1 . Each box required proper Identification Tag.
Done:
2 © Franke, www.franke.com
Dimensions required as per Drawing. -
3 © Franke, www.franke.com
1 . Hole position observed not as per Drawing , uneven cutting observed.
2 . All issues already highlighted in FPA and R&D observation mail also.
4 © Franke, www.franke.com
Box damage found -
5 © Franke, www.franke.com
1 . Please improve standard packing of box in next lot.
2 . Use High GSM boxes – to avoid transportation damage.
This happened due to oversize box, box size are corrected to actual
size.
3 . In this lot 25-30 Pcs found damage – required action plan with
replacement pcs in next lot .
25 pcs was added in lot that dispatched on13-02-2023.
6 © Franke, www.franke.com
Connector missing & wire interchange -
Requirement –
1 . 8D in attached format.
2 . Action plan to avoid this issue
in future lot.
3 .100% marking on connector.
7 © Franke, www.franke.com
Requirement –
1 . 8D in attached format.
Attached (Slide no. 14)
8 © Franke, www.franke.com
Foam thickness uneven -
Requirement –
1 . Need action plan on above issue.
2 . We will not accept next lot for uneven foam LxWxH.
please confirm in advance.
9 © Franke, www.franke.com
Please maintain Foam LxWxH same in all Parts including position.
Requirement –
1 . Need action plan on above issue.
2 . We will not accept next lot for uneven foam LxWxH.
please confirm in advance.
10 © Franke, www.franke.com
Hole missing & Wire backout -
Hole missing & Uneven cut out. Wire Backout & Connector missing
11 © Franke, www.franke.com
Hole missing & Wire backout -
Hole Missing:
A dedicated person has been placed to check hole missing before
dispatch.
Uneven Cut-out:
This issue are due to manual cutting, we are in process of
finalizing the die cutting machine, hopefully order will placed next
week and from the 1st week of may this issue will resolved.
12 © Franke, www.franke.com
Requirements with every lot –
1 . PDIR every lot with all test reports – attached with
invoice copy.
Implemented
2 . Parts should be free from all defects.
Ok
3 .100% marking on connector to avoid connector missing
& wire back out issue.
Implemented.
4 .Hole position as per given drawing.
Ok
5 .avoid hole missing & uneven hole cutting.
Ok
6 .Packing as per standard.
Done
7. 8D with evidence in attached format.
13
Attached (Slide no. 14) © Franke, www.franke.com
8D-
14 © Franke, www.franke.com