You are on page 1of 6

Tracking sheet for material and labour rate Date:

Data Collector:
Location:
No Items Unit Unit price for building Materials

Construction Materials
1 Portland Cement (50 kgs) bags

2 Ethiopian Cement bags


(50Kg)
3 Eran Cement 5(Kg) bags

4 Sand Load

5 Concrete agreggate Load


(Natural)
Creshed agreggate (gravel
6 size = 6-10mm) Load

Creshed agreggate (gravel


7 size = 8-12mm) Load

8 Masonry stones m
3

9 Gravel Load

10 Bitumen (200 L) fostor

11 Bitumen (180 L) fostor

Ceramic squatting pan


12 complete with connector 1 piece

13 White ceramic m
2
tiles(30cmx20cm)
14 White ceramic m
2
tiles(30cmx30cm)
15 White ceramic m
2
tiles(33cmx33cm)
16 Concrete Masonry units Pieces
(40x15x20cm)
17 Concrete Masonry units Pieces
(40x20x20cm)
18 Stirups 6 mm mild steel Pieces

19 High yield steel 10 mm Pieces


diameter
20 High yield steel 12 mm Pieces
diameter
21 Formwork timber 1" x 2" m
length 3.9 meter
22 Formwork timber 1" x 6" m
length 3.9 m
Roofing timber 2" x 2"
23 size 3.9 meters long m
Roofing timber 2" x 3"
24 size 3.9 meters long m

25 Ceiling board(playwood) Pieces

26 Ceiling board(Xaashi) Pieces

27 Ceiling board(Cloured) Pieces

28 CGI sheets 28 gauge x Pieces


2.4 meter long
29 CGI sheets 30 gauge x Pieces
2.4 meter long
30 CGI sheets 32 gauge x Pieces
2.4 meter long
31 CGI sheets 34 gauge x Pieces
2.4 meter long
32 Steel door complete - 1 x Pieces
2.2 m
Steel window complete -
33 1.5m x 1 m Pieces

Steel window complete -


34 0.85 x 1 m Pieces

35 Electric wire 3x1.5 m

36 Electric wire 3x2.5 m

37 Electric wire 2x2.5 m

38 water pipe 1/2" m

39 PVC pipe 2''( ) No

40 PVC pipe 4'' No

41 PVC pipe 6'' No

42 steel pipe m

43 water pipe 1" m

44 110mm pvc sewer pipe No

45 water pipe 3/4" m

46 Water fostor

47 Water m
3

48 2000 litre Plastic water Pieces


tank
Hand washing Basin 60cm
49 : Standard type Pieces

50 Turkish pour flush W.C Pieces

51 syphone Pieces

52 Roofing nails Kg

53 Nails number 6 Kg

54 Nails number 7 Kg
55 Nails number 8 Kg

56 Nails kofiyo Kg

Data Collector:
Location:
No Items Unit Unit price for building Materials

Labourer
Foreman per day
1 Mason per day
2 Carpenter per day
3 Iron bender per day
4 Concrete mixer per day
5 Casual labor per day
6 Watchmen per day
7
8
Prepared this form
Eng. Abdurrahman Mahmud Ali (Garoon)
Date: