You are on page 1of 42

CANTILEVER RETAINING WALL

0.025 o
ẞ= 20 H
0.364 8 α = 1.4320962
0.3276
Pasir γb = 18 kN/m3
3.3275732
3 c= 0 kN/m 8.327573
Ø= 21 o

Hw = 7 m Lempung γb = 20.00 kN/m3


3 c= 12 kN/m 3
m 9.327573 H
Ø= 25 o

1 Pasir γb = 18 kN/m3
γb = 18 kN/m3 Pasir m c= 0 kN/m 2
1
c= 0 kN/m Ø= 21 o
2
Ø= 21 o
1
ẞ= 0 o

rad 0.0175 2.5 0.2 0.2 0.2 0.7


m q' heel 50.8355587228
3.8 q' toe 1.6213429579
B
2.1 0.2 0.2 0.2 1 H 9.3275732 m
Hw 7 m ≤ 5m
B in 0.2 m
B 3.8 m ≈ 0.5Hw
DATA a 2.5 m 0 - 0.5 B
γbeton 24 kN/m3 O x 1.14 m 0.1 -0.3 B
β 20 ° (kemiringan tanah belakang dinding) L 0.6 m Hw/10
α 1.432 ° (kemiringan tanah depan dinding) 6.2275732 m H - 0.5B - Hw/10
LAPISAN I
β = ??? β Ø < PERLU CHECK β = ???
Bila β ≤ Ø 20
< 21
PERLU CHECK
> TIDAK PERLU Bila β ≤ Ø
Maka, ØW 2/3 Ø 14 ° (Untuk beton dan dinding bata) Maka,
ØW 0.333 Ø 6.993 ° (Untuk dinding baja)
α= 1.432096 °
Mencari Va/b dan Pa/b dengan rumus Coulomb Mencari Va/b dan Pa/b den
(ka dihitung dengan rumus Coulomb sebab lebih akurat) (ka dihitung dengan rumus
cos²(Ø-α)
ka = cos²α cos (ØW+α) 1 +sin(ØW+α) sin (Ø-β) ² ka =
cos(ØW+α) cos (Ø-β)

0.8878260539
0.999375 0.963946 0.266096 0.01745241
1
0.963946 0.94794694

0.8878260539
0.9633444024 1 0.07129
1.1476622148
ka = 0.803031 ka =

γtanah*H2*ka/2 cos ØW γtanah*H2*ka/2


Pa/b = 63.11337 kN/m Pa/b =

γtanah*H2*ka/2 sin ØW γtanah*H2*ka/2


Va/b = 19.35999 kN/m Va/b =
LAPISAN II LAP
β Ø < PERLU CHECK β = ??? β
20
< 25
PERLU CHECK
> TIDAK PERLU Bila β ≤ Ø 20
ØW 2/3 Ø 16.66667 ° (Untuk beton dan dinding bata) Maka, ØW
ØW 0.333 Ø 8.325 ° (Untuk dinding baja) ØW
α= 1.432096 ° α=
Mencari Va/b dan Pa/b dengan rumus Coulomb Mencari Va/b dan Pa/b dengan rumus C
(ka dihitung dengan rumus Coulomb sebab lebih akurat) (ka dihitung dengan rumus Coulomb seb
cos²(Ø-α) cos²(Ø-α)
cos²α cos (ØW+α) 1 +sin(ØW+α) sin (Ø-β) ² ka = cos²α cos (ØW+α) 1 +
cos(ØW+α) cos (Ø-β)

0.8401314626 0.8878260
0.999375 0.950522 0.310656 0.08715574 0.999375
1
0.950522 0.94794694

0.8401314626 0.8878260
0.9499287342 1 0.173346 0.9633444024
1.3767415717
0.642397 ka = 0.803031

γtanah*H2*ka/2 cos ØW γtanah*H2*ka/2


55.3869 kN/m Pa/b = 28.05039

γtanah*H2*ka/2 sin ØW γtanah*H2*ka/2


16.58175 kN/m Va/b = 6.993747

LAPISAN
Mencari Pp/b dengan rumus Rankine (k
kp = 2.117051
β= 0
γtanah*H^2*kp/2
Pp/b = 58.35123
LAPISAN III
Ø < PERLU CHECK
< 21
PERLU CHECK
> TIDAK PERLU
2/3 Ø 14 ° (Untuk beton dan dinding bata)
0.333 Ø 6.993 ° (Untuk dinding baja)
1.432096 °
Va/b dan Pa/b dengan rumus Coulomb
ng dengan rumus Coulomb sebab lebih akurat)
cos²(Ø-α)
cos²α cos (ØW+α) 1 +sin(ØW+α) sin (Ø-β) ²
cos(ØW+α) cos (Ø-β)

0.8878260539
0.963946 0.266096 0.017452
1
0.963946 0.947947

0.8878260539
0.9633444024 1 0.07129
1.1476622148

cos ØW
kN/m

sin ØW
kN/m

LAPISAN DEPAN RW
Pp/b dengan rumus Rankine (kp lebih praktis dan akurat)
55.5 DRW = 2 m
° D = 1.8 m
cos ØW 1.75 m
kN/m ~ 58 kN/m
Sliding Friction
TRASH Soil (behind) 122.578 kN/m'
< OK Soil (front) 45.225 kN/m'
> NOT OK Footing 91.2 kN/m'
Stem 76.8 kN/m'
Va/b 42.935487127 +
Pf/b 378.73883013 kN/m'

Vf/b = Pf/b x tan


(from
Øf table 23.4 page 696)
378.7388 25 (fine sandy silt, nonplastic silt)
176.6088 kN/m'

Factor of safety ∑(PR/b) Vf/b + Pp/b R = Resisting


F= =
∑(PD/b) Pa/b D = Driving

F ≥ 1.5 for cohesionless soils


F ≥ 2.0 for cohesive soils

F = 1.600872 > 1.5 OK

Lapisan a b alas tinggi A (m2) γb (kN/m3) Pf/b (kN/m')


I 0.9 0.3275732 0.147408 18 2.653
0.9 0.825 2.5875 18 46.575
II 0.825 0.75 2.3625 20 47.25
III 0.75 0.7 1.45 18 26.1
∑ soil behind the wall = 122.578

DETAIL
Lapisan p l alas tinggi A (m2) γb (kN/m3) Pf/b (kN/m')
IA 0.9 0.3275732 0.147408 18 2.653
I Ba 0.075 3 0.1125 18 2.025
I Bb 0.825 3 2.475 18 44.55
II a 0.075 3 0.1125 20 2.25
II b 0.75 3 2.25 20 45
III a 0.05 2 0.05 18 0.9
III b 0.7 2 1.4 18 25.2
∑ soil behind the wall = 122.578

Lapisan p l alas tinggi A (m2) γb (kN/m3) Pf/b (kN/m')


Depan 0.025 1 0.0125 18 0.225
2.5 1 2.5 18 45
∑ soil in front of the wall = 45.225
MOMEN

Letak c.o. 0.1 B 0.38

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 3.128.27843 -
I Ba 2.03 - 2.575.20425 -
SOIL BEHIND

I Bb 44.55 - 3.0075133.9841 -
II a 2.25 - 2.6455.95125 -
II b 45.00 - 3.045137.025 -
III a 0.90 - 2.703333 2.433 -
III b 25.20 - 3.07 77.364 -
IA 0.225 - 2.128333 0.478875 -
S. FRONT

IB 38.16 - 1.0640.4496 -
IC 6.84 - -0.38 -2.5992 -
LEFT 9.12 - -0.19 -1.7328 -
FOOTING
RIGHT 82.08 - 1.71 140.3568 -
LEFT 19.2 - 2.253333 43.264 -
STEM CENTER 38.4 - 2.42 92.928 -
RIGHT 19.2 - 2.586667 49.664 -
Pa - 146.5506552 -3.66667 - -537.352
Pp - 58 1.333333 77.33333 -
∑ 335.80 810.3827 -537.352

Letak c.o. 0.2 B 0.76

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 2.74 7.27016 -
I Ba 2.03 - 2.19 4.43475 -
SOIL BEHIND

I Bb 44.55 - 2.6275117.0551 -
II a 2.25 - 2.265 5.09625 -
II b 45.00 - 2.665 119.925 -
III a 0.90 - 2.323333 2.091 -
III b 25.20 - 2.69 67.788 -
IA 0.225 - 1.748333 0.393375 -
S. FRONT

IB 31.32 - 0.87 27.2484 -


IC 13.68 - -0.76-10.3968 -
LEFT 18.24 - -0.38 -6.9312 -
FOOTING
RIGHT 72.96 - 1.52 110.8992 -
LEFT 19.2 - 1.873333 35.968 -
STEM CENTER 38.4 - 2.04 78.336 -
RIGHT 19.2 - 2.206667 42.368 -
Pa - 146.5506552 -3.66667 - -537.352
Pp - 58 1.333333 77.33333 -
∑ 335.80 678.8786 -537.352
Letak c.o. 0.3 B 1.14

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 2.366.261889 -
I Ba 2.03 - 1.81 3.66525 -
SOIL BEHIND

I Bb 44.55 - 2.2475 100.1261 -


II a 2.25 - 1.885 4.24125 -
II b 45.00 - 2.285 102.825 -
III a 0.90 - 1.943333 1.749 -
III b 25.20 - 2.31 58.212 -
IA 0.225 - 1.368333 0.307875 -
S. FRONT

IB 24.48 - 0.68 16.6464 -


IC 20.52 - -1.14-23.3928 -
LEFT 27.36 - -0.57 -15.5952 -
FOOTING
RIGHT 63.84 - 1.33 84.9072 -
LEFT 19.2 - 1.493333 28.672 -
STEM CENTER 38.4 - 1.66 63.744 -
RIGHT 19.2 - 1.826667 35.072 -
Pa - 146.5506552 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 554.442 -537.352

Letak c.o. 0.4 B 1.52

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 1.985.253619 -
I Ba 2.03 - 1.43 2.89575 -
SOIL BEHIND

I Bb 44.55 - 1.8675 83.19713 -


II a 2.25 - 1.505 3.38625 -
II b 45.00 - 1.905 85.725 -
III a 0.90 - 1.563333 1.407 -
III b 25.20 - 1.93 48.636 -
IA 0.225 - 0.988333 0.222375 -
S. FRONT

IB 17.64 - 0.49 8.6436 -


IC 27.36 - -1.52-41.5872 -
LEFT 36.48 - -0.76 -27.7248 -
FOOTING
RIGHT 54.72 - 1.14 62.3808 -
LEFT 19.2 - 1.113333 21.376 -
STEM CENTER 38.4 - 1.28 49.152 -
RIGHT 19.2 - 1.446667 27.776 -
Pa - 146.5506552 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 417.7395 -537.352

Letak c.o. 0.5 B 1.9

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 1.6
4.245349 -
I Ba 2.03 - 1.05 2.12625 -
SOIL BEHIND

I Bb 44.55 - 1.4875 66.26813 -


II a 2.25 - 1.125 2.53125 -
II b 45.00 - 1.525 68.625 -
III a 0.90 - 1.183333 1.065 -
III b 25.20 - 1.55 39.06 -
IA 0.225 - 0.608333 0.136875 -
S. FRONT

IB 10.8 - 0.3 3.24 -


IC 34.2 - -1.9 -64.98 -
LEFT 45.6 - -0.95 -43.32 -
FOOTING
RIGHT 45.6 - 0.95 43.32 -
LEFT 19.2 - 0.733333 14.08 -
STEM CENTER 38.4 - 0.9 34.56 -
RIGHT 19.2 - 1.066667 20.48 -
Pa - 146.5506552 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 278.4378 -537.352

Letak c.o. 0.6 B 2.28

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 1.22
3.237078 -
I Ba 2.03 - 0.671.35675 -
SOIL BEHIND

I Bb 44.55 - 1.107549.33913 -
II a 2.25 - 0.7451.67625 -
II b 45.00 - 1.145 51.525 -
III a 0.90 - 0.803333 0.723 -
III b 25.20 - 1.17 29.484 -
IA 0.225 - 0.228333 0.051375 -
S. FRONT

IB 3.96 - 0.11 0.4356 -


IC 41.04 - -2.28
-93.5712 -
LEFT 54.72 - -1.14 -62.3808 -
FOOTING
RIGHT 36.48 - 0.76 27.7248 -
LEFT 19.2 - 0.353333 6.784 -
STEM CENTER 38.4 - 0.52 19.968 -
RIGHT 19.2 - 0.686667 13.184 -
Pa - 146.5506552 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 136.537 -537.352

Letak c.o. 0.7 B 2.66

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 0.84
2.228808 -
I Ba 2.03 - 0.29 0.58725 -
SOIL BEHIND

I Bb 44.55 - 0.727532.41013 -
II a 2.25 - 0.365 0.82125 -
II b 45.00 - 0.765 34.425 -
III a 0.90 - 0.423333 0.381 -
III b 25.20 - 0.79 19.908 -
IA 0.225 - -0.15167 -0.03413 -
S. FRONT

IB -2.88 - -0.08 0.2304 -


IC 47.88 - -2.66-127.361 -
LEFT 63.84 - -1.33 -84.9072 -
FOOTING
RIGHT 27.36 - 0.57 15.5952 -
LEFT 19.2 - -0.02667 -0.512 -
STEM CENTER 38.4 - 0.14 5.376 -
RIGHT 19.2 - 0.306667 5.888 -
Pa - 146.5506552 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 -7.96309 -537.352

Letak c.o. 0.8 B 3.04

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 0.46 1.220538 -
I Ba 2.03 - -0.09 -0.18225 -
SOIL BEHIND

I Bb 44.55 - 0.3475 15.48113 -


II a 2.25 - -0.015 -0.03375 -
II b 45.00 - 0.385 17.325 -
III a 0.90 - 0.043333 0.039 -
III b 25.20 - 0.41 10.332 -
IA 0.225 - -0.53167 -0.11963 -
S. FRONT

IB -9.72 - -0.27 2.6244 -


IC 54.72 - -3.04 -166.349 -
LEFT 72.96 - -1.52 -110.899 -
FOOTING
RIGHT 18.24 - 0.38 6.9312 -
LEFT 19.2 - -0.40667 -7.808 -
STEM
STEM CENTER 38.4 - -0.24 -9.216 -
RIGHT 19.2 - -0.07333 -1.408 -
Pa - 146.5506552 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 -155.062 -537.352

Letak c.o. 0.9 B 3.42

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - 0.08
0.212267 -
I Ba 2.03 - -0.47-0.95175 -
SOIL BEHIND

I Bb 44.55 - -0.0325 -1.44788 -


II a 2.25 - -0.395-0.88875 -
II b 45.00 - 0.005 0.225 -
III a 0.90 - -0.33667 -0.303 -
III b 25.20 - 0.03 0.756 -
IA 0.225 - -0.91167 -0.20513 -
S. FRONT

IB -16.56 - -0.46 7.6176 -


IC 61.56 - -3.42-210.535 -
LEFT 82.08 - -1.71 -140.357 -
FOOTING
RIGHT 9.12 - 0.19 1.7328 -
LEFT 19.2 - -0.78667 -15.104 -
STEM CENTER 38.4 - -0.62 -23.808 -
RIGHT 19.2 - -0.45333 -8.704 -
Pa - 146.5506552 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 -304.761 -537.352

Letak c.o. 1B 3.8

SOURCE Vert Load Result Force Length MR MD


IA 2.65 - -0.3 -0.796 -
I Ba 2.03 - -0.85 -1.72125 -
SOIL BEHIND

I Bb 44.55 - -0.4125 -18.3769 -


II a 2.25 - -0.775 -1.74375 -
II b 45.00 - -0.375 -16.875 -
III a 0.90 - -0.71667 -0.645 -
III b 25.20 - -0.35 -8.82 -
IA 0.225 - -1.29167 -0.29063 -
S. FRONT

IB -23.4 - -0.65 15.21 -


IC 68.4 - -3.8 -259.92 -
LEFT 91.2 - -1.9 -173.28 -
FOOTING
FOOTING
RIGHT -2.132E-14 - 0 0 -
LEFT 19.2 - -1.16667 -22.4 -
STEM CENTER 38.4 - -1 -38.4 -
RIGHT 19.2 - -0.83333 -16 -
Pa - 146.5506552 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 -457.059 -537.352
Letak c.o. 0.15 B 0.57

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - 2.93 7.774295 -
I Ba 2.03 - 2.38 4.8195 -
SOIL BEHIND

I Bb 44.55 - 2.8175 125.5196 -


II a 2.25 - 2.455 5.52375 -
II b 45.00 - 2.855 128.475 -
III a 0.90 - 2.513333 2.262 -
III b 25.20 - 2.88 72.576 -
IA 0.225 - 1.938333 0.436125 -
S. FRONT

IB 34.74 - 0.965 33.5241 -


IC 10.26 - -0.57 -5.8482 -
LEFT 13.68 - -0.285 -3.8988 -
FOOTING
RIGHT 77.52 - 1.615 125.1948 -
LEFT 19.2 - 2.063333 39.616 -
STEM CENTER 38.4 - 2.23 85.632 -
RIGHT 19.2 - 2.396667 46.016 -
Pa - 146.5507 -3.66667 - -537.352
Pp - 58 1.333333 77.33333 -
∑ 335.80 744.9555 -537.352

Letak c.o. 0.25 B 0.95

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - 2.55 6.766025 -
I Ba 2.03 - 2 4.05 -
SOIL BEHIND

I Bb 44.55 - 2.4375 108.5906 -


II a 2.25 - 2.075 4.66875 -
II b 45.00 - 2.475 111.375 -
III a 0.90 - 2.133333 1.92 -
III b 25.20 - 2.5 63 -
IA 0.225 - 1.558333 0.350625 -
S. FRONT

IB 27.9 - 0.775 21.6225 -


IC 17.1 - -0.95 -16.245 -
LEFT 22.8 - -0.475 -10.83 -
FOOTING
RIGHT 68.4 - 1.425 97.47 -
LEFT 19.2 - 1.683333 32.32 -
STEM CENTER 38.4 - 1.85 71.04 -
RIGHT 19.2 - 2.016667 38.72 -
Pa - 146.5507 -3.66667 - -537.352
Pp - 58 1.333333 77.33333 -
∑ 335.80 612.1519 -537.352
Letak c.o. 0.35 B 1.33

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - 2.17 5.757754 -
I Ba 2.03 - 1.62 3.2805 -
SOIL BEHIND

I Bb 44.55 - 2.0575 91.66163 -


II a 2.25 - 1.695 3.81375 -
II b 45.00 - 2.095 94.275 -
III a 0.90 - 1.753333 1.578 -
III b 25.20 - 2.12 53.424 -
IA 0.225 - 1.178333 0.265125 -
S. FRONT

IB 21.06 - 0.585 12.3201 -


IC 23.94 - -1.33 -31.8402 -
LEFT 31.92 - -0.665 -21.2268 -
FOOTING
RIGHT 59.28 - 1.235 73.2108 -
LEFT 19.2 - 1.303333 25.024 -
STEM CENTER 38.4 - 1.47 56.448 -
RIGHT 19.2 - 1.636667 31.424 -
Pa - 146.5507 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 486.4157 -537.352

Letak c.o. 0.45 B 1.71

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - 1.79 4.749484 -
I Ba 2.03 - 1.24 2.511 -
SOIL BEHIND

I Bb 44.55 - 1.6775 74.73263 -


II a 2.25 - 1.315 2.95875 -
II b 45.00 - 1.715 77.175 -
III a 0.90 - 1.373333 1.236 -
III b 25.20 - 1.74 43.848 -
IA 0.225 - 0.798333 0.179625 -
S. FRONT

IB 14.22 - 0.395 5.6169 -


IC 30.78 - -1.71 -52.6338 -
LEFT 41.04 - -0.855 -35.0892 -
FOOTING
RIGHT 50.16 - 1.045 52.4172 -
LEFT 19.2 - 0.923333 17.728 -
STEM CENTER 38.4 - 1.09 41.856 -
RIGHT 19.2 - 1.256667 24.128 -
Pa - 146.5507 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 348.4136 -537.352

Letak c.o. 0.55 B 2.09

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - 1.41 3.741214 -
I Ba 2.03 - 0.86 1.7415 -
SOIL BEHIND

I Bb 44.55 - 1.2975 57.80363 -


II a 2.25 - 0.935 2.10375 -
II b 45.00 - 1.335 60.075 -
III a 0.90 - 0.993333 0.894 -
III b 25.20 - 1.36 34.272 -
IA 0.225 - 0.418333 0.094125 -
S. FRONT

IB 7.38 - 0.205 1.5129 -


IC 37.62 - -2.09 -78.6258 -
LEFT 50.16 - -1.045 -52.4172 -
FOOTING
RIGHT 41.04 - 0.855 35.0892 -
LEFT 19.2 - 0.543333 10.432 -
STEM CENTER 38.4 - 0.71 27.264 -
RIGHT 19.2 - 0.876667 16.832 -
Pa - 146.5507 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 207.8123 -537.352

Letak c.o. 0.65 B 2.47

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - 1.03 2.732943 -
I Ba 2.03 - 0.48 0.972 -
SOIL BEHIND

I Bb 44.55 - 0.9175 40.87463 -


II a 2.25 - 0.555 1.24875 -
II b 45.00 - 0.955 42.975 -
III a 0.90 - 0.613333 0.552 -
III b 25.20 - 0.98 24.696 -
IA 0.225 - 0.038333 0.008625 -
S. FRONT

IB 0.54 - 0.015 0.0081 -


IC 44.46 - -2.47 -109.816 -
LEFT 59.28 - -1.235 -73.2108 -
FOOTING
RIGHT 31.92 - 0.665 21.2268 -
LEFT 19.2 - 0.163333 3.136 -
STEM CENTER 38.4 - 0.33 12.672 -
RIGHT 19.2 - 0.496667 9.536 -
Pa - 146.5507 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 64.61184 -537.352

Letak c.o. 0.75 B 2.85

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - 0.65 1.724673 -
I Ba 2.03 - 0.1 0.2025 -
SOIL BEHIND

I Bb 44.55 - 0.5375 23.94563 -


II a 2.25 - 0.175 0.39375 -
II b 45.00 - 0.575 25.875 -
III a 0.90 - 0.233333 0.21 -
III b 25.20 - 0.6 15.12 -
IA 0.225 - -0.34167 -0.07688 -
S. FRONT

IB -6.3 - -0.175 1.1025 -


IC 51.3 - -2.85 -146.205 -
LEFT 68.4 - -1.425 -97.47 -
FOOTING
RIGHT 22.8 - 0.475 10.83 -
LEFT 19.2 - -0.21667 -4.16 -
STEM CENTER 38.4 - -0.05 -1.92 -
RIGHT 19.2 - 0.116667 2.24 -
Pa - 146.5507 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 -81.1878 -537.352

Letak c.o. 0.85 B 3.23

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - 0.27 0.716403 -
I Ba 2.03 - -0.28 -0.567 -
SOIL BEHIND

I Bb 44.55 - 0.1575 7.016625 -


II a 2.25 - -0.205 -0.46125 -
II b 45.00 - 0.195 8.775 -
III a 0.90 - -0.14667 -0.132 -
III b 25.20 - 0.22 5.544 -
IA 0.225 - -0.72167 -0.16238 -
S. FRONT

IB -13.14 - -0.365 4.7961 -


IC 58.14 - -3.23 -187.792 -
LEFT 77.52 - -1.615 -125.195 -
FOOTING
RIGHT 13.68 - 0.285 3.8988 -
LEFT 19.2 - -0.59667 -11.456 -
STEM
STEM CENTER 38.4 - -0.43 -16.512 -
RIGHT 19.2 - -0.26333 -5.056 -
Pa - 146.5507 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 -229.587 -537.352

Letak c.o. 0.95 B 3.61

SOURCE Vert LoadResult Force Length MR MD


IA 2.65 - -0.11 -0.29187 -
I Ba 2.03 - -0.66 -1.3365 -
SOIL BEHIND

I Bb 44.55 - -0.2225 -9.91238 -


II a 2.25 - -0.585 -1.31625 -
II b 45.00 - -0.185 -8.325 -
III a 0.90 - -0.52667 -0.474 -
III b 25.20 - -0.16 -4.032 -
IA 0.225 - -1.10167 -0.24788 -
S. FRONT

IB -19.98 - -0.555 11.0889 -


IC 64.98 - -3.61 -234.578 -
LEFT 86.64 - -1.805 -156.385 -
FOOTING
RIGHT 4.56 - 0.095 0.4332 -
LEFT 19.2 - -0.97667 -18.752 -
STEM CENTER 38.4 - -0.81 -31.104 -
RIGHT 19.2 - -0.64333 -12.352 -
Pa - 146.5507 -5 - -732.753
Pp - 58 1.5 87 -
∑ 335.80 -380.585 -537.352
OVERTURNING

Pf.ult/b qu x c.o.
85.2948

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m 3
Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 17.1 = 224.46

Letak c.o. 0.1 B 0.38

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 3.12 8.28 -
∑ MD I Ba 2.03 2.57 5.20 -
SOIL BEHIND

I Bb 44.55 3.01 133.98 -


1.839564084 II a 2.25 2.65 5.95 -
II b 45.00 3.05 137.03 -
III a 0.90 2.70 2.43 -
III b 25.20 3.07 77.36 -
LEFT 9.12 -0.19 - -1.73
FOOTING
RIGHT 82.08 1.71 140.36 -
LEFT 19.20 2.25 43.26 -
STEM CENTER 38.40 2.42 92.93 -
RIGHT 19.20 2.59 49.66 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 3.42 146.84 -
Pf.ult/b 85.2948 0.19 16.21
∑ 859.50 467.23
OVERTURNING
Pf.ult/b qu x c.o.
226.5408

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m3 Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 41.04 = 248.4

Letak c.o. 0.24 B 0.912

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR LEFT 2.65 2.59 6.87 -
∑ MD CENTER 2.03 2.04 4.13 -
SOIL BEHIND

RIGHT 44.55 2.48 110.28 -


1.693781029 Pa 2.25 2.11 4.75 -
Pp 45.00 2.51 113.09 -
0 0.90 2.17 1.95 -
0 25.20 2.54 63.96 -
LEFT 21.89 -0.46 - -9.98
FOOTING
RIGHT 69.31 1.44 100.09 -
LEFT 19.20 1.72 33.05 -
STEM CENTER 38.40 1.89 72.50 -
RIGHT 19.20 2.05 39.45 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.89 124.00 -
Pf.ult/b 226.5408 0.456 103.30
∑ 777.41 458.98
OVERTURNING

Pf.ult/b qu x c.o.
132.8157

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m 3
Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 25.65 = 233.01

Letak c.o. 0.15 B 0.57

SOURCE Vert LoadArm to c.o. MR MD


F= ∑ MR IA 2.65 2.93 7.77 -
∑ MD I Ba 2.03 2.38 4.82 -
SOIL BEHIND

I Bb 44.55 2.82 125.52 -


1.763078 II a 2.25 2.46 5.52 -
II b 45.00 2.86 128.48 -
III a 0.90 2.51 2.26 -
III b 25.20 2.88 72.58 -
LEFT 13.68 -0.29 - -3.90
FOOTING
RIGHT 77.52 1.62 125.19 -
LEFT 19.20 2.06 39.62 -
STEM CENTER 38.40 2.23 85.63 -
RIGHT 19.20 2.40 46.02 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 3.23 138.68 -
Pf.ult/b 132.8157 0.285 37.85
∑ 819.94 465.06
OVERTURNING
Pf.ult/b qu x c.o.
237.6045

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m3 Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 42.75 = 250.11

Letak c.o. 0.25 B 0.95

SOURCE Vert LoadArm to c.o. MR MD


F= ∑ MR LEFT 2.65 2.55 6.77 -
∑ MD CENTER 2.03 2.00 4.05 -
SOIL BEHIND

RIGHT 44.55 2.44 108.59 -


1.691976 Pa 2.25 2.08 4.67 -
Pp 45.00 2.48 111.38 -
0 0.90 2.13 1.92 -
0 25.20 2.50 63.00 -
LEFT 22.80 -0.48 - -10.83
FOOTING
RIGHT 68.40 1.43 97.47 -
LEFT 19.20 1.68 32.32 -
STEM CENTER 38.40 1.85 71.04 -
RIGHT 19.20 2.02 38.72 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.85 122.37 -
Pf.ult/b 237.6045 0.475 112.86
∑ 775.15 458.13
OVERTURNING

Pf.ult/b qu x c.o.
162.88776

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m 3
Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 30.78 = 238.14

Letak c.o. 0.18 B 0.684

SOURCE Vert LoadArm to c.o. MR MD


F= ∑ MR IA 2.65 2.82 7.47 -
∑ MD I Ba 2.03 2.27 4.59 -
SOIL BEHIND

I Bb 44.55 2.70 120.44 -


1.7297871 II a 2.25 2.34 5.27 -
II b 45.00 2.74 123.35 -
III a 0.90 2.40 2.16 -
III b 25.20 2.77 69.70 -
LEFT 16.42 -0.34 - -5.61
FOOTING
RIGHT 74.78 1.56 116.51 -
LEFT 19.20 1.95 37.43 -
STEM CENTER 38.40 2.12 81.25 -
RIGHT 19.20 2.28 43.83 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 3.12 133.79 -
Pf.ult/b 162.8878 0.342 55.71
∑ 801.49 463.35
OVERTURNING

Pf.ult/b qu x c.o.
183.5856

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m 3
Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 34.2 = 241.56

Letak c.o. 0.2 B 0.76

SOURCE Vert LoadArm to c.o. MR MD


F= ∑ MR IA 2.65 2.74 7.27 -
∑ MD I Ba 2.03 2.19 4.43 -
SOIL BEHIND

I Bb 44.55 2.63 117.06 -


1.713128 II a 2.25 2.27 5.10 -
II b 45.00 2.67 119.93 -
III a 0.90 2.32 2.09 -
III b 25.20 2.69 67.79 -
LEFT 18.24 -0.38 - -6.93
FOOTING
RIGHT 72.96 1.52 110.90 -
LEFT 19.20 1.87 35.97 -
STEM CENTER 38.40 2.04 78.34 -
RIGHT 19.20 2.21 42.37 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 3.04 130.52 -
Pf.ult/b 183.5856 0.38 69.76
∑ 791.52 462.03
OVERTURNING

Pf.ult/b qu x c.o.
204.8033

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m 3
Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 37.62 = 244.98

Letak c.o. 0.22 B 0.836

SOURCE Vert LoadArm to c.o. MR MD


F= ∑ MR IA 2.65 2.66 7.07 -
∑ MD I Ba 2.03 2.11 4.28 -
SOIL BEHIND

I Bb 44.55 2.55 113.67 -


1.701072 II a 2.25 2.19 4.93 -
II b 45.00 2.59 116.51 -
III a 0.90 2.25 2.02 -
III b 25.20 2.61 65.87 -
LEFT 20.06 -0.42 - -8.39
FOOTING
RIGHT 71.14 1.48 105.42 -
LEFT 19.20 1.80 34.51 -
STEM CENTER 38.40 1.96 75.42 -
RIGHT 19.20 2.13 40.91 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.96 127.26 -
Pf.ult/b 204.8033 0.418 85.61
∑ 783.47 460.58
OVERTURNING
Pf.ult/b qu x c.o.
283.1589

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m3 Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 49.59 = 256.95

Letak c.o. 0.29 B 1.102

SOURCE Vert LoadArm to c.o. MR MD


F= ∑ MR LEFT 2.65 2.40 6.36 -
∑ MD CENTER 2.03 1.85 3.74 -
SOIL BEHIND

RIGHT 44.55 2.29 101.82 -


1.6975662 Pa 2.25 1.92 4.33 -
Pp 45.00 2.32 104.54 -
0 0.90 1.98 1.78 -
0 25.20 2.35 59.17 -
LEFT 26.45 -0.55 - -14.57
FOOTING
RIGHT 64.75 1.35 87.35 -
LEFT 19.20 1.53 29.40 -
STEM CENTER 38.40 1.70 65.20 -
RIGHT 19.20 1.86 35.80 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.70 115.84 -
Pf.ult/b 283.1589 0.551 156.02
∑ 771.36 454.39
OVERTURNING
Pf.ult/b qu x c.o.
294.8724

Rumus Terzaghi

Ø 21 o Nc 17.7
γtanah 18 kN/m3 Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 51.3 = 258.66

Letak c.o. 0.3 B 1.14

SOURCE Vert LoadArm to c.o. MR MD


F= ∑ MR LEFT 2.65 2.36 6.26 -
∑ MD CENTER 2.03 1.81 3.67 -
SOIL BEHIND

RIGHT 44.55 2.25 100.13 -


1.702289 Pa 2.25 1.89 4.24 -
Pp 45.00 2.29 102.83 -
0 0.90 1.94 1.75 -
0 25.20 2.31 58.21 -
LEFT 27.36 -0.57 - -15.60
FOOTING
RIGHT 63.84 1.33 84.91 -
LEFT 19.20 1.49 28.67 -
STEM CENTER 38.40 1.66 63.74 -
RIGHT 19.20 1.83 35.07 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.66 114.21 -
Pf.ult/b 294.8724 0.57 168.08
∑ 771.76 453.37
OVERTURNING

Berdasarkan grafik diatas dapat


diketahui bahwa :
Letak c.o (center of overturning)
atau titik guling terletak sejauh
= 0.25 * 3.8
= 0.95 m
9.00

c.o
= 0.9500
3.8
Pf.ult/b qu x c.o.
162.500616
Rumus Terzaghi

Ø 21 o
Nc 23.94
γtanah 18 kN/m 3
Nq 13.2
Ny 9.46

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 395.28 32.3532 = 427.6332

Letak c.o. 0.1 B 0.38

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 3.12 8.28 -
∑ MD I Ba 2.03 2.57 5.20 -
SOIL BEHIND

I Bb 44.55 3.01 133.98 -


1.87096 II a 2.25 2.65 5.95 -
II b 45.00 3.05 137.03 -
III a 0.90 2.70 2.43 -
III b 25.20 3.07 77.36 -
LEFT 9.12 -0.19 - -1.73
FOOTING
RIGHT 82.08 1.71 140.36 -
LEFT 19.20 2.25 43.26 -
STEM CENTER 38.40 2.42 92.93 -
RIGHT 19.20 2.59 49.66 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 3.42 146.84 -
Pf.ult/b 162.50062 0.19 30.88
∑ 874.17 467.23
Pf.ult/b qu x c.o.
252.971586
Rumus Terzaghi

Ø 21 o
Nc 23.94
γtanah 18 kN/m 3
Nq 13.2
Ny 9.46
qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ
0 395.28 48.5298 = 443.8098

Letak c.o. 0.15 B 0.57

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 2.93 7.77 -
∑ MD I Ba 2.03 2.38 4.82 -
SOIL BEHIND

I Bb 44.55 2.82 125.52 -


1.8367123 II a 2.25 2.46 5.52 -
II b 45.00 2.86 128.48 -
III a 0.90 2.51 2.26 -
III b 25.20 2.88 72.58 -
LEFT 13.68 -0.29 - -3.90
FOOTING
RIGHT 77.52 1.62 125.19 -
LEFT 19.20 2.06 39.62 -
STEM CENTER 38.40 2.23 85.63 -
RIGHT 19.20 2.40 46.02 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 3.23 138.68 -
Pf.ult/b 252.97159 0.285 72.10
∑ 854.19 465.06
Pf.ult/b qu x c.o.
183.5856
Rumus Terzaghi

Ø 21 o
Nc 17.7
γtanah 18 kN/m3 Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 34.2 = 241.56

Letak c.o. 0.2 B 0.76

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 2.74 7.27 -
∑ MD I Ba 2.03 2.19 4.43 -
SOIL BEHIND

I Bb 44.55 2.63 117.06 -


1.7131276 II a 2.25 2.27 5.10 -
II b 45.00 2.67 119.93 -
III a 0.90 2.32 2.09 -
III b 25.20 2.69 67.79 -
LEFT 18.24 -0.38 - -6.93
FOOTING
RIGHT 72.96 1.52 110.90 -
LEFT 19.20 1.87 35.97 -
STEM CENTER 38.40 2.04 78.34 -
RIGHT 19.20 2.21 42.37 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 3.04 130.52 -
Pf.ult/b 183.5856 0.38 69.76
∑ 791.52 462.03
Pf.ult/b qu x c.o.
237.6045
Rumus Terzaghi

Ø 21 o
Nc 17.7
γtanah 18 kN/m3 Nq 7.4
Ny 5

qu c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ


0 207.36 42.75 = 250.11

Letak c.o. 0.25 B 0.95

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 2.55 6.77 -
∑ MD I Ba 2.03 2.00 4.05 -
SOIL BEHIND

I Bb 44.55 2.44 108.59 -


1.6919764 II a 2.25 2.08 4.67 -
II b 45.00 2.48 111.38 -
III a 0.90 2.13 1.92 -
III b 25.20 2.50 63.00 -
LEFT 22.80 -0.48 - -10.83
FOOTING
RIGHT 68.40 1.43 97.47 -
LEFT 19.20 1.68 32.32 -
STEM CENTER 38.40 1.85 71.04 -
RIGHT 19.20 2.02 38.72 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.85 122.37 -
Pf.ult/b 237.6045 0.475 112.86
∑ 775.15 458.13
Pf.ult/b qu x c.o.
248.79816
Rumus Terzaghi

Ø 21 o
Nc 17.7
γtanah 18 kN/m 3
Nq 7.4
Ny 5

qu
c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ
0 207.36 44.46 = 251.82

Letak c.o. 0.26 B 0.988

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 2.51 6.67 -
∑ MD I Ba 2.03 1.96 3.97 -
SOIL BEHIND

I Bb 44.55 2.40 106.90 -


1.6914287 II a 2.25 2.04 4.58 -
II b 45.00 2.44 109.67 -
III a 0.90 2.10 1.89 -
III b 25.20 2.46 62.04 -
LEFT 23.71 -0.49 - -11.71
FOOTING
RIGHT 67.49 1.41 94.89 -
LEFT 19.20 1.65 31.59 -
STEM CENTER 38.40 1.81 69.58 -
RIGHT 19.20 1.98 37.99 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.81 120.73 -
Pf.ult/b 248.79816 0.494 122.91
∑ 773.40 457.25

Find the location of the resultant force acting on the footing


Use point of c.o.
Pf/b 378.738830135 (from sliding friction calculation)

+ Pf/b . X + (footing left . arm) + Pa/b . Arm - stem . Arm - (footing right . Arm) - soil arm - Va/b .
Arm
Pf/b 378.738830135
total 316.15
x 0.8347564008

e 0.0772435992 </> B/6


0.6333333 < ok
> n.ok

Pf.ult/b qu x c.o.
260.12178
Rumus Terzaghi

Ø 21 o
Nc 17.7
γtanah 18 kN/m 3
Nq 7.4
Ny 5

qu
c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ
0 207.36 46.17 = 253.53

Letak c.o. 0.27 B 1.026

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 2.47 6.56 -
∑ MD I Ba 2.03 1.92 3.90 -
SOIL BEHIND

I Bb 44.55 2.36 105.20 -


1.6921616 II a 2.25 2.00 4.50 -
II b 45.00 2.40 107.96 -
III a 0.90 2.06 1.85 -
III b 25.20 2.42 61.08 -
LEFT 24.62 -0.51 - -12.63
FOOTING
RIGHT 66.58 1.39 92.34 -
LEFT 19.20 1.61 30.86 -
STEM CENTER 38.40 1.77 68.12 -
RIGHT 19.20 1.94 37.26 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.77 119.10 -
Pf.ult/b 260.12178 0.513 133.44
∑ 772.18 456.33
Pf.ult/b qu x c.o.
271.57536
Rumus Terzaghi

Ø 21 o
Nc 17.7
γtanah 18 kN/m 3
Nq 7.4
Ny 5

qu
c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ
0 207.36 47.88 = 255.24

Letak c.o. 0.28 B 1.064

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 2.44 6.46 -
∑ MD I Ba 2.03 1.89 3.82 -
SOIL BEHIND

I Bb 44.55 2.32 103.51 -


1.6941991 II a 2.25 1.96 4.41 -
II b 45.00 2.36 106.25 -
III a 0.90 2.02 1.82 -
III b 25.20 2.39 60.13 -
LEFT 25.54 -0.53 - -13.59
FOOTING
RIGHT 65.66 1.37 89.83 -
LEFT 19.20 1.57 30.13 -
STEM CENTER 38.40 1.74 66.66 -
RIGHT 19.20 1.90 36.53 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.74 117.47 -
Pf.ult/b 271.57536 0.532 144.48
∑ 771.50 455.38
Pf.ult/b qu x c.o.
283.1589
Rumus Terzaghi

Ø 21 o
Nc 17.7
γtanah 18 kN/m3 Nq 7.4
Ny 5

qu
c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ
0 207.36 49.59 = 256.95

Letak c.o. 0.29 B 1.102

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 2.40 6.36 -
∑ MD I Ba 2.03 1.85 3.74 -
SOIL BEHIND

I Bb 44.55 2.29 101.82 -


1.6975662 II a 2.25 1.92 4.33 -
II b 45.00 2.32 104.54 -
III a 0.90 1.98 1.78 -
III b 25.20 2.35 59.17 -
LEFT 26.45 -0.55 - -14.57
FOOTING
RIGHT 64.75 1.35 87.35 -
LEFT 19.20 1.53 29.40 -
STEM CENTER 38.40 1.70 65.20 -
RIGHT 19.20 1.86 35.80 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.70 115.84 -
Pf.ult/b 283.1589 0.551 156.02
∑ 771.36 454.39
Pf.ult/b qu x c.o.
294.8724
Rumus Terzaghi

Ø 21 o
Nc 17.7
γtanah 18 kN/m3 Nq 7.4
Ny 5

qu
c.Nc + Df.γ.(Nq-1) + 0,5.γ.B.Nγ
0 207.36 51.3 = 258.66

Letak c.o. 0.3 B 1.14

SOURCE Vert Load Arm to c.o. MR MD


F= ∑ MR IA 2.65 2.36 6.26 -
∑ MD I Ba 2.03 1.81 3.67 -
SOIL BEHIND

I Bb 44.55 2.25 100.13 -


1.7022888 II a 2.25 1.89 4.24 -
II b 45.00 2.29 102.83 -
III a 0.90 1.94 1.75 -
III b 25.20 2.31 58.21 -
LEFT 27.36 -0.57 - -15.60
FOOTING
RIGHT 63.84 1.33 84.91 -
LEFT 19.20 1.49 28.67 -
STEM CENTER 38.40 1.66 63.74 -
RIGHT 19.20 1.83 35.07 -
Pa/b 146.55 3.20 - 468.96
Va/b 42.94 2.66 114.21 -
Pf.ult/b 294.8724 0.57 168.08
∑ 771.76 453.37
Letak c.o. ∑(MR/b) ∑(MD/b) F
0.1 874.17 467.23 1.87096
0.15 854.19 465.06 1.8367123
0.2 791.52 462.03 1.7131276
0.25 775.15 458.13 1.6919764
0.26 773.40 457.25 1.6914287
r 772.18 456.33 1.692162
0.28 771.50 455.38 1.6941991
0.29 771.36 454.39 1.6975662
0.3 771.76 453.37 1.7022888
Min 1.69143

Overtuning Point
1.9

1.85

1.8

1.75

1.7

1.65

1.6
0.1 0.15 0.2 0.25 0.3
CHECK BEARING CAPACITY
B' B - 2e
4.1127279

q' equiv P /A Pf/b / B'


92.0894443 kN/m2

ϬD D .γ
Rumus Terzaghi 32.4 kN/m'

c.Nc
q'u+ ϬD'(Nq-1) + 0,5.γ.B'.Nγ Nc 17.7
0 207.36 185.07276 Nq 7.4
392.43276 Ny 5
qa' q'u / F F 3
130.81092

if q' equiv q'a < ok


<
92.089444 130.81092 > not ok
bearing capacity is ok

Compute the bearing pressure at heel and toe

q' heel P / BL (1 - 6e / B) P Pf/b


99.668113 0.51004837 B B
50.8355587 L 1
q' toe P / BL (1 + 6e / B)
99.668113 0.01626742
1.62134296 50.835559
60 1.621343

50 50.8355587228
0
0
40

30

20

10

1.6213429579
0
1 2
PENULANGAN RETAINING WALL

LOAD FACTOR = 1.7


FACTOR REDUKSI KEKUATAN
LENTUR 0.8
GESER 0.75
0.85 Fc' mpa = 25.5
Vc = 0.912871 bd
Fy mpa = 400
ρ min 0.0035 ρ max 0.0244 ρ susut 0.002

hstem = 8 m
DESAIN STEM 26.24672 ft

Pa/b 146.551 kN/m 14944 kg/m


32946 lb
3.281 ft
10042 lb/ft
Pu/b = 17071.2 lb/ft
Mu/b = 179225 ft-lb/ft 1.5 m = 4.92126 ft

Ws/b = 122.5783 kN/m' 8399.275 lb/ft 13438.84 lb


Va/b = 42.93549 kN/m' 2942.012 lb/ft 5001.4206 lb
18440.261 lb 45374.6591

Ws/b = 58 kN/m' 3974.258 lb/ft


Stem = 76.8 kN/m' 5262.466 lb/ft
Footing = 91.2 kN/m' 6249.178 lb/ft
15485.9 lb/ft

moment arm = 1.6 m 5.24934 ft

Mu/b = 179225.4 15485.9 5.249344 1.6


179225.4 130065
49160.11 ft-lb/ft
589921.4 in-lb/ft
As = 0.002
STEM

1 Shear and Moment Equation


Pa/b = 146.5507 kN/m = 10042 lb/ft

Pu/b = 17071.23 lb/ft


H= 8m 26.24672 ft
Mu/b = 179225.5 ft-lb/ft

P1/b = 13.12336 P2/b 8.748907 21.8723 17071.227


0.6 0.4
P1/b = 6828.491 lb/ft P2/b = 10243 lb/ft

m= 29.73692

Vu/b = 260.1655 y + 14.8685 y2


Mu/b = 130.0827 y2 + 4.95615 y3

y = distance from top of wall

use,
fc' = 4000 lb/in2 27.57903 Mpa

fy = 60000 lb/in2 413.6854 Mpa

Mu/b = 130.0827 y2 + 4.95615 y3


130.0827 688.89 + 4.95615 18081.111

Mu/b = 89612.75 + 89612.75

Mu/b = 179225.5 ft-lb/ft


Mu/b = 2150706 in-lb/ft

As/b = fc'.b d- d2 - 2.35x Mu/b


1.17.fy фxfc'xb

= 48000 d d2 - 116.994
70200
0.683761
T= d + 1/2 bar diameter + 3 in
= d+ 0.5 + 3 inch
d T As/b
d2-x ρ ρmax
(in) (in) (in2/ft)
12 15.5 5.19669 4.651836 0.0323 0.012
11.5 15 3.90584 5.192588 0.03763 0.012
9 12.5 5.99953 2.0516 0.019 0.012
2.0516 in2/ft 1323.6104 4342.554 mm2/m
0.3048
tul no.28 jumlah tulangan 10
2.5736 in 65.36946 mm
2. design footing heel

Ws/b = 122.5783 kN/m' 8399.275 lb/ft

Va/b = 42.93549 kN/m' 2942.012 lb/ft

Vu/b = 16760.41 lb/ft

use,
fc' = 4000 lb/in2 27.57903 Mpa

fy = 60000 lb/in2 413.6854 Mpa

d Vn/b ф Vn
(in) (lb/in) (lb/ft)
20 2555.746 30669 26068.61 > 16760.406

0.7 m 2.29658 ft

Mu/b = 15431.69 + 11486.17


= 26917.86 ft-lb/ft
= 323014.3 in-lb/ft
d d2
As/b = 0.683761 20 400 17.5714
19.5557822414
As/b = 0.303739 in2/ft

ρ = 0.001266 < ρmin = 0.00333

As/b = 0.8 in2/ft 195.96 642.913 mm2/m


0.3048 tul no. 3 jmlh 9

A tul no 0.44
Jarak tul = 6.6 in 167.64 mm 170 mm

3 .Design TOE
1 m = 3.28083 ft
Ws/b = 58 kN/m' 3974.274 lb/ft
Stem = 76.8 kN/m' 5262.486 lb/ft
Footing = 91.2 kN/m' 6249.203 lb/ft
226 kN/m' 15485.96 lb/ft

moment arm = 1.6 m 5.24933 ft


Mu/b = 179225.5 - 130065.4
= 49160.05 ft-lb/ft
= 589920.6 in-lb/ft
d= 14.5 in
As/b = 0.683761 14.5 210.25 32.0906
13.3476368472
As/b = 0.787941 in2/ft

ρ = 0.004528 < ρmin = 0.00333

As = 2.204 in2 1421.933 mm2


tul no 13 jumlah 9

A tul no 0.44
Jarak tul = 2.395644 in 60.84936 mm = 65 mm