Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil
P allowable = Pu / SF
Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor
Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil
P allowable = Pu / SF
Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor
Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil
P allowable = Pu / SF
Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor
Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil
P allowable = Pu / SF
Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor
Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil
P allowable = Pu / SF
Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor
Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil
P allowable = Pu / SF
Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor
BH1 75.05 38.29 60.04 30.63 50.03 25.53 13.56 72.94 86.50
Perhitungan BH2 59.13 35.95 47.30 28.76 39.42 23.97 5.18 68.48 73.66
I berdasarkan BH3 94.50 52.06 75.60 41.65 63.00 34.71 13.42 99.16 112.58
Nilai Su BH4 68.55 33.74 54.84 26.99 45.70 22.50 13.56 64.27 77.84
(LYMON C. REESE& O"NEILL, 1989) BH5 78.27 40.54 62.61 32.43 52.18 27.03 13.56 77.23 90.79
BH6 67.26 32.84 53.81 26.27 44.84 21.89 13.56 62.55 76.11
BH1 93.70 51.35 74.96 41.08 62.47 34.23 13.56 97.81 111.37
Perhitungan BH2 83.86 46.83 67.08 37.46 55.90 31.22 11.30 89.20 100.50
I berdasarkan BH3 96.71 59.54 77.37 47.63 64.47 39.69 7.77 113.41 121.18
Nilai Su BH4 57.68 36.92 46.15 29.53 38.46 24.61 3.30 70.32 73.61
(LYMON C. REESE& O"NEILL, 1989) BH5 82.97 48.93 66.38 39.14 55.31 32.62 8.71 93.20 101.91
BH6 72.64 41.45 58.11 33.16 48.43 27.63 8.95 78.95 87.90
BH1 98.41 59.73 78.72 47.79 65.60 39.82 8.71 113.78 122.49
Perhitungan BH2 93.98 55.90 75.19 44.72 62.65 37.26 9.42 106.47 115.89
I berdasarkan BH3 99.27 64.30 79.42 51.44 66.18 42.87 4.95 122.47 127.42
Nilai Su BH4 69.66 42.58 55.73 34.07 46.44 28.39 5.89 81.11 87.00
(LYMON C. REESE& O"NEILL, 1989) BH5 96.98 58.00 77.59 46.40 64.66 38.66 9.42 110.47 119.89
BH6 86.97 50.74 69.58 33.16 57.98 33.83 9.66 96.65 106.31