You are on page 1of 6

PROJECT : IMC DISPATCH EXTENSION

SUBJECT : BILL OF MATERIALS OF IMC DISPATCH EXTENSION


LOCATION : BRGY. PASO DE BLAS, VALENZUELA CITY
OWNER : FOODSPHERE INC.

ITEM NO. DESCRIPTION QTY UNIT MATERIAL UNIT COST


CONCRETE WORKS
1 SLAB 24.03 cu. m
2 BASE WALL 0.858 cu. m
3 AREA DRAIN 0.112 cu. m
FORMWORKS
1 SLAB
PLYWOOD (1/2 thk) 3 pcs
COCOLUMBER (2x3) 3 pcs
2 BASE WALL
PLYWOOD (1/2 thk) 2 pcs
COCOLUMBER (2x3) 4 pcs
3 AREA DRAIN
PLYWOOD (1/2 thk) 1 pcs
COCOLUMBER (2x3) 3 pcs
DEFORMED BARS @10MM
1 SLAB 185 pcs
2 BASE WALL 10 pcs
3 AREA DRAIN 4 pcs
ROOFING WORKS
1 RIB SPAN (0.6MM THK) (4ft x 8ft) 22 pcs
2 C-PURLINS (2" X 6" X 20') 19 pcs
3 ANGLE BARS (2" X 2" X 3/16" X 20") 1 pcs
4 EPOXY PRIMER (GRAY) 6 gal
5 S/S GUTTER (0.6MM THK) 7.5 L.m
6 FLASHING 25 L.m
7 BENDED ACCESSORIES 1 lot
AREA DRAIN & CANAL COVER
1 MS PLATE (3/4 THK) (0.5m x 0.5m) 1 pcs
2 S/S SHEET (1.2MM THK) 4 pcs
OTHERS
1 GRAVEL BEDDING 3/4 6 cu. m
TOTAL:

SUMMARY
ITEM NO. DESCRIPTION QTY UNIT MATERIAL UNIT COST
1 CONCRETE 25 cu. m
2 FORM PLYWOOD (1/2 thk) 6 pcs
3 COCOLUMBER (2x3X8) 10 pcs
4 DEFORMED BARS @10mm 199 pcs
5 RIB SPAN (0.6MM THK) (4ft x 8ft) 22 pcs
6 C-PURLINS (2" X 6" X 20') 19 pcs
7 ANGLE BARS (2" X 2" X 3/16" X 20") 1 pcs
8 EPOXY PRIMER (GRAY) 6 gal
9 S/S GUTTER (0.6MM THK) 7.5 L.m
10 FLASHING 25 L.m
11 BENDED ACCESSORIES 1 lot
12 MS PLATE (3/4 THK) (0.5m x 0.5m) 1 pcs
13 S/S SHEET (1.2MM THK) 4 pcs
14 GRAVEL BEDDING 3/4 6 cu. m
TOTAL:
LABOR UNIT COST TOTAL AMOUNT
TOTAL:

LABOR UNIT COST TOTAL AMOUNT

TOTAL:
MATERIAL REQUEST FORM

DATE: PROJECT:
ITEM NO. QTY UNIT DESCRIPTION UNIT COST
1 1 pc Checkered Plate 2mm
2 4 pcs Caster Wheels
3 1 unit Truck for Hauling
CT:
TOTAL AMOUNT