PENGECEKAN DAYA DUKUNG TEKAN & TARIK PONDASI TIANG BOR BERDASARKAN Su (Undrained Shear Strength) PADA TANAH

KOHESIF & NON KOHESIF


DATA TANAH TITIK DB1
METODE LYMON C. REESE & 0'NEILL, 1989

Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil

P allowable = Pu / SF

Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor

BORED PILE PROPERTIES


Shear strength (KPa)
Soil Consitency Lower Upper N SPT
D 0.40 m (Diameter of Pile) Very Soft (A) <<12 12 <4
r 0.20 m (Radius of Pile) Soft (B) 12 25 4-6
Ap 0.1256 m2 (Area of Pile) Firm ( C ) 25 50 6-15
K 1.256 m (Perimeter of Pile) Stiff (D) 50 100 16-25
Very Stiff (E) 100 200 25-30
C = Cohesive Soil Hard (F) 200 200<< 30<<
N = Cohesionless Soil

Parsial Safety Faktor


L Efektif Soil Consis- Cu (Kpa) PU P Ijin, SF= 2 P Ijin, SF= 2.5 P Ijin, SF= 3
Elevasi h Layer 0 Nc QB fs As QS SF=3 SF=1.5 P Ijin
N SPT f a D/B
Pile tekan tarik tekan tarik tekan tarik tekan tarik P Ijin P Ijin tekan
Type tency (x0,1) t/m2 QB QS
(m) (m) (m) (Grafik) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (ton)
0.00
-1.00 1.00 1.00 C A 1 12.00 6.25 0.55 2.50 9.00 0.71 0.43 0.43 1.14 0.43 0.57 0.15 0.46 0.12 0.38 0.10 0.24 0.29 0.52
-2.00 1.00 2.00 C A 1 12.00 6.25 0.55 5.00 9.00 0.71 0.43 0.86 1.57 0.86 0.79 0.30 0.63 0.24 0.52 0.20 0.24 0.58 0.81
-3.00 1.00 3.00 C B 5 13.60 31.25 0.55 7.50 9.00 3.53 2.16 3.02 6.55 3.02 3.28 1.06 2.62 0.85 2.18 0.71 1.18 2.01 3.19
-4.00 1.00 4.00 C C 7 14.40 43.75 0.55 10.00 9.00 4.95 3.02 6.04 10.99 6.04 5.50 2.12 4.40 1.69 3.66 1.41 1.65 4.03 5.68
-5.00 1.00 5.00 C B 4 13.20 25.00 0.55 12.50 9.00 2.83 1.73 7.77 10.60 7.77 5.30 2.72 4.24 2.18 3.53 1.81 0.94 5.18 6.12
-6.50 1.50 6.50 C C 8 14.80 50.00 0.55 16.25 9.00 5.65 5.18 12.95 18.60 12.95 9.30 4.53 7.44 3.63 6.20 3.02 1.88 8.64 10.52
-7.50 1.00 7.50 C E 26 24.00 162.50 0.55 18.75 9.00 18.37 11.23 24.18 42.55 24.18 21.27 8.46 17.02 6.77 14.18 5.64 6.12 16.12 22.24
-9.00 1.50 9.00 C E 28 24.80 175.00 0.55 22.50 9.00 19.78 18.13 42.31 62.09 42.31 31.05 14.81 24.84 11.85 20.70 9.87 6.59 28.21 34.80
-10.50 1.50 10.50 C F 46 34.00 287.50 0.55 26.25 9.00 32.50 29.79 72.10 104.60 72.10 52.30 25.24 41.84 20.19 34.87 16.82 10.83 48.07 58.90
-12.00 1.50 12.00 C F 60 39.60 360.00 0.55 30.00 9.00 40.69 37.30 109.41 150.10 109.41 75.05 38.29 60.04 30.63 50.03 25.53 13.56 72.94 86.50
-13.50 1.50 13.50 C F 60 39.60 360.00 0.55 33.75 9.00 40.69 37.30 146.71 187.40 146.71 93.70 51.35 74.96 41.08 62.47 34.23 13.56 97.81 111.37
-15.00 1.50 15.00 C F 37 30.40 231.25 0.55 37.50 9.00 26.14 23.96 170.67 196.81 170.67 98.41 59.73 78.72 47.79 65.60 39.82 8.71 113.78 122.49

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_BH-1
PENGECEKAN DAYA DUKUNG TEKAN & TARIK PONDASI TIANG BOR BERDASARKAN Su (Undrained Shear Strength) PADA TANAH KOHESIF & NON KOHESIF
DATA TANAH TITIK DB2
METODE LYMON C. REESE & 0'NEILL, 1989

Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil

P allowable = Pu / SF

Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor

BORED PILE PROPERTIES


Shear strength (KPa)
Soil Consitency Lower Upper N SPT
D 0.40 m (Diameter of Pile) Very Soft (A) <<12 12 <4
r 0.20 m (Radius of Pile) Soft (B) 12 25 4-6
Ap 0.1256 m2 (Area of Pile) Firm ( C ) 25 50 6-15
K 1.256 m (Perimeter of Pile) Stiff (D) 50 100 16-25
Very Stiff (E) 100 200 25-30
C = Cohesive Soil Hard (F) 200 200<< 30<<
N = Cohesionless Soil

Parsial Safety Faktor


L Efektif Soil Consis- Cu (Kpa) PU P Ijin, SF= 2 P Ijin, SF= 2.5 P Ijin, SF= 3
Elevasi h Layer Nc QB fs As QS SF=3 SF=1.5 P Ijin
N SPT f 0 a D/B
Pile tekan tarik tekan tarik tekan tarik tekan tarik P Ijin P Ijin tekan
Type tency (x0,1) t/m2 QB QS
(m) (m) (m) (Grafik) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (ton)
0.00
-1.00 1.00 1.00 C A 1 12.00 6.25 0.55 2.50 9.00 0.71 0.43 0.43 1.14 0.43 0.57 0.15 0.46 0.12 0.38 0.10 0.24 0.29 0.52
-2.00 1.00 2.00 C A 1 12.00 6.25 0.55 5.00 9.00 0.71 0.43 0.86 1.57 0.86 0.79 0.30 0.63 0.24 0.52 0.20 0.24 0.58 0.81
-3.00 1.00 3.00 C A 3 12.80 18.75 0.55 7.50 9.00 2.12 1.30 2.16 4.28 2.16 2.14 0.76 1.71 0.60 1.43 0.50 0.71 1.44 2.15
-4.00 1.00 4.00 C B 4 13.20 25.00 0.55 10.00 9.00 2.83 1.73 3.89 6.71 3.89 3.36 1.36 2.68 1.09 2.24 0.91 0.94 2.59 3.53
-5.00 1.00 5.00 C B 4 13.20 25.00 0.55 12.50 9.00 2.83 1.73 5.61 8.44 5.61 4.22 1.96 3.38 1.57 2.81 1.31 0.94 3.74 4.68
-6.50 1.50 6.50 C C 7 14.40 43.75 0.55 16.25 9.00 4.95 4.53 10.15 15.09 10.15 7.55 3.55 6.04 2.84 5.03 2.37 1.65 6.76 8.41
-7.50 1.00 7.50 C F 35 29.60 218.75 0.55 18.75 9.00 24.73 15.11 25.26 49.98 25.26 24.99 8.84 19.99 7.07 16.66 5.89 8.24 16.84 25.08
-9.00 1.50 9.00 C F 40 31.60 250.00 0.55 22.50 9.00 28.26 25.91 51.16 79.42 51.16 39.71 17.91 31.77 14.33 26.47 11.94 9.42 34.11 43.53
-10.50 1.50 10.50 C F 60 39.60 360.00 0.55 26.25 9.00 40.69 37.30 88.47 129.16 88.47 64.58 30.96 51.66 24.77 43.05 20.64 13.56 58.98 72.54
-12.00 1.50 12.00 C D 22 22.40 137.50 0.55 30.00 9.00 15.54 14.25 102.71 118.26 102.71 59.13 35.95 47.30 28.76 39.42 23.97 5.18 68.48 73.66
-13.50 1.50 13.50 C F 48 34.80 300.00 0.55 33.75 9.00 33.91 31.09 133.80 167.71 133.80 83.86 46.83 67.08 37.46 55.90 31.22 11.30 89.20 100.50
-15.00 1.50 15.00 C F 40 31.60 250.00 0.55 37.50 9.00 28.26 25.91 159.70 187.96 159.70 93.98 55.90 75.19 44.72 62.65 37.26 9.42 106.47 115.89

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_BH-2
PENGECEKAN DAYA DUKUNG TEKAN & TARIK PONDASI TIANG BOR BERDASARKAN Su (Undrained Shear Strength) PADA TANAH KOHESIF & NON KOHESIF
DATA TANAH TITIK DB3
METODE LYMON C. REESE & 0'NEILL, 1989

Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil

P allowable = Pu / SF

Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor

BORED PILE PROPERTIES


Shear strength (KPa)
Soil Consitency Lower Upper N SPT
D 0.40 m (Diameter of Pile) Very Soft (A) <<12 12 <4
r 0.20 m (Radius of Pile) Soft (B) 12 25 4-6
Ap 0.1256 m2 (Area of Pile) Firm ( C ) 25 50 6-15
K 1.256 m (Perimeter of Pile) Stiff (D) 50 100 16-25
Very Stiff (E) 100 200 25-30
C = Cohesive Soil Hard (F) 200 200<< 30<<
N = Cohesionless Soil

Parsial Safety Faktor


L Efektif Soil Consis- Cu (Kpa) PU P Ijin, SF= 2 P Ijin, SF= 2.5 P Ijin, SF= 3
Elevasi h Layer Nc QB fs As QS SF=3 SF=1.5 P Ijin
N SPT f 0 a D/B
Pile tekan tarik tekan tarik tekan tarik tekan tarik P Ijin P Ijin tekan
Type tency (x0,1) t/m2 QB QS
(m) (m) (m) (Grafik) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (ton)
0.00
-1.00 1.00 1.00 C A 1 12.00 6.25 0.55 2.50 9.00 0.71 0.43 0.43 1.14 0.43 0.57 0.15 0.46 0.12 0.38 0.10 0.24 0.29 0.52
-2.00 1.00 2.00 C A 2 12.40 12.50 0.55 5.00 9.00 1.41 0.86 1.30 2.71 1.30 1.35 0.45 1.08 0.36 0.90 0.30 0.47 0.86 1.33
-3.00 1.00 3.00 C B 5 13.60 31.25 0.55 7.50 9.00 3.53 2.16 3.45 6.99 3.45 3.49 1.21 2.79 0.97 2.33 0.81 1.18 2.30 3.48
-4.00 1.00 4.00 C B 5 13.60 31.25 0.55 10.00 9.00 3.53 2.16 5.61 9.15 5.61 4.57 1.96 3.66 1.57 3.05 1.31 1.18 3.74 4.92
-5.00 1.00 5.00 C E 26 24.00 162.50 0.55 12.50 9.00 18.37 11.23 16.84 35.21 16.84 17.60 5.89 14.08 4.71 11.74 3.93 6.12 11.23 17.35
-6.50 1.50 6.50 C E 29 25.20 181.25 0.55 16.25 9.00 20.49 18.78 35.62 56.11 35.62 28.05 12.47 22.44 9.97 18.70 8.31 6.83 23.75 30.58
-7.50 1.00 7.50 C E 28 24.80 175.00 0.55 18.75 9.00 19.78 12.09 47.71 67.49 47.71 33.75 16.70 27.00 13.36 22.50 11.13 6.59 31.81 38.40
-9.00 1.50 9.00 C F 48 34.80 300.00 0.55 22.50 9.00 33.91 31.09 78.79 112.71 78.79 56.35 27.58 45.08 22.06 37.57 18.39 11.30 52.53 63.83
-10.50 1.50 10.50 C F 51 36.00 318.75 0.55 26.25 9.00 36.03 33.03 111.82 147.85 111.82 73.93 39.14 59.14 31.31 49.28 26.09 12.01 74.55 86.56
-12.00 1.50 12.00 C F 57 38.40 356.25 0.55 30.00 9.00 40.27 36.91 148.74 189.01 148.74 94.50 52.06 75.60 41.65 63.00 34.71 13.42 99.16 112.58
-13.50 1.50 13.50 C F 33 28.80 206.25 0.55 33.75 9.00 23.31 21.37 170.11 193.42 170.11 96.71 59.54 77.37 47.63 64.47 39.69 7.77 113.41 121.18
-15.00 1.50 15.00 C D 21 22.00 131.25 0.55 37.50 9.00 14.84 13.60 183.71 198.55 183.71 99.27 64.30 79.42 51.44 66.18 42.87 4.95 122.47 127.42

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_BH-3
PENGECEKAN DAYA DUKUNG TEKAN & TARIK PONDASI TIANG BOR BERDASARKAN Su (Undrained Shear Strength) PADA TANAH KOHESIF & NON KOHESIF
DATA TANAH TITIK DB4
METODE LYMON C. REESE & 0'NEILL, 1989

Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil

P allowable = Pu / SF

Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor

BORED PILE PROPERTIES


Shear strength (KPa)
Soil Consitency Lower Upper N SPT
D 0.40 m (Diameter of Pile) Very Soft (A) <<12 12 <4
r 0.20 m (Radius of Pile) Soft (B) 12 25 4-6
Ap 0.1256 m2 (Area of Pile) Firm ( C ) 25 50 6-15
K 1.256 m (Perimeter of Pile) Stiff (D) 50 100 16-25
Very Stiff (E) 100 200 25-30
C = Cohesive Soil Hard (F) 200 200<< 30<<
N = Cohesionless Soil

Parsial Safety Faktor


L Efektif Soil Consis- Cu (Kpa) PU P Ijin, SF= 2 P Ijin, SF= 2.5 P Ijin, SF= 3
Elevasi h Layer Nc QB fs As QS SF=3 SF=1.5 P Ijin
N SPT f 0 a D/B
Pile tekan tarik tekan tarik tekan tarik tekan tarik P Ijin P Ijin tekan
Type tency (x0,1) t/m2 QB QS
(m) (m) (m) (Grafik) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (ton)
0.00
-1.00 1.00 1.00 C A 0 11.60 0.00 0.55 2.50 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-2.00 1.00 2.00 C A 1 12.00 6.25 0.55 5.00 9.00 0.71 0.43 0.43 1.14 0.43 0.57 0.15 0.46 0.12 0.38 0.10 0.24 0.29 0.52
-3.00 1.00 3.00 C A 3 12.80 18.75 0.55 7.50 9.00 2.12 1.30 1.73 3.85 1.73 1.92 0.60 1.54 0.48 1.28 0.40 0.71 1.15 1.86
-4.00 1.00 4.00 C B 4 13.20 25.00 0.55 10.00 9.00 2.83 1.73 3.45 6.28 3.45 3.14 1.21 2.51 0.97 2.09 0.81 0.94 2.30 3.24
-5.00 1.00 5.00 C B 4 13.20 25.00 0.55 12.50 9.00 2.83 1.73 5.18 8.01 5.18 4.00 1.81 3.20 1.45 2.67 1.21 0.94 3.45 4.40
-6.50 1.50 6.50 C B 5 13.60 31.25 0.55 16.25 9.00 3.53 3.24 8.42 11.95 8.42 5.98 2.95 4.78 2.36 3.98 1.96 1.18 5.61 6.79
-7.50 1.00 7.50 C C 7 14.40 43.75 0.55 18.75 9.00 4.95 3.02 11.44 16.39 11.44 8.19 4.00 6.55 3.20 5.46 2.67 1.65 7.63 9.28
-9.00 1.50 9.00 C D 16 20.00 100.00 0.55 22.50 9.00 11.30 10.36 21.80 33.11 21.80 16.55 7.63 13.24 6.10 11.04 5.09 3.77 14.54 18.30
-10.50 1.50 10.50 C F 60 39.60 360.00 0.55 26.25 9.00 40.69 37.30 59.11 99.80 59.11 49.90 20.69 39.92 16.55 33.27 13.79 13.56 39.40 52.97
-12.00 1.50 12.00 C F 60 39.60 360.00 0.55 30.00 9.00 40.69 37.30 96.41 137.10 96.41 68.55 33.74 54.84 26.99 45.70 22.50 13.56 64.27 77.84
-13.50 1.50 13.50 C C 14 19.20 87.50 0.55 33.75 9.00 9.89 9.07 105.48 115.37 105.48 57.68 36.92 46.15 29.53 38.46 24.61 3.30 70.32 73.61
-15.00 1.50 15.00 C E 25 23.60 156.25 0.55 37.50 9.00 17.66 16.19 121.67 139.33 121.67 69.66 42.58 55.73 34.07 46.44 28.39 5.89 81.11 87.00

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_BH-4
PENGECEKAN DAYA DUKUNG TEKAN & TARIK PONDASI TIANG BOR BERDASARKAN Su (Undrained Shear Strength) PADA TANAH KOHESIF & NON KOHESIF
DATA TANAH TITIK DB5
METODE LYMON C. REESE & 0'NEILL, 1989

Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil

P allowable = Pu / SF

Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor

BORED PILE PROPERTIES


Shear strength (KPa)
Soil Consitency Lower Upper N SPT
D 0.40 m (Diameter of Pile) Very Soft (A) <<12 12 <4
r 0.20 m (Radius of Pile) Soft (B) 12 25 4-6
Ap 0.1256 m2 (Area of Pile) Firm ( C ) 25 50 6-15
K 1.256 m (Perimeter of Pile) Stiff (D) 50 100 16-25
Very Stiff (E) 100 200 25-30
C = Cohesive Soil Hard (F) 200 200<< 30<<
N = Cohesionless Soil

Parsial Safety Faktor


L Efektif Soil Consis- Cu (Kpa) PU P Ijin, SF= 2 P Ijin, SF= 2.5 P Ijin, SF= 3
Elevasi h Layer Nc QB fs As QS SF=3 SF=1.5 P Ijin
N SPT f 0 a D/B
Pile tekan tarik tekan tarik tekan tarik tekan tarik P Ijin P Ijin tekan
Type tency (x0,1) t/m2 QB QS
(m) (m) (m) (Grafik) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (ton)
0.00
-1.00 1.00 1.00 C A 0 11.60 0.00 0.55 2.50 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-2.00 1.00 2.00 C A 3 12.80 18.75 0.55 5.00 9.00 2.12 1.30 1.30 3.41 1.30 1.71 0.45 1.37 0.36 1.14 0.30 0.71 0.86 1.57
-3.00 1.00 3.00 C B 4 13.20 25.00 0.55 7.50 9.00 2.83 1.73 3.02 5.85 3.02 2.92 1.06 2.34 0.85 1.95 0.71 0.94 2.01 2.96
-4.00 1.00 4.00 C C 10 17.60 62.50 0.55 10.00 9.00 7.07 4.32 7.34 14.40 7.34 7.20 2.57 5.76 2.06 4.80 1.71 2.36 4.89 7.25
-5.00 1.00 5.00 C A 1 12.00 6.25 0.55 12.50 9.00 0.71 0.43 7.77 8.48 7.77 4.24 2.72 3.39 2.18 2.83 1.81 0.24 5.18 5.42
-6.50 1.50 6.50 C C 7 14.40 43.75 0.55 16.25 9.00 4.95 4.53 12.30 17.25 12.30 8.63 4.31 6.90 3.45 5.75 2.87 1.65 8.20 9.85
-7.50 1.00 7.50 C E 28 24.80 175.00 0.55 18.75 9.00 19.78 12.09 24.39 44.18 24.39 22.09 8.54 17.67 6.83 14.73 5.69 6.59 16.26 22.86
-9.00 1.50 9.00 C E 26 24.00 162.50 0.55 22.50 9.00 18.37 16.84 41.23 59.60 41.23 29.80 14.43 23.84 11.54 19.87 9.62 6.12 27.49 33.61
-10.50 1.50 10.50 C F 60 39.60 360.00 0.55 26.25 9.00 40.69 37.30 78.54 119.23 78.54 59.61 27.49 47.69 21.99 39.74 18.32 13.56 52.36 65.92
-12.00 1.50 12.00 C F 60 39.60 360.00 0.55 30.00 9.00 40.69 37.30 115.84 156.53 115.84 78.27 40.54 62.61 32.43 52.18 27.03 13.56 77.23 90.79
-13.50 1.50 13.50 C F 37 30.40 231.25 0.55 33.75 9.00 26.14 23.96 139.80 165.94 139.80 82.97 48.93 66.38 39.14 55.31 32.62 8.71 93.20 101.91
-15.00 1.50 15.00 C F 40 31.60 250.00 0.55 37.50 9.00 28.26 25.91 165.71 193.97 165.71 96.98 58.00 77.59 46.40 64.66 38.66 9.42 110.47 119.89

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_BH-5
PENGECEKAN DAYA DUKUNG TEKAN & TARIK PONDASI TIANG BOR BERDASARKAN Su (Undrained Shear Strength) PADA TANAH KOHESIF & NON KOHESIF
DATA TANAH TITIK DB6
METODE LYMON C. REESE & 0'NEILL, 1989

Qu = QB + QS
QB = qb x Ab Qs = S fs As
qb = Nc Cub <= 40 (Kg/cm Cohesive Soil fs = a Cu <=2 (untuk a = 0.55) (Kg/cm2) Cohesive Soil
Nc = 6(1+0.2(L/Bb) <= 9 fs = 0.3 x NSPT (Kg/cm2) Cohesionless Soil
qb = 2/3N-SPT <= 45 (Kg/cm Cohesionless Soil

P allowable = Pu / SF

Qu = Ultimate Pile Load Capacity (Ton) Nc = Bearing Capacity Factor L = Depth of Pile (m)
Qb = Ultimate End Bearing Stress (Ton) Cu = Undrained Shear strength = 6.25 x N-SPT (KPa) As = Area of Side Friction (m 2)
Qs = Ultimate Load in Side Resistance (Ton) Ab = Area of Base (m2) a = Empirical Factor
fs = Ultimate Load Transfer in Side Resistance (Ton/m2) SF = Safety Factor

BORED PILE PROPERTIES


Shear strength (KPa)
Soil Consitency Lower Upper N SPT
D 0.40 m (Diameter of Pile) Very Soft (A) <<12 12 <4
r 0.20 m (Radius of Pile) Soft (B) 12 25 4-6
Ap 0.1256 m2 (Area of Pile) Firm ( C ) 25 50 6-15
K 1.256 m (Perimeter of Pile) Stiff (D) 50 100 16-25
Very Stiff (E) 100 200 25-30
C = Cohesive Soil Hard (F) 200 200<< 30<<
N = Cohesionless Soil

Parsial Safety Faktor


L Efektif Soil Consis- Cu (Kpa) PU P Ijin, SF= 2 P Ijin, SF= 2.5 P Ijin, SF= 3
Elevasi h Layer Nc QB fs As QS SF=3 SF=1.5 P Ijin
N SPT f 0 a D/B
Pile tekan tarik tekan tarik tekan tarik tekan tarik P Ijin P Ijin tekan
Type tency (x0,1) t/m2 QB QS
(m) (m) (m) (Grafik) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (Ton) (ton)
0.00
-1.00 1.00 1.00 C A 0 11.60 0.00 0.55 2.50 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-2.00 1.00 2.00 C A 1 12.00 6.25 0.55 5.00 9.00 0.71 0.43 0.43 1.14 0.43 0.57 0.15 0.46 0.12 0.38 0.10 0.24 0.29 0.52
-3.00 1.00 3.00 C B 5 13.60 31.25 0.55 7.50 9.00 3.53 2.16 2.59 6.12 2.59 3.06 0.91 2.45 0.73 2.04 0.60 1.18 1.73 2.90
-4.00 1.00 4.00 C B 5 13.60 31.25 0.55 10.00 9.00 3.53 2.16 4.75 8.28 4.75 4.14 1.66 3.31 1.33 2.76 1.11 1.18 3.17 4.34
-5.00 1.00 5.00 C B 5 13.60 31.25 0.55 12.50 9.00 3.53 2.16 6.91 10.44 6.91 5.22 2.42 4.18 1.93 3.48 1.61 1.18 4.61 5.78
-6.50 1.50 6.50 C B 5 13.60 31.25 0.55 16.25 9.00 3.53 3.24 10.15 13.68 10.15 6.84 3.55 5.47 2.84 4.56 2.37 1.18 6.76 7.94
-7.50 1.00 7.50 C C 9 15.20 56.25 0.55 18.75 9.00 6.36 3.89 14.03 20.39 14.03 10.20 4.91 8.16 3.93 6.80 3.27 2.12 9.35 11.47
-9.00 1.50 9.00 C C 8 14.80 50.00 0.55 22.50 9.00 5.65 5.18 19.21 24.86 19.21 12.43 6.72 9.95 5.38 8.29 4.48 1.88 12.81 14.69
-10.50 1.50 10.50 C F 60 39.60 360.00 0.55 26.25 9.00 40.69 37.30 56.52 97.21 56.52 48.61 19.78 38.88 15.82 32.40 13.19 13.56 37.68 51.24
-12.00 1.50 12.00 C F 60 39.60 360.00 0.55 30.00 9.00 40.69 37.30 93.82 134.51 93.82 67.26 32.84 53.81 26.27 44.84 21.89 13.56 62.55 76.11
-13.50 1.50 13.50 C F 38 30.80 237.50 0.55 33.75 9.00 26.85 24.61 118.43 145.28 118.43 72.64 41.45 58.11 33.16 48.43 27.63 8.95 78.95 87.90
-15.00 1.50 15.00 C F 41 32.00 256.25 0.55 37.50 9.00 28.97 26.55 144.98 173.95 144.98 86.97 50.74 69.58 40.59 57.98 33.83 9.66 96.65 106.31

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_BH-6
REKAPITULASI PENGECEKAN DAYA DUKUNG PONDASI TIANG BOR

DIMENSI TIANG f 0.4M


PANJANG 12 m

P IJIN P IJIN P IJIN P IJIN


SF =2 SF =2.5 SF =3 Parsial Safety Factor
TITIK SOIL TEST
Tekan Tarik Tekan Tarik Tekan Tarik SF=3 SF=1.5 Pijin
(Ton) (Ton) (Ton) (Ton) (Ton) (Ton) End Bearing Skin Resistance Tekan (Ton)

BH1 75.05 38.29 60.04 30.63 50.03 25.53 13.56 72.94 86.50

Perhitungan BH2 59.13 35.95 47.30 28.76 39.42 23.97 5.18 68.48 73.66

I berdasarkan BH3 94.50 52.06 75.60 41.65 63.00 34.71 13.42 99.16 112.58

Nilai Su BH4 68.55 33.74 54.84 26.99 45.70 22.50 13.56 64.27 77.84

(LYMON C. REESE& O"NEILL, 1989) BH5 78.27 40.54 62.61 32.43 52.18 27.03 13.56 77.23 90.79

BH6 67.26 32.84 53.81 26.27 44.84 21.89 13.56 62.55 76.11

Rata-rata 73.79 38.90 59.03 31.12 49.20 25.94 86.25

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_Rekap
REKAPITULASI PENGECEKAN DAYA DUKUNG PONDASI TIANG BOR

DIMENSI TIANG f 0.4M


PANJANG 13,5 m

P IJIN P IJIN P IJIN P IJIN


SF =2 SF =2.5 SF =3 Parsial Safety Factor
TITIK SOIL TEST
Tekan Tarik Tekan Tarik Tekan Tarik SF=3 SF=1.5 Pijin
(Ton) (Ton) (Ton) (Ton) (Ton) (Ton) End Bearing Skin Resistance Tekan (Ton)

BH1 93.70 51.35 74.96 41.08 62.47 34.23 13.56 97.81 111.37

Perhitungan BH2 83.86 46.83 67.08 37.46 55.90 31.22 11.30 89.20 100.50

I berdasarkan BH3 96.71 59.54 77.37 47.63 64.47 39.69 7.77 113.41 121.18

Nilai Su BH4 57.68 36.92 46.15 29.53 38.46 24.61 3.30 70.32 73.61

(LYMON C. REESE& O"NEILL, 1989) BH5 82.97 48.93 66.38 39.14 55.31 32.62 8.71 93.20 101.91

BH6 72.64 41.45 58.11 33.16 48.43 27.63 8.95 78.95 87.90

Rata-rata 81.26 47.50 65.01 38.00 54.17 31.67 99.41

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_Rekap
REKAPITULASI PENGECEKAN DAYA DUKUNG PONDASI TIANG BOR

DIMENSI TIANG f 0.4M


PANJANG 15 m

P IJIN P IJIN P IJIN P IJIN


SF =2 SF =2.5 SF =3 Parsial Safety Factor
TITIK SOIL TEST
Tekan Tarik Tekan Tarik Tekan Tarik SF=3 SF=1.5 Pijin
(Ton) (Ton) (Ton) (Ton) (Ton) (Ton) End Bearing Skin Resistance Tekan (Ton)

BH1 98.41 59.73 78.72 47.79 65.60 39.82 8.71 113.78 122.49

Perhitungan BH2 93.98 55.90 75.19 44.72 62.65 37.26 9.42 106.47 115.89

I berdasarkan BH3 99.27 64.30 79.42 51.44 66.18 42.87 4.95 122.47 127.42

Nilai Su BH4 69.66 42.58 55.73 34.07 46.44 28.39 5.89 81.11 87.00

(LYMON C. REESE& O"NEILL, 1989) BH5 96.98 58.00 77.59 46.40 64.66 38.66 9.42 110.47 119.89

BH6 86.97 50.74 69.58 33.16 57.98 33.83 9.66 96.65 106.31

Rata-rata 90.88 55.21 72.70 42.93 60.59 36.81 113.17

Daya Dukung Bored Pile


Binus/Rev.0/19 Deesember 2008
file:///conversion/tmp/activity_task_scratch/635196314.xls_Rekap