Unit Price Amount
Qty Unit Description
Php Php
295 bags Portland Cement 250.00 73,750.00
24 m³ Sand 795.00 19,080.00
22 m³ Gravel 815.00 17,930.00
60 pcs 16mmØ x 6m RSB 350.00 21,000.00
57 pcs 12mmØ x 6m RSB 275.00 15,675.00
164 pcs 10mmØ x 6m RSB 185.00 30,340.00
1075 pcs 5" thk. CHB 18.00 19,350.00
9 kls. Tie Wire, #16 80.00 720.00
11 pcs 1/4" thk. Marine Plywood 600.00 6,600.00
19 pcs 2"x3"x12' Cocolumber 180.00 3,420.00
35 pcs 2"x2"x12' Cocolumber 120.00 4,200.00
5 kls. Common Nails, 3" 55.00 275.00
5 kls. Common Nails, 4" 70.00 350.00
33 pcs 7' Corrugated G.I. Sheet, Ga. 24 1,150.00 37,950.00
4 pcs Plain G.I. Sheet, Ga. 24 (4'x8') 650.00 2,600.00
17 pcs 2"x3"x12' Good lumber 390.00 6,630.00
38 pcs 2"x2"x12' Good lumber 260.00 9,880.00
3 kls Common Nails, 3" 55.00 165.00
3 kls Common Nails, 4" 70.00 210.00
5 kls Roofing Nails, 1 ½" 75.00 375.00
0.5 ltr Elastomeric Sealant (Vulcaseal) 450.00 225.00
1 gal Paint Thinner 375.00 375.00
4 gal Roof Paint (Boysen Roofgard) 800.00 3,200.00
5 sets Sliding Window 3,800.00 19,000.00
1 set Double Swing Aluminum Door 14,000.00 14,000.00
307,300.00
S U M M A R Y
ITEM DESCRIPTION/PARTICULARS AMOUNT
Item A Materials 307,300.00
Item B Labor 92,700.00
TOTAL ESTIMATED PROJECT COST 400,000.00
ITEM I. Structure Excavation
Est'd. Vol. = 3.38 cu.m.
Labor ( days)
No. of Personnel Rate / day Amount
Description
Required Php Php
1 Skilled Laborer 480.00 960.00 2
1 Common Laborer 310.00 620.00 2
1,580.00
RSB
16mm 12mm
footing 7.5 Masonry L W
7.5 46.67 pcs 5
15 m 140.00 m 140
90 m 28.00 pcs 28
18 pcs.
10mm
column 16 26.67 pcs
96 m 53.33 m
19.2 pcs. 320.00 m
64.00 pcs.
W 13.33 pcs
133.33 m
26.67 pcs
pcs
m
pcs