Module of Works Unit Unit Cost Qty Amount
No.
A BATTERBOARD:
Measure:
Total Perimeter m 18
Number of Outer Corner units 4
Number of Inside Corner units 0
Computed Length
CL = TP + OC*2m - IC*2m m 26
B EXCAVATION:
width m 0.30
depth m 0.45
length m 20.00
volume = w x d x L m³ 2.70
width m 1.00
length m 1.00
depth m 0.90
number units 4.00
volume = w x L x d x n m³ 3.60
width m 0.30
thickness m 0.15
length m 20.00
area = w x L m² 6.00
volume = w x t x L m³ 0.90
Materials:
Gravel bed - 3/4" = [(A1+A2+An)x0.05]+10% m³ 0.66
Concrete Mixture: Class B - 2000 to 2500 psi
Portland Cement = Vol x 7 bags/cu.m. bags 13
White Sand = Vol x 0.50 cu.m. / cu.m. m³ 0.900
Gravel bed - 3/4" = Vol x 0.99 cu.m. / cu.m. m³ 1.782
width m 1.00
length m 1.00
thickness m 0.25
number units 4
area = w x L x n m² 4.00
volume = w x L x d x n m³ 1.00
dim 1 m 0.30
dim 1 m 0.30
length m 3.00
number units 4
volume = d1 x d2 x L x n m³ 3.60
Materials:
Concrete Mixture: Class B - 3000 to 3500 psi
Portland Cement = Vol x 8.5 bags/cu.m. bags 102
White Sand = Vol x 0.48 cu.m. / cu.m. m³ 5.760
Gravel bed - 3/4" = Vol x 0.96 cu.m. / cu.m. m³ 11.520
dim 1 m 0.20
dim 1 m 0.30
length m 30.00
volume = d1 x d2 x L x n m³ 1.80
Materials:
Concrete Mixture: Class B - 3000 to 3500 psi
Portland Cement = Vol x 8.5 bags/cu.m. bags 34
White Sand = Vol x 0.48 cu.m. / cu.m. m³ 1.901
Gravel bed - 3/4" = Vol x 0.96 cu.m. / cu.m. m³ 3.802
length m 4.00
width m 3.00
thickness m 0.10
volume = L x W x t m³ 1.20
Materials:
Concrete Mixture: Class B - 3000 to 3500 psi
Portland Cement = Vol x 8.5 bags/cu.m. bags 19
White Sand = Vol x 0.48 cu.m. / cu.m. m³ 1.051
Gravel bed - 3/4" = Vol x 0.96 cu.m. / cu.m. m³ 2.102
length m 4.00
width m 3.00
thickness m 0.10
area = L x W m² 12.00
volume = L x W x t m³ 1.20
Materials:
Gravel bed - 3/4" = [(A1+A2+An)x0.05]+10% m³ 1.20
Concrete Mixture: Class B - 2000 to 2500 psi
Portland Cement = Vol x 7 bags/cu.m. bags 15
White Sand = Vol x 0.50 cu.m. / cu.m. m³ 1.095
Gravel bed - 3/4" = Vol x 0.99 cu.m. / cu.m. m³ 2.168
H FORM WORKS:
Columns:
Facing Area (Manually computed) m² 25.00
Facing Member (2"x2") = FA x 10.76BF/m² BF 269.00
Support & Brace (2"x2" & 2"x3") = FA x 18.83BF/m² BF 470.75
Totals:
Facing Members (2" x 2" wood) BF 1716.22
Supports & Braces (2" x 3" & 2" x 4" wood) BF 2910.88
Other Materials:
Total Facing Area m² 130.00
Number of Uses uses 3
Reqd Area = TFA / NU m² 43.33
Plywood 4' x 8' x 1/4" ordinary = RA / 2.98 shts 15
Lumber:
Facing Members = Total BF / NU BF 572.07
Supports & Braces = Total BF / NU BF 970.29
Total = BF 1542.37
Consumables:
CWN = TBF x 45 / 2500 kgs 28
#16 GI Wires = TBF x 45 / 4000 kgs 17
I CHB WALLS:
Materials Required:
6" CHB = A6 x 12.5 pcs 38
Materials Required:
4" CHB = A64x 12.5 pcs 35
J CHB REBARS:
Area (Specify) m² 28
Transverse Rebars:
Spacing of Bars m 0.30
Total length of WF1 m 20.00
Width of Wall Footing m 0.30
Effective Cut Size of Transbars = W-2x0.05 m 0.20
Number of WF1 units 4
Reqd Number of Cut Size = (L / S) + (1 x units) pcs 71
Number of cut size in 1-6m long rebars = 6.0/ECS pcs 30
Reqd 6.0m long Rebars = RN / NCS pcs 2
Longitudinal Rebars:
Number of Logitudinal Bars pcs 5
TNB Total number of bars pcs 20
CC Concrete Cover m 0.075
H If HookS are required, choose for bar dia:
for 12 mm (1/2") , add this length 0.33
for 16 mm (5/8") 0.43
for 20 mm (3/4") 0.51
for 25mm (1") 0.67
Ø Bar diameter mm 16
LB Length of one bar = L - (CC x 2) + H m 1.28
NCS No. of cut size in one-6.0m standard length pcs 5
Reqd 6.0m long Rebars = TNB / NCS pcs 4
(note: 0.30m for splicing allowance)
Required: 16mm Ø x 6.0 m Deformed Bars pcs 20
Transverse Rebars:
Number of Transverse Bars pcs 5
TNB Total number of bars pcs 20
CC Concrete Cover m 0.075
H If HookS are required, choose for bar dia:
for 12 mm (1/2") , add this length 0.33
for 16 mm (5/8") 0.43
for 20 mm (3/4") 0.51
for 25mm (1") 0.67
Ø Bar diameter mm 16
LB Length of one bar = L - (CC x 2) + H m 1.28
NCS No. of cut size in one-6.0m standard length pcs 5
Reqd 6.0m long Rebars = TNB / NCS pcs 4
(note: 0.30m for splicing allowance)
Required: 16mm Ø x 6.0 m Deformed Bars pcs 14
M COLUMN REBARS:
Main Bars:
Number of Bars pcs 8
TNB Total number of bars pcs 32
H Required L Hook, choose for bar dia:
for 12 mm (1/2") , add this length 0.153
for 16 mm (5/8") 0.203
for 20 mm (3/4") 0.254
for 25mm (1") 0.318
Ø Bar diameter mm 16
LB Length of one bar = L1+L2 - CC + H m 4.03
NCS No. of cut size in one-6.0m standard length pcs 1.49
Reqd 6.0m long Rebars = TNB / NCS pcs 21
0.40
0.45
15.00
2.70 0.00
CF-2 CF-3
1.00 1.50
1.20 1.50
0.90 1.50
4.00 4.00
4.32 9.00
WF-2 WF-3
0.40
0.15
15.00
6.00 0.00
0.90 0.00
CF2 CF3
1.00 1.20
1.20 1.50
0.25 0.25
4 4
4.80 7.20
1.20 1.50
C2 C3
0.40 0.25
0.40 0.30
3.00 3.00
4 4
4.80 3.60
FB-2 FB-3
0.20 0.20
0.40 0.40
12.00 15.00
0.96 1.20
S-2 S-3
3.00 2.00
2.50 1.20
0.10 0.10
0.75 0.24
S-2 S-3
3.00 2.00
2.50 1.20
0.10 0.10
7.50 2.40
0.75 0.24
WF-2 WF-3
3 3
15.00 0.00
8 0
0.30 0.30
15.00 0.00
0.30 0.30
0.20 0.20
4 0
54 0
30 30
2 0
CF-2 CF-3
1.00 1.20
1.20 1.50
0.25 0.25
4 4
6 8
24 32
0.075 0.075
0.33 0.33
0.43 0.43
0.51 0.51
0.67 0.67
16 16
1.48 1.78
4 3
6 9
5 6
20 24
0.075 0.075
0.33 0.33
0.43 0.43
0.51 0.51
0.67 0.67
16 16
1.28 1.48
5 4
4 6
C2 C3
0.40 0.25
0.40 0.30
3.00 3.00
0.90 0.90
0.08 0.08
4 4
8 6
32 24
0.153 0.153
0.203 0.203
0.254 0.254
0.318 0.318
20 16
4.08 4.03
1.47 1.49
22 16
BEAM (for 3 m span only)
LENGTH : 4.00 m No. of horizontal bar 12mm dia. : 0 units
12 mm dia. X 6 m : 0 pcs
16 mm dia. X 6 m : 17 pcs
CEMENT 12 bags
10 mm dia. X 6 m 33 pcs
CEMENT 2 bags
10 mm dia. X 6 m 8 pcs
FOOTING
CEMENT 4 bags
12 mm dia. X 6 m 5 pcs
COLUMN
LENGTH 3.9 m No. of VB (12 mm) : 2 units
NO OF COLUMNS 2 units
VOLUME 0.4 cu.m
10 mm dia. X 6 m 7 pcs
12 mm dia. X 6 m 3 pcs
16 mm dia. X 6 m 5 pcs
EXTERIOR WALLS
WIDTH 1.7 m
CEMENT 3 bags
10 mm dia. X 6 m 4 pcs
THICKNESS 0m
WIDTH 3m
CEMENT 3 bags
10 mm dia. X 6 m 8 pcs
SLAB on fill
CEMENT 18 bags
10 mm dia. X 6 m 30 pcs
WALL FOOTING
CEMENT 1 bags
10 mm dia. X 6 m 1 pcs
STAIRS
RISE 0.2 m No. of VB (12 mm and 10 mm) : 4 units
LENGTH 0.8 m
NO OF STEPS 13 units
10 mm dia. X 6 m 7 pcs
12 mm dia. X 6 m 15 pcs
10 13 4 4 4 25
12 0 3 2 0 5
16 24 5 4 3 36
WIDTH : 10.00 m
AREA : 50.00 m
HARDILITE : 17 pcs
HARDINAIL : 3.92 kg
2"X2"X12' : 54 pcs
CNW#3 : 3.70 kg
CN#4 : 0.30 kg
PARTITIONING
LENGTH : 3.10 m
AREA : 5.58 m
HARDIFLEX: 4 pcs
HARDINAIL : 1 kg
2"X2"X8' : 8 pcs
CNW#3 : 0.41 kg
CN#4 : 0.10 kg
5 2 1 1 1 10
15 7 4 2 4 32
4 2 2 8
1 1 1 3
8 8 8 24
AREA 4.5 sq m
AREA 5.58 sq m
P. COMPOUND 2 kg
6.4
6.4
2.2
4 3 4 2 2 15
***CONCRETING***
CONCRETE PROPORTIONING
Mixture Cement in Bags Sand Cu. Gravel Cu.
Proportion
Class 40 kls 50 kls M. M. Note:
AA 1 : 1.5 : 3 12 9.5 0.50 1.0 Class A = shall be used for beams, slabs, colum
A 1:2:4 9 7 0.50 1.0 Class B = shall be used for all members not re
B 1 : 2.5 : 5 7.5 6 0.50 1.0 Class C = used for footing not under water
C 1 : 3 :6 6 5 0.50 1.0
QUANTITY OF CEMENT AND SAND FOR CHB MORTAR PER SQUARE METER
Size of CHB number per Bags Cement Mixture
in cm Sq.M. A B C D sand cu.m.
10 x 20 x 40 13 0.792 0.522 0.394 0.328 0.044
15 x 20 x 40 13 1.526 1.018 0.763 0.633 0.084
20 x 20 x 40 13 2.260 1.500 1.125 0.938 0.125
Note: use for Mortar between chb anb its filler
QUANTITY OF REINFORCING STEEL BARS IN 1-WAY QUANTITY OF Tie Wire ON 1-WAY REINFO
REINFORCED CONCRETE SLAB
Bars Spacing
REBAR Number of Steel Bars per Square Meter in CM 6m
Spacing CM 6m 7.5 m 9m 12 0.30
10.0 3.764 2.937 2.421 1.769 10.0 0.474
12.5 3.062 2.381 1.934 1.427 12.5 0.316
15.0 2.584 2.004 1.636 1.197 15.0 0.228
17.5 2.232 1.726 1.407 1.033 17.5 0.168
20.0 1.980 1.528 1.258 0.914 20.0 0.132
22.5 1.786 1.369 1.109 0.81 22.5 0.110
25.0 1.627 1.25 1.014 0.736 25.0 0.089
QUANTITY OF REINFORCING STEEL BARS IN 2-WAY QUANTITY OF Tie Wire ON 2-WAY REINFO
REINFORCED CONCRETE SLAB
Bars Spacing
REBAR Number of Steel Bars per Square Meter in CM 6m
Spacing CM 6m 7.5 m 9m 12 0.30
10.0 4.369 3.337 2.772 2.022 10.0 0.592
12.5 3.603 2.662 2.245 1.635 12.5 0.416
15.0 3.221 2.296 1.921 1.382 15.0 0.350
17.5 2.647 2.025 1.650 1.196 17.5 0.247
20.0 2.360 1.775 1.461 1.056 20.0 0.174
22.5 2.168 1.601 1.312 0.907 22.5 0.168
25.0 1.977 1.466 1.217 0.862 25.0 0.142
***LUMBER***
***TILEWORKS***
*ETO GAMIT KO
5 to 25 kilos with at least 50% of the stones weighing more than 20 kilos
0 to 70 kilos with at least 50% of the stones weighing more than 50 kilos
0 to 100 kilos with at least 50% of the stones weighing more than 80 kilos
00 to 200 kilos with at least 50% of the stones weighing more than 150 kilos
ie Wire ON 2-WAY REINFORCED CONCRETE SLAB IN KILOS PER SQUARE METER chb mortar =
Legth Of Steel Bars rebar =
6m 7.5 m 9m 12 m gi wire # 16 = total kls / 30
0.40 0.30 0.40 0.30 0.40 0.30 0.40
0.896 0.648 0.863 0.648 0.864 0.596 0.794 HOW TO GET KLS OF TIE WIR
0.554 0.420 0.560 0.431 0.574 0.421 0.561 K=
0.466 0.307 0.409 0.257 0.343 0.297 0.396 OR
0.330 0.231 0.308 0.223 0.298 0.206 0.275 K=
0.232 0.171 0.227 0.173 0.231 0.163 0.217
0.224 0.150 0.200 0.148 0.198 0.130 0.173
0.189 0.134 0.178 0.114 0.152 0.116 0.155
sample
Board feet = (5pcs x 2" x 3" x 10')/12
TYPICAL
note: vert support, length of lumber depends on elevation
COLUMN BEAMS SLAB
vert 2x3x10 vert 2x3x10 vert 2x3x10
hor 2x3x10 hor 2x2x10
brace 2x2x10
0.025 ( WT OF RSB)
Project Two Storey Residential Building
Subject General Specifications
Location Town & Country Subdivision, Binan, Laguna
Owner
Area 84 sq.m
GENERAL SPECIFICATIONS
1 Footings Works
Column Footing Reinforced Concrete
Walll Footing Reinforced Concrete
2 Structural Works
Column Reinforced Concrete
Beams Reinforced Concrete
Slab on Fill Reinforced Concrete
2F Slab Reinforced Concrete
3 Walls
Interior Wall (T & B) 4" CHB
Exterior Walls/Common Walls 5" CHB
Bedroom Partition Hardiflex Board
4 Framing and Roofing
(Main Roof) Rib-Type Panels & Accessories Pre-painted Roof Panels and Accessories
Framing Steel Framing
5 Ceiling
Interior Fiber Cement Board on Metal Furrings
Eaves Fiber Cement Board on Metal Furrings
6 Floor Finishes
Ground Floor Ceramic Tiles
Second Floor Laminated Vinyl Tiles
7 Wall Finishes
Exterior Plastered Rough Troweled Finished
Interior Plastered Plain Cement Finished
T&B 5 Layers Wall Tiles/Floor Tiles
Upper wall-Plastered Plain Cement Finished
8 Doors and Jambs
Main Door Panel Type Door
Service Door Flush Door
Berdroom Doors Flush Door
T&B PVC Door
Locksets
9 Windows Steel Casement Windows
10 Kitchen Counter With Counter/Splashboard Tiles
With Counter Cabinet Door
11 Plumbing Works
Roughing-ins Standard PVC Pipes and Fittings
Fixtures Flush Type Water Closet, Wall Hang Lavatory
with Tissue and Soap Holder
Stainless Kit. Sink, Top Mounted Faucet. Chrome Faucet
and Hose bib faucet
Catch Basin
12 Stairs Reinforced Concrete with Tubular Handrailing
13 Electrical Works Circuit Breaker (Panel Board)
Roughing-ins Flexible Pipe and Wirings
Fixtures Circuit Breaker (Panel Board)
Outlets and Switches
14 Septic Tank Conventional Type
15 Painting Works Exterior Walls (2-Coats with Preparation)
Interior Walls ( 2-Coats with Preparation)
Prepared by:
Engr. Randy A. Caballes
approximate vol of concrete in bldg useful keys
=Assume 300mm thk all throughout X floor area of bldg CTRL+1 – Format
CTRL+SHIFT+L – Turn on/ o
approximate weight or rebars in a bldg per cu. M concrete CTRL + SPACE Select the w
footing 50-75 kls/cu.m. of concrete SHIFT + SPACE Select the w
slab 125-175 kls/cu.m. of concrete CTRL + ' Copy a formula from
column 150-190 kls/cu.m. of concrete press Ctrl+` (it is the key nex
walls 100-150 kls/cu.m. of concrete Now press Ctrl+H and chang
beams 120-150 kls/cu.m. of concrete – to UPPER, lower, Proper C
convert
chb mortar = 1:3 0.03 x area=m³
rebar = area of chb x 3.6F = kls
gi wire # 16 = total kls / 300 = roll
Press ALT+Enter keys in a cell to make a new line inside the cell
=if(iserror(vlookup(…)),”not found”,vlookup(…)). This will print “not found” whenever the vlookup returns any erro
Hi
###
2
conditional formating
ased on what you are looking for, MATCH is used to fetch the position of the value you are looking for.