You are on page 1of 86

BOQs FOR CONSTRUCTION OF GIRLS LATRINE BLOCK WITH 10 STANCES AT MHOVU PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE

Site clearance , profilling and


foundation excavation

Timber ( 2"x2") FT 12 Pcs 10


Nails 3" kg 3
Site clearance M2
51
Foundation excavation M3
15

Construction of
foundation,blinding and plinth
beam
Cement solid block (18"x9"x6") Pcs 828
Sand M3 6
Aggregates M3
5.5
Filling materials (gravel) M3
4
Binding wire Kg 3
Stirrup (tringle shape with 7" 140
Pcs
both sides)
Timber (1x10)", 12 feet Pcs 14
Nails 3" kg 2
Nails 2" kg 4
Water for construction item 1
Construction of walls
Burnt bricks (10"x6"x4") Pcs 8,000
Timber for form work ( 1x10)",
Pcs 23
12 feet
Binding wire kgs 3
Nails 3" kgs 6
Nails 4" kgs 3
Stirrup (tringle shape with 231
Pcs
5"x6"x6"sides)
Scaffolding - Timber (2x4)'',
Pcs 6
12feet
Scafolding - Timber (1x 8)'',12
Pcs 6
feet
Aggregates M3 2
Sand M3
11
Water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 42
Treated Timber-wall plates (2 x
Pcs 7
4)" 12, feet
Treated Timber (2x2)", 12 feet Pcs 23
Treated Fascial Board (1 x 8)",
Pcs 10
12 feet
Ridge cap (gauge 28) M 10
Roof nail kgs 20
Nails 4'' kgs 15
Tie wire/core Pcs 7
Window and Doors
Door frame 2"X5"Thickness-
(0.8Mx2.1M)-Mniga or Pcs 9
Equivalent

Paneled doors-(Mninga/or
equivalent) with accessories
reinforced with Z-timber shape Pcs 9
on back side (0.8x2.1) M as per
WARIDI Engineer guidance

Door frame 2"X5"-


Thickness(1x2.1)M-Mniga or Pcs 1
equivalent
paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 1
timber shape on back side
(1x2.1)M as per WARIDI
Engineer guidance

Windows frame (0.5MX0.5M)


with wire gauze and 2pcs of iron Pcs 13
bars

Padlock Pcs 1
Grill door Pcs 1
Plastering work
Sand M3 7
Water for construction item 1

Floor works (concrete works,


toilet sink setting and floor
finishing)

Sand M3 3.5
Aggregates M 3
5
P-Trap pcs 9
Wire mesh pcs 6
Floor tiles- (30cm x30cm) Box 31
Grouts Kgs 10
Shut-off spray 1/2"-for disability pcs 2
Flexible pipe 1/2"-for disability pcs 3
Hand rails for disabled-As per
item 1
WARIDI Engineer guidance
Water for construction item 1
Plumbing Materials
PVC Elbow 4" pcs 20
PVC Tee 4" pcs 9
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 8
IPS pipe 3/4" PN 10 M 10
IPS elbow 3/4" pcs 15
IPS Tee 3/4" pcs 6
IPS socket 3/4" pcs 5
IPS nipple 3/4" pcs 5
IPS union 3/4" pcs 4
Thread tape Pkt 1
R/bush 3/4"-1/2" pcs 9
Gate valve pex 3/4" Pcs 3
Pvc cement 0.5 L pcs 2
Pad box pcs 2
waste bin pcs 2
Bucket-10lts pcs 10
Black pipe 1/2" M 1
PVC Clamp 4" pcs 3
PVC cap 4" pcs 2
Skimming and painting
Black-Gross -4lts pcs 3
Solvent- 1lts pcs 1
Rollar brush pcs 2
brown paint-gross -4lts pcs 1
Smother No 150 M 10
Brush 2" pcs 2
Brush 3" pcs 2
LABOUR CHARGES
Skilled labour charges-
Days 100
Mansonry and roofing works
Skilled labour charges-Plumber Days 4
Skilled labour charges-
Days 11
skimming+Painting
Skilled labour charges-Tiles Days 10
Engineer supervision Days 20
Unskilled labour charges Days 80
Monitoring-Manager Days 4
TOTAL A
BOQs FOR CONSTRUCTION OF BOYS LATRINE BLOCK WITH 5 STANCES AT MHOVU PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE

Site clearance , profilling and


foundation excavation

Timber ( 2"x2") FT 12 Pcs 8

Nails 3" kg 2

Site clearance M2 32
Foundation excavation M3 9.3

Construction of
foundation,blinding and plinth
beam
Cement solid block (18"x9"x6") Pcs 536
Sand M3 4.5
Aggregates M3
3.5
Filling materials (gravel) M3
4
Binding wire Kg 2
Stirrup (tringle shape with 7" 118
Pcs
both sides)
Timber (1x10)", 12 feet Pcs 12
Nails 3" kg 2
Nails 2" kg 3
Water for construction item 1
Construction of walls
Burnt bricks (10"x6"x4") Pcs 5,000
Timber for form work ( 1x10)",
Pcs 16
12 feet
Binding wire kgs 2
Nails 3" kgs 4
Nails 4" kgs 2
Stirrup (tringle shape with 156
Pcs
5"x6"x6"sides)
Scaffolding - Timber (2x4)'',
Pcs 6
12feet
Scafolding - Timber (1x 8)'',12
Pcs 6
feet
Aggregates M3 1.5
Sand M3
7
Water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 30
Treated Timber-wall plates (2 x
Pcs 6
4)" 12, feet
Treated Timber (2x2)", 12 feet Pcs 22
Treated Fascial Board (1 x 8)",
Pcs 9
12 feet
Ridge cap (gauge 28) M 9
Roof nail kgs 10
Nails 4'' kgs 10
Tie wire/core Pcs 6
Window and Doors
Door frame 2"X5"Thickness-
(0.8Mx2.1M)-Mniga or Pcs 4
Equivalent

Paneled doors-(Mninga/or
equivalent) with accessories
reinforced with Z-timber shape Pcs 4
on back side (0.8x2.1) M as per
WARIDI Engineer guidance

Door frame 2"X5"-


Thickness(1x2.1)M-Mniga or Pcs 1
equivalent
paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 1
timber shape on back side
(1x2.1)M as per WARIDI
Engineer guidance

Windows frame (0.5MX0.5M)


with wire gauze and 2pcs of iron Pcs 9
bars

Padlock Pcs 1
Grill door Pcs 1
Plastering work
Sand M3 6
Water for construction item 1

Floor works (concrete works,


toilet sink setting and floor
finishing)

Sand M3 2.5
Aggregates M 3
3.5
P-Trap pcs 4
Wire mesh pcs 4
Floor tiles- (30cm x30cm) Box 21
Wall tiles (20cmX30cm) Box 15
Grouts Kgs 8
Shut-off spray 1/2"-for disability pcs 1
Flexible pipe 1/2"-for disability pcs 3
Hand rails for disabled-As per
item 1
WARIDI Engineer guidance
Water for construction item 1
Plumbing Materials
PVC Elbow 4" pcs 10
PVC Tee 4" pcs 5
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 4
IPS pipe 3/4" PN 10 M 10
IPS elbow 3/4" pcs 15
IPS Tee 3/4" pcs 7
IPS socket 3/4" pcs 4
IPS nipple 3/4" pcs 4
IPS union 3/4" pcs 3
Thread tape Pkt 1
R/bush 3/4"-1/2" pcs 9
IPS Plug 3/4" pcs 3
Gate valve pex 3/4" pcs 3
Pvc cement 0.5 L pcs 2
Bucket-10lts pcs 5
Black pipe 1/2" M 1
Plastic clamp 1" pcs 8
PVC Clamp 4" pcs 5
PVC cap 4" pcs 3
Skimming and painting
Black-Gross -4lts pcs 2
Solvent- 1lts pcs 1
Rollar brush pcs 2
brown paint-gross -4lts pcs 2
Smother No 150 M 10
Brush 2" pcs 2
Brush 3" pcs 2
LABOUR CHARGES
Skilled labour charges-
Days 51
Mansonry and roofing works
Skilled labour charges-Plumber Days 3
Skilled labour charges-
Days 7
skimming+Painting
Skilled labour charges-Tiles Days 7
Engineer supervision Days 13
Unskilled labour charges Days 40
Monitoring-Manager Days 3
TOTAL-B
BOQ FOR CONCRETE HAND WASHING FACILITIES

Non-trap Pcs 2
PVC Elbow 1.5" class B Pcs 12
PVC Tee 1.5" Pcs 3
Tiles (20cmmx30cm) Box 1
Nail 3" Pcs 0.5
PVC Pipe 1.5" Class B M 12
Labour charges Days 3
TOTAL-C

BOQ FOR IMPROVEMENT OF WATER SUPPLY AT MHOVU PRIMARY SCHOOL

DESCRIPTION
UNIT QNTY RATE

Aggregates M3 1

Sand M3 4

cement solid blocks (18"x9"x6") Pcs 220

IPS pipe 25mm


M 10

IPS Elbow 25mm


Pcs 10
Tank connector 25mm Pcs 3
Float valve 25mm Pcs 1
Male connector 25mm Pcs 10
HDPE Polly pipe 25mm PN 10 M 200
Tee connector 25mm Pcs 7
Gate valve-pex 25mm Pcs 5
Labour charge-mansonry,
plumbing and painting days 8
TOTAL-D
BOQs FOR SEPTIC TANK AND SOAK PIT-FOR PUPILS INCLUDING CHAMBERS
Descriptions Unit Qty Rate
Excavation of pit M3 24
Cement solid blocks (18"x9"x6") pcs 600
Sand M3 3
Aggregates M3 3.5
Timber (1x8)", 12ft pcs 13
Timber (2x4)", 12ft pcs 7
Nail 3" kg 3
Wire mesh pcs 2
Binding wire kg 1
Labour charges days 15
TOTAL-E
BOQ FOR CONSTRUCTION OF ONE BURNING CHAMBER
Description Unit Quantity Rate
Burnt bricks (10"x6"x4") pcs 300
Sand M3 2
Aggregates M3 0.5
Timber (1x8)", 12ft pcs 2
Timber( 2x4)", 12ft pcs 1
Nail 3" kg 1
Binding wire kg 0.25
Wire mesh pcs 1
Grill door pcs 1
labour costs Days 5
TOTAL-F
MOBILIZATION, DEMOBILAZATION INCLUDING HIRING WORKING EQUIPMENT

Hiring of concrete poker


vibrator item 1

mobilization and
demobilization of personal
KM 800
and plants

Transport cost for


supervision and monitoring item 1

TOTAL-G
SCHOOL TOTAL

BOQs FOR CONSTRUCTION OF GIRLS LATRINE BLOCK WITH 9 STANCES AT MWENGE PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE

Site clearance , profilling and


foundation excavation

Timber ( 2"x2") FT 12 Pcs 10


Nails 3" kg 4
Site clearance M 2
44
Foundation excavation M 3
14

Construction of
foundation,blinding and plinth
beam
Cement solid block (18"x9"x6") Pcs 755
Sand M 3 5.5
Aggregates M 3
5
Filling materials (gravel) M 3
4
Binding wire Kg 2
Stirrup (tringle shape with 7" 133
Pcs
both sides)
Timber (1x10)", 12 feet Pcs 13
Nails 3" kg 2
Nails 2" kg 4
Water for construction item 1

Construction of walls
Burnt bricks (10"x6"x4") Pcs 8,000
Timber for form work ( 1x10)",
Pcs 21
12 feet
Binding wire kgs 2
Nails 3" kgs 5
Nails 4" kgs 3
Stirrup (tringle shape with 210
Pcs
5"x6"x6"sides)
Scaffolding - Timber (2x4)'',
Pcs 9
12feet
Scafolding - Timber (1x 8)'',12
Pcs 9
feet
Aggregates M3 2
Sand M 3
11
Water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 38
Treated Timber-wall plates
Pcs 8
(2 x 4)" 12, feet
Treated Timber (2x2)", 12 feet Pcs 27
Treated Fascial Board (1 x 8)",
Pcs 10
12 feet
Ridge cap (gauge 28) M 8
Roof nail kgs 12
Nails 4'' kgs 12
Tie wire/core Pcs 7
Window and Doors
Door frame 2"X5"Thickness-
(0.8Mx2.1M)-Mniga or Pcs 8
Equivalent
Paneled doors-(Mninga/or
equivalent) with accessories
reinforced with Z-timber shape Pcs 8
on back side (0.8x2.1) M as per
WARIDI Engineer guidance

Door frame 2"X5"-


Thickness(1x2.1)M-Mniga or Pcs 1
equivalent
paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 1
timber shape on back side
(1x2.1)M as per WARIDI
Engineer guidance

Windows frame (0.5MX0.5M)


with wire gauze and 2pcs of iron Pcs 12
bars

Padlock Pcs 1
Grill door Pcs 1

Plastering work
Sand M3 6.5
Water for construction item 1

Floor works (concrete works,


toilet sink setting and floor
finishing)

Sand M3 3
Aggregates M 3
4
P-Trap pcs 8
Wire mesh pcs 7
Floor tiles- (30cm x30cm) Box 29
Grouts Kgs 9
Shut-off spray 1/2"-for disability pcs 1
Flexible pipe 1/2"-for disability pcs 2
Hand rails for disabled-As per
item 1
WARIDI Engineer guidance
Water for construction item 1
Plumbing Materials
PVC Elbow 4" pcs 20
PVC Tee 4" pcs 8
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 5
IPS pipe 3/4" PN 10 M 10
IPS elbow 3/4" pcs 20
IPS Tee 3/4" pcs 6
IPS socket 3/4" pcs 6
IPS nipple 3/4" pcs 6
IPS union 3/4" pcs 2
Thread tape Pkt 2
R/bush 3/4"-1/2" pcs 6
Gate valve pex 3/4" pcs 3
Pvc cement 0.5 L pcs 2
Pad box pcs 2
waste bin pcs 2
Bucket-10lts pcs 9
Black pipe 1/2" M 1
PVC Clamp 4" pcs 8
PVC cap 4" pcs 3
Skimming and painting
Black-Gross -4lts pcs 2
Solvent- 1lts pcs 1
Rollar brush pcs 2
brown paint-gross -4lts pcs 2
Smother No 150 M 20
Brush 2" pcs 2
Brush 3" pcs 2
LABOUR CHARGES
Skilled labour charges-
Mansonry and roofing/carpentry Days 90
works
Skilled labour charges-Plumber Days 4
Skilled labour charges-
Days 10
skimming+Painting
Skilled labour charges-Tiles Days 9
Engineer supervision Days 20
Unskilled labour charges Days 60
Monitoring-Manager Days 5
GRAND TOTAL-A

BOQ FOR CONCRETE HAND WASHING FACILITIES

Non-trap Pcs 2
PVC Elbow 1.5" class B Pcs 12
PVC Tee 1.5" Pcs 3
Tiles (20cmmx30cm) Box 1
Nail 3" Pcs 0.5
PVC Pipe 1.5" Class B M 12
LABOUR CHARGES Days 3
GRAND TOTAL-B
BOQs FOR SEPTIC TANK AND SOAK PIT-FOR PUPILS LATRINES INCLUDING CHAMBERS
Descriptions Unit Qty Rate
Excavation of pit M 3
24
Cement solid blocks (18"x9"x6") pcs 600
Sand M 3
3
Aggregates M3 3.5

Timber 1x8 pcs 13


Timber 2x4 pcs 7
Nail 3" kg 3
Wire mesh pcs 2
Binding wire kg 1
Labour charges days 15
TOTAL-C

BOQ FOR CONSTRUCTION OF ONE BURNING CHAMBER


Description Unit Quantity Rate
Burnt bricks (10"x6"x4") pcs 400
Sand M3 2
Aggregates M3 0.5
Timber 1x8 pcs 2
Timber 2x4 pcs 1
Nail 3" kg 1
Binding wire kg 0.25
Wire mesh pcs 1
Grill door pcs 1
labour costs Days 5
Total-D

BOQ FOR IMPROVEMENT OF WATER SUPPLY AT MWENGE PRIMARY SCHOOL


DESCRIPTION UNIT QNTY RATE
Aggregates M 3
1
Sand M 3
3
cement solid blocks (18"x9"x6") Pcs 220
IPS pipe 25mm M 10
IPS Elbow 25mm Pcs 10
Float valve 25mm Pcs 1
Tank connector 25mm Pcs 3
Male connector 25mm Pcs 3
HDPE Polly pipe 25mm PN 10 M 200
Tee connector 25mm Pcs 7
Gate valve-pex 25mm Pcs 5
Labour charge-mansonry,
plumbing and painting days 8
TOTAL-E

MOBILIZATION, DEMOBILAZATION INCLUDING HIRING WORKING EQUIPMENT

Hiring of concrete poker


vibrator item 1

mobilization and
demobilization of personal
KM 800
and plants

Transport cost for


supervision and monitoring item 1

TOTAL-F

SCHOOL TOTAL

BOQs FOR CONSTRUCTION OF GIRLS LATRINE BLOCK WITH 16 STANCES AT MKAMBA PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE

Site clearance , profilling and


foundation excavation

Timber ( 2"x2") FT 12 Pcs 13


Nails 3" kg 4
Site clearance M2
73.4
Foundation excavation M3
17.5

Construction of
foundation,blinding and plinth
beam
Cement solid block (18"x9"x6") Pcs 960
Sand M3 7
Aggregates M3
6
Filling materials (gravel) M3
6
Binding wire Kg 5
Stirrup (tringle shape with 7" 172
Pcs
both sides)
Timber (1x10)", 12 feet Pcs 20
Nails 3" kg 2
Nails 2" kg 5
Water for construction item 1

Construction of walls
Burnt bricks (10"x6"x4") Pcs 12,800
Timber for form work ( 1x10)",
Pcs 30
12 feet
Binding wire kgs 4
Nails 3" kgs 7
Nails 4" kgs 4
Stirrup (tringle shape with 312
Pcs
5"x6"x6"sides)
Scaffolding - Timber (2x4)'',
Pcs 10
12feet
Scafolding - Timber (1x 8)'',12
Pcs 10
feet
Aggregates M3 2.5
Sand M 3
17
Water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 60
Treated Timber-wall plates (2 x
Pcs 8
4)" 12, feet
Treated Timber (2x2)", 12 feet Pcs 37
Treated Fascial Board (1 x 8)",
Pcs 12
12 feet
Ridge cap (gauge 28) M 14
Roof nail kgs 30
Nails 4'' kgs 25
Tie wire/core Pcs 9
Window and Doors
Door frame 2"X5"Thickness-
(0.8Mx2.1M)-Mniga or Pcs 15
Equivalent

Paneled doors-(Mninga/or
equivalent) with accessories
reinforced with Z-timber shape Pcs 15
on back side (0.8x2.1) M as per
WARIDI Engineer guidance

Door frame 2"X5"-


Thickness(1x2.1)M-Mniga or Pcs 1
equivalent
paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 1
timber shape on back side
(1x2.1)M as per WARIDI
Engineer guidance
Windows frame (0.5MX0.5M)
with wire gauze and 2pcs of iron Pcs 19
bars

Padlock Pcs 1
Grill door Pcs 1

Plastering work
Sand M3 10
Water for construction item 1

Floor works (concrete works,


toilet sink setting and floor
finishing)

Sand M3 15
Aggregates M 3
7
P-Trap pcs 15
Wire mesh pcs 10
Floor tiles- (30cm x30cm) Box 48
Grouts Kgs 12
Shut-off spray 1/2"-for disability pcs 1
Flexible pipe 1/2"-for disability pcs 2
Hand rails for disabled-As per
item 1
WARIDI Engineer guidance
Water for construction item 1
Plumbing Materials
PVC Elbow 4" pcs 32
PVC Tee 4" pcs 16
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 8
IPS pipe 3/4" PN 10 M 10
IPS elbow 3/4" pcs 40
IPS Tee 3/4" pcs 6
IPS socket 3/4" pcs 6
IPS nipple 3/4" pcs 6
IPS union 3/4" pcs 2
Thread tape Pkt 2
R/bush 3/4"-1/2" pcs 10
Gate valve pex 3/4" pcs 3
Pvc cement 0.5 L pcs 2
Pad box pcs 2
waste bin pcs 2
Bucket-10lts pcs 16
Black pipe 1/2" M 1
PVC Clamp 4" pcs 8
PVC cap 4" pcs 3
Skimming and painting
Black-Gross -4lts pcs 2
Solvent- 1lts pcs 1
Rollar brush pcs 2
brown paint-gross -4lts pcs 2
Smother No 150 M 20
Brush 2" pcs 2
Brush 3" pcs 2
LABOUR CHARGES
Skilled labour charges-
Mansonry and roofing/carpentry Days 160
works
Skilled labour charges-Plumber Days 6
Skilled labour charges-
Days 10
skimming+Painting
Skilled labour charges-Tiles Days 15
Engineer supervision Days 30
Unskilled labour charges Days 120
Monitoring-Manager Days 10
GRAND TOTAL-A

BOQs FOR CONSTRUCTION OF BOYS LATRINE BLOCK WITH 8 STANCES AT MKAMBA PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE

Site clearance , profilling and


foundation excavation

Timber ( 2"x2") FT 12 Pcs 10


Nails 3" kg 4
Site clearance M2
48
Foundation excavation M3
14

Construction of
foundation,blinding and plinth
beam
Cement solid block (18"x9"x6") Pcs 760
Sand M3 5.5
Aggregates M3
5
Filling materials (gravel) M3
5
Binding wire Kg 2
Stirrup (tringle shape with 7" 160
Pcs
both sides)
Timber (1x10)", 12 feet Pcs 18
Nails 3" kg 2
Nails 2" kg 4
Water for construction item 1

Construction of walls
Burnt bricks (10"x6"x4") Pcs 7,200
Timber for form work ( 1x10)",
Pcs 25
12 feet
Binding wire kgs 2
Nails 3" kgs 6
Nails 4" kgs 2
Stirrup (tringle shape with 218
Pcs
5"x6"x6"sides)
Scaffolding - Timber (2x4)'',
Pcs 8
12feet
Scafolding - Timber (1x 8)'',12
Pcs 8
feet
Aggregates M3 2
Sand M 3
10
Water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 40
Treated Timber-wall plates (2 x
Pcs 6
4)" 12, feet
Treated Timber (2x2)", 12 feet Pcs 30
Treated Fascial Board (1 x 8)",
Pcs 11
12 feet
Ridge cap (gauge 28) M 13
Roof nail kgs 14
Nails 4'' kgs 14
Tie wire/core Pcs 6
Window and Doors
Door frame 2"X5"Thickness-
(0.8Mx2.1M)-Mniga or Pcs 7
Equivalent

Paneled doors-(Mninga/or
equivalent) with accessories
reinforced with Z-timber shape Pcs 7
on back side (0.8x2.1) M as per
WARIDI Engineer guidance

Door frame 2"X5"-


Thickness(1x2.1)M-Mniga or Pcs 1
equivalent
paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 1
timber shape on back side
(1x2.1)M as per WARIDI
Engineer guidance
Windows frame (0.5MX0.5M)
with wire gauze and 2pcs of iron Pcs 13
bars

Padlock Pcs 1
Grill door Pcs 1

Plastering work
Sand M3 8
Water for construction item 1

Floor works (concrete works,


toilet sink setting and floor
finishing)

Sand M3 3.5
Aggregates M 3
4.5
P-Trap pcs 7
PVC 4" Pipe class B pcs 1
Wire mesh pcs 6
Floor tiles- (30cm x30cm) Box 32
Wall tiles (20cmx30cm) Box 15
Grouts Kgs 8
Shut-off spray 1/2"-for disability pcs 1
Flexible pipe 1/2"-for disability pcs 2
Hand rails for disabled-As per
item 1
WARIDI Engineer guidance
Water for construction item 1
Plumbing Materials
PVC Elbow 4" pcs 14
PVC Tee 4" pcs 3
Inspection PVC Elbow 4" pcs 2
water tap (sanwa) 1/2" pcs 5
IPS pipe 3/4" PN 10 M 10
IPS elbow 3/4" pcs 12
IPS Tee 3/4" pcs 5
IPS socket 3/4" pcs 3
IPS nipple 3/4" pcs 3
IPS union 3/4" pcs 2
Thread tape Pkt 1
IPS Plug 3/4" pcs 2
R/bush 3/4"-1/2" pcs 7
Gate valve pex 3/4" pcs 3
Pvc cement 0.5 L pcs 2
Bucket-10lts pcs 4
Black pipe 1/2" M 1
PVC Clamp 4" pcs 4
Plastic Clamp 1" pcs 15
PVC cap 4" pcs 3
Skimming and painting
Black-Gross -4lts pcs 4
Solvent- 1lts pcs 1
Rollar brush pcs 2
brown paint-gross -4lts pcs 3
Smother No 150 M 30
Brush 2" pcs 2
Brush 3" pcs 2
LABOUR CHARGES
Skilled labour charges-
Mansonry and roofing/carpentry Days 81
works
Skilled labour charges-Plumber Days 4
Skilled labour charges-
Days 8
skimming+Painting
Skilled labour charges-Tiles Days 9
Engineer supervision Days 20
Unskilled labour charges Days 60
Monitoring-Manager Days 5
GRAND TOTAL-B

BOQs FOR CONSTRUCTION OF TEACHERS LATRINE BLOCK WITH 02 STANCES AT MKAMBA PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE


Site clearance , profilling and
foundation excavation
Timber ( 2x2)" FT 12 Pcs 0
Nails 3" kg 0
Site clearance M2
11
Foundation excavation M3
3.6
Construction of foundation
and plinth beam
cement solid blocks (18"X9"X6") Pcs 237
Sand M3 1.6
Aggregates M3
1.5
Filling materials (gravel) M3
1
Binding wire Kg 1
Stirrup (tringle shape with 7" 72
Pcs
both sides)
Timber (1x10), 12 feet Pcs 7
Nails 2" kg 1
Nails 3" kg 0.5
Water for construction item 1
Construction of walls
Burnt bricks (10"X6"X4") Pcs 2,000
Timber for form work ( 1x10)",
Pcs 8
12 feet
Binding wire kgs 1
Nails 3" kgs 2
Nails 4" kgs 0.5
Stirrup (tringle shape with 72
Pcs
5"x6"x6" )
Scaffolding - Timber (2x4)'',
Pcs 3
12feet
Scafolding - Timber (1x 8)'', 12
Pcs 2
feet
Aggregates M3 0.5
Sand M 3
2.5
water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 3
Treated Timber (2x2)", 12 feet Pcs 3
Treated Fascial Board (1 x 8)",
Pcs 4
12 feet
roofing nail kgs 2
Nails 4'' kgs 2
Tie wire/core Pcs 2
Window and Doors
Door frame 2"x5"-Thickness
Pcs 2
(0.8x2.1)-Mniga/Equivalent
Paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 2
timber shape on back side
(0.8x2.1) as per Engineer
guidance
Windows frame (0.5mx0.5m)
with wire gauze and 2pcs of iron Pcs 2
bars
Padlock Pcs 2
Grill door Pcs 2

Plastering work
Sand M3 2
Water for construction item 1
Floor works (concrete works,
toilet sink setting and floor
finishing)
Sand M3 1
Aggregates M3 1
P-Trap pcs 2
Wire mesh pcs 2
Floor tiles- (30cm x30cm) Box 7
Wall tiles- (20cm x 30cm) Box 1
Grouts Kgs 2
Water for construction item 1
Plumbing and chambers
PVC Elbow 4" pcs 4
PVC Tee 4" pcs 1
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 3
IPS pipe 3/4" M 10
IPS elbow 3/4" pcs 12
IPS Tee 3/4" pcs 4
IPS socket 3/4" pcs 3
IPS nipple 3/4" pcs 3
IPS union 3/4" pcs 2
Thread tape Pkt 0.25
R/bush 3/4"-1/2" pcs 5
Gate valve pex 3/4" pcs 4
flexible pipe 1/2" pcs 2
pvc cement 0.5 L pcs 1
Pad box pcs 1
waste bin pcs 1
Bucket-10lts pcs 2
Black pipe 1/2" M 2
PVC Clamp 4" pcs 2
Pvc cap 4" pcs 2
Skimming and painting
Black-Gross -4lts pcs 1
Solvent- 1lts pcs 1
Rollar brush pcs 1
Smother No 150 M 3
Brush assorted pcs 1
LABOUR CHARGES
Skilled labour charges-
Days 20
Mansonry+roofing
Skilled labour charges-Plumber Days 2
Skilled labour charges-Painter Days 2
Skilled labour charges-Tiles Days 2
Engineer supervision Days 2
Unskilled labour charges Days 15
Monitoring-Manager Days 1
GRAND TOTAL-C
BOQ FOR 2 CONCRETE HAND WASHING FACILITIES

Non-trap Pcs 2
PVC Elbow 1.5" class B Pcs 12
PVC Tee 1.5" Pcs 3
Tiles (20cmmx30cm) Box 1
Nail 3" Pcs 0.5
PVC Pipe 1.5" Class B M 12
LABOUR CHARGES Days 3
GRAND TOTAL-D

BOQ FOR IMPROVEMENT OF WATER SUPPLY AT MKAMBA PRIMARY SCHOOL


DESCRIPTION UNIT QNTY RATE
Aggregates M 3
1
Sand M 3
3
cement solid blocks (18"x9"x6") Pcs 220
IPS pipe 25mm M 10
IPS Elbow 25mm Pcs 10
Float valve 25mm Pcs 1
Tank connector 25mm Pcs 3
Male connector 25mm Pcs 3
HDPE Polly pipe 25mm PN 10 M 200
Tee connector 25mm Pcs 7
Gate valve-pex 25mm Pcs 5
Labour charge-mansonry,
plumbing and painting days 8
TOTAL-E

BOQs FOR SEPTIC TANK AND SOAK PIT-FOR PUPILS LATRINES INCLUDING CHAMBERS
Descriptions Unit Qty Rate
Excavation of pit M 3
24
Cement solid blocks (18"x9"x6") pcs 600
Sand M 3
3
Aggregates M3 3.5
Timber 1x8 pcs 13
Timber 2x4 pcs 7
Nail 3" kg 3
Wire mesh pcs 2
Binding wire kg 1
Labour charges days 15
TOTAL-F
BOQs FOR SOAK PIT-FOR TEACHERS LATRINES
Descriptions Unit Qty Rate (TZS)
Excavation of pit M3
30
Burnt bricks (10"x6"x4") pcs 1000
sand M3 0.5
Aggregates M 3
1
Timber 1x8 pcs 6
timber 2x4 pcs 2
Nail 3" kg 1
Binding wire kg 0.5
Labour charges days 4
TOTAL-G

BOQ FOR CONSTRUCTION OF ONE BURNING CHAMBER


Description Unit Quantity Rate
Burnt bricks (10"x6"x4") pcs 400
Sand M3 2
Aggregates M3 0.5
Timber 1x8 pcs 2
Timber 2x4 pcs 1
Nail 3" kg 1
Binding wire kg 0.25
Wire mesh pcs 1
Grill door pcs 1
labour costs Days 5
Total-H

MOBILIZATION, DEMOBILAZATION INCLUDING HIRING WORKING EQUIPMENT

Hiring of concrete poker


vibrator item 1

mobilization and
demobilization of personal
KM 800
and plants

Transport cost for


supervision and monitoring item 1

TOTAL-I

SCHOOL TOTAL
BOQs FOR CONSTRUCTION OF BOYS LATRINE BLOCK WITH 5 STANCES AT MSUFINI PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE


Site clearance , profilling and
foundation excavation

Timber ( 2"x2") FT 12 Pcs 8

Nails 3" kg 2
Site clearance M2 32
Foundation excavation M3 9.3

Construction of
foundation,blinding and plinth
beam
Cement solid block (18"x9"x6") Pcs 536
Sand M3 4.5
Aggregates M3
3.5
Filling materials (gravel) M3
4
Binding wire Kg 2
Stirrup (tringle shape with 7" 118
Pcs
both sides)
Timber (1x10)", 12 feet Pcs 12
Nails 3" kg 2
Nails 2" kg 3
Water for construction item 1

Construction of walls
Burnt bricks (10"x6"x4") Pcs 5,000
Timber for form work ( 1x10)",
Pcs 16
12 feet
Binding wire kgs 2
Nails 3" kgs 4
Nails 4" kgs 2
Stirrup (tringle shape with 156
Pcs
5"x6"x6"sides)
Scaffolding - Timber (2x4)'',
Pcs 6
12feet
Scafolding - Timber (1x 8)'',12
Pcs 6
feet
Aggregates M3 1.5
Sand M3
7
Water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 30
Treated Timber-wall plates (2 x
Pcs 6
4)" 12, feet
Treated Timber (2x2)", 12 feet Pcs 22
Treated Fascial Board (1 x 8)",
Pcs 9
12 feet
Ridge cap (gauge 28) M 9
Roof nail kgs 10
Nails 4'' kgs 10

Tie wire/core Pcs 6

Window and Doors

Door frame 2"X5"Thickness-


(0.8Mx2.1M)-Mniga or Pcs 4
Equivalent

Paneled doors-(Mninga/or
equivalent) with accessories
reinforced with Z-timber shape Pcs 4
on back side (0.8x2.1) M as per
WARIDI Engineer guidance
Door frame 2"X5"-
Thickness(1x2.1)M-Mniga or Pcs 1
equivalent
paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 1
timber shape on back side
(1x2.1)M as per WARIDI
Engineer guidance
Windows frame (0.5MX0.5M)
with wire gauze and 2pcs of iron Pcs 9
bars
Padlock Pcs 1
Grill door Pcs 1

Plastering work
Sand M3 6
Water for construction item 1
Floor works (concrete works,
toilet sink setting and floor
finishing)
Sand M3 2.5
Aggregates M3 3.5
P-Trap pcs 4
PVC 4" Pipe class B pcs 1
Wire mesh pcs 4
Floor tiles- (30cm x30cm) Box 21
Grouts Kgs 8
Shut-off spray 1/2"-for disability pcs 1
Flexible pipe 1/2"-for disability pcs 3
Hand rails for disabled-As per
item 1
WARIDI Engineer guidance
Water for construction item 1
Plumbing Materials
PVC Elbow 4" pcs 10
PVC Tee 4" pcs 5
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 5
IPS pipe 3/4" PN 10 M 10
IPS elbow 3/4" pcs 15
IPS Tee 3/4" pcs 7
IPS socket 3/4" pcs 4
IPS nipple 3/4" pcs 4
IPS union 3/4" pcs 3
Thread tape Pkt 1
R/bush 3/4"-1/2" pcs 9
IPS Plug 3/4" pcs 3
Gate valve pex 3/4" pcs 3
Pvc cement 0.5 L pcs 2
Bucket-10lts pcs 5
Black pipe 1/2" M 1
Pad box pcs 2
PVC Clamp 4" pcs 5
Waste bin pcs 2
PVC cap 4" pcs 2
Skimming and painting
White cement bag 7
White Emulsion paint-20lts bucket 9
Summer blue (Weather guard)-
Bucket 1
20lts
White paint (weather guard)-
bucket 1
20lts
Black-Gross -4lts pcs 2
Solvent- 1lts pcs 1
Rollar brush pcs 2
brown paint-gross -4lts pcs 2
Smother No 150 M 10
Brush 2" pcs 2
Brush 3" pcs 2
LABOUR CHARGES
Skilled labour charges-
Days 51
Mansonry and roofing works
Skilled labour charges-Plumber Days 3
Skilled labour charges-
Days 7
skimming+Painting
Skilled labour charges-Tiles Days 7
Engineer supervision Days 13
Unskilled labour charges Days 40
Monitoring-Manager Days 3
GRAND TOTAL-A

BOQs FOR CONSTRUCTION OF TEACHERS LATRINE BLOCK WITH 02 STANCES AT MSUFINI PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE


Site clearance , profilling and
foundation excavation
Timber ( 2x2)" FT 12 Pcs 0
Nails 3" kg 0
Site clearance M2
11
Foundation excavation M3
3.6
Construction of foundation
and plinth beam
cement solid blocks (18"X9"X6") Pcs 237
Sand M3 1.6
Aggregates M3
1.5
Filling materials (gravel) M3 1
Binding wire Kg 1
Stirrup (tringle shape with 7" 72
Pcs
both sides)
Timber (1x10), 12 feet Pcs 7
Nails 2" kg 1
Nails 3" kg 0.5
Water for construction item 1

Construction of walls
Burnt bricks (10"X6"X4") Pcs 2,000

Timber for form work ( 1x10)",


Pcs 8
12 feet

Binding wire kgs 1


Nails 3" kgs 2
Nails 4" kgs 0.5
Stirrup (tringle shape with 72
Pcs
5"x6"x6" )
Scaffolding - Timber (2x4)'',
Pcs 3
12feet
Scafolding - Timber (1x 8)'', 12
Pcs 2
feet
Aggregates M3 0.5
Sand M 3
2.5
water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 3
Treated Timber (2x2)", 12 feet Pcs 3
Treated Fascial Board (1 x 8)",
Pcs 4
12 feet
roofing nail kgs 2
Nails 4'' kgs 2
Tie wire/core Pcs 2
Window and Doors
Door frame 2"x5"-Thickness
Pcs 2
(0.8x2.1)-Mniga/Equivalent
Paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 2
timber shape on back side
(0.8x2.1) as per Engineer
guidance
Windows frame (0.5mx0.5m)
with wire gauze and 2pcs of iron Pcs 2
bars
Padlock Pcs 2
Grill door Pcs 2

Plastering work
Sand M3 2
Water for construction item 1
Floor works (concrete works,
toilet sink setting and floor
finishing)
Sand M3 1
Aggregates M 3
1
P-Trap pcs 2
Wire mesh pcs 2
Floor tiles- (30cm x30cm) Box 7
Wall tiles- (20cm x 30cm) Box 1
Grouts Kgs 2
Water for construction item 1
Plumbing materials
PVC Elbow 4" pcs 4
PVC Tee 4" pcs 1
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 2
IPS pipe 3/4" M 10
IPS elbow 3/4" pcs 12
IPS Tee 3/4" pcs 4

IPS socket 3/4" pcs 3

IPS nipple 3/4" pcs 3


IPS union 3/4" pcs 2
Thread tape Pkt 0.25
R/bush 3/4"-1/2" pcs 5
Gate valve pex 3/4" pcs 4
flexible pipe 1/2" pcs 2
pvc cement 0.5 L pcs 1
Pad box pcs 1
waste bin pcs 1

Bucket-10lts pcs 2

Black pipe 1/2" M 2


PVC Clamp 4" pcs 2
Pvc cap 4" pcs 2
Skimming and painting
White cement bag 2
White Emulsion paint-20lts bucket 3
Summer blue (Weather guard)-
Bucket 0.5
20lts
White paint (weather guard)-
bucket 0.5
20lts
Black-Gross -4lts pcs 1
Solvent- 1lts pcs 1
Rollar brush pcs 1
Smother No 150 M 3
Brush assorted pcs 1
LABOUR CHARGES
Skilled labour charges-
Days 20
Mansonry, roofing/carpentry
Skilled labour charges-Plumber Days 2
Skilled labour charges-Painter Days 2
Skilled labour charges-Tiles Days 2
Engineer supervision Days 2
Unskilled labour charges Days 15
Monitoring-Manager Days 1
TOTAL-B
BOQ FOR CONCRETE HAND WASHING FACILITIES
Non-trap Pcs 2
PVC Elbow 1.5" class B Pcs 12
PVC Tee 1.5" Pcs 3
Tiles (20cmmx30cm) Box 1
Nail 3" Pcs 0.5
PVC Pipe 1.5" Class B M 12
LABOUR CHARGES Days 3
GRAND TOTAL-C

BOQ FOR IMPROVEMENT OF WATER SUPPLY AT MSUFINI PRIMARY SCHOOL


DESCRIPTION UNIT QNTY RATE
Aggregates M 3
1
Sand M 3
3
cement solid blocks (18"x9"x6") Pcs 220
IPS pipe 25mm M 10
IPS Elbow 25mm Pcs 10
Tank connector 25mm Pcs 3
Male connector 25mm Pcs 3
HDPE Polly pipe 25mm PN 10 M 200
Float valve 25mm Pcs 1
Tee connector 25mm Pcs 7
Gate valve-pex 25mm Pcs 5
Labour charge-
mansonry,painting and plumbing days 8
TOTAL-D

BOQs FOR SEPTIC TANK AND SOAK PIT-FOR PUPILS LATRINES INCLUDING CHAMBERS
Descriptions Unit Qty Rate
Excavation of pit M 3
24
Cement solid blocks (18"x9"x6") pcs 600
Sand M 3
3
Aggregates M3 3.5
Timber 1x8 pcs 13
Timber 2x4 pcs 7
Nail 3" kg 3

Wire mesh pcs 2


Binding wire kg 1

Labour charges days 15


TOTAL-E

BOQs FOR SOAK PIT-FOR TEACHERS LATRINE


Descriptions Unit Qty Rate (TZS)
Excavation of pit M3
30
Burnt bricks (10"x6"x4") pcs 1000
sand M 3
0.5
Aggregates M3 1
Timber 1x8 pcs 6
timber 2x4 pcs 2
Nail 3" kg 1
Binding wire kg 0.5
Labour charges days 4
TOTAL-F

BOQ FOR CONSTRUCTION OF ONE BURNING CHAMBER


Description Unit Quantity Rate
Burnt bricks (10"x6"x4") pcs 400
Sand M3 2
Aggregates M3 0.5
Timber 1x8 pcs 2
Timber 2x4 pcs 1
Nail 3" kg 1
Binding wire kg 0.25
Wire mesh pcs 1
Grill door pcs 1
labour costs Days 5
Total-G

MOBILIZATION, DEMOBILAZATION INCLUDING HIRING WORKING EQUIPMENT

Hiring of concrete poker


vibrator item 1
mobilization and
demobilization of personal KM 800
and plants
Transport cost for
supervision and monitoring item 1

TOTAL-H

SCHOOL TOTAL

BOQs FOR CONSTRUCTION OF GIRLS LATRINE BLOCK WITH 9 STANCES AT SABASABA PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE


Site clearance , profilling and
foundation excavation
Timber ( 2"x2") FT 12 Pcs 10
Nails 3" kg 4
Site clearance M2 44
Foundation excavation M3 14
Construction of
foundation,blinding and plinth
beam
Cement solid block (18"x9"x6") Pcs 755
Sand M3 5.5
Aggregates M3
5
Filling materials (gravel) M3
4
Binding wire Kg 2
Stirrup (tringle shape with 7" 133
Pcs
both sides)
Timber (1x10)", 12 feet Pcs 13
Nails 3" kg 2
Nails 2" kg 4
Water for construction item 1

Construction of walls
Burnt bricks (10"x6"x4") Pcs 8,000
Timber for form work ( 1x10)",
Pcs 21
12 feet
Binding wire kgs 2
Nails 3" kgs 5
Nails 4" kgs 3
Stirrup (tringle shape with 210
Pcs
5"x6"x6"sides)
Scaffolding - Timber (2x4)'',
Pcs 9
12feet
Scafolding - Timber (1x 8)'',12
Pcs 9
feet
Aggregates M3 2
Sand M 3
11
Water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 38
Treated Timber-wall plates
Pcs 8
(2 x 4)" 12, feet
Treated Timber (2x2)", 12 feet Pcs 27
Treated Fascial Board (1 x 8)",
Pcs 10
12 feet
Ridge cap (gauge 28) M 8
Roof nail kgs 12
Nails 4'' kgs 12
Tie wire/core Pcs 7
Window and Doors
Door frame 2"X5"Thickness-
(0.8Mx2.1M)-Mniga or Pcs 8
Equivalent
Paneled doors-(Mninga/or
equivalent) with accessories
reinforced with Z-timber shape Pcs 8
on back side (0.8x2.1) M as per
WARIDI Engineer guidance
Door frame 2"X5"-
Thickness(1x2.1)M-Mniga or Pcs 1
equivalent
paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 1
timber shape on back side
(1x2.1)M as per WARIDI
Engineer guidance
Windows frame (0.5MX0.5M)
with wire gauze and 2pcs of iron Pcs 12
bars
Padlock Pcs 1
Grill door Pcs 1

Plastering work
Sand M3 6.5
Water for construction item 1
Floor works (concrete works,
toilet sink setting and floor
finishing)
Sand M3 3
Aggregates M3 4
P-Trap pcs 8
Wire mesh pcs 7
Floor tiles- (30cm x30cm) Box 29
Grouts Kgs 9
Shut-off spray 1/2"-for disability pcs 1
Flexible pipe 1/2"-for disability pcs 2
Hand rails for disabled-As per
item 1
WARIDI Engineer guidance
Water for construction item 1
Plumbing Materials
PVC Elbow 4" pcs 20
PVC Tee 4" pcs 8
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 5
IPS pipe 3/4" PN 10 M 10
IPS elbow 3/4" pcs 20
IPS Tee 3/4" pcs 6
IPS socket 3/4" pcs 6
IPS nipple 3/4" pcs 6
IPS union 3/4" pcs 2
Thread tape Pkt 2
R/bush 3/4"-1/2" pcs 6
Gate valve pex 3/4" pcs 3
Pvc cement 0.5 L pcs 2
Pad box pcs 2
waste bin pcs 2
Bucket-10lts pcs 9
Black pipe 1/2" M 1
PVC Clamp 4" pcs 8
PVC cap 4" pcs 3
Skimming and painting
Black-Gross -4lts pcs 2
Solvent- 1lts pcs 1
Rollar brush pcs 2
brown paint-gross -4lts pcs 2
Smother No 150 M 20
Brush 2" pcs 2
Brush 3" pcs 2
LABOUR CHARGES
Skilled labour charges-
Mansonry and roofing/carpentry Days 90
works
Skilled labour charges-Plumber Days 4
Skilled labour charges-
Days 10
skimming+Painting
Skilled labour charges-Tiles Days 9
Engineer supervision Days 20
Unskilled labour charges Days 60
Monitoring-Manager Days 5
GRAND TOTAL-A

BOQs FOR CONSTRUCTION OF TEACHERS LATRINE BLOCK WITH 02 STANCES AT SABASABA PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE


Site clearance , profilling and
foundation excavation
Timber ( 2x2)" FT 12 Pcs 0
Nails 3" kg 0
Site clearance M2
11
Foundation excavation M3
3.6
Construction of foundation
and plinth beam
cement solid blocks (18"X9"X6") Pcs 237
Sand M3 1.6
Aggregates M3
1.5
Filling materials (gravel) M3
1
Binding wire Kg 1
Stirrup (tringle shape with 7" 72
Pcs
both sides)
Timber (1x10), 12 feet Pcs 7
Nails 2" kg 1
Nails 3" kg 0.5
Water for construction item 1

Construction of walls
Burnt bricks (10"X6"X4") Pcs 2,000
Timber for form work ( 1x10)",
Pcs 8
12 feet
Binding wire kgs 1
Nails 3" kgs 2
Nails 4" kgs 0.5
Stirrup (tringle shape with 72
Pcs
5"x6"x6" )
Scaffolding - Timber (2x4)'',
Pcs 3
12feet
Scafolding - Timber (1x 8)'', 12
Pcs 2
feet
Aggregates M3 0.5
Sand M3
2.5
water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 3
Treated Timber (2x2)", 12 feet Pcs 3
Treated Fascial Board (1 x 8)",
Pcs 4
12 feet
roofing nail kgs 2
Nails 4'' kgs 2
Tie wire/core Pcs 2
Window and Doors
Door frame 2"x5"-Thickness
Pcs 2
(0.8x2.1)-Mniga/Equivalent
Paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 2
timber shape on back side
(0.8x2.1) as per Engineer
guidance
Windows frame (0.5mx0.5m)
with wire gauze and 2pcs of iron Pcs 2
bars
Padlock Pcs 2
Grill door Pcs 2

Plastering work
Sand M3 2
Water for construction item 1
Floor works (concrete works,
toilet sink setting and floor
finishing)
Portland Cement bag 10
Toilet sink ( Squatting) pcs 2
PVC 4" Pipe class B pcs 1
Plumbing materials
PVC Elbow 4" pcs 4
PVC Tee 4" pcs 1
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 3
IPS pipe 3/4" M 10
IPS elbow 3/4" pcs 12
IPS Tee 3/4" pcs 4
IPS socket 3/4" pcs 3
IPS nipple 3/4" pcs 3
IPS union 3/4" pcs 2
Thread tape Pkt 0.25
R/bush 3/4"-1/2" pcs 5
Gate valve pex 3/4" pcs 4
flexible pipe 1/2" pcs 2
pvc cement 0.5 L pcs 1
Pad box pcs 1
waste bin pcs 1
Bucket-10lts pcs 2
Black pipe 1/2" M 2
PVC Clamp 4" pcs 2
Pvc cap 4" pcs 2
Skimming and painting
Black-Gross -4lts pcs 1
Solvent- 1lts pcs 1
Rollar brush pcs 1
Smother No 150 M 3
Brush assorted pcs 1
LABOUR CHARGES
Skilled labour charges-
Days 20
Mansonry+roofing
Skilled labour charges-Plumber Days 2
Skilled labour charges-Painter Days 2
Skilled labour charges-Tiles Days 2
Engineer supervision Days 2
Unskilled labour charges Days 15
Monitoring-Manager Days 1
GRAND TOTAL-B
BOQ FOR CONCRETE HAND WASHING FACILITIES
Non-trap Pcs 2
PVC Elbow 1.5" class B Pcs 12
PVC Tee 1.5" Pcs 3
Tiles (20cmmx30cm) Box 1
Nail 3" Pcs 0.5
PVC Pipe 1.5" Class B M 12
LABOUR CHARGES Days 3
GRAND TOTAL-C

BOQ FOR IMPROVEMENT OF WATER SUPPLY AT SABASABA PRIMARY SCHOOL


DESCRIPTION UNIT QNTY RATE
Aggregates M3
1
Clamp saddle 90mm-32mm Pcs 1
GS-R/bush 32mm-25mm Pcs 1
HDPE straight coupling 25mm Pcs 2
Sand M3
3
cement solid blocks (18"x9"x6") Pcs 220
IPS pipe 25mm M 10
IPS Elbow 25mm Pcs 10
Tank connector 25mm Pcs 5
Float valve 25mm Pcs 1
Male connector 25mm Pcs 8
HDPE Polly pipe 25mm PN 10 M 200
Tee connector 25mm Pcs 7
Gate valve-pex 25mm Pcs 5
Labour charge-
mansonry,painting and plumbing days 8
TOTAL-D

BOQs FOR SEPTIC TANK AND SOAK PIT-FOR PUPILS LATRINES INCLUDING CHAMBERS
Descriptions Unit Qty Rate
Excavation of pit M 3
24
Cement solid blocks (18"x9"x6") pcs 600
Sand M 3
3
Aggregates M3 3.5
Timber 1x8 pcs 13
Timber 2x4 pcs 7
Nail 3" kg 3
Wire mesh pcs 2
Binding wire kg 1
Labour charges days 15
TOTAL-E

BOQs FOR SOAK PIT-FOR TEACHERS LATRINE


Descriptions Unit Qty Rate (TZS)
Excavation of pit M 3
30
Burnt bricks (10"x6"x4") pcs 1000
sand M3 0.5
Aggregates M3 1
Timber 1x8 pcs 6
timber 2x4 pcs 2
Nail 3" kg 1
Binding wire kg 0.5
Labour charges days 4
TOTAL-F

BOQ FOR CONSTRUCTION OF ONE BURNING CHAMBER


Description Unit Quantity Rate
Burnt bricks (10"x6"x4") pcs 400
Sand M3 2
Aggregates M 3
0.5
Timber 1x8 pcs 2
Timber 2x4 pcs 1
Nail 3" kg 1
Binding wire kg 0.25
Wire mesh pcs 1
Grill door pcs 1
labour costs Days 5
Total-G

MOBILIZATION, DEMOBILAZATION INCLUDING HIRING WORKING EQUIPMENT

Hiring of concrete poker


vibrator item 1

mobilization and
demobilization of personal KM 800
and plants
Transport cost for
supervision and monitoring item 1

TOTAL-H

SCHOOL TOTAL

BOQs FOR CONSTRUCTION OF GIRLS LATRINE BLOCK WITH 10 STANCES AT KALUNGA PRIMARY SCHOOL

ITEM DESCRIPTION UNIT QNTY RATE


Site clearance , profilling and
foundation excavation
Timber ( 2"x2") FT 12 Pcs 10
Nails 3" kg 3
Site clearance M 2
51
Foundation excavation M 3
15
Construction of
foundation,blinding and plinth
beam
Cement solid block (18"x9"x6") Pcs 828
Sand M3 6
Aggregates M3 5.5
Filling materials (gravel) M 3
4
Binding wire Kg 3
Stirrup (tringle shape with 7" 140
Pcs
both sides)
Timber (1x10)", 12 feet Pcs 14
Nails 3" kg 2
Nails 2" kg 4
Water for construction item 1
Construction of walls
Burnt bricks (10"x6"x4") Pcs 8,000
Timber for form work ( 1x10)",
Pcs 23
12 feet
Binding wire kgs 3
Nails 3" kgs 6
Nails 4" kgs 3
Stirrup (tringle shape with 231
Pcs
5"x6"x6"sides)
Scaffolding - Timber (2x4)'',
Pcs 6
12feet
Scafolding - Timber (1x 8)'',12
Pcs 6
feet
Aggregates M3 2
Sand M 3
11
Water for construction item 1
Roofing
Treated Timber (2 x 4)" 12, feet Pcs 42
Treated Timber-wall plates (2 x
Pcs 7
4)" 12, feet
Treated Timber (2x2)", 12 feet Pcs 23
Treated Fascial Board (1 x 8)",
Pcs 10
12 feet
Ridge cap (gauge 28) M 10
Roof nail kgs 20
Nails 4'' kgs 15
Tie wire/core Pcs 7
Window and Doors
Door frame 2"X5"Thickness-
(0.8Mx2.1M)-Mniga or Pcs 9
Equivalent
Paneled doors-(Mninga/or
equivalent) with accessories
reinforced with Z-timber shape Pcs 9
on back side (0.8x2.1) M as per
WARIDI Engineer guidance
Door frame 2"X5"-
Thickness(1x2.1)M-Mniga or Pcs 1
equivalent
paneled doors-
(Mninga/Equivalent) with
accessories reinforced with Z-
Pcs 1
timber shape on back side
(1x2.1)M as per WARIDI
Engineer guidance
Windows frame (0.5MX0.5M)
with wire gauze and 2pcs of iron Pcs 13
bars
Padlock Pcs 1
Grill door Pcs 1

Plastering work
Sand M3 7
Water for construction item 1
Floor works (concrete works,
toilet sink setting and floor
finishing)
Sand M3 3.5
Aggregates M 3
5
P-Trap pcs 9
Wire mesh pcs 6
Floor tiles- (30cm x30cm) Box 31
Grouts Kgs 10
Shut-off spray 1/2"-for disability pcs 2
Flexible pipe 1/2"-for disability pcs 3
Hand rails for disabled-As per
item 1
WARIDI Engineer guidance
Water for construction item 1
Plumbing Materials
PVC Elbow 4" pcs 20
PVC Tee 4" pcs 9
Inspection PVC Elbow 4" pcs 1
water tap (sanwa) 1/2" pcs 8
IPS pipe 3/4" PN 10 M 10
IPS elbow 3/4" pcs 15
IPS Tee 3/4" pcs 6
IPS socket 3/4" pcs 5
IPS nipple 3/4" pcs 5
IPS union 3/4" pcs 4
Thread tape Pkt 1
R/bush 3/4"-1/2" pcs 9
Gate valve pex 3/4" pcs 3
Pvc cement 0.5 L pcs 2
Pad box pcs 2
waste bin pcs 2
Bucket-10lts pcs 10
Black pipe 1/2" M 1
PVC Clamp 4" pcs 3
PVC cap 4" pcs 2
Skimming and painting
Black-Gross -4lts pcs 3
Solvent- 1lts pcs 1
Rollar brush pcs 2
brown paint-gross -4lts pcs 1
Smother No 150 M 10
Brush 2" pcs 2
Brush 3" pcs 2
LABOUR CHARGES
Skilled labour charges-
Days 100
Mansonry and roofing works
Skilled labour charges-Plumber Days 4
Skilled labour charges-
Days 11
skimming+Painting
Skilled labour charges-Tiles Days 10
Engineer supervision Days 20
Unskilled labour charges Days 80
Monitoring-Manager Days 4
GRAND TOTAL-A
BOQ FOR CONCRETE HAND WASHING FACILITIES
Non-trap Pcs 2
PVC Elbow 1.5" class B PCS 12
PVC Tee 1.5" Pcs 3
Tiles (20cmmx30cm) Box 1
Nail 3" Pcs 0.5
PVC Pipe 1.5" Class B M 12
LABOUR CHARGES Days 3
GRAND TOTAL-B

BOQ FOR EXTENSION OF WATER WATER SUPPLY NETOWORK TO LATRINES BLOCKS


DESCRIPTION UNIT QNTY RATE
HDPE Polly pipe 25mm PN 10 M 200
HDPE straight coupling 25mm Pcs 2
Tee connector 25mm Pcs 4
Male connector 25mm Pcs 8
Gate valve 25mm-pex Pcs 3
Nipple IPS 25mm Pcs 5
Labour charge-plumbing days 2
TOTAL-C

BOQs FOR SEPTIC TANK AND SOAK PIT-PUPILS LATRINES


Descriptions Unit Qty Rate
Excavation of pit M3
24
Cement solid blocks (18"x9"x6") pcs 600
Sand M3 3
Aggregates M 3
3.5
Timber 1x8 pcs 13
Timber 2x4 pcs 7
Nail 3" kg 3
Wire mesh pcs 2
Binding wire kg 1
Labour charges days 12
TOTAL-D

BOQ FOR CONSTRUCTION OF ONE BURNING CHAMBER


Description Unit Quantity Rate
Burnt bricks (10"x6"x4") pcs 400
Sand M3 2
Aggregates M3 0.5
Timber 1x8 pcs 2
Timber 2x4 pcs 1
Nail 3" kg 1
Binding wire kg 0.25
Wire mesh pcs 1
Grill door pcs 1
labour costs Days 5
Total-E

MOBILIZATION, DEMOBILAZATION INCLUDING HIRING WORKING EQUIPMENT


Hiring of concrete poker
vibrator item 1

mobilization and
demobilization of personal KM 800
and plants
Transport cost for
supervision and monitoring item 1

TOTAL-F

SCHOOL TOTAL

LOT1-TOTAL COST
STANCES AT MHOVU PRIMARY SCHOOL

AMOUNT
STANCES AT MHOVU PRIMARY SCHOOL

AMOUNT
Y SCHOOL

AMOUNT

NCLUDING CHAMBERS
Total
Amount

HIRING WORKING EQUIPMENT

STANCES AT MWENGE PRIMARY SCHOOL

AMOUNT
ATRINES INCLUDING CHAMBERS
Total

Amount

RY SCHOOL
AMOUNT
HIRING WORKING EQUIPMENT

STANCES AT MKAMBA PRIMARY SCHOOL

AMOUNT
TANCES AT MKAMBA PRIMARY SCHOOL

AMOUNT
02 STANCES AT MKAMBA PRIMARY SCHOOL

AMOUNT
RY SCHOOL
AMOUNT

ATRINES INCLUDING CHAMBERS


Total
Total

Amount

HIRING WORKING EQUIPMENT


STANCES AT MSUFINI PRIMARY SCHOOL

AMOUNT
02 STANCES AT MSUFINI PRIMARY SCHOOL

AMOUNT
Y SCHOOL
AMOUNT

ATRINES INCLUDING CHAMBERS


Total
Total

Amount

HIRING WORKING EQUIPMENT


TANCES AT SABASABA PRIMARY SCHOOL

AMOUNT
2 STANCES AT SABASABA PRIMARY SCHOOL

AMOUNT
MARY SCHOOL
AMOUNT
ATRINES INCLUDING CHAMBERS
Total

Total

Amount
HIRING WORKING EQUIPMENT

STANCES AT KALUNGA PRIMARY SCHOOL

AMOUNT
O LATRINES BLOCKS
AMOUNT

NES
Total
Amount

HIRING WORKING EQUIPMENT

You might also like