You are on page 1of 1

Adelfa Labor Cost Total Cost

Item Description qty unit


Electrical
1 Outlet Set 2 gang 3 pcs 350.00 1050.00
3 Electrical Tape 2 pcs 0.00
4 Utility Box 6 pcs 0.00
5 Junction Box 2 pcs 50.00 100.00
6 #18 Flat Cord 10 m 10.00 100.00
7 #16 Flat Cord 10 m 10.00 100.00
8 Electrical Moulding 3/4" 4 pcs 50.00 200.00
9 Switch 3 pcs 350.00 1050.00
Plumbing 0.00
1 T-shower w/ Faucet 1 set 350.00 350.00
2 Flexible Hose 1/2"x 1' 1 pcs 0.00
3 Lavatory 1 pcs 2500.00 2500.00
4 T.B. water tank fittings 1 set 700.00 700.00
5 2 way valve for ablosion 1/2" 1 pcs 0.00
6 End cap 1/2" 1 pcs 0.00
7 Lavatory drain 1 pcs 150.00 150.00
8 Shut Off valve 1/2" 1 pcs 0.00
9 Floor Drain 1 pcs 150.00 150.00
Carpentry 0.00
1 Door 2 set 1000.00 2000.00
3 Head Board 1 set 2500.00 2500.00
4 Door knob 2 pcs 0.00
5 Hinges 4"x2" 3 pcs 0.00
6 Terrace Repair 1 set 1000.00 1000.00
7 sink Cabinet 1 set 0.00
Painting Works 0.00
1 Interior and exterior 192.4 sq.m 40.00 7696.00
2 Flat white 7 galon 0.00
Furniture 0.00
1 flat wall boysen 1 gallon 0.00
Grand Total 19646

You might also like