You are on page 1of 6

MATERIALS

I. CONCRETE AND MASONRY


ITEM NAME AND SPECIFICATION OF MATERIALS QUANTITY
1 40 kgs PORTLAND CEMENT
2 SAND
3 5" CHB
4 4" CHB
5 8mm BARS
6 9mm BARS
7 12mm BARS
8 GI #16 TIE WIRE
9 CRASHED GRAVEL
10 FINE ADGREGATE
TOTAL
II. CARPENTRY
1 1/4" x 4' x 8' thk ORDINARY PLYWOOD 10
2 1/4" x 4' x 8' thk MARINE PLYWOOD 12
3 1” x 3' x 12' COCO LUMBER 70
4 2" x 3' x 10' LUMBER 50
5 2" x 3' x 12' LUMBER 50
6 ASSORTED NAILS 10
TOTAL
III. STEEL TRUSSES
1 25mm x 25mm x 4mm ANGLE BAR 18
2 100mm x 50mm x 1.0mm thk C-PURLINS 20
3 150mm x 50mm x 1.2mm thk C-PURLINS 15
4 20mm x 3mm thk FLAT BAR 40
5 WELDING ROD 10
6 METAL PRIMER (4lt/gal) 3
7 PAINT THINNER 8
8 PAINT BRUSH (101mm) 5
9 HACKSAW BLADE (12") 2
TOTAL
IV. ROOFING MATERIALS
1 TILE SPAN ROOFING (0.50mm) 286
2 GA 24 (0.701 mm) 2.44m RIDGE ROLL 40
3 TEKSCREW 3
4 ROOFTILE SEALER 1
5 1/8" x 1/2" BLINDREVITS 1
6 TOUCH-UP PAINT 1
TOTAL
V. DOORS
1 STAINLESS LEVER DOOR KNOBS 9
2 1.50 x 2.10 m DOUBLE PANEL DOOR 1
3 0.90 x 2.10 m PANEL DOOR 3
4 0.70 x 2.10 m FLUSH DOOR 4
TOTAL
VI. WINDOW
1 4-SASH SLIDING WINDOW 3
2 1.50 x 1.50 m SLIDING WINDOW 2
3 1.00 x 1.50 m SLIDING WINDOW 2
TOTAL
VII. PLUMBING ROUGH-IN
1 WATER CLOSETS 3
2 STAINLESS KITCHEN SINK 1
3 4" x 4" FLOOR STRAINER 3
4 12mm WATER FAUCET 4
PVC ASSORTED FIXTURES
TOTAL
VIII. TILE WORKS
1 PORTLAND CEMENT
2 CERAMIC WALL TILES
3 CERAMIC FLOOR TILES
4 60 x 60 PORCELAIN FLOOR TILES
5 TILE GROUT 20
TOTAL
IX. ELECTRICAL WORKS
1 4" diameter PORCELAIN RECEPTACLE 32
2 THREEGANG
3 SINGLE SWITCH 3
4 TWO GANG
5 2" x 4" UTILITY BOX 3
6 4" x 4" JUNCTION BOX 1
7 PANEL BOX 2
8 ELECTRICAL WIRES
9 SAFETY SWITCH 2
10 PVC CONDUIT PIPE 6
11 7 watts SPOTLIGHT 3
12 9 watts LIGHT BULB 6
13 5 watts LIGHT BULB 26
TOTAL
X. PAINTING WORKS
1 LATEX FLAT 1
2 ENAMEL PAINT 1/2
3 GALVANIZED METAL PRIMER 1/2
4 NEUTRALIZER PAINT 1
5 PAINT THINNER 2
6 SAND PAPER
TOTAL
EQUIPMENT
ITEM EQUIPMENT/TOOLS NO. OF UNITS
1 ELECTRIC DRILL 1
2 ELECTRIC GRINDER 1
3 OTHER EQUIPMENTS
TOTAL

EMBANKMENT/OTHER EARTHWORKS
TOTAL

LABOR
ITEM DESIGNATION OF PERSONNEL NO. OF MEN
1 FOREMAN 1
2 INSTALLER 1
3 HELPER 1
4 OTHER CONSTRUCTION WORKERS 3

PERIOD OF CONSTRUCTION (
TOTAL

SUMMARY
MATERIAL COST
LABOR COST

TOTAL PROBABLE PROJECT COST


UNIT UNIT COST AMOUNT
bag 252.36
cu.m 800
pc 19
pc 18
kg 40
kg 40
kg 40
kg 71.37
cu.m 635.52
cu.m 687.12
398,502.50

pc 381 3,810
pc 435 5,220
bd ft 62 4,340
bd ft 150 7,500
bd ft 180 9,000
kg 65 650
30,520

pc 460 8280
pc 471 9,420
pc 712 10,680
pc 107 4,280
kg 169 1,690
gal 450 1,350
gal 286 2,288
pc 72 360
pc 60 120
38,461

ft 180 51,480
ln.m 204 8,160
kg 200 600
gal 858 858
box 277 277
pc 526.79 526.79
61,901.79

pc 350 3,150
pc 8,239 8,239
pc 5,653 16,959
pc 951 3,804
32,152

pc 10,210 30,630
pc 5,410 10,820
pc 4,810 9,620
51,070

pc 3,788 11,364
pc 2,687 2,687
pc 62 186
pc 269 1,184
set 20,000

bag 252.36

pc 180
kg 50 1,000
57,345

pc 30 960
pc 120
pc 80 240
pc 100
pc 59 167
pc 350 350
pc 110 220
20,000
pc 550 1100
pc 123 738
pc 200 600
pc 180 1020
PC 130 4,380

gal 619 619


gal 762 381
gal 450 225
gal 422 422
gal 286 572
dozen 123 123
1,723.62
NO. OF HOURS HOURLY RATE AMOUNT
8 60 480
8 60 480
1000
1,960

45,000.00

NO. OF HOURS HOURLY RATE AMOUNT


6 73.44 440.64
6 40.25 241.5
6 35.65 213.9
8 46.87 1,124
2,019.74

PERIOD OF CONSTRUCTION (DAYS) 60 DAYS


121,184.40

121,184.40