BILL OF MATERIALS

PROJECT :
LOCATION :
OWNER :

DIVISION 1 - GENERAL REQUIREMENTS


Item Description Unit Quantity Unit Rate Amount
1 Mobilization LS 1 0
2 Temporary Facilities LS 1 0
Sub-total-General Requirements 0

DIVISION 2 – SITEWORK
Item Description Unit Quantity Unit Rate Amount
1 Excavation m3 27.00 0
2 Backfilling m3 18.00 0
Sub-total-Siteworks 0

DIVISION 3 – CONCRETE
Item Description Unit Quantity Unit Rate Amount
A Sub-structure Reinforced Concrete
1 APO Portland Cement (40 Kilos) Bags 143 0
2 Washed Sand m3 9 0
3 Gravel m3 8 0
4 10mm diameter x 6m RSB Pcs. 164 0
5 12mm diameter x 6m RSB Pcs. 56 0
6 16mm diameter x 6m RSB Pcs. 20 0
7 #16 G.I. Tie Wire Kls. 17 0
8 ¼” Thick Marine Plywood Pcs. 11 0
9 2”x2”x12’ Coco lumber Pcs. 83 0
10 Common Wire Nails #2-1/2 Kgs. 8.00 0
11 Common Wire Nails #3 Kgs. 10.00 0
12 Common Wire Nails #4 Kgs. 2.00 0

B Super-structure Reinforced Concrete


1 APO Portland Cement (40 Kilos) Bags 64 0
2 Washed Sand m3 4 0
3 Gravel m3 7 0
4 10mm diameter x 6m RSB Pcs. 61 0
6 16mm diameter x 6m RSB Pcs. 36 0
7 #16 G.I. Tie Wire Kls. 11 0
8 ¼” Thick Marine Plywood Pcs. 27 0
9 2”x2”x12’ Coco lumber Pcs. 387 0
10 2”x3”x12’ Coco lumber Pcs. 91 0
11 Common Wire Nails #2-1/2 Kgs. 8.00 0
12 Common Wire Nails #3 Kgs. 12.00 0
13 Common Wire Nails #4 Kgs. 3.00 0
Sub-total-Concrete Works 0
BILL OF MATERIALS
PROJECT :
LOCATION :
OWNER :

DIVISION 4 – MASONRY
Item Description Unit Quantity Unit Rate Amount

1 100mm (4”) Concrete Hollow Blocks Pcs. 2,452 0


2 APO Portland Cement (40 Kilos) Bags 103 0
3 Washed Sand m3 9 0
4 10mm diameter x 6m RSB Pcs. 124 0
5 #16 G.I. Tie Wire Kls. 5 0
Sub-total-Masonry 0

DIVISION 5 – METALS
Item Description Unit Quantity Unit Rate Amount
A Roofing
1 0.40mm thk Rib Type Pre-Painted Long span m2 150 0
Roofing
2-1/2”x 2-1/2”x 1/4”thk x 6m Angle Bar
2 (standard)
Pcs 37 0

3 2”x 2”x 1/4”thk x 6m Angle Bar (standard) Pcs 14 0


4 2"x 4" x 2.0mm. Thick x 6m C-Purlins Pcs 39 0
5 1”x 1”x 3/16”thk x 6m Angle Bar (standard) Pcs 22 0
6 1” x 3/16” thk x 6m Flat Bar (standard) Pcs 7 0
7 12mm Ø x 6m length Round Bar Pcs 17 0
Pre-Painted, Pre-Fabricated Flushing Gutter,
8 0.40mm thk
Pcs 26 0

9 Insulation PE Foam 1Side Foil (10mm x 50m) m 150 0


10 Silicone Sealant, clear Pcs 5 0
11 Rust Converter Gals. 2 0
12 Welding Rod Box 2 0
13 Tex Screw 2 1/2" full thread Pcs 650 0
14 Blind rivets Pcs 250 0
15 Paint brush, 2" Pcs 2 0
16 Paint brush, 3" Pcs 2 0
Sub-total-Metals 0

DIVISION 8 – DOORS AND WINDOWS


Item Description Unit Quantity Unit Rate Amount
A Doors
1 Wooden Door Type D1, Size 900mm x Pcs. 1 0
2100mm including door jamb

2 Wooden Door Type D2, Size 800mm x Pcs. 3 0


2100mm including door jamb

3 Wooden Door Type D3, Size 700mm x Pcs. 1 0


2100mm
BILL OF MATERIALS
PROJECT :
LOCATION :
OWNER :

4 PVC Door Type D4, Size 600mm x 2100mm Pcs. 2 0

5 Aluminum Sliding Door Type D5, Size Pcs. 1 0


1800mm x 2100mm
B Windows

1 Aluminum Sliding Window Type W1, Size Pcs. 1 0


1600mm x 1200mm

2 Aluminum Sliding Window Type W2, Size Pcs. 5 0


1200mm x 1200mm

3 Aluminum Sliding Window Typw W3, Size Pcs. 1 0


800mm x 1200mm

4 Aluminum Awning Window Typw W4, Size Pcs. 2 0


400mm x 500mm

C Door Hardware
1 Loose pin Hinges (3½"x 4") Pairs 8 0
2 CTX Lock Sets Pcs. 2 0
3 Sherlock Lock Sets Pcs. 5 0
Sub-total-Doors & Windows 0

DIVISION 9 – FINISHES
Item Description Unit Quantity Unit Rate Amount
A Floor Finishes
1 Alfagres sologoso Hi-Shine, 600mm x 600mm Pcs. 160.00 0
Floor Tiles

2 Diamond Airlangga Grey Tiles, 500mm x Pcs. 130.00 0


500mm Floor Tiles

3 ½” x 200mm x 200mm (8" x 8") Platinum Pcs. 179.00 0


Welco Green Floor Tiles
4 APO Portland Cement (40 Kilos) Bags 11 0
5 Washed Sand m3 1 0
6 Tile Adhesive (25kgs) Bags 4 0
7 White cement for joint filler (1 Kilo/Bag) Bags 4 0
8 Tile trim Pcs. 6 0

B Wall Finishes
1 APO Portland Cement (40 Kilos) Bags 84 0
2 Washed Sand m3 7 0
3 ½” x 200mm x 300mm Romano Mosaic Green Pcs. 278.00 0
Wall Tiles (8" x 12")
4 Concrete Neutralizer quartz 2 0
5 Flat Latex Paint Gals 12.00 0
6 Acrylic Gloss Latex Paint Gals 12 0
7 Tile trim Pcs. 6 0
8 Stone Cladding m2 10 0
BILL OF MATERIALS
PROJECT :
LOCATION :
OWNER :

C Ceiling Finishes
1 1/4"x4'x8' Marine Plywood Pcs. 36 0
2 2" x 2" Mahogany Lumber Bd.Ft. 469.00 0
3 Boysen Flatwall White Gals 4 0
4 Boysen Quick Drying Enamel White Gals 3 0
5 Paint Thinner Gals 4 0
Sub-total-Finishes 0

DIVISION 10 – SPECIALTIES
Item Description Unit Quantity Unit Rate Amount
A Toilet Accessories
1 La Fonza Bowl, Siena White (including Set 2 0
lavatory)
2 Kitchen Sink, Single Set 1 0
3 Telephone Shower Sets 2 0
4 Floor Drain Pcs. 2 0
5 PVC Faucet Pcs. 4 0
6 Mirror, 600mm x 450mm Pcs. 2 0
Sub-total-Specialties 0

DIVISION 15 – PLUMBING WORKS


Item Description Unit Quantity Unit Rate Amount
A Water Supply Systems
1 1/2" x 10' PVC Pipe Pcs. 12 0
2 1/2" PVC Tee Pcs. 8 0
3 1/2" PVC Elbow 90 degrees Pcs. 8 0
4 1/2" PVC Clean Out Plug Pcs. 2 0
5 1/2" PVC Gate Valve Pcs. 2 0
6 PVC Solvent Cement (400cc) Pcs. 3 0

B Sanitary Systems
1 4" x 10' PVC Pipe, S-1000 Pcs. 8 0
2 3" x 10' PVC Pipe, S-1000 Pcs. 3 0
3 2" x 10' PVC Pipe, S-1000 Pcs. 3 0
4 4" PVC Clean Out Pc 1 0
5 4" x 3" PVC Sanitary Tee Pc 1 0
6 3" x 3" PVC Sanitary Tee Pc 2 0
7 3" x 2" PVC Sanitary Tee Reducer Pcs. 4 0
8 3" x 3" PVC Wye Pc 2 0
9 3" PVC Elbow, 90 Degrees Pc 2 0
10 3" PVC Closet Bend, 90 Degrees Pc 2 0
11 2" PVC Elbow, 90 Degrees Pc 6 0
12 PVC Solvent Cement (400cc) Pcs. 4 0
Sub-total-Plumbing Works 0
BILL OF MATERIALS
PROJECT :
LOCATION :
OWNER :

DIVISION 16 - ELECTRICAL
Item Description Unit Quantity Amount
A Electrical Fixtures
1 LED Downlight, 5W Pcs. 8 0
2 9W LED Bulb Pcs. 4 0
3 14W LED Bulb Pcs. 5 0
4 16W LED Bulb Pcs. 1 0
5 Ceiling Lamp, 18W Pcs. 2 0
6 18W LED Bulb Pcs. 1 0
7 Socket Pcs. 11 0
B Wiring & Outlets
1 Metal Panel Board Set 1 0
2 15 Amperes Circuit Breaker Sets 3 0
3 20 Amperes Circuit Breaker Sets 3 0
4 30 Amperes Circuit Breaker Sets 2 0
5 Safety Breaker 60 A Pc 1 0
6 Duplex Convenience Outlet Pcs 11 0
7 AC Convenience Outlet, Royu Pcs 2 0
8 REF Convenience Outlet, Royu Pcs 1 0
9 3 Gang Switch, Flush Type Pcs 3 0
10 2 Gang Switch, Flush Type Pcs 2 0
11 1 Gang Switch, Flush Type Pcs 5 0
12 PVC Type Junction Box with cover Pc 16 0
13 1/2" Flexible Hose m 45 0
14 1/2" uPVC Electrical Conduit Pipe x 3m Pc 12 0
15 Service Drop wire m 50 0
16 THHN Wire # 8 black m 12 0
17 THHN Wire # 8 white m 12 0
18 THHN Wire # 12 Box 1 0
19 THHN Wire # 14 Box 1 0
20 1/2" PVC Elbow Pc 4 0
21 1/2" Entrance Cap Pc 1 0
22 PVC Clip 1/2 Pc 12 0
23 Electrical Tape Pc 12 0
24 Bell Switch Pc 1 0
25 PVC Utility Box Pc 6 0
Sub-total-Electrical Works 0
BILL OF MATERIALS
PROJECT :
LOCATION :
OWNER :

SUMMARY OF TOTAL PROJECT COST


DIV. Description Unit Quantity Unit Rate
1 GENERAL REQUIREMENTS
2 EARTHWORKS
3 CONCRETE WORKS
4 MASONRY WORKS
5 METAL WORKS
6 WOODS & PLASTICS
7 THERMAL & MOISTURE PROTECTION
8 DOORS AND WINDOWS
9 FINISHES
10 SPECIALTIES
11 EQUIPMENTS
12 FURNISHINGS
13 SPECIAL CONSTRUCTION
14 PLUMBING WORKS
15 ELECTRICAL WORKS
TOTAL MATERIAL COST 0
TOTAL LABOR COST (40% OF TOTAL MATERIAL COST) 0

A TOTAL DIRECT COST Total Material Cost + Labor Cost 0

OVERHEAD, CONTINGENCIES &


B 15% of Total Direct Cost 0
MISCELLANEOUS(OCM)

C CONTRACTOR'S PROFIT (CP) 10% of Total Direct Cost 0

D VALUE ADDED TAX (VAT) 5% of (A+B+C) 0

E TOTAL PROJECT COST 0