Professional Documents
Culture Documents
With Honours,
With this letter we offering you quotation for Renovation
Rp 165,080,000
DISCOUNT Rp 80,000
Best Regards,
Moxie Creative House
No Item SPESIFICATION QTY Total Cost / item
PEKERJAAN AWAL
1 Pemakaian listrik kerja 1.00 bulan Rp 1,000,000
2 Keamanan 1.00 m2 Rp 500,000
3 Transportasi dan Akomodasi selama Proyek 1.00 m3 Rp 500,000
4 Mobilisasi Pekerja 1.00 m2 Rp 500,000
Total Rp 2,500,000
PEKERJAAN DINDING
1 Panel Gypsum kiri (12 m x 1 m) 1 muka 12.00 m² Rp 2,160,000
2 Panel Gypsum kanan (6.5 m x 3.5 m) 1 muka 22.75 m² Rp 4,095,000
3 Partisi Kitchen (2.5 m x 3.5 m) 2 muka 8.75 m² Rp 2,625,000
4 Partisi tangga (3 m x 3 m) 2 muka 9.00 m² Rp 2,700,000
Total Rp 11,580,000
PEKERJAAN ALUMUNIUM
1 Pintu Kitchen (0.8 m x 2.1 m) 1.00 set Rp 3,250,000
2 Jendela Kitchen (1.6 m x 1 m) 1.00 set Rp 2,100,000
Total Rp 5,350,000
PEKERJAAN STUDIO BOOTH
1 Partisi Studio (1 m + 1.3 m + 1.8 m +1.3 m) x 2.1 m 1.00 set Rp 3,510,000
2 Pintu Swing (0.9 m x 2.5 m) 1.00 set Rp 3,250,000
3 Levelling lantai +15 cm (2 m x 3 m) 1.00 set Rp 2,100,000
4 Panel Peredam Dinding (3 m x 2.5 m) 1.00 set Rp 337,500
5 Panel Peredam Lantai (2 m x 3 m) 1.00 set Rp 270,000
6 Busa Diffuser (3 m x 2.5 m) 1.00 set Rp 1,875,000
Total Rp 11,342,500
PEKERJAAN PENGECATAN
1 Concrete look kanan (3.5 m x 3.5 m) 12.25 m² Rp 918,750
2 Concrete look Kiri (12 m x 1 m) 12.00 m² Rp 900,000
3 Dinding Kiri Warna Gelap (3 m x 3.5 m) 10.50 m² Rp 577,500
4 Partisi Dapur Warna Gelap (2.5 m x 3.5 m) 8.75 m² Rp 481,250
5 Dinding (8 m x 3.5 m) + (6 m x 3.5 m) + (4 m x 3.5 m) 63.00 m² Rp 3,465,000
6 Dinding Kitchen dll 40.00 m² Rp 2,200,000
7 Cat Plafond (4 m x 12 m) 48.00 m² Rp 2,640,000
Total Rp 11,182,500
PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Instalasi Stop Kontak 8.00 ttk Rp 2,160,000
2 Instalasi Saklar Tunggal 8.00 ttk Rp 2,560,000
3 Instalasi Saklar Ganda 4.00 ttk Rp 1,320,000
4 Instalasi Stop Kontak AC 3.00 ttk Rp 1,125,000
5 Instalasi titik lampu 12.00 ttk Rp 2,280,000
6 MCB 2.00 bh Rp 240,000
7 Router Penguat Signal Internet 1.00 bh Rp 1,500,000
Total Rp 11,185,000
PEKERJAAN ARMATUR
1 Stop Kontak 8.00 bh Rp 360,000
2 Stop Kontak Pararel 4 2.00 bh Rp 120,000
3 Saklar Tunggal 8.00 bh Rp 200,000
4 Saklar Ganda 4.00 bh Rp 120,000
5 Lampu Spotlight indoor 5.00 bh Rp 600,000
6 Lampu Gantung 3.00 bh Rp 1,500,000
7 Lampu Rel Isi 5 3.00 bh Rp 1,350,000
8 General Light 4.00 bh Rp 480,000
9 AC 1 PK 2.00 bh Rp 13,000,000
10 AC 1 PK Inverter 1.00 bh Rp 7,500,000
- Total Rp 25,230,000
PEKERJAAN FURNITURE
1 Kursi Café 1 8.00 bh Rp 4,400,000
2 Meja Café Kecil (0.6 m x 0.6 m) 4.00 bh Rp 2,400,000
3 Kursi Café 2 4.00 bh Rp 1,960,000
4 Meja Café Besar (1.6 m x 1 m) 1.00 bh Rp 4,900,000
5 Sofa 1 Seat 2.00 bh Rp 7,000,000
6 Coffee Table Bulat (dia. 0.6 m) 1.00 bh Rp 620,000
7 Sofa 2 Seat 1.4 m 2.00 bh Rp 8,600,000
8 Ottoman (dia. 0.55 m) 4.00 bh Rp 3,200,000
9 Coffee Table Kotak (0.45 m x 0.45 m) 4.00 bh Rp 2,000,000
10 Rak Kitchen (1.6 m x 3 m) 1.00 Set Rp 4,000,000
Total Rp 39,080,000
PEKERJAAN AKSESORIS
1 Cermin Bulat (dia. 0.8 m) 4.00 bh Rp 4,800,000
2 Aneka Frame 1.00 Set Rp 1,000,000
3 Stiker "DEHILLS RADIO" 2 m 1.00 bh Rp 700,000
4 Frame Vintage (1.5 m x 1 m) 1.00 bh Rp 1,500,000
5 Pot Tanaman 2.00 bh Rp 1,000,000
6 Papan Menu (2.2 m x 0.9 m) 1.00 bh Rp 1,000,000
Total Rp 10,000,000
PEKERJAAN AKSESORIS STUDIO BOOTH
1 Neon Box "ON AIR" (1.3 m x 0.9 m) 2.00 bh Rp 2,400,000
2 Meja Siaran (1.5 m x 0.8 m) 1.00 Set Rp 2,500,000
3 Kursi Siaran 2.00 bh Rp 4,800,000
4 Smart Lamp 1.00 bh Rp 650,000
5 Smart TV 43 inch 1.00 bh Rp 4,500,000
6 Cutting Sticker (2 m x 1 m) 2.00 bh Rp 1,300,000
Total Rp 16,150,000
PEKERJAAN OUTDOOR
1 Canopy Kain (4 m x 2.5 m) 10.00 m² Rp 8,000,000
2 Lampu Outdoor 2.00 bh Rp 760,000
3 Neon Box Logo "DEHILLS" (1 m x 1 m) 1.00 set Rp 3,920,000
4 Kursi Café 3 (Bench) 8.00 bh Rp 4,400,000
5 Meja Café 3 4.00 bh Rp 2,000,000
6 Pot Tanaman 4.00 bh Rp 2,000,000
Total Rp 21,080,000
PEKERJAAN LAIN - LAIN
1 Buang Puing 1.00 rit Rp 400,000
Total Rp 400,000
TOTAL Rp 165,080,000
BILL OF QUANTITY
Nama Pekerjaan : Renovasi Rumah Klender
NO ITEM
No PEKERJAAN AWAL VOLUME SATUAN HARGA MATERIAL TOTAL
1 Pemakaian listrik kerja 1.00 bln 1,000,000.00 Rp 1,000,000
2 Keamanan,(koordinasi dengan security internal, Sistem
Reimbustment jika dari pihak luar) 1.00 Ls 500,000.00 Rp 500,000
3 Transportasi dan Akomodasi selama Proyek 1.00 Ls 500,000.00 Rp 500,000
4 Mobilisasi Pekerja 1.00 Ls 500,000.00 Rp 500,000
Rp 2,500,000
No PEKERJAAN DINDING VOLUME SATUAN HARGA SATUAN
1 Panel Gypsum kiri (12 m x 1 m) 1 muka 12.00 m² 180,000.00 2,160,000
2 Panel Gypsum kanan (6.5 m x 3.5 m) 1 muka 22.75 m² 180,000.00 4,095,000
3 Partisi Kitchen (2.5 m x 3.5 m) 2 muka 8.75 m² 300,000.00 2,625,000
4 Partisi tangga (3 m x 3 m) 2 muka 9.00 m² 300,000.00 2,700,000
Rp 11,580,000
No PEKERJAAN ALUMUNIUM VOLUME SATUAN HARGA SATUAN
1 Pintu Kitchen (0.8 m x 2.1 m) 1.00 set 3,250,000.00 3,250,000
2 Jendela Kitchen (1.6 m x 1 m) 1.00 set 2,100,000.00 2,100,000
Rp 5,350,000
No PEKERJAAN STUDIO BOOTH VOLUME SATUAN HARGA SATUAN
1 Partisi Studio (1 m + 1.3 m + 1.8 m +1.3 m) x 2.1 m 1.00 set 3,510,000.00 3,510,000
2 Pintu Swing (0.9 m x 2.5 m) 1.00 set 3,250,000.00 3,250,000
3 Levelling lantai +15 cm (2 m x 3 m) 1.00 set 2,100,000.00 2,100,000
4 Panel Peredam Dinding (3 m x 2.5 m) 1.00 set 337,500.00 337,500
5 Panel Peredam Lantai (2 m x 3 m) 1.00 set 270,000.00 270,000
6 Busa Diffuser (3 m x 2.5 m) 1.00 set 1,875,000.00 1,875,000
Rp 11,342,500
Pekerjaan Pengecatan
1 Concrete look kanan (3.5 m x 3.5 m) 12.25 m² 75,000.00 Rp 918,750
2 Concrete look Kiri (12 m x 1 m) 12.00 m² 75,000.00 Rp 900,000
3 Dinding Kiri Warna Gelap (3 m x 3.5 m) 10.50 m² 55,000.00 Rp 577,500
4 Partisi Dapur Warna Gelap (2.5 m x 3.5 m) 8.75 m² 55,000.00 Rp 481,250
5 Dinding (8 m x 3.5 m) + (6 m x 3.5 m) + (4 m x 3.5 m) 63.00 m² 55,000.00 Rp 3,465,000
6 Dinding Kitchen dll 40.00 m² 55,000.00 Rp 2,200,000
7 Cat Plafond (4 m x 12 m) 48.00 m² 55,000.00 Rp 2,640,000
Rp 11,182,500
No PEKERJAAN MEKANIKAL ELEKTRIKAL VOLUME SATUAN HARGA SATUAN
1 Instalasi Stop Kontak 8.00 ttk 270,000.00 Rp 2,160,000
2 Instalasi Saklar Tunggal 8.00 ttk 320,000.00 Rp 2,560,000
3 Instalasi Saklar Ganda 4.00 ttk 330,000.00 Rp 1,320,000
4 Instalasi Stop Kontak AC 3.00 ttk 375,000.00 Rp 1,125,000
5 Instalasi titik lampu 12.00 ttk 190,000.00 Rp 2,280,000
6 MCB 2.00 bh 120,000.00 Rp 240,000
7 Router Penguat Signal Internet 1.00 bh 1,500,000.00 Rp 1,500,000
Rp 11,185,000
No PEKERJAAN ARMATUR VOLUME SATUAN HARGA SATUAN
1 Stop Kontak 8.00 bh 45,000.00 Rp 360,000
2 Stop Kontak Pararel 4 2.00 bh 60,000.00 Rp 120,000
2 Saklar Tunggal 8.00 bh 25,000.00 Rp 200,000
3 Saklar Ganda 4.00 bh 30,000.00 Rp 120,000
4 Lampu Spotlight indoor 5.00 bh 120,000.00 Rp 600,000
6 Lampu Gantung 3.00 bh 500,000.00 Rp 1,500,000
7 Lampu Rel Isi 5 3.00 bh 450,000.00 Rp 1,350,000
8 General Light 4.00 bh 120,000.00 Rp 480,000
9 AC 1 PK 2.00 bh 6,500,000.00 Rp 13,000,000
10 AC 1 PK Inverter 1.00 bh 7,500,000.00 Rp 7,500,000
Rp 25,230,000
No PEKERJAAN FURNITURE VOLUME SATUAN HARGA SATUAN
1 Kursi Café 1 8.00 bh 550,000.00 Rp 4,400,000
2 Meja Café Kecil (0.6 m x 0.6 m) 4.00 bh 600,000.00 Rp 2,400,000
3 Kursi Café 2 4.00 bh 490,000.00 Rp 1,960,000
4 Meja Café Besar (1.6 m x 1 m) 1.00 bh 4,900,000.00 Rp 4,900,000
5 Sofa 1 Seat 2.00 bh 3,500,000.00 Rp 7,000,000
7 Coffee Table Bulat (dia. 0.6 m) 1.00 bh 620,000.00 Rp 620,000
8 Sofa 2 Seat 1.4 m 2.00 bh 4,300,000.00 Rp 8,600,000
9 Ottoman (dia. 0.55 m) 4.00 bh 800,000.00 Rp 3,200,000
10 Coffee Table Kotak (0.45 m x 0.45 m) 4.00 bh 500,000.00 Rp 2,000,000
11 Rak Kitchen (1.6 m x 3 m) 1.00 Set 4,000,000.00 Rp 4,000,000
Rp 39,080,000
No PEKERJAAN AKSESORIS VOLUME SATUAN HARGA SATUAN
1 Cermin Bulat (dia. 0.8 m) 4.00 bh 1,200,000.00 Rp 4,800,000
2 Aneka Frame 1.00 Set 1,000,000.00 Rp 1,000,000
3 Stiker "DEHILLS RADIO" 2 m 1.00 bh 700,000.00 Rp 700,000
4 Frame Vintage (1.5 m x 1 m) 1.00 bh 1,500,000.00 Rp 1,500,000
5 Pot Tanaman 2.00 bh 500,000.00 Rp 1,000,000
6 Papan Menu (2.2 m x 0.9 m) 1.00 bh 1,000,000.00 Rp 1,000,000
Rp 10,000,000
No PEKERJAAN AKSESORIS STUDIO BOOTH VOLUME SATUAN HARGA SATUAN
1 Neon Box "ON AIR" (1.3 m x 0.9 m) 2.00 bh 1,200,000.00 Rp 2,400,000
2 Meja Siaran (1.5 m x 0.8 m) 1.00 Set 2,500,000.00 Rp 2,500,000
3 Kursi Siaran 2.00 bh 2,400,000.00 Rp 4,800,000
4 Smart Lamp 1.00 bh 650,000.00 Rp 650,000
5 Smart TV 43 inch 1.00 bh 4,500,000.00 Rp 4,500,000
6 Cutting Sticker (2 m x 1 m) 2.00 bh 650,000.00 Rp 1,300,000
Rp 16,150,000
No PEKERJAAN OUTDOOR VOLUME SATUAN HARGA SATUAN
1 Canopy Kain (4 m x 2.5 m) 10.00 m² 800,000.00 Rp 8,000,000
2 Lampu Outdoor 2.00 bh 380,000.00 Rp 760,000
3 Neon Box Logo "DEHILLS" (1 m x 1 m) 1.00 set 3,920,000.00 Rp 3,920,000
4 Kursi Café 3 (Bench) 8.00 bh 550,000.00 Rp 4,400,000
5 Meja Café 3 4.00 bh 500,000.00 Rp 2,000,000
6 Pot Tanaman 4.00 bh 500,000.00 Rp 2,000,000
Rp 21,080,000
No PEKERJAAN LAIN - LAIN VOLUME SATUAN HARGA SATUAN
1 Buang Puing 1.00 rit 400,000.00 Rp 400,000
Rp 400,000
TOTAL KESELURUHAN 165,080,000
BILL OF QUANTITY
Nama Pekerjaan : Renovasi Rumah Klender
NO ITEM
No PEKERJAAN AWAL VOLUME SATUAN HARGA MATERIAL HARGA UPAH TOTAL
1 Pemakaian listrik kerja 1.00 bln 1,000,000.00
Keamanan,(koordinasi dengan security internal, Sistem
2 Reimbustment jika dari pihak luar) 1.00 Ls 500,000.00
3 Transportasi dan Akomodasi selama Proyek 1.00 Ls 500,000.00
4 Mobilisasi Pekerja 1.00 Ls 500,000.00
TOTAL
No PEKERJAAN DINDING VOLUME SATUAN HARGA SATUAN HARGA UPAH
1 Panel Gypsum kiri (12 m x 1 m) 1 muka 12.00 m² 60,000.00 40,000.00 480,000
2 Panel Gypsum kanan (6.5 m x 3.5 m) 1 muka 22.75 m² 60,000.00 40,000.00 910,000
3 Partisi Kitchen (2.5 m x 3.5 m) 2 muka 8.75 m² 110,000.00 75,000.00 656,250
4 Partisi tangga (3 m x 3 m) 2 muka 9.00 m² 110,000.00 75,000.00 675,000
TOTAL
No PEKERJAAN ALUMUNIUM VOLUME SATUAN HARGA SATUAN HARGA UPAH
1 Pintu Kitchen (0.8 m x 2.1 m) 1.00 set 478,800.00 159,600.00 159,600
2 Jendela Kitchen (1.6 m x 1 m) 1.00 set 544,000.00 136,000.00 136,000
No PEKERJAAN AKSESORIS STUDIO BOOTH VOLUME SATUAN HARGA SATUAN HARGA UPAH
1 Neon Box "ON AIR" (1.3 m x 0.9 m) 2.00 bh Rp -
2 Meja Siaran (1.5 m x 0.8 m) 1.00 Set Rp -
3 Kursi Siaran 2.00 bh Rp -
4 Smart Lamp 1.00 bh Rp -
5 Smart TV 43 inch 1.00 bh Rp -
6 Cutting Sticker (2 m x 1 m) 2.00 bh Rp -
REV. DATE
PURCHASE ORDER
PROJECT TITLE
VENUE / DATE
CLIENT
JOB NUMBER
Rp -
DISCOUNT
GRAND TOTAL Rp -
NOTE: • Price exclude tax
• Details are available below
NO DESCRIPTION AMOUNT
PEMBAYARAN TERMIN I
1 Transfer BCA 17/12/2020 Rp 75,000,000
SUBTOTAL Rp 75,000,000
Sistem Pembayaran Termin I 75,000,000.00 √ TAX RATE
Termin II 56,000,000.00 TAX
Termin III 37,000,000.00 S&H
Termin IV 20,000,000.00 DISCOUNT
Transfer ke Rekening BCA 4980170581 a/n Dealawidhilima
Penambahan pekeraan selain yang disebut diatas akan dikonfirmasi terlebih dahulu
TOTAL Rp 75,000,000
Pada hari ini, Senin tanggal 30 bulan November, tahun 2020 kami yang bertandatangan
dibawah ini :
Dengan ini setuju dan sepakat melakukn serah terima Pekerjaan Renovasi Carport Rumah Hunian Rawamangun
dengan ketentuan sebagai berikut :
Berdasarkan hasil pemeriksaan pekerjaan, pihak kedua dapat menerima hasil pekerjaan dengan
1 baik dan tersusun rapih, bersama berita acara ini sekaligus dilakukan serah terima Pekerjaan
Kepada Penerima Manfaat
2 Pihak Pertama telah menyerahkan hasil pekerjaan kepada Pihak kedua yang menerima dengan
baik pekerjaan.
3 Apabila terjadi kerusakan dikarenakan pemakaian akan menjadi tanggung jawab penerima
manfaat.
Demikian Berita Acara Serah Terima Pekerjaan ini sehingga dapat digunakan sebagai mana mestinya