PERHITUNGAN

1. Tiang

a. K. 225 = 0.40 + 0.30 x 0.40 + 0.30 x 2.49 x 6 = 1.83 m3


2 2
0.40 x 0.40 x 0.10 x 6 = 0.10 m3

0.30 x 0.30 x 0.90 x 6 = 0.49 m3

0.10 x 0.25 x 2.16 x 2 = 0.11 m3

0.10 x 0.25 x 3.24 x 4 = 0.32 m3


1.05

2.84 m3 0.90

0.10
b. Bekisting = 0.40 + 0.30 x 2.49 x 4 x 6 = 20.92 m2
2
0.3 x 0.9 x 4 x 6 = 6.48 m2

0.25 x 2.16 x 2 = 1.08 m2 2.49

2.16 x 0.1 x 4 = 0.86 m2

0.25 x 3.24 x 4 = 3.24 m2

3.24 x 0.1 x 8 = 2.59 m2

35.17 m2

c. Plesteran = 0.40 + 0.30 x 2.49 x 4 x 6 = 20.92 m2


2
PERHITUNGAN
0.05 x 0.4 x 4 x 6 = 0.48 m2

0.05 x 0.3 x 4 x 6 = 0.36 m2

0.1 x 0.4 x 4 x 6 = 0.96 m2

0.3 x 0.9 x 4 x 6 = 6.48 m2

0.25 x 2.16 x 2 = 1.08 m2

2.16 x 0.1 x 4 = 0.86 m2

0.25 x 3.24 x 4 = 3.24 m2


0.90
3.24 x 0.1 x 8 = 2.59 m2
0.10
36.97 m2

d. Cat = 0.40 + 0.30 x 2.49 x 4 x 6 = 20.92 m2


2
0.05 x 0.4 x 4 x 6 = 0.48 m2

0.05 x 0.3 x 4 x 6 = 0.36 m2

0.1 x 0.4 x 4 x 6 = 0.96 m2

0.3 x 0.9 x 4 x 6 = 6.48 m2

0.25 x 2.16 x 2 = 1.08 m2

2.16 x 0.1 x 4 = 0.86 m2

0.25 x 3.24 x 4 = 3.24 m2


PERHITUNGAN

3.24 x 0.1 x 8 = 2.59 m2

36.97 m2

e. Angkur = 4 x 6 = 24.00 Bh

24.00 Bh
PERHITUNGAN
2. Dinding

a. Bata Ringan = 3.14 x 0.90 x 2 = 5.65 m2

Area 1 = 1.40 x 2 = 2.80 m2

Area 2 = 2.83 x 2 = 5.66 m2

Area 3 = 2.14 x 2 = 4.28 m2

Area 4 = 2.14 x 2 = 4.28 m2

7.15 x 0.75 x 2 = 10.73 m2 0.95

33.40 m2

b. Wiremesh M8 = 0.25 x 2.16 x 2.00 = 1.08 m2

0.25 x 3.24 x 2.00 x 2.00 = 1.62 m2

2.70 m2

c. K.225 = 1.05 x 8.65 x 0.1 = 0.91 m3

0.65 x 8.65 x 0.1 = 0.56 m3

0.95 x 2.25 x 0.1 = 0.21 m3

0.85 x 2.25 x 0.1 = 0.19 m3

1.88 m3
PERHITUNGAN

d. Bekisting = 0.83 x 8.65 = 7.18 m2

0.43 x 8.65 = 3.72 m2

0.63 x 2.7 x 2 = 3.40 m2

8.65 x 0.1 x 2 = 1.73 m2

4.18 x 0.1 x 2 = 0.84 m2

16.87 m2

e. Plesteran = 3.14 x 0.90 x 2 x 2 = 11.30 m2

0.05 x 3.14 x 2 x 2 = 0.63 m2

0.10 x 3.14 x 2 x 2 = 1.26 m2

0.20 x 3.14 x 2 = 1.26 m2

Area 1 = 1.40 x 2 x 2 = 5.60 m2 0.83

Area 2 = 3.06 x 2 = 6.12 m2

0.90
Area 2.1 = 2.83 x 2 = 5.66 m2

0.10
Area 3 = 2.14 x 2 x 2 = 8.56 m2

Area 4 = 2.14 x 2 x 2 = 8.56 m2


PERHITUNGAN
7.15 x 0.75 x 2 = 10.73 m2

6.85 x 0.75 x 2 = 10.28 m2

69.94 m2
PERHITUNGAN

f. Cat = 3.14 x 0.90 x 2 x 2 = 11.30 m2

0.05 x 3.14 x 2 x 2 = 0.63 m2

0.10 x 3.14 x 2 x 2 = 1.26 m2

0.20 x 3.14 x 2 = 1.26 m2

Area 1 = 1.40 x 2 x 2 = 5.60 m2

Area 2 = 3.06 x 2 = 6.12 m2

Area 2.1 = 2.83 x 2 = 5.66 m2

Area 3 = 2.14 x 2 x 2 = 8.56 m2

Area 4 = 2.14 x 2 x 2 = 8.56 m2

7.15 x 0.75 x 2 = 10.73 m2

6.85 x 0.75 x 2 = 10.28 m2

69.94 m2

3. Atap

a. Rangka Atap = 1.36 x 8.65 x 2 = 23.53 m2

1.26 x 8.65 x 2 = 21.80 m2


PERHITUNGAN

45.33 m2

b. Lisplank = 8.65 x 2 = 17.30 m

1.36 x 2 = 2.72 m

1.26 x 2 = 2.52 m

22.54 m
SKETSA

8.65
4.18

2.10

2.10

0.95 0.85

3.95 0.30

1.05 0.65
0

3.50
0.10

3.50

0.40 3.10 0.40 3.10 0.40

7.40

4.18
4.18

SKETSA

area 2.1 = 3.06 m2

area 2 = 2.83 m2

area 1 = 1.40 m2
area 1 = 1.40 m2 0.90

0.10

7.15

0.75

area 3 = 2.14 m2 area 4 = 2.14 m2


0.75

area 3 = 2.14 m2 SKETSA area 4 = 2.14 m2


SKETSA

8.65

2.10

5 0.85

0.63
0.30
3.24

1.26 1.26

1.36 1.36
1.36 1.36
SKETSA

4.18

.83 3.95 0.43

90 2.16

0.10
SKETSA
SKETSA

TOTAL VOLUME

K.225 = 4.72 m3

Bekisting = 52.04 m2

Plesteran = 106.92 m2

Cat = 106.92 m2

Bata Ringan = 33.40 m2


SKETSA

Wiremesh M8 = 0.19 m2

Rangka Atap = 45.33 m2

Lisplank = 22.54 m

Pembesian = 215.45 Kg

Angkur = 24.00 Bh
B1
A14

A
A13

A12

A11

A10

A9

A8

A7

A6

A5

A4

A3

A2

A1

Kode Uraian
a b c d e f

A1. Ø8 0.05 0.37 0.37 0.37 0.37 0.05

A2. Ø8 0.05 0.36 0.36 0.36 0.36 0.05

A3. Ø8 0.05 0.35 0.35 0.35 0.35 0.05

A4. Ø8 0.05 0.34 0.34 0.34 0.34 0.05

A5. Ø8 0.05 0.33 0.33 0.33 0.33 0.05

A6. Ø8 0.05 0.33 0.33 0.33 0.33 0.05

A7. Ø8 0.05 0.32 0.32 0.32 0.32 0.05


A8. Ø8 0.05 0.31 0.31 0.31 0.31 0.05

A9 Ø8 0.05 0.30 0.30 0.30 0.30 0.05

A10. Ø8 0.05 0.29 0.29 0.29 0.29 0.05

A11. Ø8 0.05 0.29 0.29 0.29 0.29 0.05

A12. Ø8 0.05 0.28 0.28 0.28 0.28 0.05

A13. Ø8 0.05 0.27 0.27 0.27 0.27 0.05

B1. 4 Ø 10 0.05 0.27 1.06 2.49

C1. dia. 13 1.67

C2. dia. 13 1.71

C3. dia. 13 1.74

C4. dia. 13 1.76

C5. dia. 13 1.79

C6. dia. 13 1.80

C7. dia. 13 1.82

C8. dia. 13 1.83

C9. dia. 13 1.84

C10. dia. 13 1.84

C11. dia. 13 1.84

C12. dia. 13 1.84

C13. dia. 13 1.83

C14. dia. 13 1.82

C15. dia. 13 1.80

C16. dia. 13 1.79


C17. dia. 13 1.76

C18. dia. 13 1.74

C19. dia. 13 1.71

C20. dia. 13 1.67


SKETSA

C7 C9 C11 C13 C15


C5
C3
C1

B1

C2 C4 C6 C8 C10 C12 C14 C1

Perhitungan
Panjang Besi Jumlah Berat Besi Total Berat
g h i j
(m) (Nos) (Kg) (Kg)

1.56 12 0.39 7.38

1.53 12 0.39 7.23

1.50 12 0.39 7.08

1.46 12 0.39 6.93

1.43 12 0.39 6.78

1.40 12 0.39 6.63

1.37 12 0.39 6.47


1.34 12 0.39 6.32

1.30 12 0.39 6.17

1.27 12 0.39 6.02

1.24 12 0.39 5.87

1.21 12 0.39 5.72

1.18 12 0.39 5.57

3.87 24 0.62 57.23

1.67 2 1.04 3.47

1.71 2 1.04 3.56

1.74 2 1.04 3.62

1.76 2 1.04 3.66

1.79 2 1.04 3.72

1.80 2 1.04 3.74

1.82 2 1.04 3.79

1.83 2 1.04 3.81

1.84 2 1.04 3.83

1.84 2 1.04 3.83

1.84 2 1.04 3.83

1.84 2 1.04 3.83

1.83 2 1.04 3.81

1.82 2 1.04 3.79

1.80 2 1.04 3.74

1.79 2 1.04 3.72


1.76 2 1.04 3.66

1.74 2 1.04 3.62

1.71 2 1.04 3.56

1.67 2 1.04 3.47

TOTAL 215.45
C7 C9 C11 C13 C15
C5 C17
C3 C19
C1

C2 C4 C6 C8 C10 C12 C14 C16 C18 C20

Keterrangan

You might also like