You are on page 1of 30

THE UNITED REPUBLIC OF TANZANIA

PRESIDENT’S OFFICE
REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT

PROPOSED DISPENSARY

Schedule of Material, Labour & Drawings for Staff Quarter

PROJECT AREA

TANZANIA MAINLAND

Ministry of Health, Community, President‘s Office,


Delelopment Gender, Elderly and Children, Regional Administration,
University of Dodoma, & Local Government,
College of Humanities, Mkapa House,
&Social Science 11th Building, Mlezi Road,
P.O.Box 743, P.O.Box 1923,
40478 DODOMA. 41185 DODOMA.

APRIL, 2018 PO-RALG


Schedule of Materials
SHEDULE OF MATERIALS STAFF QUARTER - (GROSS FLOOR AREA = 118 SQ.M)

ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT

MATERIALS

A SUBSTRUCTURE -PROVISIONAL

1 Strip Foundation - Grade 15 Plain


3
Aggregate (3/4'') 12 M
3
Sand 6M
Cement-50kgs 54 Bags

2 Foundation Walls
6'' Cement & Sand Block 1,232 No
3
Sand 4M
Cement -50kgs 21 Bags

3 Moram, Hardcore & Site sterilization


Moram-(4.5m3 lorry) 8 Trips
3
Hadcore-(4.5m lorry) 4 Trips
3
Sand 6M
Aldrin solution or equal and approved 735 Litres

Oversite Concrete (100mm thick - 15 grade) &


4
Ground Beam - 20 grade
2
DPM 105 M
Cement -50kgs 97 Bags
3
Aggregates (1/2'') 16 M
3
Sand 9M
Reinforcement - 12mm diameter high tensile 26 PC'S
Reinforcement - 8mm diameter 32 PC'S

Timber 1'' X 8 '' (5.2m long) 9 PC'S


Timber 2'' X 2'' 10 PC'S
Nails-4'' 15 Kgs
Nails-3'' 12 Kgs
Supporting props 18 PC'S
SUB-TOTAL SUB STRUCTURE

APRIL, 2018 Page/1 PO-RALG


SHEDULE OF MATERIALS STAFF QUARTER - (GROSS FLOOR AREA = 118 SQ.M)

ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT

B. SUPERSTRUCTURE

1 Walls & Ring beam


6'' Cement & Sand Block 2,604 No

DPC (20m long) 4 Roll


3
Sand 12 M
Cement-50kgs 90 Bags
3
Aggregates (1/2'') 5M
Reinforcement - 12mm diameter high tensile 27 PC'S
Reinforcement - 8mm diameter 36 PC'S
Binding Wire - 1kg 9 Bundle
Timber 1'' X 8'' to Sides (5.2m long) 16 PC'S
Timber 1'' X 5'' (Plates) 7 PC'S
Timber 2'' X 2'' 25 PC'S
Supporting Props 48 PC'S
SUB-TOTAL SUPER STRUCTURE

C. ROOF STRUCTURE & COVERING

1 Roof Structure - Provisional


Timber 2 '' X 3'' purlins 438 FT
Timber 2'' X 4'' King Post, wall plate and struss 534 FT
Timber 2'' X 6'' Rafter and Tie beam 501 FT
Fascia board 1'' X 10'' (5.2m long) 11 PC'S

Nails -5'' 23 Kgs


Nails -4'' 17 Kgs
Nails -3'' 12 Kgs
NOTE: The above softwood timber structure should
be pressure impregnated treated

2 Roof Covering
2
28G IT resincoated sheet 120 M
Hips - 28 G 3 PC'S
Roofing Nails 10 Box
TO COLLECTION C/F

APRIL, 2018 Page/2 PO-RALG


SHEDULE OF MATERIALS STAFF QUARTER - (GROSS FLOOR AREA = 118 SQ.M)

ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT


B/F
3 Gutter's
Upvc 125mm half round (6m long)-5'' 6 PC'S
Upvc 100mm diametre down pipe; Class B 5 PC'S
PVC pipe 3'' 1 PC'S
PVC outlet 1 PC'S
PVC bend 90' 1 PC'S
PVC bend 45' 2 PC'S
Gutter support bracket 24 PC'S
Gutter Clamp 3'' 2 PC'S
Connector/reducer 4 PC'S
PVC wall pipe bracket 3 PC'S
SUB-TOTAL ROOF STRUCTURE & COVERING

E. CEILING
Gypsum board -12mm thick 23 PC'S
Plain Cornice 42 PC'S
Gypsum Screw 1'' 800pcs/box 3 Box
Screw 1.25'' 800pcs/box 1 Box
Gypsum powder 5 Bags
Fibre tape 2 Pcs
Treated softwood Timber 2'' X 2'' 1,047 FT
Nails 4'' 11 Kgs
Nails 3'' 13 Kgs
PVC ceiling with its fittings - 40 Pc's
SUB-TOTAL FOR CEILING
F. DOOR
1 45mm thick Pannelled door shutter
900 x 2100mm high 7 PC'S

2 Frames (hardwood),Varnish, Glass & Burglar bar

900 x 2500mm high 7 PC'S


2
4mm thick clear glass to Vents 3M
16 mm burglar bars 2 PC'S
Brush 3'' 2 Pcs
Sand paper (msasa) No.80 10 LM
Clear Varnish - 4Litres 1 TIN
Thinner for Varnish -4Litres 1 Litres
TO COLLECTION C/F

APRIL, 2018 Page/3 PO-RALG


SHEDULE OF MATERIALS STAFF QUARTER - (GROSS FLOOR AREA = 118 SQ.M)
ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT

3 IronMongeries B/F
Mortice lock Three lever - ref: union 7 No
Brass hinges - 100mm 10.5 Pairs
Barrel bolt - 150mm 2 No
SUB-TOTAL FOR DOORS

G. WINDOWS
1 Supply and fix Aluminium Windows 2mm thick frem
with fibre glass, Mosquitor gauze and its
ironmongeries
1200 X 1500mm high 8 PC'S
900 X 600mm high 3 PC'S

2 Supply and fix 4mm thick flat bar grill painted red-
oxide
1200 x 1500mm high 8 PC'S
900 x 600 mm high 3 PC'S
SUB-TOTAL FOR WINDOWS

H. FINISHING
1 Floor finishing
3
Sand 5M
Cement-50kgs 32 Bags
600 x 600Non slippery Porcelain floor tiles (1.46
44 Box
Sqm/Box)
Skirting (600 mm long; 25No/Box) 6 Box
Grout 2 Packet
Spacer 2 Packet

2 Wall Finishing
3
Sand 12 M
Cement-50kgs 73 Bags
White cement - 50kg 4 Bags
Gypsum powder 5 Bags
Sand paper (msasa) No.120 0.5 Roll
200 X 300 Wall tiles to toilets full height 35 Box
(0.96Sqm/Box)
Grout 3 Packet
Spacer 1 Packet
SUB-TOTAL FOR FINISHING

APRIL, 2018 Page/4 PO-RALG


SHEDULE OF MATERIALS STAFF QUARTER - (GROSS FLOOR AREA = 118 SQ.M)
ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT
J. PAINTING & DECORATION
Emulsion Paint - 20 LTRS 4 buckets
Weather guard Paint - 20 LTRS 3 buckets
Washable paint -20 LTRS 3 buckets
Primer paint -20 LTRS 2 buckets
Solvent - 5LTRS 1 TIN
Brush 3'' 2 Pcs
Roller 3 Pcs
Gloss paint-4LTR 1 TIN
Bitumen paint - 4Litres 1 TIN

K Allow sum for kitchen cabinate ; hard wood with


marble tops; refer Archtectural floor plan
ndrawings
SUB-TOTAL FOR PAINTING&DECORATION

APRIL, 2018 Page/5 PO-RALG


SHEDULE OF MATERIALS STAFF QUARTER - (GROSS FLOOR AREA = 118 SQ.M)

ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT

J. ELECTRICAL INSTALLATION
1 Single flourescent fiiting, approved philips or equal 7 No

2 Double switch sorcket 7 No


3 Main switch 12way,3PH with intergral RCD as MEM 1 No
or equal
4 Single core wire 1.5sqmm -Red 3 Roller
5 Single core wire 1.5sqmm -Black 2 Roller
6 Single core wire 1.5sqmm -green 2 Roller
7 Single core wire 2.5sqmm -Red 1 Roller
8 Single core wire 2.5sqmm -Black 1 Roller
9 Single core wire 2.5sqmm Green 1 Roller
10 Ceilling fan, approved National or equal 4 PC'S
11 16mmsq 4 core cable 20 M
12 1gang one way switch 0 No
13 2gang two way switch 8 No
14 Cooker control unit -45A 1 No
15 TV socket 1 No
16 Gypsum light complete with energy saver 18w 12 No
17 Earth rod approved copper not less than 1200mm 1 No
18 Earth wire 4sqmm 20 M
19 Plastic clips 3 BOX
20 Conduit pipe 80 PC
21 Metal box double 8 PC
22 Metal box single 10 PC
23 Round cover 20 PC
24 Junction box 30 PC
25 Elbow 25 PC
26 Conduit coupling 20 PC
27 Round Box 20 PC
28 Fine screw 5 Packets
SUB-TOTAL FOR ELECTRICAL INSTALLATION

APRIL, 2018 Page/6 PO-RALG


SHEDULE OF MATERIALS STAFF QUARTER - (GROSS FLOOR AREA = 118 SQ.M)

ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT


L. PLUMBING & SANITARY INSTALLATION-
PROVISIONAL
1 PVC pipe 4'' class C 6M
2 PVC pipe 1 1/4
'' 3M
3 PVC pipe 1 '' 1/2 3M
4 Polypipe 3/4'' 10 M
5 Tee connector 3/4'' 1 pc
6 IPS pipe 3/4'' 6M
7 IPS pipe 1/2'' 6M
8 IPS Elbow 1/2'' 6 PC'S
9 IPS Elbow 3/4'' 2 PC'S
10 IPS tee 1/2'' 2 PC'S
11 IPS nipple 1/2'' 5 PC'S
12 IPS nipple 3/4'' 1 PC'S
13 IPS union 3/4'' 1 PC'S
14 IPS reducing bush 3/4'' - 1/2'' 1 PC'S
15 Flexible pipe; 3 PC'S
16 Toilet shower shataf 1 PC'S
17 stop cock pex 3/4'' 1 PC'S
18 stop cock pex 1/2'' 1 PC'S
19 Angle valve 3 PC'S
20 PVC tee 11/2'' 1 PC'S
21 PVC tee 11/4'' 1 PC'S
22 PVC bend 1 1/4'' 1 PC'S
23 PVC bend 1 1/2'' 1 PC'S
24 PVC plug 11/4'' 1 PC'S

25 PVC plug 11/2'' 1 PC'S

26 PVC glue 1 TIN


27 Thread seal tap 10 PC'S
28 Shower rose 1 PC'S
29 WC squating complete with all necessary fittings 1 PC'S
and accessories
30 Toilet aper holder 1 PC'S
31 Hands wash basin complete with 6'' Levers 1 PC'S
operating for elbow control and its accessories
32 Mirror 1 PC'S
SUB-TOTAL FOR PLUMBING AND SANITARY
INSTALLATION

APRIL, 2018 Page/7 PO-RALG


SHEDULE OF MATERIALS STAFF QUARTER - (GROSS FLOOR AREA = 118 SQ.M)

GENERAL SUMMARY AMOUNT


TZS
STAFF QUARTER DISPENDARY

A. SUBSTRUCTURE -PROVISIONAL

B. SUPERSTRUCTURE

C. ROOF STRUCTURE & COVERING

D. CEILING

E. DOOR

F. WINDOWS

G. FINISHING

H. PAINTING & DECORATION

J. ELECTRICAL INSTALLATION

K. PLUMBING & SANITARY INSTALLATION-PROVISIONAL


TOTAL MATERIALS COST TZS

APRIL, 2018 Page/8 PO-RALG


Schedule of Labour
GHARAMA ZA UFUNDI NYUMBA YA MTUMISHI

Na. AINA YA KAZI BEI YA UFUNDI - Shs

A Msingi wa Jengo (Sub-structure)


1 Kuseti jengo
2 Uchimbaji wa msingi
3 Kufukia

Kufunga mbao
4 Pembezoni mwa jamvi
5 Pembezoni mwa nguzo
6 Kuondoa mbao

Kumwaga zege
7 Chini kwenye msingi wa tofali
8 Chini kwenye msingi wa nguzo
9 katika nguzo ya awali
10 kwenye jamvi

11 Ujenzi wa tofali (1232 No)

Mawe
12 Upangaji wa mawe na utandazaji wa DPM

13 Umwagiliaji wa maji
Jumla ndogo msingi wa jengo

B. Kunyanyua jengo (Super-structure)


1 Ujenzi wa tofali za kuta na uwekaji DPC (2604No)

Kufunga mbao katika:


2 Nguzo mlalo
3 Nguzo wima

Kusuka nondo katika:


4 Nguzo mlalo
5 Nguzo wima

Kumwaga zege katika:


6 Nguzo mlalo
7 Nguzo wima
8 Umwagiliaji wa maji

C. Kuezeka (Roof structure and covering)


Kuezeka na ufungaji wa gata
Jumla ndogo kunyanyua jengo

D. Milango
1 Kufitisha fremu za milango
2 Kufitisha shata za milango pamoja na vitasa
3 Upakaji wa Varnishi katika milango na fremu

E. Umaliziaji (Finishing)
Upigaji wa lipu pamoja na kutengeneza koplo:
1 Nje ya jengo
2 Ndani ya jengo

Sakafu
3 Uwekaji wa sakafu ya kupokea vigae (beds)
4 Uwekaji wa vigae pamoja na grauti katika sakafu (floor tiles) -

APRIL -2018 PAGE/1 PO-RALG


GHARAMA ZA UFUNDI NYUMBA YA MTUMISHI

Na. AINA YA KAZI BEI YA UFUNDI - Shs

Dali:
6 Ufungaji wa mbao za dali (Brandering)
7 Uwekaji wa dali na mikanda ya gypsum
8 Uwekaji wa dali ya pvc kuzunguka nyumba kwa nje

9 Uwekaji wa vigae katika kuta na upakaji grout


Jumla ndogo umaliziaji(finishing)

F. Rangi na Mapambo (Painting & Decoration)

Kupaka rangi mikono mitatu pamoja na skimming katika:


1 Kuta za nje
2 Kuta za ndani
3 Dali

Kupaka rangi mikono mitatu katika:


5 Msingi wa nyumba
6 Grill za milango na madirisha

Jumla ndogo Rangi na mapambo

G. Umeme (Electrical installation)


1 Usukaji wa umeme awamu ya kwanza - Conduit na Box
2 Usukaji wa umeme awamu ya pili (2nd fix)-fittings
Jumla ndogo Umeme

H.
Mifumo ya maji safi na taka (Water Supply and Sewage system)

1 Ufungaji bomba awamu ya kwanza (Kuchimbia bomba)


2 Ufungaji bomba awamu ya pili (2nd fix) -fittings
3 Ufungaji wa Mifumo ya maji ya mvua kwenda kwenye tanki

Jumla ndogo Mifumo ya maji safi na taka

APRIL -2018 PAGE/2 PO-RALG


GHARAMA ZA UFUNDI NYUMBA YA MTUMISHI

MAJUMUISHO (SUMMARY)
Shs
A. Msingi wa Jengo (Sub-structure)

B. Kunyanyua jengo (Super-structure)

C. Kuezeka (Roof structure and covering)

D. Milango

E. Umaliziaji (Finishing)

F. Rangi na Mapambo (Painting & Decoration)

G. Umeme (Electrical installation)

H. Mifumo ya maji safi na taka (Water Supply and Sewage system)

JUMLA KUU Shs.

ANGALIZO:

Fundi anatakiwa kujaza hii fomu kwa kupitia mchoro wa jengo husika

APRIL -2018 PAGE/3 PO-RALG


Drawings
DOOR & WINDOW SCHEDULE
NO. WIDTH HEIGHT TOTAL
D1 900mm 2500mm 6 A B C D E F G
D2 900mm 2100mm 3 14150
1990 4270 2930 1130 2700 1130
W1 1200mm 1500mm 8
2180 3180 900 1540 1200 2740 1200 1430
W2 900mm 600mm 3
W1 W1
D2
230

230

230

230
1 1
860
1950 4080 3870 3640
1090

1090
W2

1430
900

900

230 TOILET D2 230 230


7 3 2 1 150
4 BEDROOM
150

150

2 2
W1 2

1200

2550
1950 3 PRINCIPAL
SHOWER
1050

1050
230
900

900

8 D2 BEDROOM
W2

3600

1200
3 2 1 W1
150

3 3

860
600

600
1950 D1
900

230

150
4 4
KITCHEN 1700 900 1660

1350
1050

1050
CORRIDOR

900

900
D1 D1
2400
900

X2 9 X2 6 150 230
1 2 3 2070 900 900 3870
W2 3 2 1

150

150

150
5 5
D1
7960

7960
D1
900

900
D1
900

900
1580
6
150 X1 6

980
W1 SITTING

3960
3980

3980
5 BEDROOM 2 VERRANDAH

1200
1 1
X1

3080
3 2 1
3270

3270
1200
3310

W1
2100mm high,

1580
230mm thick

1130
230 painted block wall 230 150 230
6030 2740 3640 1130

250
230

230

230
7 7
W1 W1
6260 980 1200 2030 1200 1580 880
250
GROUND PLAN 1990 4270
14150

2930 1130 2700 1130


SCALE: 1:100
A B C D E F G
TOTAL AREA = 77sqm
Building Section
Policy and Planning Department
Approved No. Description Date Client
STAFF QUARTER
PRESIDENT'S OFFICE, REGIONAL ADMINISTRATION
Ministry of Health, Community Developent, Ground Floor Plan
Gender, Elderly and Children AND LOCAL GOVERNMENT Project number 2017 / 05 / 02
University of Dodoma
College of Humanities and Social Science 11th Project
Date 24 APRIL 2018 A101
Building,
P. O. Box 743, PROPOSED STANDARD DESIGN FOR A DISPENSARY Drawn by DCNM
40478 DODOMA Checked by DCNM Scale 1: 100
A B C D E F G
14150
1990 4270 2930 1130 2700 1130
1 1
1090

1090
2 2
1050

1050
3 3
600

600
4 4
1050

1050
X2 X2
5 5
7960

7960
900

900
6 X1 6
X1
3270

3270
2100mm high,
230mm thick
painted block wall
7 7
1990 4270 2930 1130 2700
14150
ROOF PLAN
A B C D E F G
SCALE: 1:100
Building Section
Policy and Planning Department
Approved No. Description Date Client
STAFF QUARTER
PRESIDENT'S OFFICE, REGIONAL ADMINISTRATION
Ministry of Health, Community Developent, Roof Plan
Gender, Elderly and Children AND LOCAL GOVERNMENT Project number 2017 / 05 / 02
University of Dodoma
College of Humanities and Social Science 11th Project
Date 24 APRIL 2018 A102
Building,
P. O. Box 743, PROPOSED STANDARD DESIGN FOR A DISPENSARY Drawn by DCNM
40478 DODOMA Checked by DCNM Scale 1: 100
C D E F G
50x50mm ceiling joists
50x150mm tie beams
26°
500

500

500

500
1500

3000

2500

2500

2500
BEDROOM 1 SITTING VERANDAH

1000
50mm total thickness floor 50mm total thickness floor
finish including 1:3 cement finish including 1:3 cement
G.F screed & floor finish screed & floor finish

150 100

150 100
230

230

230
690 690 690 690
10mm thick Porcelain floor tiles on
40mm sand-cement backing on
SECTION X1:X1
100mm thick plain concrete slab on
150mm thick hardcore on well compacted back fill
SCALE: 1:50
Building Section
Policy and Planning Department
Approved No. Description Date Client
STAFF QUARTER
PRESIDENT'S OFFICE, REGIONAL ADMINISTRATION
Ministry of Health, Community Developent, Section X1:X1
Gender, Elderly and Children AND LOCAL GOVERNMENT Project number 2017 / 05 / 02
University of Dodoma
College of Humanities and Social Science 11th Project
Date 24 APRIL 2018 A103
Building,
P. O. Box 743, PROPOSED STANDARD DESIGN FOR A DISPENSARY Drawn by DCNM
40478 DODOMA Checked by DCNM Scale 1:50
7 6 5 4 3 2 1 G F E D C B A
FRONT ELEVATION RIGHT SIDE ELEVATION
1 2 3 4 5 6 7 A B C D E F G
REAR ELEVATION LEFT SIDE ELEVATION
ELEVATIONS
SCALE: 1:100
Building Section
Policy and Planning Department
Approved No. Description Date Client
STAFF QUARTER
PRESIDENT'S OFFICE, REGIONAL ADMINISTRATION
Ministry of Health, Community Developent, Elevations
Gender, Elderly and Children AND LOCAL GOVERNMENT Project number 2017 / 05 / 02
University of Dodoma
College of Humanities and Social Science 11th Project
Date 24 APRIL 2018 A105
Building,
P. O. Box 743, PROPOSED STANDARD DESIGN FOR A DISPENSARY Drawn by DCNM
40478 DODOMA Checked by DCNM Scale 1:100
NOTE:
A B C D E F 1. All dimensions are in mm
unless otherwise specified
2. All discrepancies shall be
referred to the structural
engineer
3. Reinforced concrete shall be
of grade 20 with
fcu=25N/mm² at 28 days of
age
4. Main reinforcements shall be
1 1 high tensile steel with fy =
460N/mm²
5. Nominal cover to the
reinforcements:
2 2 a) Foundation 50mm
b) Column 25mm
c) Beam 25mm
d) Slab 25mm
3 3 PROJECT:
PROPOSED REHABILITATION
OF HEALTH CENTRE
4 4
CLIENT:
PRESIDENT'S OFFICE
5 5 REGIONAL ADMINISTRATION
LOCAL GOVERNMENT
MINISTRY OF HEALTH,
COMMUNITY DEVELOPMENT,
6 6 GENDER AND CHILDREN
DRAWING TITLE:
STAFF HOUSE
FOUNDATION LAYOUT
Designed by: Eng. R.A.M
Drawn by: ENG. MKHOTYA
Checked by: Eng. R.A.M
A B C D E F
Approved by:
Date: Scale:
2018
FOUNDATION PLAN Drawing No. Sheet:
STR.101
230 NOTE:
150 1. All dimensions are in mm
unless otherwise specified
+0.450
+0.450 2. All discrepancies shall be
100mm floor slab
100mm floor slab referred to the structural
200mm hardcore engineer
450

200mm hardcore
3. Reinforced concrete shall be
dpm level
of grade 25 with
dpc level dpc level fcu=25N/mm² at 28 days of
Well compacted
age
1000

Well compacted selected earth fill 4. Main reinforcements shall be


selected earth fill
high tensile steel with fy =
-1.000

230
-1.000 460N/mm²
230

Concrete grade 15
Concrete grade 15 5. Nominal cover to the
reinforcements:
230 230 230 a) Foundation 50mm
230 230 230
b) Column 25mm
345 345
345 345 c) Beam 25mm
690 d) Slab 25mm
690
Section B - B Section C - C
PROJECT:
PROPOSED REHABILITATION
OF HEALTH CENTRE
1000
CLIENT:
PRESIDENT'S OFFICE
REGIONAL ADMINISTRATION
6Y16-01-200(B2

230
LOCAL GOVERNMENT
1000
230

MINISTRY OF

250
6Y16-01-200(B1) HEALTH,COMMUNITY
DEVELOPMENT,GENDER,
0mm CONCRETE BLINDING ELDERLY AND CHILDREN
TYPICAL SECTION A-A THROUGH
FOOTING
COLUMN FOOTING F1 -4Nos
1000x1000x250mm
DRAWING TITLE:
STAFF HOUSE PLINTH
BEAM LAYOUT
Designed by: Eng. R.A.M
Drawn by: Eng. R.A.M
Checked by: ENG. A.MKHOTYA
Approved by:
Date: Scale:
2018
Drawing No. Sheet:
STR,102
NOTE:
A B C D E F
1. All dimensions are in mm
unless otherwise specified
2. All discrepancies shall be
referred to the structural
engineer
3. Reinforced concrete shall be
of grade 25 with
fcu=25N/mm² at 28 days of
age
BEAM 01 4. Main reinforcements shall be
1 1
high tensile steel with fy =
460N/mm²
BEAM 02 5. Nominal cover to the
2 2 reinforcements:
a) Foundation 50mm
b) Column 25mm
BEAM 05

BEAM 07

BEAM 08
BEAM 06

c) Beam 25mm
d) Slab 25mm
3 3
PROJECT:
PROPOSED REHABILITATION
BEAM 03
OF HEALTH CENTRES
4 4
CLIENT:
5 5 PRESIDENT'S OFFICE
REGIONAL ADMINISTRATION
LOCAL GOVERNMENT
BEAM 04 MINISTRY OF
6 6 HEALTH,COMMUNITY
DEVELOPMENT,GENDER,
ELDERLY AND CHILDREN
DRAWING TITLE:
STAFF HOUSE PLINTH
BEAM LAYOUT
Designed by: Eng. R.A.M
Drawn by: Eng. R.A.M
Checked by: Eng. A. MKHOTYA
A B C D E F
Approved by:
Date: Scale:
2018
FOUNDATION BEAM LAYOUT Drawing No. Sheet:
STR,103
NOTE:
1. All dimensions are in mm
unless otherwise specified
2. All discrepancies shall be
referred to the structural
engineer
3. Reinforced concrete shall be
of grade 25 with
2Y12 fcu=25N/mm² at 28 days of
age
4. Main reinforcements shall be
high tensile steel with fy =
460N/mm²
A
5. Nominal cover to the
reinforcements:
a) Foundation 50mm
A b) Column 25mm
c) Beam 25mm
2Y12 d) Slab 25mm
SECTION B-B PROJECT:
PROPOSED REHABILITATION
OF HEALTH CENTRES
A 2Y12
CLIENT:
PRESIDENT'S OFFICE
A REGIONAL ADMINISTRATION
LOCAL GOVERNMENT
MINISTRY OF
HEALTH,COMMUNITY
230 DEVELOPMENT,GENDER,
ELDERLY AND CHILDREN
2Y12
DRAWING TITLE:
STAFF HOUSE PLINTH BEAM
SECTION A-A DETAILS
Designed by: Eng. R.A.M
Drawn by: Eng. R.A.M
Checked by: Eng. A.MKOTYA
Approved by:
Date: Scale:
2018
Drawing No. Sheet:
STR.104
NOTE:
A B C D E F 1. All dimensions are in mm
unless otherwise specified
2. All discrepancies shall be
referred to the structural
engineer
3. Reinforced concrete shall be
of grade 25 with
fcu=25N/mm² at 28 days of
age
BEAM 01 4. Main reinforcements shall be
1 1 high tensile steel with fy =
460N/mm²
BEAM 02 5. Nominal cover to the
2 2 reinforcements:
BEAM 10 a) Foundation 50mm
b) Column 25mm

BEAM 11
c) Beam 25mm
d) Slab 25mm
BEAM 03
3 3
PROJECT:
BEAM 08
BEAM 07

PROPOSED REHABILITATION
BEAM 04 OF HEALTH CENTRES
4 4
BEAM 09
BEAM 05 CLIENT:
5 5 PRESIDENT'S OFFICE
REGIONAL ADMINISTRATION
LOCAL GOVERNMENT
BEAM 06 MINISTRY OF
6 6 HEALTH,COMMUNITY
DEVELOPMENT,GENDER,
ELDERLY AND CHILDREN
DRAWING TITLE:
STAFF HOUSE RINGBEAM
LAYOUT
Designed by: Eng. R.A.M
Drawn by: Eng. R.A.M
A B C D E F Checked by: Eng. A.MKHOTYA
Approved by:
Date: Scale:
RING BEAM LAYOUT 2018
Drawing No. Sheet:
STR. 105
NOTE:
1. All dimensions are in mm
unless otherwise specified
2. All discrepancies shall be
referred to the structural
engineer
3. Reinforced concrete shall be
2Y12 of grade 25 with
fcu=25N/mm² at 28 days of
age
4. Main reinforcements shall be
B high tensile steel with fy =
460N/mm²
5. Nominal cover to the
reinforcements:
B a) Foundation 50mm
b) Column 25mm
c) Beam 25mm
d) Slab 25mm
2Y12
SECTION B-B PROJECT:
PROPOSED REHABILITATION
OF HEALTH CENTRES
2Y12
CLIENT:
PRESIDENT'S OFFICE
REGIONAL ADMINISTRATION
LOCAL GOVERNMENT
A
MINISTRY OF
HEALTH,COMMUNITY
DEVELOPMENT,GENDER,
A 150 ELDERLY AND CHILDREN
2Y12 DRAWING TITLE:
STAFF HOUSE RING BE
DETAILS
SECTION A-A Designed by: Eng. R.A.M
Drawn by: Eng. R.A.M
Checked by: Eng. A.MKHOTYA
Approved by:
Date: Scale:
2018
Drawing No. Sheet:
STR.106
NOTE:
1. All dimensions are in mm
unless otherwise specified
2. All discrepancies shall be
referred to the structural
engineer
2640 19715 3. Reinforced concrete shall be
of grade 25 with
fcu=25N/mm² at 28 days of
age
4. Main reinforcements shall be

600
high tensile steel with fy =
460N/mm²
1690

5. Nominal cover to the


reinforcements:
a) Foundation 50mm
b) Column 25mm
c) Beam 25mm
d) Slab 25mm
PROJECT:
PROPOSED REHABILITATION

10210
6830

OF HEALTH CENTRES
CLIENT:
PRESIDENT'S OFFICE
REGIONAL ADMINISTRATION
LOCAL GOVERNMENT
1690

MINISTRY OF
HEALTH,COMMUNITY
DEVELOPMENT,GENDER,
ELDERLY AND CHILDREN
DRAWING TITLE:
TRUSS LAYOUT
Designed by: Eng. R.A.M
Drawn by: Eng. R.A.M
Checked by: Eng. A.MKHOTYA
Approved by:
Date: Scale:
2018
Drawing No. Sheet:
STR.107
NOTE:
1. All dimensions are in mm
unless otherwise specified
2. All discrepancies shall be
referred to the structural
engineer
3. Reinforced concrete shall be
of grade 25 with
fcu=25N/mm² at 28 days of
age
4. Main reinforcements shall be
high tensile steel with fy =
A
460N/mm²
5. Nominal cover to the
reinforcements:
B a) Foundation 50mm
B
b) Column 25mm
c) Beam 25mm
C d) Slab 25mm
F
PROJECT:
PROPOSED
REHABILITATION OF
D E D C HEALTH CENTRES
CLIENT:
PRESIDENT'S OFFICE
REGIONAL ADMINISTRATION
LOCAL GOVERNMENT
MINISTRY OF
HEALTH,COMMUNITY
SCALE 1:50
DEVELOPMENT,GENDER,
ELDERLY AND CHILDREN
TYPICAL ROOF TRUSS T01 ; 9Nos. DRAWING TITLE:
STAFF HOUSE TRUSS
DETAILS
Designed by: Eng. R.A.M
Drawn by: Eng. R.A.M
Checked by: Eng. A. MKOTYA
Approved by:
Date: Scale:
2018
Drawing No. Sheet:
STR.108
NOTE:
1. All dimensions are in mm
unless otherwise specified
2. All discrepancies shall be
1
150
referred to the structural
engineer
171
2 3. Reinforced concrete shall be
of grade 25 with
fcu=25N/mm² at 28 days of
1825

950
73
140

age
23

37
4

22 4. Main reinforcements shall be


26°

high tensile steel with fy =


526

460N/mm²
1290 2420 2640 2420 1290
5. Nominal cover to the
545
545
reinforcements:
TIMBER PLATE(GUSSET)
Nails.
a) Foundation 50mm
50
50
b) Column 25mm
c) Beam 25mm
TYPICAL ROOF TRUSS T01 ; 9Nos. d) Slab 25mm

150

150
50
50
0
15 150 150
PROJECT:
50

50 ROOF TRUSS DETAIL " 4 "


PROPOSED

15
0
REHABILITATION OF
HEALTH CENTRES
50

150
0 15
15 0 Nails.
50

50

TIMBER PLATE(GUSSET) Nails


25 25
50
50
25 25 25 25
CLIENT:

150
50 50
PRESIDENT'S OFFICE

150
150

150

TIMBER PLATE(GUSSET) Nails


16mm diameter bolts
REGIONAL ADMINISTRATION
ROOF TRUSS DETAIL " 6 " LOCAL GOVERNMENT
TIMBER PLATE(GUSSET)

50
150
ROOF TRUSS DETAIL " 2 " MINISTRY OF
HEALTH,COMMUNITY
DEVELOPMENT,GENDER,
TIMBER PLATE(GUSSET) ELDERLY AND CHILDREN
25 25 25 25
50 Nails 50
TIMBER PLATE(GUSSET)
DRAWING TITLE:
150

150
ROOF TRUSS DETAIL " 7 " Nails.
ROOF TRUSS DETAIL " 5 " STAFF HOUSE TRUSS DETAILS AND
CONNECTIONS
50 50
Designed by: Eng. R.A.M

150
Eng. R.A.M

150
50
Drawn by:

15
Eng. A. MKHOTYA

50
Checked by:

50
TIMBER PLATE(GUSSET) 25 25 50
50
50 150
150
Approved by:

15
150

0
0
15
ROOF TRUSS DETAIL " 1 "
ROOF TRUSS DETAIL " 4 " Date: Scale:
ROOF TRUSS DETAIL " 2 " 2018
Drawing No. Sheet:
STR.109
NOTES:

1. All work to be carried out in strict accordance with local


authority requirements and Engineers Registration Board.
2. This drawing may not be scaled. Only figured dimensions
and levels may be used.
3. All relevant details, levels, dimensions must be checked on
site before commencement of work. Any discrepancies to be
reported to the Electrica Engineer office immediately.

No. Date Description

6WAYS SPN DISTRIBUITION BOARD STH

3X1.5MM2 01 LIGHTS -6pts


10A 3X1.5MM2 Building Section,
02 LIGHTS - 7pts Policy and Planning Department,
Ministry of Health, Community Development, Eldery and
10A 3X1.5MM2 Children
03 LIGHTS - 6pts University of Dodoma,
10A College of Humanities and Social Science 11th Building,
P.O.Box 743,
Dodoma
3X1.5MM2 05 LIGHTS SECURITY 6pts
10A 3X1.5MM2 06 FANS PROJECT NAME
10A STAFF HOUSE
63A 300mA ELCB
3X2.5MM2 08 SWITCH SOCKET RING
30A PROPOSED DISPENSARY

DRAWING DESCRIPTION

FLOOR PLANS

SCALE DATE DESIGNED CHENGULA


1:100 APRIL. 2018 DRAWN CHENGULA

CHECKED CHENGULA
DRAWING NUMBER REVISION
NOTES:

1. All work to be carried out in strict accordance with local


authority requirements and Engineers Registration Board.
2. This drawing may not be scaled. Only figured dimensions
and levels may be used.
3. All relevant details, levels, dimensions must be checked on
site before commencement of work. Any discrepancies to be
reported to the Electrica Engineer office immediately.

ELECTRICAL SYMBOLS
No. Date Description
Fluorescent light fitting Single tube 1200mm P Water pump F Extract fan

Fluorescent light fitting twin tube 1200mm


20A Double pole switch

Incandescent lamp X Electrical point


Telephone outlet direct line

6A 1gang 1way switch 3PH Socket Telephone outlet extension line

6A 2gang 1way switch TV TV outlet

6A 3gang 1way switch


Ceiling mounted fan

6A 3gang 1way switch


Fan regulator
2
6A 1gang 2way switch Earthing
2 Miniature Circuit Breaker with rating
6A 2gang 2way switch
2 R Building Section,
6A 3gang 1way switch Moulded Case Circuit Breaker with rating Policy and Planning Department,
Ministry of Health, Community Development, Eldery and
Children
13A Switch socket outlet single University of Dodoma,
ELECTRICAL ABBREVIATIONS College of Humanities and Social Science 11th Building,
P.O.Box 743,
Dodoma
13A Switch socket outlet twin SWA Steel Wire Armoured
SPN Single Phase & Neutral PROJECT NAME
Distribution board or Consumer unit as applicable ELECTRICAL SYMBOLS &
TPN Three Phase & Neutral
cooker control unit DB Distribution Board ABRIVIATION
PROPOSED HEARTH CENTRE

DRAWING DESCRIPTION

ELECTRICAL PLAN

SCALE DATE DESIGNED CHENGULA


1:100 APRIL. 2018 DRAWN CHENGULA

CHECKED CHENGULA
DRAWING NUMBER
REVISION