ESTIMATION FOR PROPOSED COMMERCIAL SHOP FOR SRI . DATTU.

SHOP 140, 2ND FLOOR,


SATELLITE BUILDING ,AT HUBLI.
Sl. NO. Description Qty AMOUNT
1 Plywood, Sanmica & Fevicol
19mm ply 11 2304.00 25344.00
12mm ply 7 1856.00 12992.00
White Laminate 13 380.00 4940.00
Favicol WR 20KG 4800.00
Favicol Marine 4KG 1000.00
Favicol Heat-x 2Liters 900.00
Sagavan Pati 100 RFt 1050.00
Silk mica (5710 - SST) 1.0 mm 6 1000.00 6000.00
Panama Lam (5545 - ITL) 0.8 MM 8 710.00 5680.00
Transport (carpainter items) 500.00
Abro Tape 40 MTS (2 SET) 450.00 900.00

2 Hardware Item's
i Nail's
2" * 12 no 1KG 110.00
1.1/2" * 14 NO 1KG 110.00
1.25" * 14 NO 1KG 120.00
1" * 17 NO 1/2 KG 70.00
19 * 3/4 1/4 KG 35.00
1.1/4" 12 NO 1/4 KG 30.00

ii Screw's
50 * 8 1 BOX 120.00
60 * 8 1 BOX 120.00
19*6 300 Pc's 380.00
1" Machine Screw's 10 Pc's 50.00
32*8 12 Pc's 50.00

iii Wodden Fitting's


L Hing's => 4" * 3/4" * 19 mm 14 Pc's 1600.00
L Hing's => 3" * 3/4" * 19 mm 2 Pc's 300.00
L Hing's => 3" * 3/4" * 6 mm 4 Pc's 350.00
0 Degree Auto Hinges 1 Set 280.00
20" Drawer Channel (S.S) 1 Set 600.00
Magnet's 17 Pc's 306.00
Consiled Handel's 7 Pc's 805.00
8" chain's 17 Pc's 550.00
Zig Zak Pin 100 Pc's 100.00
Drawer Lock's 2 Pc's 1000.00

iV Glass Fitting's
Channel 16' R.Ft 1850.00
Stud's 3/4" 12 Pc's 200.00
Floor spring 90kg © 1 Set 1500.00
Floor spring 120kg © 1 Set 2000.00
Top Hing's 2 Pc's 1000.00
Bottom Hing's 2 Pc's 1000.00
Paviot's 2 Pc's 350.00
12" SS Handel's 2 Set's 750.00
Glass To Wall (Lock) 1 Pc's 850.00

3 Eletric Item's
Telephone Wire 5 Mt's 50.00
Camara Wire 23 Mt's 380.00
Fan Rod 24" 2 Set's 160.00
POP Light's 6 watt 10 Pc's 1900.00
Switch Board 1 450.00
Tube light 1 380.00
Anchor Bolt's 2 set's 150.00
3/4" Clamp's 20 Pc's 40.00
3/4" Junction Box 12 Pc's 80.00
3/4" Pipe's 12 Pc's 360.00
3/4" Flexibal 3 Mt's 30.00
3/4" Bend's 10 Pc's 50.00
3/4" Bend's 5 Pc's 25.00
1.0 Sq mm wire 4 box 2040.00
2.5 Sq mm wire 1 box 1450.00
2 model metel box 1 Pc's 60.00
6 model metel box 1 Pc's 230.00
18 model metel box 1 Pc's 500.00

4 Labour Payment's
carpainter Lum/Sum 25000.00
Pop Lum/Sum 13000.00
Glass 12mm Lum/Sum 30000.00 20000.00
Eletrican Lum/Sum 5000.00 3500.00
Tile & Wall Patch Up work Lum/Sum 650.00

TOTAL AMOUNT EXPENSE'S : ₹ 1,51,177.00


AMOUNT RECIVED : ₹ 1,50,000.00
LAGGING BALANCE AMOUNT : -₹ 1,177.00