJAAN SAT. KOEFFISIEN HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
1 1 M3 MEMBUAT BETON SITE MIX K 100 ###
Semen Tiga Roda kg 218.000 1,000.00 218,000.000
Pasir beton m3 0.520 165,000.00 85,800.000
Batu pecah mesin 2/3 m3 0.870 175,000.00 152,250.000
Tenaga: -
Pekerja Oh 1.650 104,000.00 171,600.000
Tukang batu Oh 0.250 115,000.00 28,750.000
Kepala Tukang batu Oh 0.025 132,000.00 3,300.000
Mandor Oh 0.080 158,000.00 12,640.000
Peralatan Lot 0.020 672,340.00 13,446.800
Jumlah 685,786.800
Keuntungan maksimal 10% 68,578.680
Jumlah 754,365.480
Dibulatkan 754,365.000
2 1 M3 PEK. BETON SLOOF S1 15/20, TUl. ( 4 D 12 + dia 8 - 20 ) ###
Adukan beton Site Mix K-175 m3 1.000 985,820.00 985,820.000
Tulangan beton besi U-24 kg 180.667 9,382.80 1,695,159.200
Bekisting Papan m2 13.330 0.500 139,872.00 932,246.880
Jumlah 3,613,226.080
Keuntungan maksimal 10% 361,322.608
Jumlah 3,974,548.688
Dibulatkan 3,974,548.000
3 1 M3 PEK. BETON KOLOM K1 15/25, TUL. = 180 KG. ( 4 D 12, dia 8 - 20 ) ###
Adukan beton Site Mix K-175 m3 1.000 985,820.00 985,820.000
Tulangan beton besi U-24 kg 180.667 9,802.80 1,771,039.200
Bekisting Papan m2 13.333 0.500 139,872.00 932,480.000
Jumlah 3,689,339.200
Keuntungan maksimal 10% 368,933.920
Jumlah 4,058,273.120
Dibulatkan 4,058,273.000
4 1 M3 PEK. BETON KOLOM / RINGBALK PRAKTIS 12/12, TUL. = 177.766 KG. ( 4 dia 8 + dia 8 - 20 ) ###
Adukan beton Site Mix K-175 m3 1.000 985,820.00 985,820.000
Tulangan beton besi U-24 kg 177.766 9,382.80 1,667,942.825
Bekisting Papan m2 16.666 0.500 204,554.00 1,704,507.571
Jumlah 4,358,270.396
Keuntungan maksimal 10% 435,827.040
Jumlah 4,794,097.436
Dibulatkan 4,794,097.000
5 1 M3 PEK. BETON KOLOM K3 20/20, TUL. = 144 KG. ( 4 D 12+ dia 8 - 20 ) ###
Adukan beton Site Mix K-175 m3 1.000 985,820.00 985,820.000
Tulangan beton besi U-24 kg 144.000 9,802.80 1,411,603.200
Bekisting Papan m2 20.000 0.500 204,554.00 2,045,540.000
Jumlah 4,442,963.200
Keuntungan maksimal 10% 444,296.320
Jumlah 4,887,259.520
Dibulatkan 4,887,259.000
1 2 3 4 5 6 7
6 1 M3 PEK. BETON PLAT T = 10 CM, TUL. = 100 KG. ###
Adukan beton Site Mix K-175 m3 1.000 985,820.00 985,820.000
Tulangan beton besi U-24 kg 88.800 9,382.80 833,192.640
Bekisting Papan m2 2.200 218,634.00 480,994.800
Jumlah 2,300,007.440
Keuntungan maksimal 10% 230,000.744
Jumlah 2,530,008.184
Dibulatkan 2,530,008.000
7 1 M3 PEK. BETON BALOK RB 15/20, TUL. = 180 KG. ( 4 D 12, dia 8 - 20 )
Adukan beton Site Mix K-175 m3 1.000 985,820.00 985,820.000
Tulangan beton besi U-24 kg 180.667 9,382.80 1,695,159.200
Bekisting Papan m2 13.333 0.500 218,634.00 1,457,560.000
Jumlah 4,138,539.200
Keuntungan maksimal 10% 413,853.920
Jumlah 4,552,393.120
Dibulatkan 4,552,393.000
ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

HARGA SATUAN JUMLAH HARGA JUMLAH HARGA


NO. URAIAN JENIS PEKERJAAN SAT. KOEFF. BAHAN / UPAH BAHAN UPAH BAHAN + UPAH
Rp. Rp. Rp.
1 2 3 4 5 6 7 8
1 1M' 1M' PENGUKURAN DAN PEMASANGAN BOUWPLANK
Kayu papan Albasia 2/20 m3 0.0070 1,500,000.00 10,500.00 - -
Kayu kaso Albasia / Klas IV m3 0.0120 1,500,000.00 18,000.00 - -
Paku 5 - 7 cm kg 0.0200 20,000.00 400.00 - -
Pekerja oh 0.1000 104,000.00 10,400.00 -
Tukang Kayu oh 0.1000 115,000.00 11,500.00 -
Kepala Tukang kayu oh 0.0100 132,000.00 1,320.00 -
Mandor oh 0.0050 158,000.00 790.00 -
Jumlah 28,900.00 24,010.00 52,910.00
Keuntungan Maksimal 10 % 5,291.00
Jumlah 58,201.00
Dibulatkan 58,201.00
2 1M2 1M2 PAPAN NAMA PROYEK
Kayu Borneo m3 0.1300 4,000,000.00 520,000.00 - -
Plat seng BJLS 25 lbr 0.6787 75,000.00 50,902.50 - -
Paku 5 - 7 cm kg 0.2500 25,000.00 6,250.00 - -
Cat Minyak kg 1.0000 70,000.00 70,000.00 - -
Penulisan ls 1.0000 50,000.00 50,000.00 - -
Ongkos Pasang ls 1.0000 25,000.00 - 25,000.00 -
Jumlah 697,152.50 25,000.00 722,152.50
Keuntungan Maksimal 10 % 72,215.25
Jumlah 794,367.75
Dibulatkan 794,367.00
3 1M3 1M3 GALIAN TANAH BIASA KEDALAMAN 1 M'
Pekerja oh 0.4000 104,000.00 41,600 -
Mandor oh 0.0400 158,000.00 - 6,320.00 -
Jumlah - 47,920.00 47,920.00
Keuntungan Maksimal 10 % 4,792.00
Jumlah 52,712.00
Dibulatkan 52,712.00
4 1M3 1M3 GALIAN TANAH BIASA KEDALAMAN 2 M'
Pekerja oh 0.5260 104,000.00 54,704.00 -
Mandor oh 0.0520 158,000.00 8,216.00 -
Jumlah - 62,920.00 62,920.00
Keuntungan Maksimal 10 % 6,292.00
Jumlah 69,212.00
Dibulatkan 69,212.00
5 1M3 1M3 URUGAN TANAH KEMBALI
Pekerja oh 0.1920 104,000.00 19,968.00 -
Mandor oh 0.0190 158,000.00 - 3,002.00 -
Jumlah - 22,970.00 22,970.00
Keuntungan Maksimal 10 % 2,297.00
Jumlah 25,267.00
Dibulatkan 25,267.00
6 1M3 1M3 PEMADATAN TANAH TIAP 20 CM, TANAH DARI LUAR LOKASI
Tanah dari luar lokasi m3 1.2000 60,000.00 72,000.00 - -
Alat bantu ls 1.0000 1,500.00 1,500.00 - -
Pekerja oh 0.2500 104,000.00 26,000 -
Mandor oh 0.0110 158,000.00 1,738 -
Jumlah 73,500.00 27,738.00 101,238.00
Keuntungan Maksimal 10 % 10,123.80
Jumlah 111,361.80
Dibulatkan 111,361.00
7 1M3 1M3 URUGAN PASIR
Pasir urug m3 1.2000 85,000.00 102,000.00 -
Pekerja oh 0.3000 104,000.00 31,200.00
Mandor oh 0.0100 158,000.00 - 1,580.00 -
Jumlah 102,000.00 32,780.00 134,780.00
Keuntungan Maksimal 10 % 13,478.00
Jumlah 148,258.00
Dibulatkan 148,258.00
1 2 3 4 5 6 7 8
8 1M3 1M3 MEMBUAT BETON TUMBUK CAMP. 1 PC : 3 PS : 5 KR
PC. kg 218.0000 1,000.00 218,000.00 - -
Pasir Beton Galunggung m3 0.5200 165,000.00 85,800.00 - -
Split Pecah mesin 1/2 m3 0.8700 185,000.00 160,950.00 - -
Pekerja oh 1.6500 104,000.00 171,600.00 -
Tukang Batu oh 0.2500 115,000.00 28,750.00 -
Kepala Tukang Batu oh 0.0250 132,000.00 3,300.00 -
Mandor oh 0.0800 158,000.00 12,640.00 -
Jumlah 464,750.00 216,290.00 681,040.00
Keuntungan Maksimal 10 % 68,104.00
Jumlah 749,144.00
Dibulatkan 749,144.00
9 1M3 1M3 MEMBUAT BETON BERTULANG ( TANPA BESI ) CAMP. 1 PC : 2 PS : 3 KR
PC. kg 336.0000 1,000.00 336,000.00 - -
Pasir Beton Galunggung m3 0.5400 165,000.00 89,100.00 - -
Split Pecah mesin 1/2 m3 0.8100 185,000.00 149,850.00 - -
Pekerja oh 2.0000 104,000.00 208,000.00 -
Tukang Batu oh 0.3500 115,000.00 40,250.00 -
Kepala Tukang Batu oh 0.0350 132,000.00 4,620.00 -
Mandor oh 1.0000 158,000.00 158,000.00 -
Jumlah 574,950.00 410,870.00 985,820.00
Keuntungan Maksimal 10 % 98,582.00
Jumlah 1,084,402.00
Dibulatkan 1,084,402.00
10 1KG 1KG PEMBESIAN DENGAN BESI POLOS
Besi beton polos, rata-rata kg 1.0500 7,100.00 7,455.00 - -
Kawat beton kg 0.0150 17,000.00 255.00 - -
Pekerja oh 0.0070 104,000.00 728.00
Tukang besi oh 0.0070 115,000.00 805.00
Kepala Tukang besi oh 0.0007 132,000.00 92.40
Mandor oh 0.0003 158,000.00 47.40 -
Jumlah 7,710.00 1,672.80 9,382.80
Keuntungan Maksimal 10 % 938.28
Jumlah 10,321.08
Dibulatkan 10,321.00
11 1KG 1KG PEMBESIAN DENGAN BESI URIL
Besi beton uril, rata-rata kg 1.0500 7,500.00 7,875.00 - -
Kawat beton kg 0.0150 17,000.00 255.00 - -
Pekerja oh 0.0070 104,000.00 728.00
Tukang besi oh 0.0070 115,000.00 805.00
Kepala Tukang besi oh 0.0007 132,000.00 92.40
Mandor oh 0.0003 158,000.00 47.40 -
Jumlah 8,130.00 1,672.80 9,802.80
Keuntungan Maksimal 10 % 980.28
Jumlah 10,783.08
Dibulatkan 10,783.00
12 1M2 1M2 PAS. BEKISTING PAPAN UTK SLOOF
Kayu Papan klas IV / albasia m3 0.0450 1,500,000.00 67,500.00 - -
Paku 5 - 7 cm kg 0.3000 20,000.00 6,000.00
Minyak bekisting Lt 0.1000 10,500.00 1,050.00
Pekerja oh 0.3000 104,000.00 31,200.00
Tukang kayu oh 0.2600 115,000.00 29,900.00
Kepala tukang kayu oh 0.0260 132,000.00 3,432.00
Mandor oh 0.0050 158,000.00 790.00
Jumlah 74,550.00 65,322.00 139,872.00
Keuntungan Maksimal 10 % 13,987.20
Jumlah 153,859.20
Dibulatkan 153,859.00
13 1M2 1M2 PAS. BEKISTING PAPAN UTK KOLOM
Kayu Papan klas IV / albasia m3 0.0400 1,500,000.00 60,000.00 - -
Paku 5 - 7 cm kg 0.4000 20,000.00 8,000.00
Minyak bekisting Lt 0.2000 10,500.00 2,100.00
Kayu Balok klas II m3 0.0150 4,000,000.00 60,000.00
Pekerja oh 0.3000 104,000.00 31,200.00
Tukang kayu oh 0.3300 115,000.00 37,950.00
Kepala tukang kayu oh 0.0330 132,000.00 4,356.00
Mandor oh 0.0060 158,000.00 948.00
Jumlah 130,100.00 74,454.00 204,554.00
Keuntungan Maksimal 10 % 20,455.40
Jumlah 225,009.40
Dibulatkan 225,009.00
1 2 3 4 5 6 7 8
14 1M2 1M2 PAS. BEKISTING PAPAN UTK KOLOM STRUKTUR/ BEBAS
Kayu Papan klas IV / albasia m3 0.0400 1,500,000.00 60,000.00 - -
Paku 5 - 7 cm kg 0.4000 20,000.00 8,000.00
Minyak bekisting Lt 0.2000 10,500.00 2,100.00
Kayu Balok klas II m3 0.0150 4,000,000.00 60,000.00
Plywood 9 mm lbr 0.3500 120,000.00 42,000.00
Dolken dia 8 - 10 / 400 cm btg 2.0000 17,000.00 34,000.00
Pekerja oh 0.3000 104,000.00 31,200.00
Tukang kayu oh 0.3300 115,000.00 37,950.00
Kepala tukang kayu oh 0.0330 132,000.00 4,356.00
Mandor oh 0.0060 158,000.00 948.00
Jumlah 206,100.00 74,454.00 280,554.00
Keuntungan Maksimal 10 % 28,055.40
Jumlah 308,609.40
Dibulatkan 308,609.00
15 1M2 1M2 PAS. BEKISTING PAPAN UTK BALOK BETON
Kayu Papan klas IV / albasia m3 0.0400 1,500,000.00 60,000.00 - -
Paku 5 - 7 cm kg 0.4000 20,000.00 8,000.00
Minyak bekisting Lt 0.2000 10,500.00 2,100.00
Kayu Balok klas II m3 0.0180 4,000,000.00 72,000.00
Pekerja oh 0.3200 104,000.00 33,280.00
Tukang kayu oh 0.3300 115,000.00 37,950.00
Kepala tukang kayu oh 0.0330 132,000.00 4,356.00
Mandor oh 0.0060 158,000.00 948.00
Jumlah 142,100.00 76,534.00 218,634.00
Keuntungan Maksimal 10 % 21,863.40
Jumlah 240,497.40
Dibulatkan 240,497.00
16 1M2 PAS. BEKISTING PAPAN UTK BALOK STRUKTUR
Kayu Papan klas IV / albasia m3 0.0400 1,500,000.00 60,000.00 - -
Paku 5 - 7 cm kg 0.4000 20,000.00 8,000.00
Minyak bekisting Lt 0.2000 10,500.00 2,100.00
Kayu Balok klas II m3 0.0180 4,000,000.00 72,000.00
Plywood 9 mm lbr 0.3500 120,000.00 42,000.00
Dolken dia 8 - 10 / 400 cm btg 2.0000 17,000.00 34,000.00
Pekerja oh 0.3200 104,000.00 33,280.00
Tukang kayu oh 0.3300 115,000.00 37,950.00
Kepala tukang kayu oh 0.0330 132,000.00 4,356.00
Mandor oh 0.0060 158,000.00 948.00
Jumlah 218,100.00 76,534.00 294,634.00
Keuntungan Maksimal 10 % 29,463.40
Jumlah 324,097.40
Dibulatkan 324,097.00
17 1M2 PAS. BEKISTING PAPAN UTK PONDASI
Kayu Papan klas IV / albasia m3 0.0400 1,500,000.00 60,000.00 - -
Paku 5 - 7 cm kg 0.3000 20,000.00 6,000.00
Minyak bekisting Lt 0.1000 10,500.00 1,050.00
Pekerja oh 0.3000 104,000.00 31,200.00
Tukang kayu oh 0.2600 115,000.00 29,900.00
Kepala tukang kayu oh 0.0260 132,000.00 3,432.00
Mandor oh 0.0050 158,000.00 790.00
Jumlah 67,050.00 65,322.00 132,372.00
Keuntungan Maksimal 10 % 13,237.20
Jumlah 145,609.20
Dibulatkan 145,609.00
18 1M3 PAS. PONDASI BATU KOSONG / AANSTAMPING
Batu belah m3 1.2000 100,000.00 120,000.00 - -
Pasir urug m3 0.3000 85,000.00 25,500.00
Pekerja oh 0.7800 104,000.00 81,120.00
Tukang Batu oh 0.3900 115,000.00 44,850.00
Kepala Tukang Batu oh 0.0390 132,000.00 5,148.00
Mandor oh 0.0390 158,000.00 6,162.00
Jumlah 145,500.00 137,280.00 282,780.00
Keuntungan Maksimal 10 % 28,278.00
Jumlah 311,058.00
Dibulatkan 311,058.00
1 2 3 4 5 6 7 8
19 1M3 PAS. PONDASI BATU KALI 1 : 5 sni 2008
Batu belah m3 1.2000 100,000.00 120,000.00 - -
PC. kg 136.0000 1,000.00 136,000.00
Pasir Pasang m3 0.5440 90,000.00 48,960.00
Pekerja oh 1.5000 104,000.00 156,000.00
Tukang batu oh 0.7500 115,000.00 86,250.00
Kepala Tukang batu oh 0.0750 132,000.00 9,900.00
Mandor oh 0.0750 158,000.00 11,850.00
Jumlah 304,960.00 264,000.00 568,960.00
Keuntungan Maksimal 10 % 56,896.00
Jumlah 625,856.00
Dibulatkan 625,856.00
20 1M2 PAS. LANTAI KERAMIK NON SLIP UK. 20 x 20 CM
Ubin keramik non slip 20 x 20 cm warna roman bh 25.0000 2,260.00 56,500.00 - -
PC. kg 11.3800 1,000.00 11,380.00
Pasir pasang m3 0.0420 90,000.00 3,780.00
Semen warna muda kg 1.5000 1,500.00 2,250.00
Pekerja org 0.6200 104,000.00 64,480.00
Tukang batu org 0.3500 115,000.00 40,250.00
Kepala Tukang batu org 0.0350 132,000.00 4,620.00
Mandor org 0.0300 158,000.00 4,740.00
Jumlah 73,910.00 114,090.00 188,000.00
Keuntungan Maksimal 10 % 18,800.00
Jumlah 206,800.00
Dibulatkan 206,800.00
21 1M2 PAS. DINDING KERAMIK PUTIH POLOS UK. 20 x 25 CM
Keramik Dinding Putih Polos, 20 x 25 cm Mulia bh 20.0000 3,000.00 60,000.00 - -
PC. kg 9.3000 1,000.00 9,300.00
Pasir pasang m3 0.0180 90,000.00 1,620.00
Semen putih kg 0.5000 1,500.00 750.00
Pekerja org 0.6000 104,000.00 62,400.00
Tukang batu org 0.3500 115,000.00 40,250.00
Kepala Tukang batu org 0.0350 132,000.00 4,620.00
Mandor org 0.0300 158,000.00 4,740.00
Jumlah 71,670.00 112,010.00 183,680.00
Keuntungan Maksimal 10 % 18,368.00
Jumlah 202,048.00
Dibulatkan 202,048.00
22 1M2 PAS. LANTAI KERAMIK UKURAN 40 x 40 CM POLOS
Ubin Keramik Putih / Polos 40 x 40 cm Mulia bh 6.2500 12,560.00 78,500.00 - -
PC. kg 8.1900 1,000.00 8,190.00
Pasir pasang m3 0.0420 90,000.00 3,780.00
Semen Putih kg 0.5000 1,500.00 750.00
Pekerja oh 0.6200 104,000.00 64,480.00
Tukang batu oh 0.3500 115,000.00 40,250.00
Kepala Tukang batu oh 0.0350 132,000.00 4,620.00
Mandor oh 0.0300 158,000.00 4,740.00
Jumlah 91,220.00 114,090.00 205,310.00
Keuntungan Maksimal 10 % 20,531.00
Jumlah 225,841.00
Dibulatkan 225,841.00
23 1M2 PAS. DINDING GRANIT TILE 60X60 CM POLISH
Granit tile 60x60 cm Polish m2 1.1000 80,000.00 88,000.00 - -
PC. kg 11.3800 1,000.00 11,380.00
Pasir Pasang m3 0.0420 90,000.00 3,780.00
Pekerja org 0.6200 104,000.00 64,480.00
Tukang batu org 0.3500 115,000.00 40,250.00
Kepala Tukang batu org 0.0350 132,000.00 4,620.00
Mandor org 0.0300 158,000.00 4,740.00
Jumlah 103,160.00 114,090.00 217,250.00
Keuntungan Maksimal 10 % 21,725.00
Jumlah 238,975.00
Dibulatkan 238,900.00
1 2 3 4 5 6 7 8
24 1M2 PAS. DINDING BATU ALAM ANDESIT
Batu alam Andesit m2 1.1000 75,000.00 82,500.00 - -
PC. kg 6.0000 1,000.00 6,000.00
Pasir Pasang m3 0.0310 90,000.00 2,790.00
Pekerja org 0.3750 104,000.00 39,000.00
Tukang batu org 0.4500 115,000.00 51,750.00
Kepala Tukang batu org 0.0750 132,000.00 9,900.00
Mandor org 0.0675 158,000.00 10,665.00
Jumlah 91,290.00 111,315.00 202,605.00
Keuntungan Maksimal 10 % 20,260.50
Jumlah 222,865.50
Dibulatkan 222,800.00
25 1 M2 MENDEMPUL DAN MENGGOSOK BIDANG KAYU
Dempul Jadi / plamuur kg 0.0800 25,000.00 2,000.00 - -
Minyak cat Lt 0.0200 70,000.00 1,400.00
Batu apung kg 0.0100 80,000.00 800.00
Kape kayu bh 0.0050 9,000.00 45.00
Pekerja oh 0.0400 104,000.00 4,160.00
Tukang cat oh 0.0400 115,000.00 4,600.00
Kepala Tukang cat oh 0.0040 132,000.00 528.00
Mandor oh 0.0025 158,000.00 395.00
Jumlah 4,245.00 9,683.00 13,928.00
Keuntungan Maksimal 10 % 1,392.80
Jumlah 15,320.80
Dibulatkan 15,320.00
26 1 M2 MENDEMPUL DAN MENGGOSOK BIDANG TEMBOK
Plamuur Tembok kg 0.0800 18,000.00 1,440.00 - -
Amplas lbr 0.0500 4,900.00 245.00
Kape tembok bh 0.0050 29,000.00 145.00
Pekerja oh 0.0400 104,000.00 4,160.00
Tukang cat oh 0.0400 115,000.00 4,600.00
Kepala Tukang cat oh 0.0040 132,000.00 528.00
Mandor oh 0.0025 158,000.00 395.00
Jumlah 1,830.00 9,683.00 11,513.00
Keuntungan Maksimal 10 % 1,151.30
Jumlah 12,664.30
Dibulatkan 12,664.00
27 1M2 PAS. BATA MERAH TRASRAAM TEBAL 1/2 BATA 1 PC : 3 PS
Bata merah bh 70.0000 550.00 38,500.00 - -
PC. kg 14.3700 1,000.00 14,370.00
Pasir pasang m3 0.0400 90,000.00 3,600.00
Pekerja oh 0.3200 104,000.00 33,280.00
Tukang batu oh 0.1000 115,000.00 11,500.00
Kepala Tukang batu oh 0.0100 132,000.00 1,320.00
Mandor oh 0.0150 158,000.00 2,370.00
Jumlah 56,470.00 48,470.00 104,940.00
Keuntungan Maksimal 10 % 10,494.00
Jumlah 115,434.00
Dibulatkan 115,434.00
28 1M2 PAS. BATA MERAH TEBAL 1/2 BATA 1 PC : 4 PS ( SK SNI T-03-1991-03 )
Bata merah kw II bh 70.0000 550.00 38,500.00 - -
PC. kg 11.5000 1,000.00 11,500.00
Pasir pasang m3 0.0430 90,000.00 3,870.00
Pekerja org 0.3200 104,000.00 33,280.00
Tukang batu org 0.1000 115,000.00 11,500.00
Kepala Tukang batu org 0.0100 132,000.00 1,320.00
Mandor org 0.0150 158,000.00 2,370.00
Jumlah 53,870.00 48,470.00 102,340.00
Keuntungan Maksimal 10 % 10,234.00
Jumlah 112,574.00
Dibulatkan 112,574.00
1 2 3 4 5 6 7 8
29 1M2 PAS. BATA MERAH TEBAL 1/2 BATA 1 PC : 5 PS
Bata merah bh 70.0000 550.00 38,500.00 - -
PC. kg 9.6800 1,000.00 9,680.00
Pasir pasang m3 0.0450 90,000.00 4,050.00
Pekerja oh 0.3200 104,000.00 33,280.00
Tukang batu oh 0.1000 115,000.00 11,500.00
Kepala Tukang batu oh 0.0100 132,000.00 1,320.00
Mandor oh 0.0150 158,000.00 2,370.00
Jumlah 52,230.00 48,470.00 100,700.00
Keuntungan Maksimal 10 % 10,070.00
Jumlah 110,770.00
Dibulatkan 110,770.00
30 1M2 PLESTERAN DINDING TRASRAAM 1 PC : 3 PS + ACIAN, T = 15 MM
PC. kg 6.4800 1,000.00 6,480.00
Pasir pasang m3 0.0190 90,000.00 1,710.00
Pekerja oh 0.2000 104,000.00 20,800.00
Tukang batu oh 0.1500 115,000.00 17,250.00
Kepala Tukang batu oh 0.0150 132,000.00 1,980.00
Mandor oh 0.0100 158,000.00 1,580.00
Jumlah 8,190.00 41,610.00 49,800.00
Keuntungan Maksimal 10 % 4,980.00
Jumlah 54,780.00
Dibulatkan 54,780.00
31 1M2 PLESTERAN DINDING BIASA 1 PC : 5 PS + ACIAN, T = 15 MM
PC. kg 4.3200 1,000.00 4,320.00
Pasir pasang m3 0.0220 90,000.00 1,980.00
Pekerja oh 0.2000 104,000.00 20,800.00
Tukang batu oh 0.1500 115,000.00 17,250.00
Kepala Tukang batu oh 0.0150 132,000.00 1,980.00
Mandor oh 0.0100 158,000.00 1,580.00
Jumlah 6,300.00 41,610.00 47,910.00
Keuntungan Maksimal 10 % 4,791.00
Jumlah 52,701.00
Dibulatkan 52,701.00
32 1 BUAH BAK KONTROL DARI PAS. BATA UK. 30 x 30 x 35 CM
Batu bata bh 132.0000 550.00 72,600.00 - -
Semen Portland kg 44.0000 1,000.00 44,000.00
Pasir Pasang m3 0.0700 90,000.00 6,300.00
Batu Kerikil m3 0.0700 185,000.00 12,950.00
Besi Beton kg 1.6000 7,100.00 11,360.00
Pasir beton m3 0.0600 165,000.00 9,900.00
Pekerja oh 3.2000 104,000.00 332,800.00
Tukang batu oh 1.0150 115,000.00 116,725.00
Kepala Tukang batu oh 0.0015 132,000.00 198.00
Mandor oh 0.0160 158,000.00 2,528.00
Jumlah 157,110.00 452,251.00 609,361.00
Keuntungan Maksimal 10 % 60,936.10
Jumlah 670,297.10
Dibulatkan 670,297.00
33 1 UNIT PEK. SEPTICTANK uk. 2,50 x 1,50 x 2,00 M
Galian tanah m3 7.5000 62,920.00 471,900.00 - -
Pasir Urug T = 5 cm m3 0.1875 85,000.00 15,937.50
Pas. bata 1 bata 1 : 4 + plester 1 : 3 m2 25.0000 152,140.00 3,803,500.00
Plat beton tutup + balok m3 0.4500 2,300,007.44 1,035,003.35
Socket T PVC 4 " bh 9.0000 25,000.00 225,000.00
PVC 1 1/2 " m' 2.0000 12,916.67 25,833.33
Galian tanah untuk rembesan m3 5.0000 47,920.00 239,600.00
Pas. Ijuk kg 9.0000 53,000.00 477,000.00
Urugan kerikil 3/5 cm m3 1.7500 165,000.00 288,750.00
Pipa PVC 4 " berlobang jenis ( D ) m' 6.0000 46,250.00 277,500.00
Urugan kembali perataan tanah m3 1.6667 22,970.00 38,283.33
Tambahan upah ls 1.0000 25,000.00 25,000.00
Jumlah 6,898,307.51 25,000.00 6,923,307.51
Keuntungan Maksimal 10 % 692,330.75
Jumlah 7,615,638.27
Dibulatkan 7,615,638.00
1 2 3 4 5 6 7 8
34 1 UNIT PEK. SEPTICTANK uk. 2,00 x 1,50 x 1,50 M
Galian tanah m3 4.5000 62,920.00 283,140.00 - -
Pasir Urug T = 5 cm m3 0.2142 85,000.00 18,207.00
Pas. bata 1 bata 1 : 4 + plester 1 : 3 m2 15.0000 152,140.00 2,282,100.00
Plat beton tutup + balok m3 0.3000 2,300,007.44 690,002.23
Socket T PVC 4 " bh 2.0000 25,000.00 50,000.00
PVC 1 1/2 " m' 0.8000 12,916.67 10,333.33
Galian tanah untuk rembesan m3 3.3750 47,920.00 161,730.00
Pas. Ijuk kg 5.4000 53,000.00 286,200.00
Urugan kerikil 3/5 cm m3 1.0500 165,000.00 173,250.00
Pipa PVC 4 " berlobang jenis ( D ) m' 9.0000 46,250.00 416,250.00
Urugan kembali perataan tanah m3 1.1250 22,970.00 25,841.25
Tambahan upah ls 1.0000 25,000.00 25,000.00
Jumlah 4,397,053.82 25,000.00 4,422,053.82
Keuntungan Maksimal 10 % 442,205.38
Jumlah 4,864,259.20
Dibulatkan 4,864,259.00
35 1 M2 PAS. PINTU DOUBLE ALUMUNIUM, RANGKA ALUMUNIUM
Rangka Alumunium m3 0.0196 5,000,000.00 98,000.00 - -
Plat Alumunim lbr 1.0000 85,000.00 85,000.00
Karet seal Lt 0.3000 57,700.00 17,310.00
Baut/revet kg 0.0300 20,000.00 600.00
Pekerja oh 0.6000 104,000.00 62,400.00
Tukang kayu oh 2.0000 115,000.00 230,000.00
Kepala Tukang Kayu oh 0.2000 132,000.00 26,400.00
Mandor oh 0.0300 158,000.00 4,740.00
Jumlah 200,910.00 323,540.00 524,450.00
Keuntungan Maksimal 10 % 52,445.00
Jumlah 576,895.00
Dibulatkan 576,895.00
36 1 M2 PAS. PINTU PLYWOOD 4 MM DAN SENG PLAT RANGKA KAYU BORNEO
Kayu rk. papan Borneo m3 0.0196 5,000,000.00 98,000.00 - -
Kayu Plywood 4 mm lbr 1.0000 85,000.00 85,000.00
Lem Kuning Lt 0.3000 57,700.00 17,310.00
Paku Triplex kg 0.0300 20,000.00 600.00
Seng Plat BJLS 25 lbr 1.0000 75,000.00 75,000.00
Pekerja oh 0.8000 104,000.00 83,200.00
Tukang kayu oh 2.5000 115,000.00 287,500.00
Kepala Tukang Kayu oh 0.2500 132,000.00 33,000.00
Mandor oh 0.0400 158,000.00 6,320.00
Jumlah 275,910.00 410,020.00 685,930.00
Keuntungan Maksimal 10 % 68,593.00
Jumlah 754,523.00
Dibulatkan 754,523.00
37 1 M2 PAS. PINTU / JENDELA KACA, ALUMUNIUM
Alumunium m3 0.0350 5,000,000.00 175,000.00 - -
Pekerja oh 0.8000 104,000.00 83,200.00
Tukang kayu oh 2.0000 115,000.00 230,000.00
Kepala Tukang Kayu oh 0.2000 132,000.00 26,400.00
Mandor oh 0.0400 158,000.00 6,320.00
Jumlah 175,000.00 345,920.00 520,920.00
Keuntungan Maksimal 10 % 52,092.00
Jumlah 573,012.00
Dibulatkan 573,000.00
38 1 M2 PAS. KACA POLOS 5 MM + KARET
Kaca polos 5 mm , Asahi m2 1.1000 105,000.00 115,500.00 - -
List Karet m' 4.0000 - -
Pekerja oh 0.0150 104,000.00 1,560.00
Tukang kayu oh 0.1500 115,000.00 17,250.00
Kepala Tukang Kayu oh 0.0150 132,000.00 1,980.00
Mandor oh 0.0008 158,000.00 118.50
Jumlah 115,500.00 20,908.50 136,408.50
Keuntungan Maksimal 10 % 13,640.85
Jumlah 150,049.35
Dibulatkan 150,049.00
39 1 BH PAS. ENGSEL PINTU UNION BESAR
Engsel Pintu bh 1.0000 19,000.00 19,000.00 - -
Pekerja oh 0.0150 104,000.00 1,560.00
Tukang kayu oh 0.1500 115,000.00 17,250.00
Kepala Tukang Kayu oh 0.0150 132,000.00 1,980.00
Mandor oh 0.0008 158,000.00 118.50
Jumlah 19,000.00 20,908.50 39,908.50
Keuntungan Maksimal 10 % 3,990.85
Jumlah 43,899.35
Dibulatkan 43,899.00
1 2 3 4 5 6 7 8
40 1 PSG PAS. ESPAGNOLET
Espagnolet psg 1.0000 55,000.00 55,000.00 - -
Pekerja oh 0.0200 104,000.00 2,080.00
Tukang kayu oh 0.2000 115,000.00 23,000.00
Kepala Tukang Kayu oh 0.0200 132,000.00 2,640.00
Mandor oh 0.0010 158,000.00 158.00
Jumlah 55,000.00 27,878.00 82,878.00
Keuntungan Maksimal 10 % 8,287.80
Jumlah 91,165.80
Dibulatkan 91,165.00
41 1 M2 RANGKA ATAP BAJA RINGAN SNI 0.75 MM
Rangka Baja Ringan terpasang m2 1.0000 115,000.00 115,000.00 - -
Jumlah 115,000.00 - 115,000.00
Keuntungan Maksimal 10 % 11,500.00
Jumlah 126,500.00
Dibulatkan 126,500.00
42 1 M1 MEMASANG TALANG PATAHAN ATAP
Seng zingalum m1 1.1000 75,000.00 82,500.00 - -
Pekerja org 0.0350 104,000.00 3,640.00
Mandor org 0.0100 158,000.00 1,580.00
Jumlah 82,500.00 5,220.00 87,720.00
Keuntungan Maksimal 10 % 8,772.00
Jumlah 96,492.00
Dibulatkan 96,492.00
43 1 M1 PAS. LISTPLANK (8 mm/ 20 cm ) KALSIBOARD
Lisplank Kalsiboard terpasang m1 1.0500 24,800.00 26,040.00 - -
Jumlah 26,040.00 - 26,040.00
Keuntungan Maksimal 10 % 2,604.00
Jumlah 28,644.00
Dibulatkan 28,644.00
44 1 M2 PAS. RANGKA LANGIT-LANGIT BESI HOLLOW
Pipa Profil Hollow 40X 40 MM BTG 0.4150 25,000.00 10,375.00 - -
Pipa Profil Hollow 20X 20 MM BTG 0.1500 22,000.00 3,300.00
Sekrup GYPSUM KG 0.1100 50,000.00 5,500.00
Pekerja oh 0.1000 104,000.00 10,400.00
Tukang besi oh 0.0500 115,000.00 5,750.00
Kepala Tukang besi oh 0.0050 132,000.00 660.00
Mandor oh 0.0050 158,000.00 790.00
Jumlah 19,175.00 17,600.00 36,775.00
Keuntungan Maksimal 10 % 3,677.50
Jumlah 40,452.50
Dibulatkan 40,452.00
45 1 M2 PAS. LANGIT-LANGIT GYPSUMP 9MM
GYPSUMP 9 mm lbr 0.3640 65,000.00 23,660.00 - -
Paku Gypsump kg 0.1100 17,250.00 1,897.50
Pekerja oh 0.1000 104,000.00 10,400.00
Tukang kayu oh 0.0500 115,000.00 5,750.00
Kepala Tukang kayu oh 0.0050 132,000.00 660.00
Mandor oh 0.0050 158,000.00 790.00
Jumlah 25,557.50 17,600.00 43,157.50
Keuntungan Maksimal 10 % 4,315.75
Jumlah 47,473.25
Dibulatkan 47,473.00
46 1 M2 PAS. LANGIT-LANGIT KALSIBOARD 3.5 MM
Kalsiboard 3.5 mm lbr 0.3750 67,500.00 25,312.50 - -
Paku 1/2" - 1" kg 0.0300 20,000.00 600.00
Pekerja oh 0.1000 104,000.00 10,400.00
Tukang kayu oh 0.1000 115,000.00 11,500.00
Kepala Tukang kayu oh 0.0100 132,000.00 1,320.00
Mandor oh 0.0050 158,000.00 790.00
Jumlah 25,912.50 24,010.00 49,922.50
Keuntungan Maksimal 10 % 4,992.25
Jumlah 54,914.75
Dibulatkan 54,914.00
1 2 3 4 5 6 7 8
47 1 M2 PENGECATAN BIDANG KAYU BARU
Meni kayu kg 0.2000 35,000.00 7,000.00 - -
Plamuur kayu kg 0.1500 25,000.00 3,750.00
Cat dasar kg 0.1700 52,000.00 8,840.00
Cat Penutup 2 kali kg 0.2600 35,000.00 9,100.00
Amplas lbr 0.0100 4,900.00 49.00
Kwas 3" bh 0.0500 25,000.00 1,250.00
Pekerja oh 0.0700 104,000.00 7,280.00
Tukang cat oh 0.0090 115,000.00 1,035.00
Kepala Tukang cat oh 0.0060 132,000.00 792.00
Mandor oh 0.0025 158,000.00 395.00
Jumlah 29,989.00 9,502.00 39,491.00
Keuntungan Maksimal 10 % 3,949.10
Jumlah 43,440.10
Dibulatkan 43,440.00
48 1 M2 PELABURAN BIDANG KAYU BARU
Pendempulan m2 1.0000 15,320.00 15,320.00
Pengecatan m2 1.0000 43,440.00 43,440.00
Jumlah 58,760.00 - 58,760.00
49 1 M2 PENGECATAN BIDANG TEMBOK BARU DGN CAT VINILEX
Cat dasar kg 0.1000 16,500.00 1,650.00
Cat Penutup 2 kali kg 0.1750 16,500.00 2,887.50
Amplas lbr 0.3000 4,900.00 1,470.00
Roll Cat bh 0.0100 15,000.00 150.00
Pekerja oh 0.1500 104,000.00 15,600.00
Tukang cat oh 0.0500 115,000.00 5,750.00
Kepala Tukang cat oh 0.0150 132,000.00 1,980.00
Mandor oh 0.0050 158,000.00 790.00
Jumlah 6,157.50 24,120.00 30,277.50
Keuntungan Maksimal 10 % 3,027.75
Jumlah 33,305.25
Dibulatkan 33,305.00
50 1 M2 PELABURAN BIDANG TEMBOK BARU
Pendempulan m2 1.0000 12,664.00 12,664.00
Pengecatan m2 1.0000 33,305.00 33,305.00
Jumlah 45,969.00 - 45,969.00
51 PAS. 1 BUAH CLOSET DUDUK INA, WARNA LENGKAP ( SK SNI Edisi Rev. 2003 )
Kloset Duduk Porselen Warna bh 1.0000 1,150,000.00 1,150,000.00 - -
Semen Portland kg 6.0000 1,000.00 6,000.00 - -
Pasir pasang m3 0.0100 90,000.00 900.00 - -
Pekerja org 1.0000 104,000.00 104,000.00 -
Tukang batu org 1.5000 115,000.00 172,500.00 -
Kepala Tukang batu org 1.5000 132,000.00 198,000.00 -
Mandor org 0.1600 158,000.00 25,280.00 -
Jumlah 1,156,900.00 499,780.00 1,656,680.00
Keuntungan Maksimal 10 % 165,668.00
Jumlah 1,822,348.00
Dibulatkan 1,822,348.00
52 PAS. 1 BUAH WASTAFEL LENGKAP + CERMIN ( SK SNI Edisi Rev. 2003 )
Wastafel lengkap + cermin type LW 230 bh 1.0000 750,000.00 750,000.00 - -
Perlengkapan ( 12% x Harga Wastafel ) Ls 1.0000 90,000.00 90,000.00
Semen Portland kg 6.0000 1,000.00 6,000.00 - -
Pasir pasang m3 0.0100 90,000.00 900.00 - -
Pekerja org 1.2000 104,000.00 124,800.00 -
Tukang batu org 1.4500 115,000.00 166,750.00 -
Kepala Tukang batu org 0.1500 132,000.00 19,800.00 -
Mandor org 0.1000 158,000.00 15,800.00 -
Jumlah 846,900.00 327,150.00 1,174,050.00
Keuntungan Maksimal 10 % 117,405.00
Jumlah 1,291,455.00
Dibulatkan 1,291,455.00
55 PAS. 1 BUAH WASTAFEL LENGKAP + kran ( SK SNI Edisi Rev. 2003 )
Wastafel lengkap + kran bh 1.0000 700,000.00 700,000.00 - -
Perlengkapan ( 12% x Harga Wastafel ) Ls 1.0000 84,000.00 84,000.00
Semen Portland kg 6.0000 5,000.00 30,000.00 - -
Pasir pasang m3 0.0100 550,000.00 5,500.00 - -
Pekerja org 1.2000 104,000.00 124,800.00 -
Tukang batu org 1.4500 115,000.00 166,750.00 -
Kepala Tukang batu org 0.1500 132,000.00 19,800.00 -
Mandor org 0.1000 158,000.00 15,800.00 -
Jumlah 819,500.00 327,150.00 1,146,650.00
Keuntungan Maksimal 10 % 114,665.00
Jumlah 1,261,315.00
Dibulatkan 1,261,315.00
1 2 3 4 5 6 7 8
53 PAS. 1 BUAH BAK MANDI FIBERGLASS KAP 0,30 M3 ( SK SNI Edisi Rev. 2003 )
Bak Fiberglass bh 1.0000 350,000.00 350,000.00 - -
Perlengkapan ( 18% x Harga Bak ) Ls 1.0000 63,000.00 63,000.00
Pekerja org 1.8000 104,000.00 187,200.00 -
Tukang batu org 2.7000 115,000.00 310,500.00 -
Kepala Tukang batu org 0.5400 132,000.00 71,280.00 -
Mandor org 0.1100 158,000.00 17,380.00 -
Jumlah 413,000.00 586,360.00 999,360.00
Keuntungan Maksimal 10 % 99,936.00
Jumlah 1,099,296.00
Dibulatkan 1,099,296.00
54 PAS. 1 M' PIPA PVC TYPE AW, DIA 1/2" ( SK SNI Edisi Rev. 2003 )
Pipa PVC 1/2 " type AW m' 1.2000 7,125.00 8,550.00 - -
Perlengkapan ( 35% x Harga Pipa ) Ls 1.0000 2,493.75 2,493.75
Pekerja org 0.0360 104,000.00 3,744.00 -
Tukang pipa org 0.0600 115,000.00 6,900.00 -
Kepala Tukang pipa org 0.0060 132,000.00 792.00 -
Mandor org 0.0018 158,000.00 284.40 -
Jumlah 11,043.75 11,720.40 22,764.15
Keuntungan Maksimal 10 % 2,276.42
Jumlah 25,040.57
Dibulatkan 25,040.00
55 PAS. 1 M' PIPA PVC TYPE AW, DIA 3/4" ( SK SNI Edisi Rev. 2003 )
Pipa PVC 3/4 " type AW m' 1.2000 8,625.00 10,350.00 - -
Perlengkapan ( 35% x Harga Pipa ) Ls 1.0000 3,018.75 3,018.75
Pekerja org 0.0360 104,000.00 3,744.00 -
Tukang pipa org 0.0600 115,000.00 6,900.00 -
Kepala Tukang pipa org 0.0060 132,000.00 792.00 -
Mandor org 0.0018 158,000.00 284.40 -
Jumlah 13,368.75 11,720.40 25,089.15
Keuntungan Maksimal 10 % 2,508.92
Jumlah 27,598.07
Dibulatkan 27,598.00
56 PAS. 1 M' PIPA PVC TYPE AW, DIA 2 1/2" ( SK SNI Edisi Rev. 2003 )
Pipa PVC 2 1/2 " type AW m' 1.2000 36,875.00 44,250.00 - -
Perlengkapan ( 35% x Harga Pipa ) Ls 1.0000 12,906.25 12,906.25
Pekerja org 0.0540 104,000.00 5,616.00 -
Tukang pipa org 0.0900 115,000.00 10,350.00 -
Kepala Tukang pipa org 0.0090 132,000.00 1,188.00 -
Mandor org 0.0027 158,000.00 426.60 -
Jumlah 57,156.25 17,580.60 74,736.85
Keuntungan Maksimal 10 % 7,473.69
Jumlah 82,210.54
Dibulatkan 82,210.00
57 PAS. 1 M' PIPA PVC TYPE AW, DIA 4" ( SK SNI Edisi Rev. 2003 )
Pipa PVC 4 " type AW m' 1.2000 77,500.00 93,000.00 - -
Perlengkapan ( 35% x Harga Pipa ) Ls 1.0000 27,125.00 27,125.00
Pekerja org 0.0810 104,000.00 8,424.00 -
Tukang pipa org 0.1350 115,000.00 15,525.00 -
Kepala Tukang pipa org 0.0135 132,000.00 1,782.00 -
Mandor org 0.0041 158,000.00 647.80 -
Jumlah 120,125.00 26,378.80 146,503.80
Keuntungan Maksimal 10 % 14,650.38
Jumlah 161,154.18
Dibulatkan 161,154.00
58 PAS. 1 BUAH BAK CUCI PIRING STAINLESS STEEL STANDARD 1 LUBANG ( SK SNI Edisi Rev. 2003 )
Bak Cuci Stainless Steel BH 1.0000 285,000.00 285,000.00 - -
Water drain + Assesories ( 12 % harga bak cuci ) Ls 1.0000 34,200.00 34,200.00
Pekerja org 0.0300 104,000.00 3,120.00 -
Tukang batu org 0.3000 115,000.00 34,500.00 -
Kepala Tukang batu org 0.0300 132,000.00 3,960.00 -
Mandor org 0.0015 158,000.00 237.00 -
Jumlah 319,200.00 41,817.00 361,017.00
Keuntungan Maksimal 10 % 36,101.70
Jumlah 397,118.70
Dibulatkan 397,118.00
1 2 3 4 5 6 7 8
59 PAS. 1 BH KRAN TEMBOK LOKAL DIA 1/2" ATAU 3/4" ( SK SNI Edisi Rev. 2003 )
Kran Air SEN EI bh 1.0000 65,000.00 65,000.00 - -
Seal Tape bh 0.0250 3,500.00 87.50
Pekerja org 0.0100 104,000.00 1,040.00 -
Tukang pipa org 0.1000 115,000.00 11,500.00 -
Kepala Tukang pipa org 0.0100 132,000.00 1,320.00 -
Mandor org 0.0050 158,000.00 790.00 -
Jumlah 65,087.50 14,650.00 79,737.50
Keuntungan Maksimal 10 % 7,973.75
Jumlah 87,711.25
Dibulatkan 87,711.00
60 PAS. 1 BH KRAN TEMBOK HOT & COOL LOKAL DIA 1/2" ATAU 3/4" ( SK SNI Edisi Rev. 2003 )
Kran Air HOT AND COOL bh 1.0000 325,000.00 325,000.00 - -
Seal Tape bh 0.0250 3,500.00 87.50
Pekerja org 0.0100 104,000.00 1,040.00 -
Tukang pipa org 0.1000 115,000.00 11,500.00 -
Kepala Tukang pipa org 0.0100 132,000.00 1,320.00 -
Mandor org 0.0050 158,000.00 790.00 -
Jumlah 325,087.50 14,650.00 339,737.50
Keuntungan Maksimal 10 % 33,973.75
Jumlah 373,711.25
Dibulatkan 373,711.00
61 PAS. 1 BH FLOOR DRAIN ( SK SNI Edisi Rev. 2003 )
Floor drain bh 1.0000 160,000.00 160,000.00 - -
Pekerja org 0.0100 104,000.00 1,040.00 -
Tukang pipa org 0.1000 115,000.00 11,500.00 -
Kepala Tukang pipa org 0.0100 132,000.00 1,320.00 -
Mandor org 0.0050 158,000.00 790.00 -
Jumlah 160,000.00 14,650.00 174,650.00
Keuntungan Maksimal 10 % 17,465.00
Jumlah 192,115.00
Dibulatkan 192,115.00
62 PAS. 1 BH JETWASHER ( SK SNI Edisi Rev. 2003 )
Jet washer bh 1.0000 155,000.00 155,000.00 - -
Pekerja org 0.0100 104,000.00 1,040.00 -
Tukang pipa org 0.1000 115,000.00 11,500.00 -
Kepala Tukang pipa org 0.0100 132,000.00 1,320.00 -
Mandor org 0.0050 158,000.00 790.00 -
Jumlah 155,000.00 14,650.00 169,650.00
Keuntungan Maksimal 10 % 16,965.00
Jumlah 186,615.00
Dibulatkan 186,615.00
63 1 M2 PEK. WATERPROOFING
Waterprofing emulsion kg 0.1000 40,000.00 4,000.00 - -
Kuas kg 0.0100 25,000.00 250.00
Pekerja org 0.0200 104,000.00 2,080.00 -
Tukang cat org 0.2000 115,000.00 23,000.00 -
Kepala Tukang cat org 0.0200 132,000.00 2,640.00 -
Mandor org 0.0100 158,000.00 1,580.00 -
Jumlah 4,250.00 29,300.00 33,550.00
Keuntungan Maksimal 10 % 3,355.00
Jumlah 36,905.00
Dibulatkan 36,905.00
64 1 M' PAS. SALURAN GREVEL 1/2 DIA 20 CM + PASANGAN
Galian tanah m3 0.1680 47,920.00 8,050.56 - -
Urugan Pasir m3 0.0182 134,780.00 2,453.00
Grevel beton 1/2 dia 20 cm m1 1.0000 35,000.00 35,000.00
Pasangan bata 1 pc : 5 ps m2 0.7000 100,700.00 70,490.00
Plesteran 1 pc : 5 ps m2 0.8000 47,910.00 38,328.00
Jumlah 154,321.56 - 154,321.56
Keuntungan Maksimal 10 % 15,432.16
Jumlah 169,753.71
Dibulatkan 169,700.00
65
1 1 M2 PAS. PAVING BLOCK 2 NATURAL, T= 6 CM3 4 5 6 7 8
65 1 BH PAS. MCB 1 PHASE
MCB 1 Phase + Box BH 1.0000 155,000.00 155,000.00 - -
Jumlah 155,000.00 - 155,000.00
Keuntungan Maksimal 10 % 15,500.00
Jumlah 170,500.00
Dibulatkan 170,500.00
66 1 BH PAS. MCB 3 PHASE
MCB 3 Phase + Box BH 1.0000 259,000.00 259,000.00 - -
Jumlah 259,000.00 - 259,000.00
Keuntungan Maksimal 10 % 25,900.00
Jumlah 284,900.00
Dibulatkan 284,900.00
67 INSTALASI TITIK LAMPU / STOP KONTAK
Instalasi titik lampu / Stop kontak TITIK 1.0000 150,000.00 150,000.00 - -
Jumlah 150,000.00 - 150,000.00
Keuntungan Maksimal 10 % 15,000.00
Jumlah 165,000.00
Dibulatkan 165,000.00
68 1 BH SAKLAR TUNGGAL
Saklar tunggal bh 1.0000 20,000.00 20,000.00 - -
Jumlah 20,000.00 - 20,000.00
Keuntungan Maksimal 10 % 2,000.00
Jumlah 22,000.00
Dibulatkan 22,000.00
69 1 BH SAKLAR DOBLE
Saklar seri bh 1.0000 24,000.00 24,000.00 - -
Jumlah 24,000.00 - 24,000.00
Keuntungan Maksimal 10 % 2,400.00
Jumlah 26,400.00
Dibulatkan 26,400.00
70 1 BH STOP KONTAK
Stop kontak bh 1.0000 20,000.00 20,000.00 - -
Jumlah 20,000.00 - 20,000.00
Keuntungan Maksimal 10 % 2,000.00
Jumlah 22,000.00
Dibulatkan 22,000.00
71 1 BH LAMPU LED 10 WATT
Lampu led 10 watt PHILLIPS bh 1.0000 64,000.00 64,000.00 - -
Jumlah 64,000.00 - 64,000.00
Keuntungan Maksimal 10 % 6,400.00
Jumlah 70,400.00
Dibulatkan 70,400.00
72 1 BH PAS WATER TANK KAP. 500 LTR
Water Tank Kap. 500 ltr PENGUIN bh 1.0000 1,500,000.00 1,500,000.00 - -
Jumlah 1,500,000.00 - 1,500,000.00
Keuntungan Maksimal 10 % 150,000.00
Jumlah 1,650,000.00
Dibulatkan 1,650,000.00
73 1 UNIT POMPA AIR 125 WATT
Pompaair 125 watt merk unit 1.0000 475,000.00 475,000.00 - -
Jumlah 475,000.00 - 475,000.00
Keuntungan Maksimal 10 % 47,500.00
Jumlah 522,500.00
Dibulatkan 522,500.00
74 1 UNIT TOWER AIR DARI BESI SIKU 50.50.5 + PONDASI, TINGGI 3 M'
Tower air dri besi siku 50.50.5 + Pondasi terpasa unit 1.0000 1,000,000.00 1,000,000.00 - -
Jumlah 1,000,000.00 - 1,000,000.00
Keuntungan Maksimal 10 % 100,000.00
Jumlah 1,100,000.00
Dibulatkan 1,100,000.00
75 1 M3 PEK. BONGKARAN DINDING BATA ( analisa BOW )
( Bongkaran tidak dipakai lagi )
Pekerja org 1.0000 104,000.00 104,000.00 -
Mandor org 0.0500 158,000.00 7,900.00 -
Jumlah - 111,900.00 111,900.00
Keuntungan Maksimal 10 % 11,190.00
Jumlah 123,090.00
Dibulatkan 123,000.00
1 2 3 4 5 6 7 8
76 1 M1 PAS. LIST GYPSUMP C7
List Plafond C 7 m1 0.3333 10,000.00 3,333.33 - -
Paku Gypsump kg 0.1100 17,250.00 1,897.50
Pekerja oh 0.1000 104,000.00 10,400.00
Tukang kayu oh 0.0500 115,000.00 5,750.00
Kepala Tukang kayu oh 0.0050 132,000.00 660.00
Mandor oh 0.0050 158,000.00 790.00
Jumlah 5,230.83 17,600.00 22,830.83
Keuntungan Maksimal 10 % 2,283.08
Jumlah 25,113.92
Dibulatkan 25,113.00
77 PAS. 1 BUAH CLOSET JONGKOK INA
Kloset Jongkok Porselen Toto polos bh 1.0000 275,000.00 275,000.00 - -
Semen Portland kg 6.0000 1,000.00 6,000.00 - -
Pasir pasang m3 0.0100 90,000.00 900.00 - -
Pekerja org 1.2000 104,000.00 124,800.00 -
Tukang batu org 1.2500 115,000.00 143,750.00 -
Jumlah 281,900.00 268,550.00 550,450.00
Keuntungan Maksimal 10 % 55,045.00
Jumlah 605,495.00
Dibulatkan 605,495.00
78 1 m1 Pasang hospital Plint keramik ,
Bahan:
Hospital plint 10 x 40, warna polos Mulya BH 2.6000 35,000.00 91,000.00 -
Semen Tiga Roda kg 0.8100 1,000.00 810.00 -
Semen putih kg 0.1620 1,500.00 243.00 -
Tenaga:
Pekerja Oh 0.0682 104,000.00 - 7,092.80
Tukang batu Oh 0.0550 115,000.00 - 6,325.00
Kepala Tukang batu Oh 0.0055 132,000.00 - 726.00
Mandor Oh 0.0003 158,000.00 - 47.40
Jumlah 92,053.00 14,191.20 106,244.20
Keuntungan dan Over Head 10,624.42
Jumlah 116,868.62
Dibulatkan 116,868.00
79 1 m² Acian PC SNI 2837:2008 No.6.27
Bahan:
Semen PC 50 kg kg 3.2500 1,000.00 3,250.00 -
Tenaga:
Pekerja OH 0.2000 104,000.00 - 20,800.00
Tukang Batu OH 0.1000 115,000.00 - 11,500.00
Kepala Tukang OH 0.0100 132,000.00 - 1,320.00
Mandor OH 0.0100 158,000.00 - 1,580.00
Jumlah 3,250.00 35,200.00 38,450.00
Keuntungan dan Over Head 3,845.00
Jumlah 42,295.00
Dibulatkan 42,295.00
80 1 m² Plesteran Kamprot/Ciprat halus ( 1 PC ; 2 PSR )
Bahan:
Semen PC 50 kg kg 0.0864 1,000.00 86.40 -
Pasir Pasang m3 0.0060 90,000.00 540.00 -
Tenaga:
Pekerja OH 0.2500 104,000.00 - 26,000.00
Tukang Batu OH 0.1000 115,000.00 - 11,500.00
Jumlah 626.40 37,500.00 38,126.40
Keuntungan dan Over Head 3,812.64
Jumlah 41,939.04
Dibulatkan 41,939.00
81 1 m¹ Plesteran Profilan Ban-Nan h = 10 cm
Bahan:
Semen PC 50 kg kg 0.4320 1,000.00 432.00 -
Pasir Pasang m3 0.0022 90,000.00 198.00 -
Tenaga:
Pekerja OH 0.1100 104,000.00 - 11,440.00
Tukang Batu OH 0.0800 115,000.00 - 9,200.00
Kepala Tukang OH 0.0150 132,000.00 - 1,980.00
Jumlah 630.00 22,620.00 23,250.00
Keuntungan dan Over Head 2,325.00
Jumlah 25,575.00
Dibulatkan 25,575.00
1 2 3 4 5 6 7 8
82 1 m2 Plafon UPVC t=12mm
Plafon UPVC AlEX Excel M2 1.0000 23,000.00 23,000.00 - -
Paku upvc bh 5.0000 100.00 500.00
Ongkos pasang LOT 1.0000 2,300.00 2,300.00
Jumlah 25,800.00 - 25,800.00
Keuntungan Maksimal 10 % 2,580.00
Jumlah 28,380.00
Dibulatkan 28,300.00
83 1 m3 Buang tanah galian sejauh 15 m Analisa harga satuan SNI 2835:2008 No.6.8
Pekerja M2 0.3330 104,000.00 34,632.00 - -
Mandor bh 0.0100 158,000.00 1,580.00
Jumlah 36,212.00 - 36,212.00
Keuntungan Maksimal 10 % 3,621.20
Jumlah 39,833.20
Dibulatkan 39,800.00
84 1 Unit Pas Biofil BF 04
Galian tanah M3 1.0000 69,212.00 69,212.00 - -
Pasir Urug T = 5 cm M3 0.1880 1,084,402.00 203,867.58
Biofil BF 04 BH 1.0000 3,500,000.00 3,500,000.00
Socket T PVC 4 " BH 2.0000 25,000.00 50,000.00
Socket PVC 1 1/2 " BH 0.8000 25,000.00 20,000.00
Galian tanah untuk rembesan M3 5.0000 69,212.00 346,060.00
Pas. Ijuk KG 25.0000 53,000.00 1,325,000.00
Urugan kerikil 3/5 cm M2 1.4000 16,500.00 23,100.00
Pipa PVC 4 " berlobang jenis ( D ) LS 1.0000 77,500.00 77,500.00
Jumlah 5,614,739.58 - 5,614,739.58
Keuntungan Maksimal 10 % 561,473.96
Jumlah 6,176,213.53
Dibulatkan 6,176,200.00
85 1 M3 PLAT Dekker t = 15 cm
Beton K 175 m3 1.00 754,365.00 754,365.00
Besi Beton Kg 200.00 9,382.80 1,876,560.00
Bekisting ( Dipakai Min 2 kali ) m2 6.67 139,872.00 932,480.00
Jumlah 3,563,405.00
Dibulatkan 3,563,400.00
Keuntungan Maksimal 10 % 356,340.00
Jumlah 3,919,740.00
Dibulatkan 3,919,700.00
86 1 m' Pasang list PVC
Bahan:
List pvc btg 0.2500 15,000.00 3,750.00 - -
baut bh 2.0000 100.00 200.00
Tenaga:
Upah pasang ls 1.0000 1,875.00 - 1,875.00
Jumlah 3,950.00 1,875.00 5,825.00
Keuntungan dan Over Head 582.50
Jumlah 6,407.50
Dibulatkan 6,407.00
87 Pas Waterheater dan gas melon
Bahan:
waterheater Rinnai CFC 5 LT BH 1.0000 1,500,000.00 1,500,000.00 - -
Gas LNG melon BH 1.0000 100,000.00 100,000.00
Ongkos pasang LOT 1.0000 30,000.00 30,000.00
Jumlah 1,630,000.00 - 1,630,000.00
Keuntungan dan Over Head 163,000.00
Jumlah 1,793,000.00
Dibulatkan 1,793,000.00
88 1 M2 MEMASANG ATAP onduline
Atap bitumen Onduline 200 x 95cm m2 0.6500 75,000.00 48,750.00 - -
Paku onduline bh 9.1000 1,200.00 10,920.00
Pekerja org 0.1400 104,000.00 14,560.00
Tukang besi profil / baja org 0.0700 115,000.00 8,050.00
Kepala Tukang besi profil / baja org 0.0700 132,000.00 9,240.00
Mandor org 0.0070 158,000.00 1,106.00
Jumlah 59,670.00 32,956.00 92,626.00
Keuntungan Maksimal 10 % 9,262.60
Jumlah 101,888.60
Dibulatkan 101,888.00
1 2 3 4 5 6 7 8
89 1 M1 Nok standar onduline RED
bubung bitumen Onduline bh 1.1500 85,000.00 97,750.00 - -
Paku onduline bh 10.0000 1,200.00 12,000.00
Pekerja org 0.0840 104,000.00 8,736.00
Tukang besi profil / baja org 0.1250 115,000.00 14,375.00
Kepala Tukang besi profil / baja org 0.0130 132,000.00 1,716.00
Mandor org 0.0040 158,000.00 632.00
Jumlah 109,750.00 25,459.00 135,209.00
Keuntungan Maksimal 10 % 13,520.90
Jumlah 148,729.90
Dibulatkan 148,729.00
90 1 M2 Pas. Sticker Sunblast
Sticker Sunblast m2 1.2500 65,000.00 81,250.00 - -
Alat bantu ls 1.0000 4,333.33 4,333.33
Pekerja org 0.0840 104,000.00 8,736.00
Tukang besi profil / baja org 0.1250 115,000.00 14,375.00
Kepala Tukang besi profil / baja org 0.0130 132,000.00 1,716.00
Mandor org 0.0040 158,000.00 632.00
Jumlah 85,583.33 25,459.00 111,042.33
Keuntungan Maksimal 10 % 11,104.23
Jumlah 122,146.57
Dibulatkan 122,146.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH

NO. JENIS BAHAN BANGUNAN / UPAH KERJA SAT. HARGA SATUAN


Rp.
1 2 3 4
A BAHAN AGREGAT KASAR & BAHAN PEREKAT
1 Tanah Urug m3 40,000.00
2 Tanah Urug dari luar lokasi m3 60,000.00
3 Abu batu m3 185,000.00
4 Pasir Urug m3 85,000.00
5 Pasir Pasang m3 90,000.00
6 Pasir beton m3 165,000.00
7 Pasir batu ( sirtu ) m3 95,000.00
8 Batu belah pondasi m3 100,000.00
9 Batu pecah mecin 1/2 m3 185,000.00
10 Batu pecah mecin 2/3 m3 175,000.00
11 Batu pecah mecin 3/5 m3 165,000.00
12 Batu pecah mecin 5/7 m3 155,000.00
13 Batu andesit m2 75,000.00
14 Batu Tempel Hitam m2 75,000.00
15 Batu apung m3 80,000.00
16 Semen Tiga Roda ( 50 kg ) tiga roda kg 1,000.00
17 Semen Putih ( 40 kg ) kg 1,500.00
18 Semen warna muda kg 10,000.00
19 Semen warna tua kg 10,000.00
20 Lem Kuning kg 57,700.00
21 Lem putih fox kg 45,000.00
22 Lem vinil kg 65,000.00
23 Readymix Beton K.300, tanpa pompa ( selang ) m3 860,000.00
24 Readymix Beton K.225, tanpa pompa ( selang ) m3 790,000.00
25 Readymix Beton K.175, tanpa pompa ( selang ) m3 750,000.00

B BAHAN PENUTUP DINDING


1 Bata merah bh 550.00
2 Bata Terawang/Rooster uk 20 x 20 bh 20,000.00
3 Ijuk ( 20 kg / m2 ) kg 53,000.00

C BAHAN LOGAM
1 Besi beton U-24, rata-rata uk. Dia 8 s/d 16 mm kg 7,100.00
2 Besi beton U-32, rata-rata uk. Dia 19 s/d 22 mm kg 7,500.00
3 Besi beton Ulir, rata-rata uk Dia 12 s/d 22 mm kg 7,500.00
4 Seng Plat BJLS 0.20. I = 55 cm ( 1 rol = 50 m' ) m' 47,500.00
5 Seng Plat BJLS 0.30. I = 55 cm ( 1 rol = 50 m' ) m' 55,000.00
6 Seng Plat BJLS 28 uk. 90 x 180 cm lbr 75,000.00
7 Seng Plat BJLS 30 uk. 90 x 180 cm lbr 85,000.00
8 Kawat beton kg 17,000.00
9 Plat Alumunium / Stainless t = 2 mm m2 61,000.00
10 Pintu PVC 70 x 195 bh 550,000.00
11 Paku 1cm s/d 3cm kg 20,000.00
12 Paku 4cm s/d 7cm kg 20,000.00
13 Paku 8cm s/d 12cm kg 25,000.00
14 Paku anti karat u/genteng metal ( 35.00 m2/kg ) kg 25,000.00
15 Paku Gipsump ( 20.00 m2 / kg ) kg 17,250.00
16 Besi Strip kg 14,950.00
17 Teralis besi di cat terpasang m2 350,000.00
18 Floor Hinge Solid bh 910,000.00
19 Kusen Alumunium 3" m1 105,000.00
20 Kusen alumunium warna =1.3 mm, uk. 4" m' 110,000.00
21 Spanrell alumunium m2 1,500.00
1 2 3 4
22 Silent kusen (1/2 cm) / silic Polyuretanon sealant m1 5,000.00
23 Gasket m1 Rp 2,125.00
24 Frame daun pintu + asesories warna m2 Rp 95,000.00
25 IWF
26 Frameexdaun
DN SIIjendela + asesories warna m2
kg Rp 95,000.00
27 Plat besi 6 s/d 10 mm kg 8,500.00
28 Hollow 40 x 40 bt 25,000.00
29 Hollow 20 x 20 bt 22,000.00
30 Skrup gysum kg 50,000.00

D BAHAN PENGUNCI / PENGGANTUNG DAN KACA


1 Engsel Pintu Union besar BH Rp 38,000.00
2 Engsel Jendela Union psg Rp 25,000.00
3 Grendel Jendela / Spring Knip bh Rp 15,000.00
4 Grendel Tanam Pintu Ganda ( Espagnolet ) psg Rp 55,000.00
5 Raambuncis 119 bh Rp 12,000.00
6 Kunci Pintu/ Lockset LOGO set Rp 60,000.00
7 Kunci Pintu 2 Slaag ROYAL ALUMI 775 DB Lock set 40mm BH Rp 35,000.00
8 Kunci KM bulat ALFA bh Rp 58,000.00
9 Tarikan Pintu Alumunium biasa bh Rp 50,000.00
10 Handle Pintu Stainles Steel P=80 cm unit Rp 165,000.00
11 Engsel Pintu Alumunium bh Rp 50,000.00
12 Engsel Pintu Alumunium tertanam psg Rp 550,000.00
13 Engsel Jendela casement andenberg 24" psg Rp 85,000.00
14 Hak angin sendok Stainless / kuningan bh Rp 40,000.00
15 Rel Maraton Lengkap bh Rp 582,000.00
16 Kaca polos 3 mm ( Asahi ) m2 90,000.00
17 Kaca polos 5 mm ( Asahi ) m2 105,000.00
18 Kaca Tempered 12 mm m2 550,000.00
19 Kaca Tempered 10 mm m2 450,000.00
20 Glass Block DN 20x20 (Kedawung) bh 45,000.00
21 Door Closer Kelas Standard / kelas baik unit 305,000.00
22 Kick Plate Arrow 200 * 800 mm SS bh 105,000.00
23 Sticker Sunblast m2 65,000.00

E BAHAN KAYU / KAYU LAPIS DAN PLAFOND


1 Kayu balok Albasia m3 Rp 1,300,000.00
2 Kayu papan Albasia m3 Rp 1,500,000.00
3 Kayu balok Borneo m3 Rp 4,000,000.00
4 Kayu papan Borneo, uk. 3/20 cm m3 Rp 5,000,000.00
5 Kayu kaso Borneo uk.5/7 - 4,00 m' m3 Rp 4,000,000.00
6 Dolken dia 7 s/d 10 cm btg Rp 17,000.00
7 Plywood/ Triplex 4 mm, uk. 1,20 x 2,40 lbr Rp 85,000.00
8 Plywood/ Multiplek 9 mm, uk. 1,20 x 2,40 lbr Rp 120,000.00
9 Plywood/ Multiplek 12 mm, uk. 1,20 x 2,40 lbr Rp 155,000.00
10 Gypsump Jayaboard, uk. 1,20 x 2,40, t = 9 mm lbr Rp 65,000.00
11 List Gypsump C7 m' Rp 10,000.00
12 Kalsiboard 3.5 mm lbr 67,500.00
13 Listplank Kalsiboard ( 8mm/ 20cm ) terpasang m1 24,800.00
14 Plafon PVC m2 23,000.00
15 Skrup pvc bh 100.00
16 List PVC btg 15,000.00

F BAHAN PENUTUP ATAP


1 atap twin lite terpasang m2 350,000.00
2 Rangka besi pipa medium 1 1/2" & tiang 3" terpasang m2
3 Rangka atap baja ringan m2 115,000.00
4 Self Drilling Screw bh 39,000.00
5 Paku onduline bh 1,200.00
6 Atap Onduvilla Lbr 50,000.00
7 Atap Onduline m2 75,000.00
8 Bubung / nok onduline m1 85,000.00
1 2 3 4
9 Genteng Palentong natural, ex Jatiwangi bh 2,500.00
1 2 3 4
10 Genteng bubung segitiga / bulat, natural bh 35,000.00
11 Atap Genteng Metal berpasir Rainbow Roof m2 77,000.00
12 Nok/ bubungan Atap Metal, nok Rainbow Roof m1 30,000.00
13 Paku genteng metal dus 39,000.00
14 Pipa Profil Hollow btg 41,500.00

G BAHAN PENUTUP LANTAI


1 Keramik Dinding 20 / 25, putih polos, Mulia m2 Rp 60,000.00
2 Keramik Lantai 40 x 40, Mulia m2 Rp 78,500.00
3 Keramik Lantai 20 x 20, Mulia m2 Rp 56,500.00
4 Granito tile uk. 60x60 cm Polish m2 80,000.00
5 Grevel dia 20 cm m1 35,000.00
6 Paving block natural, t = 6 cm m2 70,000.00
7 Hospital Plin bh 35,000.00

H BAHAN FINISHING
1 Cat dasar tembok kg Rp 16,500.00
2 Cat Tembok VINILEX kg Rp 16,500.00
3 Cat kayu / besi SEIV kg Rp 35,000.00
4 Meni kayu Bola mas kg Rp 35,000.00
5 Dempul Tembok ( plamuur ) Sanlex kg Rp 18,000.00
6 Dempul kayu jadi / plamuur cap kucing kg Rp 25,000.00
7 Kertas amplas kayu / tembok lbr Rp 4,900.00
8 Kape kayu bh Rp 9,000.00
9 Kape Tembok bh Rp 29,000.00
10 Kwas 3" - 4" bh Rp 25,000.00
11 Roll Cat bh Rp 15,000.00
12 Cat minyak ltr Rp 70,000.00
13 Cat dasar kayu kg 52,000.00
14 Water proofing Emulsion kg 40,000.00
15 Minyak bekisting Lt 10,500.00
16 Plint Coat ltr 40,000.00

I BAHAN PERPIPAAN
1 Pipa pralon PVC. ( AW ) dia 1/2 ", sekualitas Maspion (Abu-abu) btg 28,500.00
2 Pipa pralon PVC. ( AW ) dia 3/4 ", sekualitas Maspion (Abu-abu) btg 34,500.00
3 Pipa pralon PVC. ( AW ) dia 1 1/2 ", sekualitas Maspion (Abu-abu) btg 77,500.00
4 Pipa pralon PVC. ( AW ) dia 2 1/2", sekualitas Maspion (Abu-abu) btg 147,500.00
5 Pipa pralon PVC. ( AW ) dia 4 ", sekualitas Maspion (Abu-abu) btg 310,000.00
6 Pipa pralon PVC. ( D ) dia 4 ", sekualitas Maspion (Abu-abu) btg 185,000.00
7 Socket T pvc 4" bh 25,000.00
8 Socket T pvc 1 1/2" bh 25,000.00

J BAHAN / ALAT - ALAT SANITAIR


1 Kloset Duduk Porselen INA warna , standard bh 1,150,000.00
2 Kloset jONGKOK Porselen INA warna , standard bh 275,000.00
2 Bak mandi Fibre glass, uk. 60 x 60 cm bh 350,000.00
3 tanki air fiber glass 500 liter + radar + instalasi bh 1,500,000.00
4 Kran tembok lokal dia 1/2 " bh 65,000.00
5 Floor drain lokal Setara TOTO bh 160,000.00
6 Wastafel lengkap + cermin, ex INA type LW. 230 bh 750,000.00
7 Wastafel lengkap + kran bh 700,000.00
7 Kitchen zink stainless standard 1 lobang uk. 0,80 x 0,50 bh 285,000.00
8 Pas. Water heater gas + instalasi+tabung gas isi 3 kg unit 1,500,000.00
9 Kran air hot and cool bh 325,000.00
10 Jet washer unit 155,000.00
11 Railling stainless wc pipa 1" 1 m bh 800,000.00
12 Biofil BF 04 kap. 1m3 unit 3,500,000.00
13 Seal tape bh 3,500.00
1 2 3 4
K LAIN - LAIN
1 Exhouse fan H 145 W 45 x 45 cm unit Rp 249,000.00
2 Stop Kontak Broco Standard bh Rp 20,000.00
3 Saklar Broco Tunggal Standard bh Rp 20,000.00
4 Saklar Broco Seri Standard bh Rp 24,000.00
5 Saklar Broco Triple Standard bh Rp 27,000.00
6 Instalasi titik lampu/ stop kontak titik Rp 150,000.00
7 Lampu SL Phillips 25w bh Rp 62,000.00
8 Lampu Essential Phillips 20w bh Rp 23,000.00
9 Lampu Pijar 25 w bh Rp 7,400.00
10 LampuPANEL LED 10 WATT bh Rp 64,000.00
11 Lampu Neon TL Phillips 20 w bh Rp 62,500.00
12 Lampu Neon TL Phillips 40 w bh Rp 69,500.00
13 Trapo TL 20 w Philips bh Rp 40,000.00
14 Trapo TL 40 w Philips bh Rp 61,000.00
15 Rumah TL inbow/ outbow 2 x 20 w bh Rp 150,000.00
16 Down Light + SL 25 w Phillips bh Rp 198,500.00
17 MCB 1 Phase + Box bh Rp 155,000.00
18 MCB 3 Phase + Box bh Rp 259,000.00
19 BP Daya Listrik 7700 VA unit Rp 9,200,000.00
20 BP Daya Listrik 10500 VA unit Rp 13,000,000.00
21 Tower air dari besi siku 50.50.5 + Pondasi, tinggi 8 m terpasang unit Rp 1,500,000.00
22 Tower air dari besi siku 50.50.5 + Pondasi, tinggi 3 m terpasang unit Rp 1,000,000.00
23 Pompa air 125 watt unit 475,000.00
24 Gas melon isi 3 kg bh 100,000.00

K UPAH KERJA
1 Pekerja oh 104,000.00
2 Tk. Batu oh 115,000.00
3 Kepala Tukang Batu oh 132,000.00
4 Tk. Kayu oh 115,000.00
5 Kepala Tukang Kayu oh 132,000.00
6 Tk. Besi Profil / tk.Las oh 115,000.00
7 Kepala Tukang Besi Profil / Las oh 132,000.00
8 Tk. Besi beton oh 115,000.00
9 Kepala Tukang Besi beton oh 132,000.00
10 Tk. Cat oh 115,000.00
11 Kepala Tukang cat oh 132,000.00
12 Tukang Gali oh 115,000.00
13 Kepala Tukang Gali oh 132,000.00
14 Tukang Pipa oh 115,000.00
15 Kepala Tukang Pipa oh 132,000.00
16 Mandor oh 158,000.00
17 Operator alat berat oh 158,000.00
18 Pembantu operator oh 132,000.00
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

PEKERJAAN : PEMBANGUNAN PONED RANCAEKEK


TAHUN ANGGARAN 2018
LOKASI : JL. RAYA RANCAEKEK MAJALAYA - KABUPATEN BANDUNG

HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.

I PEKERJAAN PERSIAPAN
1 Pengukuran kembali site & Pas. Bouwplank 28.5000 M1 58,201.00
2 Pek. Papan Nama Proyek 1.0000 LS 300,000.00
3 Biaya Adm & Dokumentasi 1.0000 LS 600,000.00
4 Air dan listrik kerja 1.0000 LS 750,000.00
JUMLAH
II PEKERJAAN BONGKARAN
1 Bongkaran Atap Genteng metal 1.0000 ls 500,000.00
2 Bongkaran Rangka Atap baja ringan 1.0000 ls 500,000.00
3 Bongkaran Kuda kuda baja ringan 1.0000 ls 750,000.00
4 Bongkaran Plafond 1.0000 ls 500,000.00
5 Bongkaran kusen/pintu/jendela existing 1.0000 ls 750,000.00
6 Bongkaran Dinding 1.0000 ls 750,000.00
JUMLAH
III PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah pondasi Setempat dan Menerus 15.0840 M3 69,212.00
2 Urugan Tanah kembali bekas galian 5.0230 M3 25,267.00
3 Peninggian & Pemadatan Tanah utk bangunan, tanah dr luar lokas 87.5000 M3 111,361.00
4 Urugan pasir bawah Pondasi menerus 1.2570 M3 Err:509
5 Pas. Pondasi Batu Kali 1 PC: 5 PS 12.9890 M3 625,856.00
JUMLAH
IV PEKERJAAN BETON
1 Pas. Sloof Beton S1 15 / 20 ( 4D10 + dia 8 - 20 ) K 175 1.1983 M3 4,058,273.00
2 Pas. Kolom K1 15/20( 4 dia12, dia 8 - 20 ) K 175 0.8880 M3 4,794,097.00
3 Pas. Beton Meja Dapur dan ruang alat t 10 cm 0.1800 M3 4,058,273.00
4 Pas. Kolom K3 20/20 ( 4 dia12 dia 8 - 20 ) K 175 0.7200 M3 4,887,259.00
5 Pas. Kolom Beton Praktis KP12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 0.5184 M3 4,794,097.00
6 Pas. Kolom Beton Praktis KP2 12/12 ( 4 dia 10 + dia 8 - 20 )K 175 0.3643 M3 4,794,097.00
7 Pas. Balok Lintel 12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 0.3168 M3 4,794,097.00
8 Pas. Ring Balok RB1 15/20 ( 4 dia 10 + dia 8 - 20 ) K 175 3.3402 M3 4,552,393.00
9 Pas. Ring Balok RB2 ELEV +5.6 15/15 ( 4 dia 10 + dia 8 - 20 ) 0.9797 M3 4,794,097.00
10 Pas. Ring Balok B 15/25 ( 4 dia 12 + dia 8 - 20 ) K 175 0.6192 M3 4,672,641.00
11 Pas. Beton Listplank 7/60 ( 3D10 + dia 8 - 20 ) 1.5624 M3 #NAME?
12 Pas. Plat Dek beton, T = 10 cm ( dia 8 - 15 ) K 175 3.2830 M3 2,530,008.00
JUMLAH
V PEKERJAAN DINDING
1 Pas. Bata merah bata 1Pc : 5 Ps 281.0000 M2 110,770.00
2 Pek. Plesteran 1 Pc : 5 Ps ; tebal 15 mm 621.0000 M2 52,701.00
3 Pek. Acian Dinding dan Beton 623.0000 M2 42,295.00
4 Pek Ban banan t=10 cm 52.6500 m1 25,575.00
5 Pek. Kamprot halus coating hitam 59.5000 m2 41,939.00
6 Pas hospital plint Mulya 19.8900 m1 116,868.00
7 Pek. Dinding Keramik putih utk KM/WC/KIA/meja 20/25 Mulia 97.8000 M2 202,048.00
JUMLAH

VI PEKERJAAN ATAP
1 Pas. Rangka Atap Baja Ringan C t=0,75 mm SNI 162.8121 M2 126,500.00
2 Pas. Atap UPVC ex Excel t=12 mm 169.3246 M2 28,300.00
3 Pas. Bubung Atap UPVC ex Excel 4.0000 m1 175,000.00
4 Pas.Talang Hujan Zingkalum dia 30 cm 15.3000 M1 96,492.00
JUMLAH
VII PEKERJAAN LANTAI
1 Urugan pasir bawah Lantai T = 5cm 8.7000 M3 148,258.00
2 Pas. Lantai Keramik Uk.40/40 Mulia 173.1000 m2 225,841.00
3 Pas. Lantai Keramik non slip untuk KM/WC Mulia 20/20 cm 10.9900 M2 206,800.00
4 Pas. Adukan beton Tumbuk / Rabat T = 5 cm 1 Pc : 3 Ps : 5 Kr 1.4900 M3 754,365.00
JUMLAH
VIII PEKERJAAN KUSEN
HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.
1 Pas. Pintu Kaca Tempered Type - PE Alexindo 1.0000 UNIT 20,009,705.00
2 Pas. Kusen Alumunium 3" warna + Pintu Type P1 Alexindo 5.0000 UNIT 1,629,541.00
3 Pas. Kusen Alumunium 3" warna + Pintu Type P2 2.0000 UNIT 2,093,268.00
4 Pas. Kusen Alumunium 3" warna + Pintu Type PG Geser 1.0000 UNIT 1,754,101.00
5 Pas. Kusen Alumunium 3" warna + Pintu Type P3 WC spanrell 6.0000 UNIT 1,029,675.00
6 Pas. Kusen Alumunium + Jendela Type PJ1 Alexindo 1.0000 UNIT 1,974,115.00
7 Pas. Kusen Alumunium + Jendela Type JL 1.0000 UNIT 1,855,865.00
8 Pas. Kusen Alumunium Type BV1 11.0000 UNIT 344,136.00
9 Pas. Kusen Alumunium Type BV2 1.0000 UNIT 563,325.00
10 Pas. Kusen Alumunium + Jendela Type BV3 4.0000 UNIT 991,886.00
11 Pas. Stiker Sanblas 11.5000 m2 85,000.00
JUMLAH
IX PEKERJAAN PLAFOND
1 Pas. Rangka langit-langit Rangka Hollow zincalum 155.1300 M2 40,452.00
2 Pas. Langit-langit PVC plapon polos 155.1300 M2 28,300.00
5 Pas. List PVC 172.8000 M1 6,407.00
JUMLAH
X PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok baru VINILEX 245.0000 M2 33,305.00
2 Pengecatan bidang tembok lama VINILEX 352.0000 M2 33,305.00
JUMLAH
XI PEKERJAAN SANITASI
1 Pas. Floordrain lokal Stainless 6.0000 BH 192,115.00
2 Pas. Kloset Jongkok Porselen Standard lengkap putih INA 3.0000 BH 605,495.00
3 Pas. Kloset Duduk Porselen Standard lengkap putih INA 3.0000 bh 1,822,348.00
4 Pas. Kran stainless, dia 1/2" SAN-EIY 50JRNL 6.0000 BH 87,711.00
5 Pas. Bak cuci piring Stainless Steel Standard 1 Lubang + kran 1.0000 BH 397,118.00
6 Pas pegangan tangan kamar mandi 6.0000 BH 125,000.00
7 Pas. Wastafel lengkap + cermin Type LW 230 TOTO 4.0000 BH 1,020,519.00
8 Pek. Instalasi air bersih 1.0000 ls 950,000.00
9 Pek. Instalasi air kotor 1.0000 ls 750,000.00
JUMLAH
XII PEKERJAAN LISTRIK
1 Pas. MCB 1.0000 BH #NAME?
2 Pek. Instalasi Titik Lampu 20.0000 TTK #NAME?
3 Pek. Instalasi Stop Kontak 14.0000 TTK #NAME?
4 Pas. Lampu LED Panel inbow Kotak 15 WATT PHILIPS 10.0000 BH 165,000.00
5 Pas. Lampu LED bulb 10.5 watt PHILLIPS 10.0000 BH 70,400.00
6 Pas. Saklar tunggal BROCO 8.0000 BH 31,000.00
7 Pas Stop kontak BROCO 14.0000 TTK 35,000.00
8 Pas. Saklar double "BROCO" 7.0000 BH 35,000.00
JUMLAH
XIII PEKERJAAN LAIN-LAIN
1 Pek waterprooping dak beton 34.4800 m2 36,905.00
2 Pas exausfan ex Panasonic 1.0000 bh 300,000.00
3 Pas biofill BF 04 terpasang 1.0000 unit 6,176,200.00
4 Pas besi hollow ornamen finishing cat 7.3500 M2 440,000.00
5 Pas water heater dan gas melon 3 KG terpasang Rinnai 5 cfc 1.0000 unit 1,793,000.00
6 Pas canopy atap UPVC 15.7700 M2 300,000.00
7 Pas. Hurup Timbul Galvanil Putih" PONED" T=60 cm 1.0000 LS 3,100,000.00
8 Pembersihan bekas pekerjaan 1.0000 LS 200,000.00
JUMLAH
HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.

REKAPITULASI
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )
PEKERJAAN : PEMBANGUNAN PONED RANCAEKEK
TAHUN ANGGARAN 2018
LOKASI : JL. RAYA RANCAEKEK MAJALAYA - KABUPATEN BANDUNG

NO URAIAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN BONGKARAN

III PEKERJAAN TANAH DAN PONDASI

IV PEKERJAAN BETON

V PEKERJAAN DINDING

VI PEKERJAAN ATAP

VII PEKERJAAN LANTAI

VIII PEKERJAAN KUSEN

IX PEKERJAAN PLAFOND

X PEKERJAAN PENGECATAN

XI PEKERJAAN SANITASI

XII PEKERJAAN LISTRIK

XIII PEKERJAAN LAIN-LAIN

REAL COST

PPN 10 %

JUMLAH
TOTAL (DIBULATKAN)

Terbilang :
Lima Ratus Juta Rupiah

Maret 2018
CV KARYA NIAGARA KONSUL

ASEP MULYANA SIDIK


DIREKTUR
ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

JUMLAH
Rp.

1,658,728.50
300,000.00
600,000.00
750,000.00
3,308,728.50
###
500,000.00
500,000.00
750,000.00
500,000.00
750,000.00
750,000.00
3,750,000.00
###
1,043,993.81
126,915.43
9,744,087.50
Err:509
8,129,243.58
Err:509
###
4,863,190.87
4,257,158.14
730,489.14
3,518,826.48
2,485,259.88
1,746,585.42
1,518,769.93
15,205,903.10
4,696,537.13
2,893,299.31
#NAME?
8,306,016.26
#NAME?
###
31,126,370.00
32,727,321.00
26,349,785.00
1,346,523.75
2,495,370.50
2,324,504.52
19,760,294.40
116,130,169.17

20,595,730.65
4,791,885.73
700,000.00
1,476,327.60
27,563,943.98
###
1,289,844.60
39,093,077.10
2,272,732.00
1,124,003.85
43,779,657.55
###
JUMLAH
Rp.
20,009,705.00
8,147,705.00
4,186,536.00
1,754,101.00
6,178,050.00
1,974,115.00
1,855,865.00
3,785,496.00
563,325.00
3,967,544.00
977,500.00
53,399,942.00
###
6,275,318.76
4,390,179.00
1,107,129.60
11,772,627.36
###
8,159,725.00
11,723,360.00
19,883,085.00

1,152,690.00
1,816,485.00
5,467,044.00
526,266.00
397,118.00
750,000.00
4,082,076.00
950,000.00
750,000.00
15,891,679.00

#NAME?
#NAME?
#NAME?
1,650,000.00
704,000.00
248,000.00
490,000.00
245,000.00
#NAME?

1,272,484.40
300,000.00
6,176,200.00
3,234,000.00
1,793,000.00
4,731,000.00
3,100,000.00
200,000.00
20,806,684.40
JUMLAH
Rp.

REKAPITULASI

JUMLAH
Rp.

3,308,728.50

3,750,000.00

Err:509

#NAME?

116,130,169.17

27,563,943.98

43,779,657.55

53,399,942.00

11,772,627.36

19,883,085.00

15,891,679.00

#NAME?

20,806,684.40

#NAME?

#NAME?

#NAME?
500,000,000.00

Lima Ratus Juta Rupiah

Maret 2018
CV KARYA NIAGARA KONSULTAN

ASEP MULYANA SIDIK


DIREKTUR
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

PEKERJAAN : PEMBANGUNAN POSKESDES PANGGUH


TAHUN ANGGARAN 2018
LOKASI : DESA PANGGUH KEC IBUN KABUPATEN BANDUNG

HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.

I PEKERJAAN PERSIAPAN
1 Pengukuran kembali site & Pas. Bouwplank 46.3900 M1 58,201.00
2 Pek. Papan Nama Proyek 1.0000 LS 250,000.00
3 Biaya Adm & Dokumentasi 1.0000 LS 500,000.00
4 Air dan listrik kerja 1.0000 LS 500,000.00
JUMLAH
II PEKERJAAN TANAH DAN PONDASI
1 Galian tanah setempat 285.3480 M3 69,212.00
2 Buangan tanah galian 285.3480 M3 #NAME?
3 Galian Tanah pondasi Setempat dan Menerus 24.3750 M3 52,712.00
4 Urugan Tanah kembali bekas galian 8.1169 M3 25,267.00
5 Pas. Pondasi Batu Kali 1 PC: 5 PS 22.5715 M3 625,856.00
JUMLAH
IIIPEKERJAAN BETON
1 Pas. Sloof Beton S1 15 / 20 ( 4 D12 + dia 8 - 20 ) K 175 2.1112 M3 4,058,273.00
2 Pas. Kolom K215/30( 4D12, dia 8 - 20 ) K 175 0.3420 M3 4,552,393.00
3 Pas. Beton Meja Dapur dan ruang alat t 10 cm 0.2100 M3 4,058,273.00
4 Pas Beton plat deker K 175 t=15 0.5625 M3 4,552,393.00
5 Pas. Kolom Beton K115/15 ( 4 dia 10 + dia 8 - 20 ) K 175 1.1405 M3 4,794,097.00
6 Pas. Balok Lintel 12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 0.1296 M3 4,794,097.00
7 Pas beton topi K 175 0.8900 M3 4,552,393.00
8 Pas. Ring Balok RB 15/20 ( 4 dia 10 + dia 8 - 20 ) K 175 2.1053 M3 4,552,393.00
JUMLAH
IV PEKERJAAN DINDING
1 Pas. Bata merah bata 1Pc : 5 Ps 184.5000 M2 110,770.00
2 Pek. Plesteran 1 Pc : 5 Ps ; tebal 15 mm 361.0000 M2 52,701.00
3 Pek. Acian Dinding 361.0000 M2 42,295.00
4 Pek Ban banan t=10 cm 21.4800 m1 25,575.00
5 Pek. kamprot halus + coating 18.0000 m2 41,939.00
6 Pas hospital plint Mulya R KIA 12.0400 m1 116,868.00
7 Pek. Dinding Keramik putih utk KM/WC/KIA/meja 20/25 setara Mul 48.5400 M2 202,048.00
JUMLAH

V PEKERJAAN ATAP
1 Pas. Rangka Atap Baja Ringan C t=0,75 mm SNI 148.8190 M2 126,500.00
2 Pas. Atap geteng metal berpasir ex Prima Roof 158.8190 M2 149,685.00
3 Pas alumunium foil 158.8190 m2 9,500.00
4 Pas. Bubung Atap metal berpasir Prima roof 27.2700 m1 #NAME?
5 Pas listplang grc t=20cm 46.6500 m1 28,644.00
6 Pas capit gunting kayu 3/30 8.5000 m1 Err:509
7 Pas ampig GRC 3.2000 m2 #NAME?
8 Pas ornamen kepala burung dan sayap dari logam 1.0000 ls 2,950,000.00
9 Pas.Talang Patah zincalum 6.7900 M1 96,492.00
JUMLAH
VI PEKERJAAN LANTAI
1 Urugan pasir bawah Lantai T = 5cm 3.1600 M3 148,258.00
2 Pas. Lantai Keramik Uk.40/40 Mulia 68.9000 m2 238,900.00
3 Pas. Lantai Keramik non slip untuk KM/WC Mulia 20/20 cm 3.4300 M2 206,800.00
4 Pas. Adukan beton Tumbuk RAM/ Rabat T = 5 cm 1 Pc : 3 Ps : 5 2.5100 M3 754,365.00
JUMLAH
VII PEKERJAAN KUSEN
1 Pas. Kusen Alumunium 3" warna + Pintu Type P2 Alexindo 1.0000 UNIT 3,355,000.00
2 Pas. Kusen Alumunium 3" warna + Pintu Type P1 Alexindo 5.0000 UNIT 1,629,541.00
3 Pas. Kusen Alumunium 3" warna + Pintu Type P2a alexindo 2.0000 UNIT 2,033,956.00
4 Pas. Kusen Alumunium 3" warna + Pintu Type P3 WC spanrell 2.0000 UNIT 1,029,675.00
5 Pas. Kusen Alumunium 3" warna+ Jendela Type J2 alexindo 3.0000 UNIT 2,670,275.00
6 Pas. Kusen Alumunium + Jendela Type J1 Alexindo 4.0000 UNIT 1,208,390.00
7 Pas. Kusen Alumunium Type BV1 3.0000 UNIT 344,136.00
HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.
8 Pas. Kusen Alumunium Type BV2 5.0000 UNIT 563,325.00
JUMLAH
VIII PEKERJAAN PLAFOND
1 Pas. Rangka langit-langit Rangka Hollow zincalum 113.5900 M2 40,452.00
2 Pas. Langit-langit Gypsump 9 mm 62.2200 M2 #NAME?
3 Pas. Langit-langit kalsiboard 3.5 mm exterior 51.3700 M2 #NAME?
4 Pas. List gypsum C7 86.5000 M1 #NAME?
JUMLAH
X PEKERJAAN PENGECATAN
1 Pengecatan bidang tembok baru ex VINILEX 357.0000 M2 33,305.00
2 Pengecatan plafond ExVINILEX 113.5900 M2 33,305.00
3 Pelaburan listplang dan capit gunting 11.9000 M2 43,440.00
JUMLAH
XI PEKERJAAN SANITASI
1 Pas. Floordrain lokal Stainless TOTO 2.0000 BH 192,115.00
2 Pas. Kloset Jongkok Porselen Standard lengkap putih INA 1.0000 BH 605,495.00
3 Pas. Kloset Duduk Porselen Standard lengkap putih INA 1.0000 BH 1,822,348.00
4 Pas. Kran stainless, dia 1/2" SAN-EIY 50JRNL 2.0000 BH 87,711.00
5 Pas. Bak cuci piring Stainless Steel Standard 1 Lubang+ kran 1.0000 BH 397,118.00
6 Pas pegangan tangan kamar mandi 2.0000 BH 125,000.00
7 Pas. Wastafel lengkap + cermin Type LW 230 TOTO 3.0000 BH 1,291,455.00
8 Pek. Instalasi air bersih 1.0000 ls 750,000.00
9 Pek. Instalasi air kotor 1.0000 ls 750,000.00
JUMLAH
XII PEKERJAAN LISTRIK
1 Pas. MCB 1.0000 BH #NAME?
2 Pek. Instalasi Titik Lampu 13.0000 TTK #NAME?
3 Pek. Instalasi Stop Kontak 6.0000 TTK #NAME?
4 Pas. Lampu LED bulb 10.5 watt PHILLIPS 13.0000 BH 70,400.00
5 Pas. Saklar tunggal SNI BROCO 5.0000 BH 33,000.00
6 Pas Stop kontak SNI BROCO 7.0000 TTK 35,000.00
7 Pas. Saklar double SNI "BROCO" 4.0000 BH 35,000.00
JUMLAH
XIII PEKERJAAN LAIN-LAIN
1 Pas Biofil BF 04 terpasang 2.0000 unit 6,176,200.00
2 Pas Pompa Jet pump 250 watt SHIMIZU 1.0000 unit 2,450,000.00
3 Pek Pembuatan Sumur Bor Kedalaman 40 S/D 60' + Cassing Pipa 1.0000 unit 11,000,000.00
4 Pas water heater dan gas melon terpasang Rinnai 5 cfc 1.0000 UNIT 1,793,000.00
5 Pas TowerAir dari besi siku 50.50.5 + Pondasi, T= 3 M' 1.0000 unit 1,100,000.00
6 Pas Water Tank KAP. 500 LTR EXCEL 1.0000 bh 1,650,000.00
7 Pas. Hurup Timbul galvanis "POSKESDES PANGGUH" 1.0000 LS 2,300,000.00
8 Pembersihan bekas pekerjaan 1.0000 LS 350,000.00
JUMLAH
HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.

REKAPITULASI
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )
PEKERJAAN : PEMBANGUNAN POSKESDES PANGGUH
TAHUN ANGGARAN 2018
LOKASI : DESA PANGGUH KEC IBUN KABUPATEN BANDUNG

NO URAIAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN TANAH DAN PONDASI

III PEKERJAAN BETON

IV PEKERJAAN DINDING

VI PEKERJAAN ATAP

VII PEKERJAAN LANTAI

VIII PEKERJAAN KUSEN

IX PEKERJAAN PLAFOND

X PEKERJAAN PENGECATAN

XI PEKERJAAN SANITASI

XII PEKERJAAN LISTRIK

XIII PEKERJAAN LAIN-LAIN

REAL COST

PPN 10 %

JUMLAH
TOTAL (DIBULATKAN)

Terbilang :
Tiga Ratus Enam Puluh Juta Rupiah

Maret 2018
CV LUHUR CONSULTINDO

HERI FERIGUNA SE
DIREKTUR
ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

JUMLAH
Rp.

2,699,944.39
250,000.00
500,000.00
500,000.00
3,949,944.39
###
19,749,505.78
#NAME?
1,284,855.00
205,089.08
14,126,514.96
#NAME?
###
8,567,825.96
1,556,918.41
852,237.33
2,560,721.06
5,467,571.75
621,314.97
4,051,629.77
9,584,244.03
33,262,463.27
###
20,437,065.00
19,025,061.00
15,268,495.00
549,351.00
754,902.00
1,407,090.72
9,807,409.92
67,249,374.64

18,825,603.50
23,772,822.02
1,508,780.50
#NAME?
1,336,242.60
Err:509
#NAME?
2,950,000.00
655,180.68
#NAME?
###
468,495.28
16,460,210.00
709,324.00
1,893,456.15
19,531,485.43
###
3,355,000.00
8,147,705.00
4,067,912.00
2,059,350.00
8,010,825.00
4,833,560.00
1,032,408.00
JUMLAH
Rp.
2,816,625.00
34,323,385.00
###
4,594,942.68
#NAME?
#NAME?
#NAME?
#NAME?
###
11,889,885.00
3,783,114.95
516,936.00
16,189,935.95

384,230.00
605,495.00
1,822,348.00
175,422.00
397,118.00
250,000.00
3,874,365.00
750,000.00
750,000.00
9,008,978.00

#NAME?
#NAME?
#NAME?
915,200.00
165,000.00
245,000.00
140,000.00
#NAME?

12,352,400.00
2,450,000.00
11,000,000.00
1,793,000.00
1,100,000.00
1,650,000.00
2,300,000.00
350,000.00
32,995,400.00
JUMLAH
Rp.

REKAPITULASI

JUMLAH
Rp.

3,949,944.39

#NAME?

33,262,463.27

67,249,374.64

#NAME?

19,531,485.43

34,323,385.00

#NAME?

16,189,935.95

9,008,978.00

#NAME?

32,995,400.00

#NAME?

#NAME?

#NAME?
360,000,000.00

Tiga Ratus Enam Puluh Juta Rupiah

Maret 2018
CV LUHUR CONSULTINDO

HERI FERIGUNA SE
DIREKTUR
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

PEKERJAAN : PEMBANGUNAN POSKESDES CIHAWUK


TAHUN ANGGARAN 2020
LOKASI : DESA CIHAWUK KEC. KERTASARI KABUPATEN BANDUNG

HARGA SAT JUMLAH


NO URAIAN PEKERJAAN VOLUME SATUAN
Rp. Rp.

I PEKERJAAN PERSIAPAN
1 Pengukuran kembali site & Pas. Bouwplank 38.50 M1 58,201.00 2,240,738.50
2 Pek. Papan Nama Proyek 1.00 LS 250,000.00 250,000.00
3 Biaya Adm & Dokumentasi 1.00 LS 500,000.00 500,000.00
4 Mobilisasi & demobilisasi material 1.00 LS 1,000,000.00 1,000,000.00
5 Air dan listrik kerja 1.00 LS 500,000.00 500,000.00
1.00 1,500,000.00 1,500,000.00
JUMLAH 5,990,738.50
II PEKERJAAN TANAH DAN PONDASI ###
1 Galian Tanah pondasi Setempat dan Menerus 30.80 M3 52,712.00 1,623,529.60
2 Urugan Tanah kembali bekas galian 10.27 M3 25,267.00 259,381.93
3 Pas. Pondasi Batu Kali 1 PC: 5 PS 22.00 M3 625,856.00 13,768,832.00
4 Pas. Bata saluran gravel 1 PC: 3 PS 35.22 M2 110,770.00 3,901,319.40
JUMLAH 19,553,062.93
IIIPEKERJAAN BETON ###
1 Pas. Kolom K2 15/25( 4D12, dia 8 - 20 ) K 175 0.26 M3 4,058,273.00 1,034,859.62
2 Pas. Sloof S1 15/20( 4D12, dia 8 - 20 ) K 175 2.64 M3 3,974,548.00 10,492,806.72
3 Pas. Beton Meja Dapur dan ruang alat t 10 cm 0.22 M3 2,530,008.00 561,661.78
4 Pas. Kolom Beton Praktis K1 12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 1.47 M3 4,794,097.00 7,041,569.67
5 Pas. Balok Lintel 12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 0.58 M3 4,794,097.00 2,761,399.87
6 Pas beton topi k 175 0.58 M3 2,530,008.00 1,476,259.67
7 Pas. Ring Balok RB 15/20 ( 4 dia 10 + dia 8 - 20 ) K 175 2.64 M3 4,552,393.00 12,018,317.52
JUMLAH 35,386,874.84
IV PEKERJAAN DINDING ###
1 Pas. Bata merah bata 1Pc : 5 Ps 232.89 M2 110,770.00 25,797,225.30
2 Pek. Plesteran 1 Pc : 5 Ps ; tebal 15 mm 357.66 M2 52,701.00 18,848,776.15
3 Pek. Acian Dinding 357.66 M2 42,295.00 15,127,018.23
4 Pek Ban banan t=10 cm 18.00 m1 25,575.00 460,350.00
5 Pek Batu andesit lapis coating 12.60 m2 222,800.00 2,807,280.00
6 Pek. kamprot halus coating 10.82 m2 41,939.00 453,570.29
7 Pas hospital plint Mulya Ruang Melahirkan dan R.nipas 25.72 m1 116,868.00 3,005,844.96

8 Pek. Dinding Keramik putih KM/WC/MEJA 20/25 ex Mulia 34.90 M2 202,048.00 7,051,475.20
9 Pek. Dinding Keramik putih R.MELAHIRKAN 20/25 ex Mulia 22.00 M2 202,048.00 4,445,056.00
10 Pek. Dinding Keramik putih R.PERIKSA 20/25 ex Mulia 18.31 M2 202,048.00 3,700,004.00
11 Pek. Dinding Keramik putih R.NIPAS 20/25 ex Mulia 20.31 M2 202,048.00 4,104,100.00
JUMLAH 85,800,700.13

V PEKERJAAN ATAP
1 Pas. Rangka Atap Baja Ringan C t=100.75 mm SNI 163.93 M2 126,500.00 20,737,443.54

2 Pas. Atap genteng Bitumen Onduline 163.93 M2 101,888.00 16,702,740.30


3 Pas. Nok atap standar bitumen Onduline 28.82 m1 148,729.00 4,286,369.78
4 Pas listplang grc t=20cm 62.40 m1 28,644.00 1,787,385.60

5 Pas ampig GRC 2.79 m2 54,914.00 153,210.06

6 Pas. Talang Patah zincalum 5.70 M1 96,492.00 550,004.40


JUMLAH 44,217,153.68
VI PEKERJAAN LANTAI ###
1 Urugan pasir bawah Lantai T = 5cm 5.11 M3 148,258.00 757,320.40
2 Pas. Lantai granit Uk.60/60 polish 96.02 m2 238,900.00 22,939,178.00
3 Pas. Lantai Keramik non slip untuk KM/WC Mulia 20/20 cm 6.14 M2 206,800.00 1,270,269.00
4 Pas. Adukan beton Tumbuk RAM/ Rabat T = 7 cm 1 Pc : 3 Ps : 5 2.64 M3 754,365.00 1,993,937.57

5 Pas. Gravel dia.20 cm+ pasangan bata 58.70 M1 169,700.00 9,961,390.00


JUMLAH 36,922,094.96
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp. Rp.
VII PEKERJAAN KUSEN ###
1 Pas. Kusen Alumunium 4" warna + Pintu Type P2 1.00 UNIT 2,093,268.00 2,093,268.00
2 Pas. Kusen Alumunium 4" warna + Pintu Type P1 5.00 UNIT 1,629,541.00 8,147,705.00
3 Pas. Kusen Alumunium 4" warna + Pintu Type P2a 2.00 UNIT 2,033,956.00 4,067,912.00
4 Pas. Kusen Alumunium 4" warna + Pintu Type P3 WC 3.00 UNIT 1,029,675.00 3,089,025.00
4 Pas. Kusen Alumunium 4" warna + Pintu PG 1.00 UNIT 1,754,101.00 1,754,101.00
5 Pas. Kusen Alumunium 4" warna+ Jendela Type J2 1.00 UNIT 2,670,275.00 2,670,275.00
6 Pas. Kusen Alumunium + Jendela Type J1 5.00 UNIT 1,793,994.00 8,969,970.00
7 Pas. Kusen Alumunium Type BV1 7.00 UNIT 344,136.00 2,408,952.00
8 Pas. Kusen Alumunium Type BV2 2.00 UNIT 563,325.00 1,126,650.00
9 Pas stiker sunblast 12.84 m2 122,146.00 1,568,354.64
JUMLAH 35,896,212.64

VIII PEKERJAAN PLAFOND ###


1 Pas. Rangka langit-langit Rangka Hollow zincalum 131.60 M2 40,452.00 5,323,483.20
2 Pas. Langit-langit plapon PVC putih polos 131.60 M2 28,300.00 3,724,280.00
3 Pas. List PVC polos 216.88 m1 6,407.00 1,389,550.16
JUMLAH 10,437,313.36
IX PEKERJAAN PENGECATAN ###
1 Pengecatan bidang tembok VINILEX 357.66 M2 33,305.00 11,911,699.77
2 Pengecatan listpalng grc 12.48 M2 45,969.00 573,693.12
JUMLAH 12,485,392.90
X PEKERJAAN SANITASI
1 Pas. Floordrain lokal Stainless 3.00 BH 192,115.00 576,345.00
2 Pas. Kloset Jongkok Porselen Standard lengkap putih INA 1.00 BH 605,495.00 605,495.00
3 Pas. Kloset Duduk Porselen Standard lengkap putih INA 2.00 BH 1,822,348.00 3,644,696.00
4 Pas. Jet shower kloset 2.00 BH 186,615.00 373,230.00
5 Pas. Kran stainless, dia 1/2" 3.00 BH 87,711.00 263,133.00
6 Pas. Bak cuci piring Stainless Steel Standard 1 Lubang+ kran 2.00 BH 397,118.00 794,236.00
7 Pas Pegangan tangan kamar mandi pipa stainles 1" 3.00 BH 800,000.00 2,400,000.00
8 Pas. Wastafel lengkap + cermin Type LW 230 TOTO 3.00 BH 1,291,455.00 3,874,365.00
1.00 1,261,315.00 1,261,315.00
9 Pas. Water heater gas + instalasi+tabung gas isi 3 kg 1.00 unit 1,793,000.00 1,793,000.00
10 Pas. Kran air hot and cool 1.00 bh 373,711.00 373,711.00
11 Pek. Instalasi air bersih 1.00 ls 750,000.00 750,000.00
12 Pek. Instalasi air kotor 1.00 ls 900,000.00 900,000.00
JUMLAH 17,609,526.00
XI PEKERJAAN LISTRIK
1 Penyambungan kembali listrik existing 1.00 ls 350,000.00 350,000.00
2 Pas. MCB 1.00 BH 170,500.00 170,500.00
3 Pek. Instalasi Titik Lampu 22.00 TTK 165,000.00 3,630,000.00
4 Pek. Instalasi Stop Kontak 9.00 TTK 165,000.00 1,485,000.00
5 Pas. Lampu LED Panel 10.5 watt SNI 22.00 BH 70,400.00 1,548,800.00
6 Pas. Saklar tunggal SNI BROCO 7.00 BH 22,000.00 154,000.00
7 Pas Stop kontak SNI BROCO 9.00 TTK 22,000.00 198,000.00
8 Pas. Saklar double SNI "BROCO" 4.00 BH 26,400.00 105,600.00
7,641,900.00
XII PEKERJAAN LAIN-LAIN
1 Pas. Plat Deker t = 15 cm 0.27 M3 3,919,700.00 1,058,319.00
2 Pas Septictank Biofil BF 04 terpasang 2.00 unit 6,176,200.00 12,352,400.00
3 Pas Pompa 125 watt SHIMIZU 1.00 bh 522,500.00 522,500.00
4 Pek penyambungan air bersih dari mata air 1.00 ls 500,000.00 500,000.00
5 Pas TowerAir dari besi siku 50.50.5 + Pondasi, T= 3 M' 1.00 unit 1,100,000.00 1,100,000.00
6 Pas Water Tank KAP. 500 LTR + radar pelampung 1.00 bh 1,650,000.00 1,650,000.00
7 Pas. Hurup Timbul Stainless "POSKESDES CIHAWUK"T=15 CM 1.00 LS 2,500,000.00 2,500,000.00
8 Pembersihan bekas pekerjaan 1.00 LS 300,000.00 300,000.00
JUMLAH 19,983,219.00
HARGA SAT JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp. Rp.

REKAPITULASI
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )
PEKERJAAN : PEMBANGUNAN POSKESDES CIHAWUK
TAHUN ANGGARAN 2020
LOKASI : DESA CIHAWUK KEC. KERTASARI KABUPATEN BANDUNG

JUMLAH
NO URAIAN
Rp.

I PEKERJAAN PERSIAPAN 5,990,738.50

II PEKERJAAN TANAH DAN PONDASI 19,553,062.93

III PEKERJAAN BETON 35,386,874.84

IV PEKERJAAN DINDING 85,800,700.13

V PEKERJAAN ATAP 44,217,153.68

VI PEKERJAAN LANTAI 36,922,094.96

VII PEKERJAAN KUSEN 35,896,212.64

VIII PEKERJAAN PLAFOND 10,437,313.36

IX PEKERJAAN PENGECATAN 12,485,392.90

X PEKERJAAN SANITASI 17,609,526.00

XI PEKERJAAN LISTRIK 7,641,900.00

XII PEKERJAAN LAIN-LAIN 19,983,219.00

REAL COST 331,924,188.93

PPN 10 % 33,192,418.89

JUMLAH 365,116,607.82
TOTAL (DIBULATKAN) 365,116,000.00

Terbilang : EMPAT RATUS LIMA PULUH TUJUH JUTA DUA RATUS RIBU RUPIAH

Bandung, April 2020


CV. Teknoyasa Konsultan Indonesia
`

M. Luhur Pambudi, S.I.Kom.,M.M


Direktur
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

PEKERJAAN : PEMBANGUNAN POSKESDES MEKARMAJU


TAHUN ANGGARAN 2015
LOKASI : DESA MEKARMAJU KEC CIWIDEY KABUPATEN BANDUNG

HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.

I PEKERJAAN PERSIAPAN
1 Pengukuran kembali site & Pas. Bouwplank 48.0000 M1 58,201.00
2 Pek. Papan Nama Proyek 1.0000 LS 250,000.00
3 Biaya Adm & Dokumentasi 1.0000 LS 500,000.00
4 Air dan listrik kerja 1.0000 LS 750,000.00
JUMLAH
II PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah pondasi Setempat dan Menerus 35.1708 M3 25,267.00
2 Urugan Tanah kembali bekas galian 11.7224 M3 111,361.00
3 Urugan pasir bawah Pondasi menerus 4.1870 M3 1,084,402.00
3 Pas. Pondasi Batu Kali 1 PC: 4 PS 24.2846 M3 52,701.00
JUMLAH
IIIPEKERJAAN BETON
1 Pas. Sloof Beton S1 15 / 20 ( 4 D10 + dia 8 - 20 ) K 175 2.5122 M3 4,058,273.00
2 Pas. Kolom K1 15/20( 4D12, dia 8 - 20 ) K 175 0.4032 M3 4,794,097.00
3 Pas. Beton Meja Dapur dan ruang alat t 10 cm 0.2100 M3 4,058,273.00
4 Pas. Kolom Beton Praktis KP12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 1.1405 M3 4,794,097.00
5 Pas. Balok Lintel 12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 0.1728 M3 4,794,097.00
6 Pas beton topi 0.3750 M3 4,058,273.00
7 Pas. Ring Balok RB 15/20 ( 4 dia 10 + dia 8 - 20 ) K 175 2.3447 M3 4,552,393.00
JUMLAH
IV PEKERJAAN DINDING
1 Pas. Bata merah bata 1Pc : 5 Ps 225.0000 M2 43,440.00
2 Pek. Plesteran 1 Pc : 5 Ps ; tebal 15 mm 452.0000 M2 66,356.00
3 Pek. Acian Dinding 457.0000 M2 42,295.00
4 Pek Ban banan t=10 cm 21.4800 m1 25,575.00
5 Pek. kamprot halus 18.0000 m2 66,356.00
6 Pas hospital plint Mulya 8.4400 m1 116,868.00
7 Pek. Dinding Keramik putih utk KM/WC 20/25 setara Mulia 45.0900 M2 -
JUMLAH

V PEKERJAAN ATAP
1 Pas. Rangka Atap Baja Ringan C t=0,75 mm SNI 142.0545 M2 126,500.00
2 Pas. Atap geteng metal berpasir Prima Roof 145.0545 M2 149,685.00
3 Pas. Bubung Atap metal berpasir Prima roof 27.8700 m1 #NAME?
4 Pas listplang grc t=20cm 46.6500 m1 #NAME?
5 Pas capit gunting kayu 3/30 8.5000 m1 45,800.00
6 Pas ampig GRC 3.2000 m2 -
7 Pas ornamen kepala burung dan sayap dari logam 1.0000 ls 2,850,000.00
8 Pas.Talang Patah zincalum 6.4900 M1 96,492.00
JUMLAH
HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.
VI PEKERJAAN LANTAI
1 Urugan pasir bawah Lantai T = 5cm 3.6600 M3 1,084,402.00
2 Pas. Lantai Keramik Uk.40/40 Mulia 75.5000 m2 -
3 Pas. Lantai Keramik non slip untuk KM/WC Mulia 20/20 cm 5.2000 M2 670,297.00
4 Pas. Adukan beton Tumbuk RAM/ Rabat T = 5 cm 1 Pc : 3 Ps : 5 1.9290 M3 10,783.00
JUMLAH
VII PEKERJAAN KUSEN
1 Pas. Kusen Alumunium 3" warna + Pintu Type P2 Alexindo 1.0000 UNIT 3,940,237.00
2 Pas. Kusen Alumunium 3" warna + Pintu Type P1 Alexindo 4.0000 UNIT 1,629,541.00
3 Pas. Kusen Alumunium 3" warna + Pintu Type P2a alexindo 2.0000 UNIT 2,033,956.00
4 Pas. Kusen Alumunium 3" warna + Pintu Type P3 WC 2.0000 UNIT 1,029,675.00
6 Pas. Kusen Alumunium 3" warna+ Jendela Type J2 alexindo 3.0000 UNIT 2,670,275.00
7 Pas. Kusen Alumunium + Jendela Type J1 Alexindo 4.0000 UNIT 1,208,390.00
8 Pas. Kusen Alumunium Type BV1 6.0000 UNIT 344,136.00
9 Pas. Kusen Alumunium Type BV2 4.0000 UNIT 563,325.00
JUMLAH
VIII PEKERJAAN PLAFOND
1 Pas. Rangka langit-langit Rangka Hollow zincalum 118.8800 M2 #NAME?
2 Pas. Langit-langit Gypsump 9 mm 71.5900 M2 #NAME?
3
5 Pas. List gypsum C7 93.5100 M1 12,199.00
JUMLAH
X PEKERJAAN PENGECATAN
1 Pelaburan bidang tembok baru VINILEX 457.0000 M2 #NAME?
2 Pelaburan listplang dan capit gunting 12.0000 M2 43,440.00
JUMLAH
XI PEKERJAAN SANITASI
1 Pas. Floordrain lokal Stainless TOTO 2.0000 BH #NAME?
2 Pas. Kloset Jongkok Porselen Standard lengkap putih INA 1.0000 BH 605,495.00
3 Pas. Kloset Duduk Porselen Standard lengkap putih INA 1.0000 BH #NAME?
4 Pas. Kran stainless, dia 1/2" SAN-EIY 50JRNL 2.0000 BH 87,711.00
5 Pas. Bak cuci piring Stainless Steel Standard 1 Lubang 2.0000 BH #NAME?
6 Pas pegangan tangan kamar mandi 2.0000 BH 125,000.00
7 Pas. Wastafel lengkap + cermin Type LW 230 TOTO 2.0000 BH 1,020,519.00
8 Pek. Instalasi air bersih 1.0000 ls 750,000.00
9 Pek. Instalasi air kotor 1.0000 ls 750,000.00
JUMLAH
XII PEKERJAAN LISTRIK
1 BP listrik 1300 watt 1.0000 LS 1,650,000.00
2 Pas. MCB 1.0000 BH #NAME?
3 Pek. Instalasi Titik Lampu 13.0000 TTK #NAME?
4 Pek. Instalasi Stop Kontak 6.0000 TTK #NAME?
5 Pas. Lampu LED bulb 10.5 watt PHILLIPS 13.0000 BH 70,400.00
6 Pas. Saklar tunggal SNI BROCO 5.0000 BH 31,000.00
7 Pas Stop kontak SNI BROCO 7.0000 TTK 35,000.00
8 Pas. Saklar double SNI "BROCO" 4.0000 BH 33,000.00
JUMLAH
XIII PEKERJAAN LAIN-LAIN
1 Pas Biofil BF 04 terpasang 1.0000 unit 6,176,200.00
2 Pek. SEPTICTANK uk. 2,00 x 1,50 x 1,50 M 1.0000 unit #NAME?
3 Pas Pompa Jet pump 250 watt SHIMIZU 1.0000 unit 2,400,000.00
4 Pek Pembuatan Sumur Bor Kedalaman 40 S/D 60' + Cassing Pipa 1.0000 unit 11,000,000.00
5 Pas water heater dan gas melon terpasang Rinnai 5 cfc 1.0000 ls 1,450,000.00
6 Pas TowerAir dari besi siku 50.50.5 + Pondasi, T= 3 M' 1.0000 unit 1,100,000.00
7 Pas Water Tank KAP. 500 LTR EXCEL 1.0000 bh 1,650,000.00
8 Pas. Hurup Timbul "POSKESDES MEKARMAJU" 1.0000 LS 2,060,000.00
9 Pembersihan bekas pekerjaan 1.0000 LS 250,000.00
JUMLAH

REKAPITULASI
HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.

RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )


PEKERJAAN : PEMBANGUNAN POSKESDES MEKARMAJU
TAHUN ANGGARAN 2015
LOKASI : DESA MEKARMAJU KEC CIWIDEY KABUPATEN BANDUNG

NO URAIAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN TANAH DAN PONDASI

III PEKERJAAN BETON

IV PEKERJAAN DINDING

VI PEKERJAAN ATAP

VII PEKERJAAN LANTAI

VIII PEKERJAAN KUSEN

IX PEKERJAAN PLAFOND

X PEKERJAAN PENGECATAN

XI PEKERJAAN SANITASI

XII PEKERJAAN LISTRIK

XIII PEKERJAAN LAIN-LAIN

REAL COST

PPN 10 %

JUMLAH
TOTAL (DIBULATKAN)

Terbilang :
Tiga Ratus Enam Puluh Juta Rupiah

Maret 2018
CV LUHUR CONSULTINDO

HERI FERIGUNA SE
DIREKTUR
ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

JUMLAH
Rp.

2,793,648.00
250,000.00
500,000.00
750,000.00
4,293,648.00
###
888,660.60
1,305,421.26
4,540,391.17
1,279,822.70
8,014,295.75
###
10,195,193.43
1,932,979.91
852,237.33
5,467,571.75
828,419.96
938,969.80
10,674,086.91
30,889,459.09
###
9,774,000.00
29,992,912.00
19,328,815.00
549,351.00
1,194,408.00
986,365.92
-
61,825,851.92

17,969,894.25
21,712,482.83
#NAME?
#NAME?
389,300.00
-
2,850,000.00
626,233.08
#NAME?
JUMLAH
Rp.
###
3,968,911.32
-
3,485,544.40
20,800.41
7,475,256.13
###
3,940,237.00
6,518,164.00
4,067,912.00
2,059,350.00
8,010,825.00
4,833,560.00
2,064,816.00
2,253,300.00
33,748,164.00
###
#NAME?
#NAME?

1,140,728.49
#NAME?
###
#NAME?
521,280.00
#NAME?

#NAME?
605,495.00
#NAME?
175,422.00
#NAME?
250,000.00
2,041,038.00
750,000.00
750,000.00
#NAME?

1,650,000.00
#NAME?
#NAME?
#NAME?
915,200.00
155,000.00
245,000.00
132,000.00
#NAME?

6,176,200.00
#NAME?
2,400,000.00
11,000,000.00
1,450,000.00
1,100,000.00
1,650,000.00
2,060,000.00
250,000.00
#NAME?

REKAPITULASI
JUMLAH
Rp.

JUMLAH
Rp.

4,293,648.00

8,014,295.75

30,889,459.09

61,825,851.92

#NAME?

7,475,256.13

33,748,164.00

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?
#NAME?

Tiga Ratus Enam Puluh Juta Rupiah

Maret 2018
CV LUHUR CONSULTINDO

HERI FERIGUNA SE
DIREKTUR
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

PEKERJAAN : PEMBANGUNAN POSKESDES CIKITU


TAHUN ANGGARAN 2018
LOKASI : DESA CIKITU KEC PACET- KABUPATEN BANDUNG

HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.

I PEKERJAAN PERSIAPAN
1 Pengukuran kembali site & Pas. Bouwplank 44.3500 M1 58,201.00
2 Pek. Papan Nama Proyek 1.0000 LS 300,000.00
3 Biaya Adm & Dokumentasi 1.0000 LS 500,000.00
4 Air dan listrik kerja 1.0000 LS 500,000.00
JUMLAH
II PEKERJAAN TANAH DAN PONDASI
1 Pemadatan tanah timbunan dari luar lokasi 18.0320 M3 148,258.00
2 Galian Tanah pondasi Setempat dan Menerus 29.5050 M3 25,267.00
3 Urugan Tanah kembali bekas galian 9.7367 M3 111,361.00
4 Urugan pasir bawah Pondasi menerus 2.5290 M3 1,084,402.00
5 Pas. Pondasi Batu Kali 1 PC: 4 PS 26.9760 M3 52,701.00
JUMLAH
IIIPEKERJAAN BETON
1 Pas. Sloof Beton S1 15 / 20 ( 4D10 + dia 8 - 20 ) K 175 2.3604 M3 4,058,273.00
2 Pas. Kolom K1 15/20( 4D12, dia 8 - 20 ) K 175 0.4560 M3 4,794,097.00
3 Pas. Beton Meja Dapur dan ruang alat t 10 cm 0.2100 M3 4,058,273.00
4 Pas. Kolom Beton Praktis KP12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 1.1923 M3 4,794,097.00
5 Pas. Balok Lintel 12/12 ( 4 dia 10 + dia 8 - 20 ) K 175 0.1080 M3 4,794,097.00
6 Pas. Ring Balok RB 15/20 ( 4 dia 12 + dia 8 - 20 ) K 175 2.3604 M3 4,552,393.00
JUMLAH
IV PEKERJAAN DINDING
1 Pas. Bata merah bata 1Pc : 5 Ps 215.0000 M2 43,440.00
2 Pek. Plesteran 1 Pc : 5 Ps ; tebal 15 mm 398.0000 M2 66,356.00
3 Pek. Acian Dinding dan Beton 398.0000 M2 42,295.00
4 Pek Ban banan t=10 cm 12.0000 m1 25,575.00
6 Pas hospital plint Mulya/ruang KIA 11.8500 m1 116,868.00
7 Pek. Dinding Keramik putih utk KM/KIA/Meja beton 20/25 Mulia 53.3900 M2 -
JUMLAH

V PEKERJAAN ATAP
1 Pas. Rangka Atap Baja Ringan C t=0,75 mm SNI 173.2500 M2 126,500.00
2 Pas. Atap geteng metal Prima Roof 178.0000 M2 #NAME?
3 Pas. Bubung Atap Metal Prima roof 35.3700 m1 #NAME?
4 Pas listplang grc t=20cm 49.3500 m1 #NAME?
5 Pas ornamen kepala burung dari logam 1.0000 ls 2,850,000.00
6 Pas capit gunting 1.0000 ls 350,000.00
7 Pas.Talang Patah zincalum 8.7800 M1 96,492.00
JUMLAH
HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.
VI PEKERJAAN LANTAI
1 Urugan pasir bawah Lantai T = 5cm 5.6000 M3 1,084,402.00
2 Pas. Lantai Keramik Uk.40/40 Mulia 86.5000 m2 -
3 Pas. Lantai Keramik non slip untuk KM/WC Mulia 20/20 cm 7.5200 M2 670,297.00
4 Pas. Adukan beton Tumbuk / Rabat T = 5 cm 1 Pc : 3 Ps : 5 Kr 1.9960 M3 10,783.00
JUMLAH
VII PEKERJAAN KUSEN
1 Pas. Kusen Alumunium 3" warna + Pintu Type PE Alexindo 1.0000 UNIT 5,000,000.00
2 Pas. Kusen Alumunium 3" warna + Pintu Type P1 Alexindo 4.0000 UNIT 1,629,541.00
3 Pas. Kusen Alumunium 3" warna + Pintu Type P2 alexindo 2.0000 UNIT 2,093,268.00
4 Pas. Kusen Alumunium 3" warna + Pintu Type P3 WC 3.0000 UNIT 1,029,675.00
5 Pas. Kusen Alumunium 3" warna+ Jendela Type J1 alexindo 4.0000 UNIT 1,450,000.00
6 Pas. Kusen Alumunium + Jendela Type P2 Alexindo 2.0000 UNIT 1,650,000.00
7 Pas. Kusen Alumunium Type BV1 3.0000 UNIT 344,136.00
8 Pas. Kusen Alumunium Type BV2 4.0000 UNIT 563,325.00
9 Pas. Stiker Sanblas 7.5000 m2 85,000.00
JUMLAH
VIII PEKERJAAN PLAFOND
1 Pas. Rangka langit-langit Rangka Hollow zincalum 131.0000 M2 #NAME?
2 Pas. Langit-langit Gypsump 9 mm 79.2100 M2 #NAME?
3 Pas. Langit-langit kalsiboard 3.5 mm exterior 51.7900 M2 #NAME?
4 Pas. List Plafond kayu 114.9500 M1 11,500.00
5 Pas. List gypsum C7 83.8000 M1 12,199.00
JUMLAH
X PEKERJAAN PENGECATAN
1 Pelaburan bidang tembok baru )VINILEX 398.0000 M2 #NAME?
2 Pelaburan plafond (Pendempulan & Pengecatan)VINILEX 129.4900 M2 #NAME?
3 Pengecatan listplang dan capit gunting 12.0000 m2 43,440.00
JUMLAH
XI PEKERJAAN SANITASI
1 Pas. Floordrain lokal Stainless TOTO 3.0000 BH #NAME?
2 Pas. Kloset Jongkok Porselen Standard lengkap putih INA 3.0000 BH 605,495.00
3 Pas. Kran stainless, dia 1/2" SAN-EIY 50JRNL 3.0000 BH 87,711.00
4 Pas. Bak cuci piring Stainless Steel Standard 1 Lubang 1.0000 BH #NAME?
5 Pas pegangan tangan kamar mandi 2.0000 BH 125,000.00
6 Pas. Wastafel lengkap + cermin Type LW 230 TOTO 2.0000 BH 1,020,519.00
7 Pek. Instalasi air bersih 1.0000 ls 750,000.00
8 Pek. Instalasi air kotor 1.0000 ls 750,000.00
JUMLAH
XII PEKERJAAN LISTRIK
1 Pas. MCB 1 Phase 1.0000 BH #NAME?
2 Pek. Instalasi Titik Lampu 12.0000 TTK #NAME?
3 Pek. Instalasi Stop Kontak 6.0000 TTK #NAME?
5 Pas. Lampu LED bulb 10.5 watt PHILLIPS 12.0000 BH 70,400.00
6 Pas. Saklar tunggal BROCO 8.0000 BH 31,000.00
7 Pas Stop kontak BROCO 6.0000 TTK 35,000.00
8 Pas. Saklar double "BROCO" 1.0000 BH 33,000.00
JUMLAH
XIII PEKERJAAN LAIN-LAIN
1 Penyambungan air bersih ke sumber mata air 1.0000 ls 500,000.00
2 Pas torn air 500 lt 1.0000 bh 980,000.00
3 Pas water heater dan gas melon 1.0000 unit 1,750,000.00
4 Pek Tiang torn air tinggi 3 m 1.0000 unit #NAME?
5 Pas Biofil 2.0000 unit 6,500,000.00
6 Pas. Hurup Timbul "POSKESDES CIKITU" 1.0000 LS 2,300,000.00
7 Pembersihan bekas pekerjaan 1.0000 LS 300,000.00
JUMLAH
HARGA SAT
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.
REKAPITULASI
RENCANA ANGGARAN BIAYA ( ENGINEERING ESTIMATE )
PEKERJAAN : PEMBANGUNAN POSKESDES CIKITU
TAHUN ANGGARAN 2018
LOKASI : DESA CIKITU KEC PACET- KABUPATEN BANDUNG

NO URAIAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN TANAH DAN PONDASI

III PEKERJAAN BETON

IV PEKERJAAN DINDING

VI PEKERJAAN ATAP

VII PEKERJAAN LANTAI

VIII PEKERJAAN KUSEN

IX PEKERJAAN PLAFOND

X PEKERJAAN PENGECATAN

XI PEKERJAAN SANITASI

XII PEKERJAAN LISTRIK

XIII PEKERJAAN LAIN-LAIN

REAL COST

PPN 10 %

JUMLAH
TOTAL (DIBULATKAN)

Terbilang :
Lima Ratus Juta Seratus Enam Ribu Rupiah

Maret 2018
CV KARYA NIAGARA KONSUL

ASEP MULYANA SIDIK


DIREKTUR
ANGGARAN BIAYA ( ENGINEERING ESTIMATE )

JUMLAH
Rp.

2,581,214.35
300,000.00
500,000.00
500,000.00
3,881,214.35
###
2,673,388.26
745,502.83
1,084,283.08
2,742,452.66
1,421,662.18
5,993,900.75
###
9,579,147.59
2,186,108.23
852,237.33
5,716,097.74
517,762.48
10,745,468.44
29,596,821.80
###
9,339,600.00
26,409,688.00
16,833,410.00
306,900.00
1,384,885.80
-
54,274,483.80

21,916,125.00
#NAME?
#NAME?
#NAME?
2,850,000.00
350,000.00
847,199.76
#NAME?
JUMLAH
Rp.
###
6,072,651.20
-
5,040,633.44
21,522.87
11,134,807.51
###
5,000,000.00
6,518,164.00
4,186,536.00
3,089,025.00
5,800,000.00
3,300,000.00
1,032,408.00
2,253,300.00
637,500.00
31,816,933.00
###
#NAME?
#NAME?
#NAME?
1,321,925.00
1,022,276.20
#NAME?
###
#NAME?
#NAME?
521,280.00
#NAME?

#NAME?
1,816,485.00
263,133.00
#NAME?
250,000.00
2,041,038.00
750,000.00
750,000.00
#NAME?

#NAME?
#NAME?
#NAME?
844,800.00
248,000.00
210,000.00
33,000.00
#NAME?

500,000.00
980,000.00
1,750,000.00
#NAME?
13,000,000.00
2,300,000.00
300,000.00
#NAME?
JUMLAH
Rp.
REKAPITULASI

JUMLAH
Rp.

3,881,214.35

5,993,900.75

29,596,821.80

54,274,483.80

#NAME?

11,134,807.51

31,816,933.00

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?

#NAME?
#NAME?

Lima Ratus Juta Seratus Enam Ribu Rupiah

Maret 2018
CV KARYA NIAGARA KONSULTAN

ASEP MULYANA SIDIK


DIREKTUR
DAFTAR HARGA SATUAN PEKERJAAN BETON

No. Uraian Jenis Pekerjaan Sat. Koeffisien Harga Satuan


1 2 3 4 5 6
1 1 m³ Membuat beton tumbuk, 1 Pc. : 3 Ps. : 5 Kr.
Bahan:
Semen Tiga Roda kg 218.000 1,450.00
Pasir beton m3 0.520 270,000.00
Batu pecah mesin 2/3 m3 0.870 210,000.00
Tenaga:
Pekerja Oh 1.650 65,000.00
Tukang batu Oh 0.250 71,000.00
Kepala Tukang batu Oh 0.025 82,000.00
Mandor Oh 0.080 95,000.00
Jumlah
Dibulatkan
2 1 m³ Membuat beton bertulang, 1 Pc. : 2 Ps. : 3 Kr.
Bahan:
Semen Tiga Roda kg 233.100 1,450.00
Pasir beton m3 0.520 270,000.00
Batu pecah mesin 2/3 m3 0.780 210,000.00
Tenaga:
Pekerja Oh 1.650 65,000.00
Tukang batu Oh 0.250 71,000.00
Kepala Tukang batu Oh 0.025 82,000.00
Mandor Oh 0.080 95,000.00
Jumlah
Dibulatkan
3 1 m³ Membuat beton Site Mix K-175
Bahan:
Semen Tiga Roda kg 340.000 1,450.00
Pasir beton m3 0.540 270,000.00
Batu pecah mesin 2/3 m3 0.830 210,000.00
Tenaga:
Pekerja Oh 1.500 65,000.00
Tukang batu Oh 0.500 71,000.00
Kepala Tukang batu Oh 0.050 82,000.00
Mandor Oh 0.010 95,000.00
Peralatan Lot 0.020 951,150.00
Jumlah
Dibulatkan
4 1 m³ Membuat beton Site Mix K-250
Bahan:
Semen Tiga Roda kg 394.800 1,450.00
Pasir beton m3 0.490 270,000.00
Batu pecah mesin 2/3 m3 0.810 210,000.00
Tenaga:
Pekerja Oh 1.650 65,000.00
Tukang batu Oh 0.275 71,000.00
Kepala Tukang batu Oh 0.028 82,000.00
Mandor Oh 0.083 95,000.00
Peralatan Lot 0.020 1,011,816.00
Jumlah
Dibulatkan
5 1 Kg Pembesian dengan besi polos .
Bahan:
Besi beton U-24, rata - rata uk. dia 8 s/d 16 mm kg 1.050 9,900.00
Kawat beton kg 0.015 17,000.00
Tenaga:
Pekerja Oh 0.007 65,000.00
Tukang Besi Beton Oh 0.007 71,000.00
Kepala Tukang Besi Beton Oh 0.001 82,000.00
Mandor Oh 0.0003 95,000.00
Jumlah
Dibulatkan
6 1 Kg Pembesian dengan besi beton ulir .
Bahan:
Besi beton U-32, rata - rata uk. dia 12 s/d 22 mm kg 1.050 10,100.00
Kawat beton kg 0.020 17,000.00
Tenaga:
Pekerja Oh 0.007 65,000.00
Tukang Besi Beton Oh 0.007 71,000.00
Kepala Tukang Besi Beton Oh 0.001 82,000.00
Mandor Oh 0.000 95,000.00
Jumlah
Dibulatkan
7 1 m² Pasang bekisting untuk pondasi.
Bahan:
Kayu papan Albasia m³ 0.040 2,650,000.00
Paku uk. 2" - 5" kg 0.300 13,700.00
Minyak bekisting ltr 0.100 12,500.00
Tenaga:
Pekerja Oh 0.300 65,000.00
Tukang kayu Oh 0.260 71,000.00
Kepala tukang kayu Oh 0.026 82,000.00
Mandor Oh 0.005 95,000.00
Jumlah
Dibulatkan
8 1 m² Pasang bekisting untuk sloof.
Bahan:
Kayu papan Albasia m³ 0.045 2,650,000.00
Paku uk. 2" - 5" kg 0.300 13,700.00
Minyak bekisting ltr 0.100 12,500.00
Tenaga:
Pekerja Oh 0.300 65,000.00
Tukang kayu Oh 0.260 71,000.00
Kepala tukang kayu Oh 0.026 82,000.00
Mandor Oh 0.005 95,000.00
Jumlah
Dibulatkan
9 1 m² Pasang bekisting untuk kolom struktur
Bahan:
Kayu papan Albasia m³ 0.040 2,650,000.00
Paku uk. 3" - 6" kg 0.400 13,700.00
Paku uk. 2" - 5" ltr 0.200 12,500.00
Kayu balok Albasia m³ 0.015 2,110,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 lbr 0.350 127,800.00
Dolken dia 8 s/d 10 cm btg 2.000 17,000.00
Tenaga:
Pekerja Oh 0.300 65,000.00
Tukang kayu Oh 0.330 71,000.00
Kepala tukang kayu Oh 0.033 82,000.00
Mandor Oh 0.006 95,000.00
Jumlah
Dibulatkan
10 1 m² Pasang bekisting untuk kolom struktur biasa
Bahan:
Kayu papan Albasia m³ 0.040 2,650,000.00
Paku uk. 2" - 5" kg 0.400 13,700.00
Minyak bekisting ltr 0.200 12,500.00
Kayu balok Albasia m³ 0.015 2,110,000.00
Tenaga:
Pekerja Oh 0.300 65,000.00
Tukang kayu Oh 0.330 71,000.00
Kepala tukang kayu Oh 0.033 82,000.00
Mandor Oh 0.006 95,000.00
Jumlah
Dibulatkan
11 1 m² Pasang bekisting untuk balok struktur
Bahan:
Kayu papan Albasia m³ 0.040 2,650,000.00
Paku uk. 2" - 5" kg 0.400 13,700.00
Minyak bekisting ltr 0.200 12,500.00
Kayu balok Albasia m³ 0.018 2,110,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 lbr 0.350 127,800.00
Dolken dia 8 s/d 10 cm btg 2.000 17,000.00
Tenaga:
Pekerja Oh 0.320 65,000.00
Tukang kayu Oh 0.330 71,000.00
Kepala tukang kayu Oh 0.033 82,000.00
Mandor Oh 0.006 95,000.00
Jumlah
Dibulatkan
12 1 m² Pasang bekisting untuk balok biasa
Bahan:
Kayu papan Albasia m³ 0.040 2,650,000.00
Paku uk. 2" - 5" kg 0.400 13,700.00
Minyak bekisting ltr 0.200 12,500.00
Kayu balok Albasia m³ 0.018 2,110,000.00
Tenaga:
Pekerja Oh 0.320 65,000.00
Tukang kayu Oh 0.330 71,000.00
Kepala tukang kayu Oh 0.033 82,000.00
Mandor Oh 0.006 95,000.00
Jumlah
Dibulatkan
13 1 m² Pasang bekisting untuk lantai.
Bahan:
Kayu papan Albasia m³ 0.040 2,650,000.00
Paku uk. 3" - 6" kg 0.400 13,700.00
Minyak bekisting ltr 0.200 12,500.00
Kayu balok Albasia m³ 0.015 2,110,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 lbr 0.350 127,800.00
Dolken dia 8 s/d 10 cm btg 6.000 17,000.00
Tenaga:
Pekerja Oh 0.320 65,000.00
Tukang kayu Oh 0.330 71,000.00
Kepala tukang kayu Oh 0.033 82,000.00
Mandor Oh 0.006 95,000.00
Jumlah
Dibulatkan
14 1 m² Pasang bekisting untuk tangga.
Bahan:
Kayu papan Albasia m³ 0.030 2,650,000.00
Paku uk. 3" - 6" kg 0.400 13,700.00
Minyak bekisting ltr 0.150 12,500.00
Kayu balok Albasia m³ 0.020 2,110,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 lbr 0.350 127,800.00
Dolken dia 8 s/d 10 cm btg 2.000 17,000.00
Tenaga:
Pekerja Oh 0.320 65,000.00
Tukang kayu Oh 0.330 71,000.00
Kepala tukang kayu Oh 0.033 82,000.00
Mandor Oh 0.006 95,000.00
Jumlah
Dibulatkan
15 1 M3 PEK. BETON PONDASI PLAT SETEMPAT 80X80X25 CM, TUL. = 130.83 KG. ( SNI dia.12 - 20 )
Adukan beton Site Mix K-175 m3 1.000 970,173.00
Tulangan beton besi U-24 kg 130.830 11,687.00
Bekisting Papan m2 0.000 151,927.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
16 1 M3 PEK. BETON PONDASI PLAT TANGGA 90 X 60 X 25, TUL. = 151.102 KG. ( SNI dia.12 - 15 + dia.12 - 15 )
Adukan beton Site Mix K-175 m3 1.000 970,173.00
Tulangan beton besi U-24 kg 151.102 11,687.00
Bekisting Papan m2 5.556 151,927.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
17 1 M3 PEK. BETON SLOOF 15/20, TUL. = 180.6677 KG. ( 4 Dia. 12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 180.667 11,687.00
Bekisting Papan m2 13.333 0.50 165,177.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
18 1 M3 PEK. BETON KOLOM STRUKTUR 25/25, TUL. = 177.7KG. ( 8 Dia. 12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 177.760 11,687.00
Bekisting Papan m2 16.000 0.50 191,836.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
19 1 M3 PEK. BETON KOLOM STRUKTUR 15/35, TUL. = 154.857 KG. ( 8 Dia. 12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 154.857 11,687.00
Bekisting Papan m2 19.048 0.50 191,836.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
20 1 M3 PEK. BETON KOLOM STRUKTUR, TUL. = 159.156 KG. ( 4 Dia. 12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 159.156 11,687.00
Bekisting Papan m2 21.333 0.50 191,836.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
21 1 M3 PEK. BETON KOLOM / RINGBALK PRAKTIS 12/12, TUL. = 207 KG. ( 4 dia 10 + dia 6 - 20 )
Adukan beton Site Mix K-175 m3 1.000 970,173.00
Tulangan beton besi U-24 kg 207.361 11,687.90
Bekisting Papan m2 33.333 0.50 191,836.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
22 1 M3 PEK. BETON BALOK 15/40, TUL. = 175.089 KG. ( 8 Dia.12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 175.089 11,687.90
Bekisting Papan m2 15.833 0.50 278,196.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
23 1 M3 PEK. BETON BALOK 15/25, TUL. = 206.908 KG. ( 6 Dia.12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 206.908 11,687.90
Bekisting Papan m2 17.333 0.50 278,196.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
24 1 M3 PEK. BETON BALOK BORDES 15/25, TUL. = 206.908 KG. ( 4 Dia.12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 206.908 11,687.90
Bekisting Papan m2 17.333 0.50 199,466.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
25 1 M3 PEK. BETON RINGBALK 15/20, TUL. = 180.667 KG. ( 4 Dia.12 + dia 10 - 20 )
Adukan beton Site Mix K-175 m3 1.000 970,173.00
Tulangan beton besi U-24 kg 180.667 11,687.90
Bekisting Papan m2 13.333 0.50 278,196.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
26 1 M3 PEK. BETON AMPIG 15/15, TUL. = 153.556 KG. ( 4 Dia.10 + dia 8 - 20 )
Adukan beton Site Mix K-175 m3 1.000 970,173.00
Tulangan beton besi U-24 kg 153.556 11,687.90
Bekisting Papan m2 13.333 0.50 278,196.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
27 1 M3 PEK. BETON BALOK LISPLANK 15/25, TUL. = 159.413 KG. ( 4 dia 12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 159.413 11,687.90
Bekisting Papan m2 17.333 0.50 199,466.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
28 1 M3 PEK. BETON PLAT LANTAI T = 12 CM, TUL. = 86.667 KG, ( dia 8 - 15),
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 86.667 11,687.90
Bekisting Papan m2 8.333 0.50 339,866.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
29 1 M3 PEK. BETON PLAT TANGGA, T = 15 CM, TUL. = 207.667 KG, ( dia 12 - 12,5 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 207.667 11,687.90
Bekisting Papan m2 10.000 0.50 255,291.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
30 1 M3 PEK. BETON PLAT T = 10 CM, TUL. = 86.66 KG, ( dia 10 - 15 )
Adukan beton Site Mix K-175 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 86.660 11,687.90
Bekisting Papan m2 8.333 0.50 339,866.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
31 1 M3 PEK. BETON PLAT T = 8 CM, TUL. =103.333KG, ( dia 10 - 15 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 103.333 11,687.90
Bekisting Papan m2 8.333 0.50 339,866.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
32 1 M2 PLAT LANTAI SISTEM BONDEX TEBAL 12 CM
Bahan :
Plat Bondex T=0,75 mm m2 1.000 115,000.00
Wiremesh M8 m2 1.000 51,146.38
Adukan Beton K-250 m3 0.120 1,032,052.00
Perancah Kaso 5/7 cm x 50% (2 x Pakai ) m3 0.102 0.50 2,110,000.00
Paku 5-10 cm kg 0.100 13,700.00
Upah :
Pekerja oh 0.429 65,000.00
Tukang kayu oh 0.215 71,000.00
Kepala Tukang kayu oh 0.021 82,000.00
Mandor oh 0.021 95,000.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
33 1 M3 PEK. BETON Strauss dia 30, TUL. = 118.567 KG. ( 6dia 13+ dia 8 - 20 )
Adukan beton Site Mix K-175 m3 1.000 970,173.00
Tulangan beton besi U-24 kg 118.576 11,687.90
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
34 1 M3 PEK. BETON BALOK 20/40, TUL. = 131.625 KG. ( 8 Dia.12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 131.625 11,687.90
Bekisting Papan m2 12.500 0.50 278,196.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
35 1 M3 PEK. BETON BALOK 25/40, TUL. = 170.33 KG. ( 8 Dia.12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 170.333 11,687.90
Bekisting Papan m2 16.667 0.50 278,196.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
36 1 M3 PEK. BETON BALOK 20/25, TUL. = 156.4KG. ( 8 Dia.12 + dia 10 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 156.400 11,687.90
Bekisting Papan m2 14.000 0.50 278,196.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
37 1 M3 PEK. BETON KOLOM STRUKTUR 25/25, TUL. = 189.28KG. ( 6 Dia. 16+ dia 8 - 15 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 189.280 11,687.00
Bekisting Papan m2 16.000 0.50 191,836.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
38 1 M3 PEK. BETON KOLOM STRUKTUR 20/20, TUL. = 167.625KG. ( 6Dia. 12 + dia 8 - 20 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 167.625 11,687.00
Bekisting Papan m2 20.000 0.50 191,836.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
39 1 M3 PEK. BETON BALOK 20/30, TUL. = 232.3 KG. (4 Dia.16 + 2 dia 12 dia 8 - 15 )
Adukan beton Site Mix K-250 m3 1.000 1,032,052.00
Tulangan beton besi U-24 kg 232.302 11,687.90
Bekisting Papan m2 13.333 0.50 278,196.00
Jumlah
Keuntungan maksimal 10%
Jumlah
Dibulatkan
TON

Jumlah Harga
7

316,100.00
140,400.00
182,700.00

107,250.00
17,750.00
2,050.00
7,600.00
773,850.00
773,850.00

337,995.00
140,400.00
163,800.00

107,250.00
17,750.00
2,050.00
7,600.00
776,845.00
776,845.00

493,000.00
145,800.00
174,300.00

97,500.00
35,500.00
4,100.00
950.00
19,023.00
970,173.00
970,173.00

572,460.00
132,300.00
170,100.00

107,250.00
19,525.00
2,296.00
7,885.00
20,236.32
1,032,052.32
1,032,052.00

10,395.00
255.00

455.00
497.00
57.40
28.50
11,687.90
11,687.00

10,605.00
340.00

455.00
497.00
57.40
28.50
11,982.90
11,982.00

106,000.00
4,110.00
1,250.00

19,500.00
18,460.00
2,132.00
475.00
151,927.00
151,927.00

119,250.00
4,110.00
1,250.00
-
19,500.00
18,460.00
2,132.00
475.00
165,177.00
165,177.00

106,000.00
5,480.00
2,500.00
31,650.00
44,730.00
34,000.00

19,500.00
23,430.00
2,706.00
570.00
270,566.00
270,566.00

106,000.00
5,480.00
2,500.00
31,650.00
19,500.00
23,430.00
2,706.00
570.00
191,836.00
191,836.00

106,000.00
5,480.00
2,500.00
37,980.00
44,730.00
34,000.00

20,800.00
23,430.00
2,706.00
570.00
278,196.00
278,196.00

106,000.00
5,480.00
2,500.00
37,980.00

20,800.00
23,430.00
2,706.00
570.00
199,466.00
199,466.00

106,000.00
5,480.00
2,500.00
31,650.00
44,730.00
102,000.00

20,800.00
23,430.00
2,706.00
570.00
339,866.00
339,866.00

79,500.00
5,480.00
1,875.00
42,200.00
44,730.00
34,000.00

20,800.00
23,430.00
2,706.00
570.00
255,291.00
255,291.00

970,173.00
1,529,010.21
-
2,499,183.21
249,918.32
2,749,101.53
2,749,101.00
5 + dia.12 - 15 )
970,173.00
1,765,931.67
844,038.89
3,580,143.56
358,014.36
3,938,157.92
3,938,157.00

1,032,052.00
2,111,451.33
1,101,180.00
4,244,683.33
424,468.33
4,669,151.67
4,669,151.00

1,032,052.00
2,077,481.12
1,534,688.00
4,644,221.12
464,422.11
5,108,643.23
5,108,643.00

1,032,052.00
1,809,815.43
1,827,009.52
4,668,876.95
466,887.70
5,135,764.65
5,135,764.00

1,032,052.00
1,860,056.17
2,046,218.69
4,938,326.87
493,832.69
5,432,159.55
5,432,159.00

970,173.00
2,423,615.93
3,197,266.67
6,591,055.60
659,105.56
7,250,161.16
7,250,161.00

1,032,052.00
2,046,422.72
2,202,338.63
5,280,813.36
528,081.34
5,808,894.69
5,808,894.00

1,032,052.00
2,418,320.01
2,411,032.00
5,861,404.01
586,140.40
6,447,544.41
6,447,544.00

1,032,052.00
2,418,320.01
1,728,672.09
5,179,044.10
517,904.41
5,696,948.51
5,696,948.00

970,173.00
2,111,613.93
1,854,640.00
4,936,426.93
493,642.69
5,430,069.63
5,430,069.00

970,173.00
1,794,741.98
1,854,640.00
4,619,554.98
461,955.50
5,081,510.48
5,081,510.00

1,032,052.00
1,863,207.10
1,728,705.33
4,623,964.43
462,396.44
5,086,360.88
5,086,360.00

1,032,052.00
1,012,951.33
1,416,108.33
3,461,111.67
346,111.17
3,807,222.83
3,807,222.00

1,032,052.00
2,427,187.23
1,276,455.00
4,735,694.23
473,569.42
5,209,263.66
5,209,263.00

1,032,052.00
1,012,873.41
1,416,108.33
3,461,033.75
346,103.37
3,807,137.12
3,807,137.00

1,032,052.00
1,207,749.67
1,416,108.33
3,655,910.00
365,591.00
4,021,501.00
4,021,501.00

115,000.00
51,146.38
123,846.24
107,135.25
1,370.00

27,885.00
15,229.50
1,758.90
2,037.75
445,409.02
44,540.90
489,949.93
489,949.00

970,173.00
1,385,901.60
2,356,074.60
235,607.46
2,591,682.06
2,591,682.00

1,032,052.00
1,538,419.84
1,738,725.00
4,309,196.84
430,919.68
4,740,116.52
4,740,116.00

1,032,052.00
1,990,838.97
2,318,300.00
5,341,190.97
534,119.10
5,875,310.06
5,875,310.00

1,032,052.00
1,827,987.56
1,947,372.00
4,807,411.56
480,741.16
5,288,152.72
5,288,152.00
1,032,052.00
2,212,115.36
1,534,688.00
4,778,855.36
477,885.54
5,256,740.90
5,256,740.00

1,032,052.00
1,959,033.37
1,918,360.00
4,909,445.38
490,944.54
5,400,389.91
5,400,389.00

1,032,052.00
2,715,125.14
1,854,640.00
5,601,817.14
560,181.71
6,161,998.86
6,161,998.00

You might also like