No Item QTY Total Cost / item

I PEKERJAAN AWAL
II PEKERJAAN DINDING
III PEKERJAAN ALUMUNIUM
IV PEKERJAAN STUDIO BOOTH
V PEKERJAAN PENGECATAN
VI PEKERJAAN MEKANIKAL ELEKTRIKAL
VII PEKERJAAN ARMATUR
VIII PEKERJAAN FURNITURE
IX PEKERJAAN AKSESORIS
X PEKERJAAN AKSESORIS STUDIO BOOTH
XI PEKERJAAN OUTDOOR
XII PEKERJAAN LAIN - LAIN

Rp -

DISCOUNT

GRAND TOTAL
No Item SPESIFICATION QTY Total Cost / item
PEKERJAAN AWAL
1 Pemakaian listrik kerja 1.00 bulan ###
2 Keamanan 1.00 m2 ###
3 Transportasi dan Akomodasi selama Proyek 1.00 m3 ###
4 Mobilisasi Pekerja 1.00 m2 ###
Total Rp -
PEKERJAAN DINDING
1 Panel Gypsum kiri (12 m x 1 m) 1 muka 12.00 m² ###
2 Panel Gypsum kanan (6.5 m x 3.5 m) 1 muka 22.75 m²
3 Partisi Kitchen (2.5 m x 3.5 m) 2 muka 8.75 m²
4 Partisi tangga (3 m x 3 m) 2 muka 9.00 m²
Total Rp -
PEKERJAAN ALUMUNIUM
1 Pintu Kitchen (0.8 m x 2.1 m) 1.00 set
2 Jendela Kitchen (1.6 m x 1 m) 1.00 set
Total Rp -
PEKERJAAN STUDIO BOOTH
1 Partisi Studio (1 m + 1.3 m + 1.8 m +1.3 m) x 2.1 m 1.00 set
2 Pintu Swing (0.9 m x 2.5 m) 1.00 set
3 Levelling lantai +15 cm (2 m x 3 m) 1.00 set
4 Panel Peredam Dinding (3 m x 2.5 m) 1.00 set
5 Panel Peredam Lantai (2 m x 3 m) 1.00 set
6 Busa Diffuser (3 m x 2.5 m) 1.00 set
Total Rp -
PEKERJAAN PENGECATAN
1 Concrete look kanan (3.5 m x 3.5 m) 12.25 m²
2 Concrete look Kiri (12 m x 1 m) 12.00 m²
3 Dinding Kiri Warna Gelap (3 m x 3.5 m) 10.50 m²
4 Partisi Dapur Warna Gelap (2.5 m x 3.5 m) 8.75 m²
5 Dinding (8 m x 3.5 m) + (6 m x 3.5 m) + (4 m x 3.5 m) 63.00 m²
6 Dinding Kitchen dll 40.00 m²
7 Cat Plafond (4 m x 12 m) 48.00 m²
Total Rp -
PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Instalasi Stop Kontak 8.00 ttk
2 Instalasi Saklar Tunggal 8.00 ttk
3 Instalasi Saklar Ganda 4.00 ttk
4 Instalasi Stop Kontak AC 3.00 ttk
5 Instalasi titik lampu 12.00 ttk
6 MCB 2.00 bh
7 Router Penguat Signal Internet 1.00 bh
Total Rp -
PEKERJAAN ARMATUR
1 Stop Kontak 8.00 bh
2 Stop Kontak Pararel 4 2.00 bh
3 Saklar Tunggal 8.00 bh
4 Saklar Ganda 4.00 bh ###
5 Lampu Spotlight indoor 5.00 bh ###
6 Lampu Gantung 3.00 bh
7 Lampu Rel Isi 5 3.00 bh
8 General Light 4.00 bh
9 AC 1 PK 2.00 bh
10 AC 1 PK Inverter 1.00 bh
- Total Rp -
PEKERJAAN FURNITURE
1 Kursi Café 1 8.00 bh
2 Meja Café Kecil (0.6 m x 0.6 m) 4.00 bh
3 Kursi Café 2 4.00 bh
4 Meja Café Besar (1.6 m x 1 m) 1.00 bh
5 Sofa 1 Seat 2.00 bh
6 Coffee Table Bulat (dia. 0.6 m) 1.00 bh
7 Sofa 2 Seat 1.4 m 2.00 bh
8 Ottoman (dia. 0.55 m) 4.00 bh
9 Coffee Table Kotak (0.45 m x 0.45 m) 4.00 bh
10 Rak Kitchen (1.6 m x 3 m) 1.00 Set
Total Rp -
PEKERJAAN AKSESORIS
1 Cermin Bulat (dia. 0.8 m) 4.00 bh
2 Aneka Frame 1.00 Set
3 Stiker "DEHILLS RADIO" 2 m 1.00 bh
4 Frame Vintage (1.5 m x 1 m) 1.00 bh
5 Pot Tanaman 2.00 bh
6 Papan Menu (2.2 m x 0.9 m) 1.00 bh
Total Rp -
PEKERJAAN AKSESORIS STUDIO BOOTH
1 Neon Box "ON AIR" (1.3 m x 0.9 m) 2.00 bh
2 Meja Siaran (1.5 m x 0.8 m) 1.00 Set
3 Kursi Siaran 2.00 bh
4 Smart Lamp 1.00 bh
5 Smart TV 43 inch 1.00 bh
6 Cutting Sticker (2 m x 1 m) 2.00 bh
Total Rp -
PEKERJAAN OUTDOOR
1 Canopy Kain (4 m x 2.5 m) 10.00 m²
2 Lampu Outdoor 2.00 bh
3 Neon Box Logo "DEHILLS" (1 m x 1 m) 1.00 set
4 Kursi Café 3 (Bench) 8.00 bh
5 Meja Café 3 4.00 bh
6 Pot Tanaman 4.00 bh
Total Rp -
PEKERJAAN LAIN - LAIN
1 Buang Puing 1.00 rit
Total Rp -
TOTAL Rp -
BILL OF QUANTITY
Nama Pekerjaan : Renovasi Rumah Klender

NO ITEM
No PEKERJAAN AWAL VOLUME SATUAN HARGA MATERIAL TOTAL
1 Pemakaian listrik kerja 1.00 bln 1,000,000.00 Rp 1,000,000
2 Keamanan,(koordinasi dengan security internal, Sistem
Reimbustment jika dari pihak luar) 1.00 Ls 500,000.00 Rp 500,000
3 Transportasi dan Akomodasi selama Proyek 1.00 Ls 500,000.00 Rp 500,000
4 Mobilisasi Pekerja 1.00 Ls 500,000.00 Rp 500,000
Rp 2,500,000
No PEKERJAAN DINDING VOLUME SATUAN HARGA SATUAN
1 Panel Gypsum kiri (12 m x 1 m) 1 muka 12.00 m² 180,000.00 2,160,000
2 Panel Gypsum kanan (6.5 m x 3.5 m) 1 muka 22.75 m² 180,000.00 4,095,000
3 Partisi Kitchen (2.5 m x 3.5 m) 2 muka 8.75 m² 300,000.00 2,625,000
4 Partisi tangga (3 m x 3 m) 2 muka 9.00 m² 300,000.00 2,700,000
Rp 11,580,000
No PEKERJAAN ALUMUNIUM VOLUME SATUAN HARGA SATUAN
1 Pintu Kitchen (0.8 m x 2.1 m) 1.00 set 3,250,000.00 3,250,000
2 Jendela Kitchen (1.6 m x 1 m) 1.00 set 2,100,000.00 2,100,000
Rp 5,350,000
No PEKERJAAN STUDIO BOOTH VOLUME SATUAN HARGA SATUAN
1 Partisi Studio (1 m + 1.3 m + 1.8 m +1.3 m) x 2.1 m 1.00 set 3,510,000.00 3,510,000
2 Pintu Swing (0.9 m x 2.5 m) 1.00 set 3,250,000.00 3,250,000
3 Levelling lantai +15 cm (2 m x 3 m) 1.00 set 2,100,000.00 2,100,000
4 Panel Peredam Dinding (3 m x 2.5 m) 1.00 set 337,500.00 337,500
5 Panel Peredam Lantai (2 m x 3 m) 1.00 set 270,000.00 270,000
6 Busa Diffuser (3 m x 2.5 m) 1.00 set 1,875,000.00 1,875,000
Rp 11,342,500
Pekerjaan Pengecatan
1 Concrete look kanan (3.5 m x 3.5 m) 12.25 m² 75,000.00 Rp 918,750
2 Concrete look Kiri (12 m x 1 m) 12.00 m² 75,000.00 Rp 900,000
3 Dinding Kiri Warna Gelap (3 m x 3.5 m) 10.50 m² 55,000.00 Rp 577,500
4 Partisi Dapur Warna Gelap (2.5 m x 3.5 m) 8.75 m² 55,000.00 Rp 481,250
5 Dinding (8 m x 3.5 m) + (6 m x 3.5 m) + (4 m x 3.5 m) 63.00 m² 55,000.00 Rp 3,465,000
6 Dinding Kitchen dll 40.00 m² 55,000.00 Rp 2,200,000
7 Cat Plafond (4 m x 12 m) 48.00 m² 55,000.00 Rp 2,640,000
Rp 11,182,500
No PEKERJAAN MEKANIKAL ELEKTRIKAL VOLUME SATUAN HARGA SATUAN
1 Instalasi Stop Kontak 8.00 ttk 270,000.00 Rp 2,160,000
2 Instalasi Saklar Tunggal 8.00 ttk 320,000.00 Rp 2,560,000
3 Instalasi Saklar Ganda 4.00 ttk 330,000.00 Rp 1,320,000
4 Instalasi Stop Kontak AC 3.00 ttk 375,000.00 Rp 1,125,000
5 Instalasi titik lampu 12.00 ttk 190,000.00 Rp 2,280,000
6 MCB 2.00 bh 120,000.00 Rp 240,000
7 Router Penguat Signal Internet 1.00 bh 1,500,000.00 Rp 1,500,000
Rp 11,185,000
No PEKERJAAN ARMATUR VOLUME SATUAN HARGA SATUAN
1 Stop Kontak 8.00 bh 45,000.00 Rp 360,000
2 Stop Kontak Pararel 4 2.00 bh 60,000.00 Rp 120,000
2 Saklar Tunggal 8.00 bh 25,000.00 Rp 200,000
3 Saklar Ganda 4.00 bh 30,000.00 Rp 120,000
4 Lampu Spotlight indoor 5.00 bh 120,000.00 Rp 600,000
6 Lampu Gantung 3.00 bh 500,000.00 Rp 1,500,000
7 Lampu Rel Isi 5 3.00 bh 450,000.00 Rp 1,350,000
8 General Light 4.00 bh 120,000.00 Rp 480,000
9 AC 1 PK 2.00 bh 6,500,000.00 Rp 13,000,000
10 AC 1 PK Inverter 1.00 bh 7,500,000.00 Rp 7,500,000
Rp 25,230,000
No PEKERJAAN FURNITURE VOLUME SATUAN HARGA SATUAN
1 Kursi Café 1 8.00 bh 550,000.00 Rp 4,400,000
2 Meja Café Kecil (0.6 m x 0.6 m) 4.00 bh 600,000.00 Rp 2,400,000
3 Kursi Café 2 4.00 bh 490,000.00 Rp 1,960,000
4 Meja Café Besar (1.6 m x 1 m) 1.00 bh 4,900,000.00 Rp 4,900,000
5 Sofa 1 Seat 2.00 bh 3,500,000.00 Rp 7,000,000
7 Coffee Table Bulat (dia. 0.6 m) 1.00 bh 620,000.00 Rp 620,000
8 Sofa 2 Seat 1.4 m 2.00 bh 4,300,000.00 Rp 8,600,000
9 Ottoman (dia. 0.55 m) 4.00 bh 800,000.00 Rp 3,200,000
10 Coffee Table Kotak (0.45 m x 0.45 m) 4.00 bh 500,000.00 Rp 2,000,000
11 Rak Kitchen (1.6 m x 3 m) 1.00 Set 4,000,000.00 Rp 4,000,000
Rp 39,080,000
No PEKERJAAN AKSESORIS VOLUME SATUAN HARGA SATUAN
1 Cermin Bulat (dia. 0.8 m) 4.00 bh 1,200,000.00 Rp 4,800,000
2 Aneka Frame 1.00 Set 1,000,000.00 Rp 1,000,000
3 Stiker "DEHILLS RADIO" 2 m 1.00 bh 700,000.00 Rp 700,000
4 Frame Vintage (1.5 m x 1 m) 1.00 bh 1,500,000.00 Rp 1,500,000
5 Pot Tanaman 2.00 bh 500,000.00 Rp 1,000,000
6 Papan Menu (2.2 m x 0.9 m) 1.00 bh 1,000,000.00 Rp 1,000,000
Rp 10,000,000
No PEKERJAAN AKSESORIS STUDIO BOOTH VOLUME SATUAN HARGA SATUAN
1 Neon Box "ON AIR" (1.3 m x 0.9 m) 2.00 bh 1,200,000.00 Rp 2,400,000
2 Meja Siaran (1.5 m x 0.8 m) 1.00 Set 2,500,000.00 Rp 2,500,000
3 Kursi Siaran 2.00 bh 2,400,000.00 Rp 4,800,000
4 Smart Lamp 1.00 bh 650,000.00 Rp 650,000
5 Smart TV 43 inch 1.00 bh 4,500,000.00 Rp 4,500,000
6 Cutting Sticker (2 m x 1 m) 2.00 bh 650,000.00 Rp 1,300,000
Rp 16,150,000
No PEKERJAAN OUTDOOR VOLUME SATUAN HARGA SATUAN
1 Canopy Kain (4 m x 2.5 m) 10.00 m² 800,000.00 Rp 8,000,000
2 Lampu Outdoor 2.00 bh 380,000.00 Rp 760,000
3 Neon Box Logo "DEHILLS" (1 m x 1 m) 1.00 set 3,920,000.00 Rp 3,920,000
4 Kursi Café 3 (Bench) 8.00 bh 550,000.00 Rp 4,400,000
5 Meja Café 3 4.00 bh 500,000.00 Rp 2,000,000
6 Pot Tanaman 4.00 bh 500,000.00 Rp 2,000,000
Rp 21,080,000
No PEKERJAAN LAIN - LAIN VOLUME SATUAN HARGA SATUAN
1 Buang Puing 1.00 rit 400,000.00 Rp 400,000
Rp 400,000
TOTAL KESELURUHAN 165,080,000
BILL OF QUANTITY
Nama Pekerjaan : Renovasi Rumah Klender

NO ITEM
No PEKERJAAN AWAL VOLUME SATUAN HARGA MATERIAL HARGA UPAH TOTAL

1 Pemakaian listrik kerja 1.00 bln 1,000,000.00 Rp 1,000,000


Keamanan,(koordinasi dengan security internal, Sistem
2 Reimbustment jika dari pihak luar) 1.00 Ls 500,000.00 Rp 500,000

3 Transportasi dan Akomodasi selama Proyek 1.00 Ls 500,000.00 Rp 500,000

4 Mobilisasi Pekerja 1.00 Ls 500,000.00 Rp 500,000


TOTAL
No PEKERJAAN DINDING VOLUME SATUAN HARGA SATUAN HARGA UPAH

1 Panel Gypsum kiri (12 m x 1 m) 1 muka 12.00 m² -


2 Panel Gypsum kanan (6.5 m x 3.5 m) 1 muka 22.75 m² -
3 Partisi Kitchen (2.5 m x 3.5 m) 2 muka 8.75 m² -
4 Partisi tangga (3 m x 3 m) 2 muka 9.00 m² -
TOTAL
No PEKERJAAN ALUMUNIUM VOLUME SATUAN HARGA SATUAN HARGA UPAH
Pintu Kitchen (0.8 m x 2.1 m)
1 1.00 set -
Jendela Kitchen (1.6 m x 1 m)
2 1.00 set -

No PEKERJAAN STUDIO BOOTH VOLUME SATUAN HARGA SATUAN HARGA UPAH

1 Partisi Studio (1 m + 1.3 m + 1.8 m +1.3 m) x 2.1 m 1.00 set -

2 Pintu Swing (0.9 m x 2.5 m) 1.00 set -

3 Levelling lantai +15 cm (2 m x 3 m) 1.00 set -

4 Panel Peredam Dinding (3 m x 2.5 m) 1.00 set -

5 Panel Peredam Lantai (2 m x 3 m) 1.00 set -

6 Busa Diffuser (3 m x 2.5 m) 1.00 set -


TOTAL
Pekerjaan Pengecatan

1 Concrete look kanan (3.5 m x 3.5 m) 12.25 m² Rp -

2 Concrete look Kiri (12 m x 1 m) 12.00 m² Rp -

3 Dinding Kiri Warna Gelap (3 m x 3.5 m) 10.50 m² Rp -

4 Partisi Dapur Warna Gelap (2.5 m x 3.5 m) 8.75 m² Rp -

5 Dinding (8 m x 3.5 m) + (6 m x 3.5 m) + (4 m x 3.5 m) 63.00 m² Rp -

6 Dinding Kitchen dll 40.00 m² Rp -

7 Cat Plafond (4 m x 12 m) 48.00 m² Rp -


TOTAL
No PEKERJAAN MEKANIKAL ELEKTRIKAL VOLUME SATUAN HARGA SATUAN HARGA UPAH

1 Instalasi Stop Kontak 8.00 ttk Rp -

2 Instalasi Saklar Tunggal 8.00 ttk Rp -

3 Instalasi Saklar Ganda 4.00 ttk Rp -

4 Instalasi Stop Kontak AC 3.00 ttk Rp -

5 Instalasi titik lampu 12.00 ttk Rp -

6 MCB 2.00 bh Rp -

7 Router Penguat Signal Internet 1.00 bh Rp -


No PEKERJAAN ARMATUR VOLUME SATUAN HARGA SATUAN HARGA UPAH

1 Stop Kontak 8.00 bh Rp -

2 Stop Kontak Pararel 4 2.00 bh Rp -

2 Saklar Tunggal 8.00 bh Rp -

3 Saklar Ganda 4.00 bh Rp -

4 Lampu Spotlight indoor 5.00 bh Rp -

6 Lampu Gantung 3.00 bh Rp -

7 Lampu Rel Isi 5 3.00 bh Rp -

8 General Light 4.00 bh Rp -

9 AC 1 PK 2.00 bh Rp -

10 AC 1 PK Inverter 1.00 bh Rp -
TOTAL
No PEKERJAAN FURNITURE VOLUME SATUAN HARGA SATUAN HARGA UPAH

1 Kursi Café 1 8.00 bh Rp -

2 Meja Café Kecil (0.6 m x 0.6 m) 4.00 bh Rp -

3 Kursi Café 2 4.00 bh Rp -

4 Meja Café Besar (1.6 m x 1 m) 1.00 bh Rp -

5 Sofa 1 Seat 2.00 bh Rp -

7 Coffee Table Bulat (dia. 0.6 m) 1.00 bh Rp -

8 Sofa 2 Seat 1.4 m 2.00 bh Rp -

9 Ottoman (dia. 0.55 m) 4.00 bh Rp -

10 Coffee Table Kotak (0.45 m x 0.45 m) 4.00 bh Rp -

11 Rak Kitchen (1.6 m x 3 m) 1.00 Set Rp -

No PEKERJAAN AKSESORIS VOLUME SATUAN HARGA SATUAN HARGA UPAH

1 Cermin Bulat (dia. 0.8 m) 4.00 bh Rp -

2 Aneka Frame 1.00 Set Rp -

3 Stiker "DEHILLS RADIO" 2 m 1.00 bh Rp -

4 Frame Vintage (1.5 m x 1 m) 1.00 bh Rp -

5 Pot Tanaman 2.00 bh Rp -

6 Papan Menu (2.2 m x 0.9 m) 1.00 bh Rp -

No PEKERJAAN AKSESORIS STUDIO BOOTH VOLUME SATUAN HARGA SATUAN HARGA UPAH

1 Neon Box "ON AIR" (1.3 m x 0.9 m) 2.00 bh Rp -

2 Meja Siaran (1.5 m x 0.8 m) 1.00 Set Rp -

3 Kursi Siaran 2.00 bh Rp -

4 Smart Lamp 1.00 bh Rp -

5 Smart TV 43 inch 1.00 bh Rp -

6 Cutting Sticker (2 m x 1 m) 2.00 bh Rp -

No PEKERJAAN OUTDOOR VOLUME SATUAN HARGA SATUAN HARGA UPAH

1
Canopy Kain (4 m x 2.5 m) 10.00 m² Rp -

2
Lampu Outdoor 2.00 bh Rp -

3
Neon Box Logo "DEHILLS" (2 m x 1 m) 1.00 set Rp -

4
Kursi Café 3 (Bench) 8.00 bh - Rp -

5
Meja Café 3 4.00 bh - Rp -

6
Pot Tanaman 4.00 bh - Rp -
TOTAL
No PEKERJAAN LAIN - LAIN VOLUME SATUAN HARGA SATUAN HARGA UPAH
1
Buang Puing 1.00 rit Rp -
TOTAL

2,500,000
BERITA ACARA SERAH
TERIMA PEKERJAAN

Subject Yusuf Satria Boy - Ibu Maya DATE 30 November 2020


Address
Email
Phone - -

Pada hari ini, Senin tanggal 30 bulan November, tahun 2020 kami yang bertandatangan
dibawah ini :

i. Nama : Andrian Salim


Jabatan : Pelaksana Lapangan

ii Nama : Yusuf Satria Boy


Jabatan : User

Dengan ini setuju dan sepakat melakukn serah terima Pekerjaan Renovasi Carport Rumah Hunian Rawamangun
dengan ketentuan sebagai berikut :

Berdasarkan hasil pemeriksaan pekerjaan, pihak kedua dapat menerima hasil pekerjaan dengan
1 baik dan tersusun rapih, bersama berita acara ini sekaligus dilakukan serah terima Pekerjaan
Kepada Penerima Manfaat

2 Pihak Pertama telah menyerahkan hasil pekerjaan kepada Pihak kedua yang menerima dengan
baik pekerjaan.

3 Apabila terjadi kerusakan dikarenakan pemakaian akan menjadi tanggung jawab penerima
manfaat.

Demikian Berita Acara Serah Terima Pekerjaan ini sehingga dapat digunakan sebagai mana mestinya

Pihak Pertama Pihak Kedua

Andrian Salim Yusuf Satria Boy


Pelaksana Lapangan User