PAKET
LOKASI
SUMBER DANA
TAHUN ANGGARAN
NO
: Rencana Box Culvert
:
:
:
: 2022
SKET GAMBAR
BOX CULVERT
PEMBESIAN
PERHITUNGAN
BOX CULVERT
Galian tanah
1.2 X 2 X 8.8
Beton BO
Beton Struktur
2 X 2 = 4 m3
1.4 X 1 = 1.4
1.8 X 8.8
Begesting
L X P X S
Luar = 2 X 8.8 X 2 =
Dalam = 1.4 X 8.8 X 2 =
Atas = 1 X 8.8 X =
Depan = 0.2 X 1.4 X 2 =
= 0.2 X 1 X 2 =
Belakang = 0.2 X 1.4 X 2 =
= 0.2 X 1 X 2 =
PEMBESIAN
Plat Atas + Lantai
ø10-150
880 + 1 = 60 bt X 2
15
Pembesian
ø10 = 120 X 0.62
Dinding KA + KI
ø10-150
880 + 1 = 60 bt X 4
15
Plat + Lantai
140 + 1 = 10 bt X 4
15
ø10 = 40 X 0.62
Dinding KA + KI
100 + 1 = 8 bt X 4
15
ø10 = 32 X 0.62
HASIL SATUAN
= 21.12 m3
= 0.616 m3
= 15.84 m3
35.2
24.64
8.8
0.56
0.4
0.56
0.4
jumlah 70.56 m2
= 10.56 m3
= 120 bt
= 74.4 kg
= 240 bt
= 133.92 kg
= 40 bt
= 24.8 kg
= 32 bt
= 19.84 kg
Jumlah = 252.96 kg