Perhitungan Dinding Penahan Tanah Batu Kali + Pile

Project : Binus Dormitory Tgl : 17/12/2008


Engineer : Agha Riwayat Revisi : R.3

b
qo qt = q o K a
a

gt ; fa

h Wt
W1 h1
H Pa1
W2

e1 Pa2

a' b'
H/3
hp Pp t1

O qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L

Tinjauan per M'

1. Data Geometri
h = 4.70 ( tinggi tanah urugan awal )
hp = 0.30 m
H = 5.00 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
h1 = 4.80 m e1 = 1.13 m
L1 = 0.50 m e2 = 0.04 m
L2 = 0.75 m e3 = 0.13 m
l = 1.75 m 'et = 0.79 m
L = 3.00 m eq = 0.38 m
t1 = 0.20 m
a = 0.50 m
a' = 0.50 m
b = 2.50 m
b' = 2.50 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³

2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )

gs = 1.50 Ton/m³ ( Berat Jenis Tanah Asli )


fp = 12.50 º ( Sudut Geser Tanah Asli)
sin fp = 0.22
Kp = 1.55 ( Koef Tek. Tanah Pasif )

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 1
3. Data Tiang Pancang
Ukuran Tiang = 25 x 25 cm2 L = 12 m
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton

4. Data Beton dan Tulangan Dinding Beton


Berat Jenis Beton = 2.40 Ton/m³
Mutu Beton K-250 = 250.0 kg/cm²
f'c = 20.8 Mpa
fy U_24 = 240.0 Mpa
fy U_40 = 400.0 Mpa

5. Tekanan Tanah Aktif per m1

Pa1 = q0.Ka.H
= 1.35 Ton/m
Pa2 = ½gt.H2.Ka
= 5.76 Ton/m
Pa = Pa1+Pa2
= 7.11 Ton/m

6. Tekanan Tanah Pasif per m1

Pp = ½gs.hp2.Kp
= 0.10 Ton/m

7. Beban Vertikal ( Fz ) per m1

(Batu Kali) W1 = a x h1 x 1m x BJ batu kali = 5.28 Ton/m


(Batu Kali) W2 = (h1 x b / 2) x 1m x BJ batu kali = 13.20 Ton/m
(Beton) W3 = L x t1 x 1m x BJ beton = 1.44 Ton/m
(Tanah) Wt = (b x h1 / 2) x 1 m x gt = 10.20 Ton/m
Beban q = 'q0 x b = 2.50 Ton/m
Fz = 32.62 Ton/m

8. Perhitungan Momen Terhadap Titik Tengah Tiang-tiang

a. Akibat Beban Vertikal

Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 16.73 Ton m (per m1)

b. Akibat Tekanan Tanah


Ma1 = Pa1 x (H/2)
= 3.39 Ton m (per m1)
Ma2 = Pa2 x (H/3)
= 9.60 Ton m (per m1)
Mp = Pp x (Hp/3)
= 0.02 Ton m (per m1)
Total Momen
MTotal = Mw1 + Ma1 + Ma2 - Mp
= 29.70 Ton m (per m1)

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 2
* Tinjauan Lebar Jalur (b)
= 0.85 m

M b
b
b

Jarak lajur antar tiang = b

R1 R2

7. Check Thd Guling & Daya Dukung Tiang

Reaksi Tiang Akibat Momen Guling

R1 = M / l (Tekan)
R2 = M / l (Tarik)

R1 = Mxb
l
= 14.42 Ton (Tekan)
R2 = (-M x b)
l
= -14.42 Ton (Tarik)

Check Thd Daya Dukung Tiang

Total Vertikal (Rz) = Fz x b Ton


= 27.73 Ton
Reaksi Tiang
R1=R2 = Rz(total) / 2
= 13.86 Tonf

Cek Reaksi R1 R2
(Akibat Momen) 14.42 -14.42
(Akibat Vertikal) 13.86 13.86
= 28.29 (Tekan) -0.56 (Tekan)
(OK < P ijin Tekan Tiang) (OK < P ijin Tekan Tiang)

8. Check Thd Geser

Pp = ½gs.hp2.Kp.b
= 0.09 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 6.05

Check Thd Geser = Pp + PH Tiang ≥ 1.5


Pa1 + Pa2

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 3
= 1.54 ≥ 1.5 OK

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 4
Perhitungan Dinding Penahan Tanah Batu Kali + Pile
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.3

b
qo qt = qo Ka
a

g t ; fa

h Wt
W1 h1
H Pa1
W2

e1 Pa2

a' b'
H/3
hp Pp t1

O qb
g s ; fp W3

qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L

Tinjauan per M'

1. Data Geometri
h = 3.70 ( tinggi tanah urugan awal )
hp = 0.30 m
H = 4.00 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
h1 = 3.80 m e1 = 0.83 m
L1 = 0.50 m e2 = 0.06 m
L2 = 0.75 m e3 = 0.13 m
l = 1.15 m 'et = 0.69 m
L = 2.40 m eq = 0.38 m
t1 = 0.20 m
a = 0.50 m
a' 0.50 m
b = 1.90 m
b' 1.90 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³

2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )

gs = 1.50 Ton/m³ ( Berat Jenis Tanah Asli )


fp = 12.50 º ( Sudut Geser Tanah Asli)
sin fp = 0.22
Kp = 1.55 ( Koef Tek. Tanah Pasif )

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 5
3. Data Tiang Pancang
Ukuran Tiang = 25 x 25 cm2 L = 12 m
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton

4. Data Beton dan Tulangan Dinding Beton


Berat Jenis Beton = 2.40 Ton/m³
Mutu Beton K-250 = 250.0 kg/cm²
f'c = 20.8 Mpa
fy U_24 = 240.0 Mpa
fy U_40 = 400.0 Mpa

5. Tekanan Tanah Aktif per m1

Pa1 = q0.Ka.H
= 1.08 Ton/m
Pa2 = ½gt.H2.Ka
= 3.69 Ton/m
Pa = Pa1+Pa2
= 4.77 Ton/m

6. Tekanan Tanah Pasif per m1

Pp = ½gs.hp2.Kp
= 0.10 Ton/m

7. Beban Vertikal ( Fz ) per m1

(Batu Kali) W1 = a x h1 x 1m x BJ batu kali = 4.18 Ton/m


(Batu Kali) W2 = (h1 x b / 2) x t1 x 1m x BJ batu kali = 7.94 Ton/m
(Beton) W3 = L x t1 x 1m x BJ beton = 1.15 Ton/m
(Tanah) Wt = (b x h1 / 2) x 1 m x gt = 6.14 Ton/m
Beban q = 'q0 x b = 1.90 Ton/m
Fz = 21.31 Ton/m

8. Perhitungan Momen Terhadap Titik Tengah Tiang-tiang

a. Akibat Beban Vertikal

Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 8.44 Ton m (per m1)

b. Akibat Tekanan Tanah


Ma1 = Pa1 x (H/2)
= 2.17 Ton m (per m1)
Ma2 = Pa2 x (H/3)
= 4.91 Ton m (per m1)
Mp = Pp x (Hp/3)
= 0.02 Ton m (per m1)
Total Momen
MTotal = Mw1 + Ma1 + Ma2 - Mp
= 15.50 Ton m (per m1)

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 6
* Tinjauan Lebar Jalur (b)
= 1.3 m

M b
b
b

Jarak lajur antar tiang = b

R1 R2

7. Check Thd Guling & Daya Dukung Tiang

Reaksi Tiang Akibat Momen Guling

R1 = M / l (Tekan)
R2 = M / l (Tarik)

R1 = Mxb
l
= 17.53 Ton (Tekan)
R2 = (-M x b)
l
= -17.53 Ton (Tarik)

Check Thd Daya Dukung Tiang

Total Vertikal (Rz) = Fz x b Ton


= 27.70 Ton
Reaksi Tiang
R1=R2 = Rz(total) / 2
= 13.85 Tonf

Cek Reaksi R1 R2
(Akibat Momen) 17.53 -17.53
(Akibat Vertikal) 13.85 13.85
= 31.38 (Tekan) -3.67 (Tekan)
(OK < P ijin Tekan Tiang) (OK < P ijin Tekan Tiang)

8. Check Thd Geser

Pp = ½gs.hp2.Kp.b
= 0.14 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 6.20

Check Thd Geser = Pp + PH Tiang ≥ 1.5


Pa1 + Pa2
= 1.51 ≥ 1.5 OK

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 7
Perhitungan Dinding Penahan Tanah Batu Kali + Pile
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.3

b
qo qt = q o K a
a

gt ; fa

h Wt
W1 h1
H Pa1
W2

e1 Pa2

a' b'
H/3
hp Pp t1

qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L

Tinjauan per M'

1. Data Geometri
h = 2.80 ( tinggi tanah urugan)
hp = 0.30 m
H = 3.10 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
h1 = 2.90 m e1 = 0.77 m
L1 = 0.50 m e2 = 0.08 m
L2 = 0.75 m e3 = 0.13 m
l = 1.03 m 'et = 0.67 m
L = 2.28 m eq = 0.38 m
t1 = 0.20 m
a = 0.50 m
a' = 0.50 m
b = 1.78 m
b' = 1.78 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³

2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )

gs = 1.50 Ton/m³ ( Berat Jenis Tanah Asli )


fp = 12.50 º ( Sudut Geser Tanah Asli)
sin fp = 0.22
Kp = 1.55 ( Koef Tek. Tanah Pasif )

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 8
3. Data Tiang Pancang
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton

4. Data Beton dan Tulangan Dinding Beton


Berat Jenis Beton = 2.40 Ton/m³
Mutu Beton K-250 = 250.0 kg/cm²
f'c = 20.8 Mpa
fy U_24 = 240.0 Mpa
fy U_40 = 400.0 Mpa

3. Tekanan Tanah Aktif (per m1)

Pa1 = q0.Ka.H
= 0.84 Ton/m
Pa2 = ½gt.H2.Ka
= 2.21 Ton/m
Pa = Pa1+Pa2
= 3.05 Ton/m

4. Tekanan Tanah Pasif (per m1)

Pp = ½gs.hp2.Kp
= 0.10 Ton/m

7. Beban Vertikal ( Fz ) (per m1)

(Batu Kali) W1 = a x h1 x 1m x BJ batu kali = 3.19 Ton/m


(Batu Kali) W2 = (h1 x b / 2) x 1m x BJ batu kali = 5.68 Ton/m
(Beton) W3 = L x t1 x 1m x BJ beton = 1.09 Ton/m
(Tanah) Wt = (b x h1 / 2) x 1 m x gt = 0.42 Ton/m
Beban q = 'q0 x b = 1.78 Ton/m
Fz = 12.16 Ton/m

8. Perhitungan Momen Terhadap Titik Tengah Tiang-tiang

a. Akibat Beban Vertikal

Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 3.33 Ton m (per m1)

b. Akibat Tekanan Tanah


Ma1 = Pa1 x (H/2)
= 1.22 Ton m (per m1)
Ma2 = Pa2 x (H/3)
= 2.14 Ton m (per m1)
Mp = Pp x (Hp/3)
= 0.03 Ton m (per m1)
Total Momen
MTotal = Mw1 + Ma1 + Ma2 - Mp
= 6.66 Ton m (per m1)

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 9
* Tinjauan Lebar Jalur (b)
= 2.0 m

M b

b
b

Jarak lajur antar tiang = b

R1 R2

7. Check Thd Guling & Daya Dukung Tiang

Reaksi Tiang Akibat Momen Guling

R1 = M / l (Tekan)
R2 = M / l (Tarik)

R1 = Mxb
l
= 12.93 Ton (Tekan)
R2 = (-M x b)
l
= -12.93 Ton (Tarik)

Check Thd Daya Dukung Tiang

Total Vertikal (Rz) = Fz x b Ton


= 24.32 Ton
Reaksi Tiang
R1=R2 = Rz(total) / 2
= 12.16 Tonf

Cek Reaksi R1 R2
(Akibat Momen) 12.93 -12.93
(Akibat Vertikal) 12.16 12.16
= 25.09 (Tekan) -0.77 (Tarik)
(OK < P ijin Tekan Tiang) (OK < P ijin Tarik Tiang)

8. Check Thd Geser

Pp = ½gs.hp2.Kp.b
= 0.21 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 6.11

Check Thd Geser = Pp + PH Tiang ≥ 1.5


Pa1 + Pa2
= 1.54 ≥ 1.5 OK

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 10
Perhitungan Dinding Penahan Tanah Batu Kali + Pile
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.3

b
qo qt = q o K a
a

gt ; fa

h Wt
W1 h1
H Pa1
W2

e1 Pa2

a' b'
H/3
hp Pp t1

qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L

Tinjauan per M'

1. Data Geometri
h = 2.50 ( tinggi tanah urugan)
hp = 0.30 m
H = 2.80 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
h1 = 2.60 m e1 = 0.43 m
L1 = 0.25 m e2 = 0.25 m
L2 = 0.40 m e3 = 0.08 m
l = 1.03 m 'et = 0.58 m
L = 1.68 m eq = 0.42 m
t1 = 0.20 m
a = 0.68 m
a' = 0.68 m
b = 1.00 m
b' = 1.00 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³

2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )

gs = 1.50 Ton/m³ ( Berat Jenis Tanah Asli )


fp = 12.50 º ( Sudut Geser Tanah Asli)
sin fp = 0.22
Kp = 1.55 ( Koef Tek. Tanah Pasif )

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 11
3. Data Tiang Pancang
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton

4. Data Beton dan Tulangan Dinding Beton


Berat Jenis Beton = 2.40 Ton/m³
Mutu Beton K-250 = 250.0 kg/cm²
f'c = 20.8 Mpa
fy U_24 = 240.0 Mpa
fy U_40 = 400.0 Mpa

5. Tekanan Tanah Aktif (per m1)

Pa1 = q0.Ka.H
= 0.76 Ton/m
Pa2 = ½gt.H2.Ka
= 1.81 Ton/m
Pa = Pa1+Pa2
= 2.56 Ton/m

6. Tekanan Tanah Pasif (per m1)

Pp = ½gs.hp2.Kp
= 0.10 Ton/m

7. Beban Vertikal ( Fz ) (per m1)

(Batu Kali) W1 = a x h1 x 1m x BJ batu kali = 3.89 Ton/m


(Batu Kali) W2 = (h1 x b / 2) x 1m x BJ batu kali = 5.72 Ton/m
(Beton) W3 = L x t1 x 1m x BJ beton = 0.81 Ton/m
(Tanah) Wt = (b x h1 / 2) x 1 m x gt = 2.21 Ton/m
Beban q = 'q0 x b = 1.00 Ton/m
Fz = 13.63 Ton/m

8. Perhitungan Momen Terhadap Titik Tengah Tiang-tiang

a. Akibat Beban Vertikal

Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 1.87 Ton m (per m1)

b. Akibat Tekanan Tanah


Ma1 = Pa1 x (H/2)
= 1.06 Ton m (per m1)
Ma2 = Pa2 x (H/3)
= 1.69 Ton m (per m1)
Mp = Pp x (Hp/3)
= 0.01 Ton m (per m1)
Total Momen
MTotal = Mw1 + Ma1 + Ma2 - Mp
= 4.61 Ton m (per m1)

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 12
* Tinjauan Lebar Jalur (b)
= 2.4 m

M b

b
b

Jarak lajur antar tiang = b

R1 R2

7. Check Thd Guling & Daya Dukung Tiang

Reaksi Tiang Akibat Momen Guling

R1 = M / l (Tekan)
R2 = M / l (Tarik)

R1 = Mxb
l
= 10.74 Ton (Tekan)
R2 = (-M x b)
l
= -10.74 Ton (Tarik)

Check Thd Daya Dukung Tiang

Total Vertikal (Rz) = Fz x b Ton


= 32.70 Ton
Reaksi Tiang
R1=R2 = Rz(total) / 2
= 16.35 Tonf

Cek Reaksi R1 R2
(Akibat Momen) 10.74 -10.74
(Akibat Vertikal) 16.35 16.35
= 27.09 (Tekan) 5.61 (Tekan)
(OK < P ijin Tekan Tiang) (OK < P ijin Tekan Tiang)

8. Check Thd Geser

Pp = ½gs.hp2.Kp.b
= 0.25 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 6.16

Check Thd Geser = Pp + PH Tiang ≥ 1.5


Pa1 + Pa2
= 1.54 ≥ 1.5 OK

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 13
Perhitungan Dinding Penahan Tanah Batu Kali + Pile
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.3

b
qo qt = q o K a
a

gt ; fa

h Wt
W1 h1
H Pa1
W2

e1 Pa2

a' b'
H/3
hp Pp t1

qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L

Tinjauan per M'

1. Data Geometri
h = 1.80 m ( tinggi tanah urugan)
hp = 0.30 m
H = 2.10 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
h1 = 1.90 m e1 = 0.38 m
L1 = 0.25 m e2 = 0.18 m
L2 = 0.40 m e3 = 0.07 m
l = 0.75 m 'et = 0.48 m
L = 1.40 m eq = 0.33 m
t1 = 0.20 m
a = 0.50 m
a' = 0.50 m
b = 0.90 m
b' = 0.90 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³

2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )

gs = 1.50 Ton/m³ ( Berat Jenis Tanah Asli )


fp = 12.50 º ( Sudut Geser Tanah Asli)
sin fp = 0.22
Kp = 1.55 ( Koef Tek. Tanah Pasif )

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 14
3. Data Tiang Pancang
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton

4. Data Beton dan Tulangan Dinding Beton


Berat Jenis Beton = 2.40 Ton/m³
Mutu Beton K-250 = 250.0 kg/cm²
f'c = 20.8 Mpa
fy U_24 = 240.0 Mpa
fy U_40 = 400.0 Mpa

5. Tekanan Tanah Aktif (per m1)

Pa1 = q0.Ka.H
= 0.57 Ton/m
Pa2 = ½gt.H2.Ka
= 1.02 Ton/m
Pa = Pa1+Pa2
= 1.58 Ton/m

6. Tekanan Tanah Pasif (per m1)

Pp = ½gs.hp2.Kp
= 0.10 Ton/m

7. Beban Vertikal ( Fz ) (per m1)

(Batu Kali) W1 = a x h1 x 1m x BJ batu kali = 2.09 Ton/m


(Batu Kali) W2 = (h1 x b / 2) x 1m x BJ batu kali = 1.88 Ton/m
(Beton) W3 = L x t1 x 1m x BJ beton = 0.67 Ton/m
(Tanah) Wt = (b x h1 / 2) x 1 m x gt = 1.45 Ton/m
Beban q = 'q0 x b = 0.90 Ton/m
Fz = 7.00 Ton/m

8. Perhitungan Momen Terhadap Titik Tengah Tiang-tiang

a. Akibat Beban Vertikal

Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 1.36 Ton m (per m1)

b. Akibat Tekanan Tanah


Ma1 = Pa1 x (H/2)
= 0.54 Ton m (per m1)
Ma2 = Pa2 x (H/3)
= 0.64 Ton m (per m1)
Mp = Pp x (Hp/3)
= 0.01 Ton m (per m1)
Total Momen
MTotal = Mw1 + Ma1 + Ma2 - Mp
= 2.53 Ton m (per m1)

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 15
* Tinjauan Lebar Jalur (b)
= 3.0 m

M b
b
b

Jarak lajur antar tiang = b

R1 R2

7. Check Thd Guling & Daya Dukung Tiang

Reaksi Tiang Akibat Momen Guling

R1 = M / l (Tekan)
R2 = M / l (Tarik)

R1 = Mxb
l
= 10.11 Ton (Tekan)
R2 = (-M x b)
l
= -10.11 Ton (Tarik)

Check Thd Daya Dukung Tiang

Total Vertikal (Rz) = Fz x b Ton


= 20.99 Ton
Reaksi Tiang
R1=R2 = Rz(total) / 2
= 10.49 Tonf

Cek Reaksi R1 R2
(Akibat Momen) 10.11 -10.11
(Akibat Vertikal) 10.49 10.49
= 20.61 (Tekan) 0.38 (Tarik)
(OK < P ijin Tekan Tiang) (OK < P ijin Tarik Tiang)

8. Check Thd Geser

Pp = ½gs.hp2.Kp.b
= 0.31 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 4.75

Check Thd Geser = Pp + PH Tiang ≥ 1.5


Pa1 + Pa2
= 2.00 ≥ 1.5 OK

file:///conversion/tmp/activity_task_scratch/635196260.xls Page 16
PILE LOAD CAPACITY

Pu = ( 25 x Np x Ap ) + (∑Ns x Ls + Nc x Lc ) x K
5 2

Pu = Ultimate pile load capacity (Ton)


Np = Average Nvalue ( 4xDia above and 1xD below pile toe)
Ap = Pile area (m2) = 0.25 x phi x (Dia.)2
Ns = Average Nvalue at Sand layer
Ls = Depth of Sand layer
Nc = Average Nvalue at Clay layer
Lc = Depth of Clay layer
K = Perimeter of pile (meter)

P allowable = Pu / 2

1. Data DB1 SF = 2 (Clay)


= 5 (Sand)
No. Elevasi Soil Type SF N SPT L N x L x K1
SF

1 -1.00 Clay 2 1 1.00 0.50


2 -2.00 Clay 2 1 1.00 0.50
3 -3.00 Clay 2 5 1.00 2.50
4 -4.00 Clay 2 7 1.00 3.50
5 -5.00 Clay 2 4 1.00 2.00
6 -6.50 Clay 2 8 1.50 6.00
7 -7.50 Clay 2 26 1.00 13.00
8 -9.00 Clay 2 26 1.50 19.50
9 -10.50 Sand 5 46 1.50 13.80
10 -12.00 Sand 5 60 1.50 18.00

∑ = 79.30

Pile 25x25
K1 = 4 x 0.25 = 1.00 m
Ap = 0.25 x 0.25 = 0.06 m

Pu = 25 x 60 x 0.06 + 79.30 = 173.05

P Allowable = 173.05 = 57.7 Tonf (Tekan)

P Allowable = 79.3 = 15.86 Tonf (Tarik)

5
Pile 20x20

K1 = 4 x 0.20 = 0.80 m

Ap = 0.20 x 0.20 = 0.04 m

Pu = 25 x 60 x 0.04 + 79.30 = 139.3

P Allowable = 139.3 = 46.4 Tonf (Tekan)

P Allowable = 79.3 = 15.86 Tonf (Tarik)

5
B. Perhitungan Dinding Penahan Tanah
Batu Kali +Pile