JOSEFINO D. MINGUILLAN JR.

Block 51 lot 11 Dela Costa Homes V Ph1 Brgy. Burgos, Rodriguez, Rizal

BILL OF MATERIALS AND LABOR

Job Description Qty Unit Price Total

Plywood 24 pcs 430.00 10,320.00

2x2x10 Tanguili rough wood 26 pcs 156 .00 4,056.00

#4 CW nail 2kls 75.00 150.00

#3 CW nail 2kls 75.00 150.00

#2CW Nail 2kls 75.00 150.00

#1 ½ CW Nail Finishing 2kls 95.00 190.00

#2 CW Nail Finishing 2kls 95.00 190.00

#4 Concrete Nail 1kl 105.00 105.00

#3 Concrete Nail 1kl 105.00 105.00

#2 Concrete Nail 1kl 105.00 105.00

Sink 1pc 4000.00 4,000.00

Pvc pipes 10 pcs 400.00 4,000.00

Hydraulic (Bisagra) 32 pcs 70.00 2,240

Screw 200pcs 2.00 400.00

Electrical Wire 2 bxs 2800 5,600.00

Electrical Outlet 6pcs 200 .00 1,200.00

Switch 7pcs 200.00 1,400.00

Enamel Paint 4gals 535.00 2,140

Latex Paint 4 gals 580.00 2,320.00

LABOR-Carpenter 15 days 800/day 12,000

LABOR-Helper 15 days 600/day 9,000

Circuit breaker 1pc 4,000.00 5,243.00

=65,064.00
For Windows and Doors

Wooden door 3,500.00

Windows/glass jalousie 1,500.00

Mosquito wire 9mtrs 140 .00 1,260.00

1x2x8 Tanguile Kiln Dried Wood (for framing) 8pcs 85.00 680.00

1x2x2x8 Kiln Dried wood (for framing) 8pcs 62.00 496.00

LABOR COST 7,500.00

=14,936.00

TOTAL COST 80,000.00

JOSEFINO D. MINGUILLAN JR.

Owner