2 Base works for poles of reinforced concrete with 12 mm iron, size (50*50*20 cm) No 30
3 Excavation works around the stadium from concrete reinforced with a 12 mm iron grid LM 154
(total of 6 rods 12 mm with 6 mm) size 40*15 cm
4 Poles works from Reinforced cement concrete with a 12 mm iron (total of 4 rods 12 mm with 6 mm) No 30
size 40*15 cm and 2 meters height
5 Supply and apply and fix a concrete layer with 15 cm thickness and a size of 10 cm M3 216
6 Supply and apply and fix a layer of agriculture soil with 15 cm thickness M3 216
8 Make a threshold of reinforced concrete over the pumice to fix it with a 6 mm iron rod LM 100
9 Supply and install Iron hooks with 3 mm thickness from the valley side with 3 inches iron poles every M2 64
2.5 meters is high by 2 meters