A. EXCAVATION
-
Labor
4 Days 1 Foreman
4 Days 6 Unskilled
Total Cost PhP 14,000.00
Unit = 1 lot
Materials
C. STEEL WORKS
1
Materials
D. CONCRETE WORKS
Materials
E. MASONRY WORKS
Materials
2
29 m3 Sand 1,100.00 31,900.00
550 Bags Portland Cement (mortar and 240.00 132,000.00
plastering both sides)
F. PLUMBING WORKS
Unit = 1 lot
Materials
G. ROOFING WORKS
Materials
3
12 In. m. 0.40mm THICK x 1.07m x 9m 1,800.00 21,600.00
RIB TYPE, LONG SPAN
94.2 In. m. BOX GUTTER 320.00 30,144.00
10 Pcs ¼” THICK FIBER CEMENT 550.00 5,500.00
BOARD FACIA COVER
78 Pcs 2” x 4” 1.6mm C-PRULINS 175.00 13,650.00
15 Lengths 10mm dia DRB 165.00 2,475.00
Unit = 1 lot
Materials
4
I. TILE WORKS
Unit = 1 lot
Materials
J. PAINTING WORKS
Materials
K. CEILING WORKS
Materials
5
237 Pcs SINGLE METAL FURRING 117.00 27,728.95
136 Pcs METAL FURRING CARRYING 120.00 16,320.00
CHANNEL
60 Pcs WALL ANGLE (INTERIOR) 70.00 4,200.00
150 Pcs SPANDREL CEILING 215.00 32,250.00
115 Pcs WALL ANGLE (EXTERIOR) 70.00 8,050.00