September 19, 2023

QUOTATION

Scope of Work:
1. Demolition CHB Wall
2. Preparation Flooring Slab
3. Roofing Work
4. Sliding Window
5. Grill Work
6. Ceiling Work
7. Painting Work

Materials:
Quantity Materials
4 pcs. Angle Bar 3/16x2 x20 ft.
3 pcs. C. Purlins 1.5 x2 x3 x20ft.
1 pc Tubular 2.0 x2 x6 x20 ft.
1 pc Tubular 2.0 x2 x3 x20 ft.
4 pcs. Tubular 2.0 x2x2 x20 ft
30 pcs. Tubular 2.0 x1 x1 x20ft
10 kls. Welding Rod # 3/16
3 pcs. Long Span 5 x110 x260
2 pcs. Gutter Boy Type
6 pcs. Wall Flashing
3 pcs. Cuffing Flashing
50 pcs. Text Crew 2 ½
1 Box Blind Rivet 1/8 x 1/2
1 pc Plain Sheet
5 pcs. HardieFlex
8 pcs. Metal Furring
1 Bag Skim Coat
2 Gallon Flat Latex
1 Liter Epoxy AB
½ Yard Sanding Paper # 80
½ Yard Sanding Paper # 120
1 Gallon Epoxy Primer
1 Gallon Epoxy Reducer
2 Liters Polituff
1 pc Roller Track
10 Bags Cements
1.5 Cubic Meter White Sand
1 Cubic Meter Gravel 3/4
2 kls. G.I. Wire

Labour Cost:
 FOURTY FIVE THOUSAND PESOS (PHP 45,000.00)