Project: Residential House

Location: Blk. 6, Lot 6, Novel St. KS-20 Lancaster Estate, General Trias, Cavite
Package: Civil Works

BILL OF MATERIALS:
Item Description Quantity Unit Unit Price Total Cost
(PHP) (PHP)
36,152
Rebar 10 mm 240 pcs 152
Rebar 12 mm 110 pcs 220 24,200
Rebar 16 mm 45 pcs 394 17.730
Tie Wire #16 3 rolls 1,500 4500
"2 20 kg 90 1800
Common Nail "3 60 kg 90 5,400
"4 15 kg 90 1,350
Welding Rod - 15 kls 105 1575
Cut-Off Disc "16 inches 10 pcs. 220 2,200
Sand - 36 cu.m 2,300 82,800
Gravel - 26 cu. 3,000 78,000
Cement - 250 bags 240 60,000
Penolic 3/4 thick 14 pcs 720 10,080
Coco Lumber 2X3X10 120 pcs 135 16,200
Roofing RYB 6 m 900 5,400
1 1/2X 1 pcs
Angle Bar 1/2X1/8- 4 450 1800
C-Furlins 2" X 4" X 12" 4 pcs 485 1,940
Red Oxide Steel Paint 3 gals 492 1,476

Item Description Quantity Unit Unit Price Unit Cost


(PHP) (PHP)
Epoxy Enamel Finishing Paint 3 gals 868 2604
Text Screw 3" 150 pcs 5 750
GI Plain Sheet Gauge 20 3 pcs 360 1,080
Gutter - 3 pcs 490 1470
Skimmed Coat - 20 bags 395 7,900
#14 50 m 38 1900
Stranded Wire
#10 12 m 75 900
#12 20 m 46 920
Junction Box and Cover Junction box 2 box 48 96
Utility Box - 4 - 30 120
Grinder Disc “4 10 pcs 95 1425
Electrical Tape - 1 roll 65 65
Tapelon Tape - 10 pcs 32 320
Conduit Hose 3/4 Flexible 50 meters 12 600
Switch single 3 pcs 138 414
Female Adapter ½” 3 pcs 15 45
Male Adapter ½” 2 pcs 15 30
C/O 3 gang 2 pcs 160 320
Bulb 13w LED 5 pcs 135 675
2” X 2’ X 20” 4 pcs 675 2,700
1” X 2” X 20” 14 pcs 585 8,190
Tubular Steel
2” X 4” X 10” 2 pcs 893 1,786
Spandrel ceiling sheet 5,500
3” X 8” X ¼” 4 pcs 425 1700
uPVC Pipes ½” X 8” X ¼” 3 pcs 98 294
2” X 8” X ¼” 1 pcs 388 388

Item Description Quantity Unit Unit Price Unit Cost


(PHP) (PHP)
uPVC Elbow 3" X 8 “X ¼” 3 pcs 74 222
uPVC P-Trap 2" X 8” X ¼” 1 pcs 120 120
Neltex Glue pipe jointing 1 liter 300 300
Sandpaper - 10 pcs 20 200
Room door door 1 pc 3180 3180

Total Material Cost: 381,105


Labor Cost: 325,000
Mobilization: 5,000
Dismantling: 5,000
Clearing: 18.000
Hauling: 18,000

GRAND TOTAL 734,123

NOTES:
1. Terms of Payment
 40% of the down payment from the total project cost
 60% progress billing

2. The warranty does not include any failure due to any accident, misuse, abuse, and natural risk occurrences such as typhoons,
floods, earthquakes, etc.

3. Tiles, grout, diamond blade, tile adhesive, Structural finishing paint, and bricks for the terrace are not included in the materials’
cost.

4. Weekly payroll will be collected from the client deductible from the contractor’s remaining balance.

You might also like