You are on page 1of 1

Gumamela Labor Cost Total Cost

Item Description qty unit


Electrical
1 Outlet Set 2 gang 3 pcs
2 Electrical Tape 2 pcs
3 Utility Box 6 pcs
4 Junction Box 2 pcs
5 #18 Flat Cord 10 m
6 #16 Flat Cord 10 m
7 Electrical Moulding 3/4" 4 pcs
Plumbing
1 T-shower w/ Faucet 1 set
2 Flexible Hose 1/2"x 1' 1 pcs
3 Lavatory 1 pcs
4 T.B. water tank fittings 1 set
5 2 way valve for ablosion 1/2" 1 pcs
6 End cap 1/2" 1 pcs
7 Lavatory drain 1 pcs
8 Shut Off valve 1/2"
Carpentry
1 Head Board 1 set
2 sink cabinet 1 set
3 Hinges 2"x4" 3 pcs
4 Door knob 1 pcs
Painting Works
1 Interior and exterior 197.6 sq.m
2 Flat white
3 Ceiling 40 sq.m
Ceiling
1 Mesh tape 3/4" 1 pcs
2 sand paper 100 20 ft
3 Paint roller 9" 2 pcs
4 Paint Brush 4" 2 pcs
5 2 peil
6 1 peil
7 Flat white latex boysen 6 gallon
Furniture
1 flat wall boysen 1 gallon
2 Thinner for Enamel 1 bottle
Tile
1 Grout
2 Tile wall 18.36 sq.m

You might also like