EMBANKMENT/OTHER EARTHWORKS
TOTAL
LABOR
ITEM DESIGNATION OF PERSONNEL NO. OF MEN
1 FOREMAN 1
2 INSTALLER 1
3 HELPER 1
4 OTHER CONSTRUCTION WORKERS 3
PERIOD OF CONSTRUCTION (
TOTAL
SUMMARY
MATERIAL COST
LABOR COST
pc 381 3,810
pc 435 5,220
bd ft 62 4,340
bd ft 150 7,500
bd ft 180 9,000
kg 65 650
30,520
pc 460 8280
pc 471 9,420
pc 712 10,680
pc 107 4,280
kg 169 1,690
gal 450 1,350
gal 286 2,288
pc 72 360
pc 60 120
38,461
ft 180 51,480
ln.m 204 8,160
kg 200 600
gal 858 858
box 277 277
pc 526.79 526.79
61,901.79
pc 350 3,150
pc 8,239 8,239
pc 5,653 16,959
pc 951 3,804
32,152
pc 10,210 30,630
pc 5,410 10,820
pc 4,810 9,620
51,070
pc 3,788 11,364
pc 2,687 2,687
pc 62 186
pc 269 1,184
set 20,000
bag 252.36
pc 180
kg 50 1,000
57,345
pc 30 960
pc 120
pc 80 240
pc 100
pc 59 167
pc 350 350
pc 110 220
20,000
pc 550 1100
pc 123 738
pc 200 600
pc 180 1020
PC 130 4,380
45,000.00
121,184.40