TAH
HARI/ UPAH/HARI
NO. TENAGA KERJA UNIT (TANPA PAJAK)
(Rp)
1 Mandor Lapangan 1 141,000.00
2 Mekanik 1 119,000.00
5 Tukang 1 130,000.00
9 Supir 1 119,000.00
12 Pekerja 1 110,000.00
15 Penjaga 1 110,000.00
HARI/ UPAH/HARI
NO. TENAGA KERJA UNIT (TANPA PAJAK)
(Rp)
16 Pemasak Aspal 1 110,000.00
SATUAN /
NO. BAHAN / MATERIAL (TANPA PAJAK)
UNIT
(Rp)
22 Paku Kg 16,225.00
23 Aspal Kg 13000-14000
45 Bataco Kp 1,483.00
53 Triplek
77 Plamir Kg 10,648.00
80 Kaca 3 mm M2 176,000.00
81 Kaca 5 mm M2 198,000.00
Muhammad Kaidi, SE
NIP. 19670408 199403 1 006
DAN HARGA SATUAN MATERIAL/BAHAN
TAHUN 2018
PAJAK ( Rp. )
PPN GALIAN TRANSPORT OVERHEAD JUMLAH HARGA
10 % "C" (Rp/Hari) Th.2018
0.00 0.00 0.00 0.00 141,000.00
Disahkan Oleh :
Ir. Suharli
NIP. 19670606199303 1 003
BAHAN
KET
Naik
Naik
Naik
Naik
Naik
Naik
Naik
Naik
Naik
Naik
Naik
Naik
Naik
Naik
Naik
KET
Naik
Naik
KET
+ Galian C
+ Galian C
+ Galian C
+ Galian C
+ Galian C
+ Galian C
+ Galian C
+ Galian C
+ Galian C
+ Galian C
+ Galian C
+ Galian C
Tetap
KAB
Tetap
KAB
Turun
Turun
KET
KET
KAB
KAB
Naik
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
Naik
KAB
KAB
Naik
KAB
Turun
KAB
Turun
KAB
KET
Turun
Turun
KAB
KAB
KAB
KAB
Turun
KAB
Tetap
Naik
Naik
Naik
Turun
KAB
KAB
Naik
KAB
KAB
KAB
Turun
Turun
Turun
KET
Tetap
KAB
KAB
KAB
Turun
Turun
KAB
KAB
KAB
KAB
Naik
Turun
KET
Turun
KAB
KAB
KAB
KAB
KAB
KAB
KAB
Tetap
Turun
KAB
KAB
KAB
KAB
Turun
Turun
KAB
Turun
KAB
KAB
KAB
KAB
KAB
KET
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
Tetap
Turun
KAB
KAB
Turun
KAB
KAB
KAB
KAB
KAB
Tetap
Naik
KAB
KAB
KAB
KET
KAB
Turun
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
Turun
KAB
KAB
KAB
KET
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
Turun
Turun
Turun
Turun
Turun
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KAB
KET
KAB
KAB
KAB
KAB
KAB
Turun
KAB
KAB
KAB
KAB
KAB
KAB
Naik
KAB
KAB
KAB
KAB
KAB
KAB
KAB
Turun
Turun
Naik
KET
Turun
KAB
Turun
KAB
KAB
KAB
Tetap
Turun
KAB
Naik
Turun
KAB
KAB
Turun
KET
KAB
KAB
KAB
Tetap
Naik
KAB
KAB
KAB
KAB
Tetap
Turun
Naik
Tetap
Turun
Tetap
Naik
Tetap
Turun
Turun
Naik
Naik
Naik
Tetap
KET
PROPINSI : KEPULAUAN BANGKA BELITUNG
KABUPATEN : BANGKA BARAT
ZONA : I KECAMATAN MUNTOK & SIMP.TERITIP
BIDANG : CIPTA KARYA
22 Paku Kg 16,225.00
23 Aspal Kg 13000-14000
a.Standart
b.Premium (Exterior)
45 Bataco Kp 1,483.00
61 Triplek
88 Plamir Kg 10,648.00
91 Kaca 3 mm M2 176,000.00
92 Kaca 5 mm M2 198,000.00
Plt.Kepala
SURVEI HARGA SATUAN MATERIAL/BAHAN
TAHUN 2018 DAN 2019
SIMPANG TERITIP
0.00 280,000.00
50,000.00 65,000.00 - - -
50,000.00 50,000.00 - - -
1,325.00 1,400.00
187,500.00 187,500.00
0.00 2,000,000.00
2,500,000.00 2,500,000.00
10,223.44 12,000.00
0.00
178,500.00 185,300.00
0.00
0.00
0.00
11,500.00 12,300.00
70,000.00 71,100.00
185,000.00 185,000.00
0.00 185,300.00
0.00
0.00
0.00
0.00
0.00 17,100.00
0.00 12,100.00
0.00 15,400.00
0.00 25,300.00
0.00 24,200.00
0.00 330,000.00
0.00 495,000.00
0.00 660,000.00
0.00 1,430,000.00
0.00 220,000.00
0.00 1,650.00
22,166.67 22,166.00
105,000.00 105,000.00
0.00 6,450.00
0.00 313,500.00
0.00 15,950.00
0.00 66,000.00
0.00 66,000.00
0.00
59,333.33 59,500.00
0.00
0.00
70,000.00
0.00 7,700.00
0.00
137,500.00 151,250.00
0.00 132,000.00
0.00 8,800.00
0.00 7,000.00
0.00 23,100.00
0.00 71,500.00
0.00 176,000.00
0.00 198,000.00
0.00 209,000.00
0.00 44,000.00
375,000.00 525,000.00
140,000.00 192,500.00
270,000.00 302,500.00
450,000.00 450,000.00
780,000.00 780,000.00
0.00 1,155,000.00
0.00 1,485,000.00
0.00 280,500.00
0.00 22,000.00
130,000.00 130,000.00
0.00 49,500.00
0.00 132,000.00
0.00 8,800.00
0.00 1,300,000.00
0.00 50,600.00
0.00 15,400,000.00
0.00 24,200.00
0.00 8,800.00
42,500.00 42,500.00
0.00 60,500.00
0.00 77,000.00
0.00 27,500.00
0.00 33,000.00
30,000.00 148,500.00
0.00 82,500.00
0.00 16,500.00
0.00 1,265,000.00
0.00 3,300.00
0.00 7,150.00
0.00 12,100.00
0.00 15,400.00
0.00 2,000,000.00
2,500,000.00 2,500,000.00
0.00 2,000,000.00
0.00 22,000.00
0.00 27,500.00
0.00 495,000.00
0.00 55,000.00
0.00 93,500.00
0.00 220,000.00
0.00 33,000.00
0.00 5,500.00
0.00 6,600,000.00
0.00 3,300,000.00
0.00 44,000.00
0.00 1,980,000.00
0.00 2,420,000.00
0.00 13,200.00
0.00 19,800.00
0.00 825,000.00
0.00 137,500.00
0.00 6,600.00
0.00 13,383.00
0.00 29,300.00
0.00 11,000.00
0.00 11,000.00
0.00 242,000.00 -
55,000.00 59,000.00
59,400.00 65,000.00
0.00 60,000.00
56,500.00 63,000.00
0.00 71,500.00
0.00 110,000.00
0.00 275,000.00
0.00 187,000.00
61,666.67 62,500.00
30,000.00 44,000.00
0.00 12,500.00
0.00 8,250.00
9,000.00 11,000.00
0.00 1,000.00
0.00 60,500.00
0.00 34,375.00
0.00 49,500.00
0.00 148,000.00
0.00 132,500.00
0.00 245,000.00
170,000.00 170,000.00
450,000.00 450,000.00
250,000.00 275,000.00
NOVAROLY,ST
NIP. 197311232005011006
MUNTOK
0.00
50,000.00 - - - 50,000.00
50,000.00 - - - 50,000.00
0.00
0.00
2,500,000.00 2,500,000.00
2,000,000.00 1,850,000.00
0.00
0.00
0.00
0.00
0.00
0.00
70,000.00 70,000.00
185,000.00 185,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120,000.00
0.00
0.00
0.00
130,000.00
0.00
0.00
95,000.00
0.00
0.00
105,000.00
0.00
0.00
0.00
8,000.00 14,000.00
0.00
0.00
0.00
55,000.00 59,000.00
0.00
0.00
55,000.00
70,000.00
0.00
0.00
0.00
7,500.00 7,625.00
25,000.00 26,666.67
0.00
5,500.00
0.00
40,555.56
120,000.00
0.00
0.00
0.00
0.00
0.00
0.00
70,000.00 82,500.00
1,600,000.00 1,700,000.00
140,000.00 180,000.00
630,000.00
140,000.00 140,000.00
270,000.00 270,000.00
450,000.00 450,000.00
780,000.00 780,000.00
0.00
0.00
775,000.00
1,295,000.00
0.00
0.00
130,000.00 130,000.00
0.00
0.00
0.00
75,000.00
0.00
5,416.67
0.00
0.00
0.00
0.00
210,000.00
170,000.00 170,000.00
0.00
0.00
0.00
0.00
30,000.00 30,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,500,000.00 2,500,000.00
0.00
2,000,000.00
30,000.00 32,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
450,000.00 473,333.33
0.00
0.00
0.00
0.00
0.00
130,000.00 185,000.00
0.00
0.00
0.00
30,000.00 30,000.00
0.00
0.00
9,000.00 9,000.00
0.00
0.00
0.00
0.00
7,500.00
75,000.00
0.00
0.00
0.00
170,000.00 170,000.00
450,000.00 450,000.00
250,000.00 250,000.00
-SIMPANG TERITIP
R ALBARA : ……………………………..
UPAH TENAGA KERJA DAN HARGA SATUAN
TAHUN 2019 KECAMATAN M
KETERANGAN
* = Harga toko tidak tersedia, harga mengikuti tahun sebelumnya (2018)
HARI/ UPAH/HARI PAJAK ( Rp. )
NO. TENAGA KERJA UNIT (TANPA PAJAK) PPN GALIAN
(Rp) 10 % "C"
IR.SUHARLI
NIP. 196106061993031003
RGA SATUAN MATERIAL/BAHAN
CAMATAN MUNTOK
JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 150,000.00
0.00 0.00 120,000.00
0.00 0.00 115,000.00
0.00 0.00 150,000.00
0.00 0.00 145,000.00
0.00 0.00 145,000.00
0.00 0.00 130,000.00
0.00 0.00 115,000.00
0.00 0.00 125,000.00
0.00 0.00 125,000.00
0.00 0.00 115,000.00
0.00 0.00 115,000.00
0.00 0.00 115,000.00
0.00 0.00 115,000.00
0.00 0.00 115,000.00
0.00 0.00 115,000.00
0.00 0.00 115,000.00
JUMLAH HARGA
TRANSPORT OVERHEAD TERMASUK PAJAK KETERANGAN
DLL
0.00 0.00 287,532.00
0.00 0.00 287,532.00
0.00 0.00 287,532.00 *
0.00 0.00 487,532.00
0.00 0.00 487,532.00
0.00 0.00 487,532.00
0.00 0.00 487,532.00
0.00 0.00 487,532.00 *
0.00 0.00 75,900.00
0.00 0.00 77,600.00
0.00 0.00 77,600.00
0.00 0.00 61,900.00 On Site
0.00 0.00 1,400.00
0.00 0.00 187,500.00 *
JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 426,666.00 *
0.00 0.00 2,000,000.00
0.00 0.00 2,500,000.00 *
0.00 0.00 2,000,000.00 *
0.00 0.00 12,000.00 *
0.00 0.00 32,666.67
0.00 0.00 53,000.00
0.00 0.00 73,666.67
0.00 0.00 109,166.67
0.00 0.00 0.00
0.00 0.00 178,500.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 12,300.00
0.00 0.00 70,000.00
0.00 0.00 185,000.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 26,000.00
0.00 0.00 18,500.00
0.00 0.00 17,100.00 *
0.00 0.00 12,100.00
0.00 0.00 15,400.00 *
0.00 0.00 25,300.00 *
0.00 0.00 24,200.00 *
0.00 0.00 30,000.00
0.00 0.00 330,000.00 *
0.00 0.00 495,000.00 *
0.00 0.00 660,000.00 *
0.00 0.00 935,000.00 *
0.00 0.00 1,430,000.00 *
0.00 0.00 220,000.00 *
0.00 0.00 18,100.00
0.00 0.00 95,000.00
0.00 0.00 1,650.00 *
0.00 0.00 1,640.00
0.00 0.00 22,166.00
0.00 0.00 6,450.00 *
0.00 0.00 313,500.00 *
0.00 0.00 65,625.00 *
0.00 0.00 15,950.00 *
0.00 0.00 17,000.00
JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 1,600.00
0.00 0.00 52,250.00
0.00 0.00 66,000.00 *
0.00 0.00 66,000.00 *
0.00 0.00 59,000.00
0.00 0.00 59,500.00
0.00 0.00 7,700.00 *
0.00 0.00 26,200.00
Disiapkan oleh
Plt.Kepala Dinas Perumahan,Kawasan Permukiman
Dan Perhubungan
Kabupaten Bangka Barat
HERWANDA,ST.M.Eng
NIP. 197610212002121004
STANDAR NASIONA
DAFTAR ANALISA HA
DINAS PEKERJAAN UMUM
TAHUN AN
( 1 ) PEKERJAAN PERS
1 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER
6,1,1 Bahan
1.25 btg Dolken Ø 8-10 Cm
2.5 kg Semen (PC)
0.005 m3 Pasir Beton/Pasangan
0.009 m3 Batu Pecah 2/3 cm
0.072 m3 Kayu Kelas IV
0.06 kg Paku
0.4 ltr Teer
Upah :
0.2 Oh Tukang
0.4 Oh Pekerja
0.02 Oh Kepala Tukang
0.02 Oh Mandor Lapangan
2 PAGAR SEMENTARA/ SENG GELOMBANG TINGGI 2 METER
6,2,1 Bahan
1.25 btg Dolken Ø 8-10 Cm
2.5 kg Semen (PC)
1.2 lbr Seng Gelombang
0.005 m3 Pasir Beton/Pasangan
0.009 m3 Batu Pecah 2/3 cm
0.072 m3 Kayu Kelas IV
0.06 kg Paku
0.45 kg Cat Meni Besi/kayu
Upah :
0.2 Oh Tukang
0.4 Oh Pekerja
0.02 Oh Kepala Tukang
0.02 Oh Mandor Lapangan
3 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1.8 m
6,3,1 Bahan
1 bt Dolken Ø 8-10 Cm
2 kg Semen (PC)
25 kg Kawat duri
0.005 m3 Pasir Beton/Pasangan
0.009 m3 Batu Pecah 2/3 cm
0.06 kg Paku
Upah :
0.2 Oh Tukang
0.3 Oh Pekerja
0.02 Oh Kepala Tukang
0.02 Oh Mandor Lapangan
4 PENGUKURAN DAN PEMASANGAN BOWPLANK
6,4,1 Bahan
0.012 m3 Kayu Kelas IV
0.02 kg Paku
0.007 m3 Kayu Kelas IV
Upah :
0.1 Oh Tukang
0.1 Oh Pekerja
0.01 Oh Kepala Tukang
0.005 Oh Mandor Lapangan
5 PEMBUATAN KANTOR SEMENTARA/DIREKSI KEET/Lt. plesteran
6,5,1 Bahan
1.25 bt Dolken Ø 8-10 Cm
0.18 m3 Kayu Kelas IV
0.85 kg Paku
1.1 kg Besi Strip
35 Kg Semen (PC)
0.15 m3 Pasir Beton/Pasangan
0.1 m3 Pasir Beton/Pasangan
0.15 m3 Batu Pecah 0,5 + 1 cm
30 Bh Batu Bata Kecil
0.25 Lbr Seng Plat
2 Bh Kaca nako reyben 5 mm (lengkap)
0.08 M2 Kaca 3 mm
0.15 Bh Kunci tanam 1 x putar
0.06 Lbr Teakwood
Upah :
2 Oh Tukang
1 Oh Tukang
2 Oh Pekerja
0.3 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
6 PEMBUATAN GUDANG SEMEN DAN ALAT2
6,6,1 Bahan
1.7 bt Dolken Ø 8-10 Cm
0.21 m3 Kayu Kelas IV
0.3 Kg Paku
10.5 Kg Semen (PC)
0.03 m3 Pasir Beton/Pasangan
0.05 m3 Batu Pecah 2/3 cm
1.5 lbr Seng Gelombang
0.3 kg Paku 2-5"
Upah :
2 Oh Tukang
1 Oh Pekerja
0.2 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
7 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
6,7,1 Bahan
3 bt Dolken Ø 8-10 Cm
0.276 m3 Kayu Kelas IV
1.5 lbr Seng Gelombang
0.7 kg Paku
Upah :
1.5 Oh Tukang
1 Oh Pekerja
0.15 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
8 PEKERJAAN PEMBERSIHAN LAPANGAN DAN PEMERATAAN
6,8,1 Bahan -
Upah :
0.1 Hr Pekerja
0.05 Hr Mandor Lapangan
9 PEMBUATAN BEDENG BURUH
6,9,1 Bahan
1.25 bt Dolken Ø 8-10 Cm
18 kg Semen (PC)
0.186 m3 Kayu Kelas IV
0.03 m3 Pasir Beton/Pasangan
0.05 m3 Batu Pecah 2/3 cm
1.35 lbr - Triplek Uk. 4,0 mm
1.5 lbr Seng Gelombang
0.3 kg Paku
Upah :
2 Oh Tukang
1 Oh Pekerja
0.2 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
10 PEMBUATAN BAK ADUKAN ( 40 X 50 X 20 )
6,10,1 Bahan
0.036 m3 Kayu Kelas IV
0.08 Btng Kayu Papan Kelas II
1 kg Paku
Upah :
0.3 Oh Tukang
0.0015 Oh Mandor Lapangan
11 PEMBUATAN STEGGER BAMBU/40 X 50 X 20
6,11,1 Bahan
1 BT Bambu 6-8/600cm
0.25 kg Tali ijuk
Upah :
0.017 Oh Tukang
0.002 Oh Pekerja
0.25 Oh Kepala Tukang
0.013 Oh Mandor Lapangan
12 PEMBUATAN JALAN SEMENTARA
6,12,1 Bahan
0.15 m3 Batu Belah / Batu Gunung
0.09 m3 Batu Pecah 5/7 cm
0.01 m3 Pasir Beton/Pasangan
Upah :
1 Oh Tukang
0.05 Oh Mandor Lapangan
13 PEMBERSIHAN LAPANGAN DAN PERATAAN
6,13,1 Upah :
0.100 Oh Pekerja
0.050 Oh Mandor Lapangan
14 BONGKARAN BETON BERTULANG
6,14,1
Upah
6.667 Oh Pekerja
0.333 Oh Mandor Lapangan
15 BONGKARAN DINDING TEMBOK BATA MERAH
6,15,1
Upah
6.667 Oh Pekerja
0.333 Oh Mandor Lapangan
16 BONGKAR GENTING BUBUNGAN
6,16,1 Bahan -
Upah
0.04 Oh Pekerja
17 BONGKAR ATAP
6,17,1 Bahan -
Upah
0.025 Oh Tukang
0.0025 Oh Pekerja
0.1 Oh Kepala Tukang
0.005 Oh Mandor Lapangan
18 MENURUNKAN GENTENG
6,18,1 Bahan -
Upah
0.02 Oh Pekerja
0.001 Oh Mandor Lapangan
19 BONGKAR PLAFON HANGER
6,19,1 Bahan -
Upah
0.5 Oh Pekerja
20 BONGKAR KUDA-KUDA
6,20,1 Bahan -
Upah
6 Oh Tukang
0.6 Oh Pekerja
4 Oh Kepala Tukang
0.2 Oh Mandor Lapangan
21 MENGUPAS PLESTERAN
6,21,1 Bahan -
Upah
0.05 Oh Pekerja
0.0025 Oh Mandor Lapangan
22 BONGKAR DINDING TEMBOK
6,22,1 Bahan -
Upah
2 Oh Pekerja
0.1 Oh Mandor Lapangan
23 BONGKAR LANTAI
6,23,1 Bahan -
Upah
0.2 Oh Pekerja
0.01 Oh Mandor Lapangan
24 BONGKAR PONDASI
6,24,1 Bahan -
Upah
4 Oh Pekerja
0.4 Oh Mandor Lapangan
25 MENGUPAS BIDANG CAT
6,25,1 Bahan -
Upah
0.04 Oh Pekerja
( 2 ) PEKE
1 GALIAN TANAH BIASA SEDALAM 1 M
6,1,2 Bahan -
Upah :
0.4 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.04 Oh Mandor Lapangan
2 GALIAN TANAH BIASA SEDALAM 2 M
6,2,2 Bahan -
Upah :
0.526 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.052 Oh Mandor Lapangan
3 BOR STRUSS
6,3,2 Bahan -
Upah :
1.23 Oh Pekerja
0 Oh Tukang
0.05 Oh Kepala Tukang
0.073 Oh Mandor Lapangan
4 GALIAN TANAH KERAS SEDALAM 1 M
6,4,2 Bahan -
Upah :
0.625 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.062 Oh Mandor Lapangan
5 GALIAN TANAH LUMPUR SEDALAM 1 M
6,5,2 Bahan -
Upah :
0.823 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.083 Oh Mandor Lapangan
6 PEKERJAAN STRIPPING SETINGGI 1 M
6,6,2 Bahan -
Upah :
0.05 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.005 Oh Mandor Lapangan
7 PEMBUANGAN TANAH SEJAUH 150 M
6,7,2 Bahan -
Upah :
0.516 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
8 URUGAN KEMBALI
6,8,2 Bahan -
Upah :
0.192 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.019 Oh Mandor Lapangan
9 PEKERJAAN PEMADATAN TANAH
6,9,2 Bahan -
Upah :
0.5 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
10 URUGAN PASIR
6,10,2 Bahan
1.2 M3 Pasir Urug
Upah :
0.3 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.01 Oh Mandor Lapangan
15 URUGAN SIRTU
6,15,2 Bahan
1.2 M3 Sirtu
Upah :
0.25 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.025 Oh Mandor Lapangan
16 URUGAN TANAH GUNUNG/MERAH
6,16,2 Bahan
1.2 m3 Tanah Puru
Upah :
0.3 Oh Pekerja
0.004 Oh Tukang
0.042 Oh Kepala Tukang
0.01 Oh Mandor Lapangan
( 3 ) PEKER
5 PONDASI BATU KALI 1 PC : 4 PS
6,5,3 Bahan
1.1 m3 Batu Belah / Batu Gunung
163 kg Semen (PC)
0.52 m3 Pasir Beton/Pasangan
Upah :
1.5 Oh Pekerja
0.6 Oh Tukang
0.06 Oh Kepala Tukang
0.075 Oh Mandor Lapangan
6 PONDASI BATU KALI 1 PC : 5 PS
6,6,3 Bahan
1.1 m3 Batu Belah / Batu Gunung
136 kg Semen (PC)
0.544 m3 Pasir Beton/Pasangan
Upah :
1.5 Oh Pekerja
0.6 Oh Tukang
0.06 Oh Kepala Tukang
0.075 Oh Mandor Lapangan
14 PONDASI BATU KOSONG/ ANSTAMPENG
6,14,3 Bahan
1.2 m3 Batu Belah / Batu Gunung
0.3 m3 Pasir Urug
Upah :
0.78 Oh Pekerja
0.39 Oh Tukang
0.039 Oh Kepala Tukang
0.039 Oh Mandor Lapangan
15 PONDASI SIKLOP 40% BATU KALI
6,15,3 Bahan
75 kg Besi Beton
202 kg Semen (PC)
0.8 kg Kawat Beton
0.49 m3 Batu Pecah 2/3 cm
0.32 m3 Pasir Beton/Pasangan
Upah :
3 Oh Pekerja
0.85 Oh Tukang
0.085 Oh Kepala Tukang
0.15 Oh Mandor Lapangan
16 PONDASI SUMURAN/ D : 100 CM
6,16,3 Bahan
0.45 m3 Batu Belah / Batu Gunung
280 kg Semen (PC)
0.67 m3 Batu Pecah 2/3 cm
0.45 m3 Pasir Beton/Pasangan
Upah :
2.38 Oh Pekerja
0.3 Oh Tukang
0.03 Oh Kepala Tukang
0.08 Oh Mandor Lapangan
17 PEMBUATAN TIANG PANCANG/40 X 40/ BETON BERTULANG
6,17,3 Bahan
0.019 m3 Pasir Urug
0.094 m3 Pasir Beton/Pasangan
0.15 m3 Batu Pecah 2/3 cm
60 kg Semen (PC)
45 kg Besi Beton
ANDAR NASIONAL INDONESIA (S N I )
AR ANALISA HARGA UPAH DAN BAHAN
ERJAAN UMUM KABUPATEN BANGKA BARAT
TAHUN ANGGARAN 2019
PEKERJAAN PERSIAPAN
1m' Harga upah+Bahan Jumlah Rp 270,011
@ Rp 7,500 Rp 9,375
@ Rp 1,400 Rp 3,500
@ Rp 77,600 Rp 388
@ Rp 487,532 Rp 4,388
Usuk 5/7 @ Rp 2,000,000 Rp 144,000
2-5" @ Rp 18,500 Rp 1,110
Residu @ Rp 65,625 Rp 26,250 Rp 189,011
@ Rp 7,500 Rp 9,375
@ Rp 1,400 Rp 3,500
@ Rp 76,250 Rp 91,500
@ Rp 77,600 Rp 388
@ Rp 487,532 Rp 4,388
Usuk 5/7 @ Rp 2,000,000 Rp 144,000
2-5" @ Rp 18,500 Rp 1,110
@ Rp 37,500 Rp 16,875 Rp 271,136
@ Rp 7,500 Rp 7,500
@ Rp 1,400 Rp 2,800
@ Rp 16,500 Rp 412,500
@ Rp 77,600 Rp 388
@ Rp 487,532 Rp 4,388
2-5" @ Rp 18,500 Rp 1,110 Rp 428,686
@ Rp 7,500 Rp 9,375
@ Rp 2,000,000 Rp 360,000
2-5" @ Rp 18,500 Rp 15,725
@ Rp 27,500 Rp 30,250
@ Rp 1,400 Rp 49,000
@ Rp 77,600 Rp 11,640
@ Rp 77,600 Rp 7,760
Koral beton @ Rp 487,532 Rp 73,130
@ Rp 1,650 Rp 49,500
@ Rp 49,500 Rp 12,375
@ Rp 44,000 Rp 88,000
@ Rp 176,000 Rp 14,080
@ Rp 120,000 Rp 18,000
@ Rp 132,000 Rp 7,920 Rp 746,755
@ Rp 7,500 Rp 12,750
@ Rp 2,000,000 Rp 420,000
2-5" @ Rp 18,500 Rp 5,550
@ Rp 1,400 Rp 14,700
@ Rp 77,600 Rp 2,328
@ Rp 487,532 Rp 24,377
@ Rp 76,250 Rp 114,375 Rp 594,080
@ Rp -
@ Rp 7,500 Rp 22,500
Usuk 5/7 @ Rp 2,000,000 Rp 552,000
@ Rp 76,250 Rp 114,375
2-5" @ Rp 18,500 Rp 12,950 Rp 701,825
@ Rp 115,000 Rp 11,500
@ Rp 150,000 Rp 7,500 Rp 19,000
1m2 Rp 1,101,005
@ Rp 7,500 Rp 9,375
@ Rp 1,400 Rp 25,200
Usuk 5/7 @ Rp 2,000,000 Rp 372,000
@ Rp 77,600 Rp 2,328
@ Rp 487,532 Rp 24,377
@ Rp 78,000 Rp 105,300
@ Rp 76,250 Rp 114,375
2-5" @ Rp 18,500 Rp 5,550 Rp 658,505
@ Rp 22,000 Rp 22,000
@ Rp 27,500 Rp 6,875 Rp 28,875
@ Rp 287,532 Rp 43,130
@ Rp 487,532 Rp 43,878
@ Rp 77,600 Rp 776 Rp 87,784
@ Rp 145,000 Rp 145,000
@ Rp 150,000 Rp 7,500 Rp 152,500
1m2 Rp 19,000
@ Rp 115,000 Rp 11,500
@ Rp 150,000 Rp 7,500 Rp 19,000
1m3 Rp 816,655
@ Rp 115,000 Rp 766,705
@ Rp 150,000 Rp 49,950 Rp 816,655
1m3 Rp 816,655
@ Rp 115,000 Rp 766,705
@ Rp 150,000 Rp 49,950 Rp 816,655
1m' Rp 4,600
@ Rp 115,000 Rp 2,300
@ Rp 150,000 Rp 150 Rp 2,450
1m' Rp 57,500
@ Rp 115,000 Rp 5,750
@ Rp 150,000 Rp 375 Rp 6,125
1m3 Rp 245,000
@ Rp 115,000 Rp 230,000
@ Rp 150,000 Rp 15,000 Rp 245,000
1m2 Rp 24,500
@ Rp 115,000 Rp 23,000
@ Rp 150,000 Rp 1,500 Rp 24,500
1m2 Rp 520,000
@ Rp 115,000 Rp 460,000
@ Rp 150,000 Rp 60,000 Rp 520,000
1m2 Rp 4,600
@ Rp 115,000 Rp 46,000
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 6,000 Rp 52,000
1m3 Rp 68,290
@ Rp 115,000 Rp 60,490
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 7,800 Rp 68,290
1m' Rp 159,900
@ Rp 115,000 Rp 141,450
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp 7,500
@ Rp 150,000 Rp 10,950 Rp 159,900
1m3 Rp 81,175
@ Rp 115,000 Rp 71,875
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 9,300 Rp 81,175
1m3 Rp 107,095
@ Rp 115,000 Rp 94,645
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 12,450 Rp 107,095
1m2 Rp 6,500
@ Rp 115,000 Rp 5,750
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 750 Rp 6,500
1m3 Rp 66,840
@ Rp 115,000 Rp 59,340
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 7,500 Rp 66,840
1m3 Rp 24,930
@ Rp 115,000 Rp 22,080
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 2,850 Rp 24,930
1m3 Rp 65,000
@ Rp 115,000 Rp 57,500
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 7,500 Rp 65,000
1m3 Rp 127,080
@ Rp 115,000 Rp 34,500
Gali @ Rp 145,000 Rp -
Gali @ Rp 150,000 Rp -
@ Rp 150,000 Rp 1,500 Rp 36,000
1m3 Rp 144,700
@ Rp 115,000 Rp 28,750
@ Rp 145,000 Rp -
@ Rp 150,000 Rp -
@ Rp 150,000 Rp 3,750 Rp 32,500
1m3 Rp 117,160
@ Rp 115,000 Rp 34,500
Gali @ Rp 145,000 Rp 580
Gali @ Rp 150,000 Rp 6,300
@ Rp 150,000 Rp 1,500 Rp 42,880
( 3 ) PEKERJAAN PONDASI
1m3 Rp 864,587
@ Rp 287,532 Rp 316,285
@ Rp 1,400 Rp 228,200
@ Rp 77,600 Rp 40,352 Rp 584,837
@ Rp 115,000 Rp 172,500
@ Rp 145,000 Rp 87,000
@ Rp 150,000 Rp 9,000
@ Rp 150,000 Rp 11,250 Rp 279,750
1m3 Rp 828,650
@ Rp 287,532 Rp 316,285
@ Rp 1,400 Rp 190,400
@ Rp 77,600 Rp 42,214 Rp 548,900
@ Rp 115,000 Rp 172,500
@ Rp 145,000 Rp 87,000
@ Rp 150,000 Rp 9,000
@ Rp 150,000 Rp 11,250 Rp 279,750
1m3 Rp 525,758
@ Rp 287,532 Rp 345,038
@ Rp 75,900 Rp 22,770 Rp 367,808
@ Rp 115,000 Rp 89,700
@ Rp 145,000 Rp 56,550
@ Rp 150,000 Rp 5,850
@ Rp 150,000 Rp 5,850 Rp 157,950
1m3 Rp 1,970,823
@ Rp 12,000 Rp 900,000
@ Rp 1,400 Rp 282,800
@ Rp 26,000 Rp 20,800
@ Rp 487,532 Rp 238,891
@ Rp 77,600 Rp 24,832 Rp 1,467,323
@ Rp 115,000 Rp 345,000
@ Rp 145,000 Rp 123,250
@ Rp 150,000 Rp 12,750
@ Rp 150,000 Rp 22,500 Rp 503,500
1m3 Rp 1,216,656
@ Rp 287,532 Rp 129,389
@ Rp 1,400 Rp 392,000
@ Rp 487,532 Rp 326,646
@ Rp 77,600 Rp 34,920 Rp 882,956
@ Rp 115,000 Rp 273,700
@ Rp 145,000 Rp 43,500
@ Rp 150,000 Rp 4,500
@ Rp 150,000 Rp 12,000 Rp 333,700
1m3 Rp 1,029,251
@ Rp 75,900 Rp 1,442
@ Rp 77,600 Rp 7,294
@ Rp 487,532 Rp 73,130
@ Rp 1,400 Rp 84,000
@ Rp 12,000 Rp 540,000
)
AN
A BARAT
Overhead 10%
Rp 297,012
Rp 387,349
Rp 548,004
Rp 73,282
Rp 1,610,680
Rp 1,140,238
Rp 1,191,658
Rp 20,900
Rp 1,211,105
Rp 367,648
Rp 78,122
Rp 264,312
Rp 20,900
Rp 898,321
Rp 898,321
Rp 5,060
Rp 20,804
Rp 2,695
Rp 63,250
Rp 1,725,900
Rp 6,738
Rp 269,500
Rp 26,950
Rp 572,000
Rp 5,060
Rp 57,200
Rp 75,119
Rp 175,890
Rp 89,293
Rp 117,805
Rp 7,150
Rp 73,524
Rp 27,423
Rp 71,500
Rp 139,788
Rp 159,170
Rp 128,876
Rp 951,046
Rp 911,515
Rp 578,334
Rp 2,167,905
Rp 1,338,321
Rp 1,132,176
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG
Harga
Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0,081
Tukang pipa L.02 OH 0,041
Mandor L.04 OH 0,008
A TENAGA
Pekerja L.01 OH 0,094
Tukang pipa L.02 OH 0,047
Mandor L.04 OH 0,009
D Jumlah (A+B+C)
E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0,105
Tukang pipa L.02 OH 0,053
Mandor L.04 OH 0,011
D Jumlah (A+B+C)
E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.118
Tukang pipa L.02 OH 0.059
Mandor L.04 OH 0.012
D Jumlah (A+B+C)
E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.189
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.019
D Jumlah (A+B+C)
E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.256
Tukang pipa L.02 OH 0.128
Mandor L.04 OH 0.026
D Jumlah (A+B+C)
E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
UAR GEDUNG
Jumlah
Harga
(Rp)
Jumlah
Harga
(Rp)
Jumlah
Harga
(Rp)
Jumlah
Harga
(Rp)
10
Jumlah
Harga
(Rp)
Jumlah
Harga
(Rp)
Harga
Satuan
No Uraian Satuan JUMLAH (Rp)
A ALAT PENGADAAN K3
RAMBU/BENDERA
PAPAN PROYEK Bh 1 150,000.00
BENDERA/RAMBU UTAMAKAN KESEHATAN DAN
KESELAMATAN KERJA Bh 2 150,000.00
RAMBU PERINGATAN "HATI HATI ADA PEKERJAAN Bh 2 150,000.00
GALIAN"
B PERALATAN KESEHATAN
KOTAK P3K DAN ISI Unit 1 150,000.00
APART CO2 Unit 1 700,000.00
C ALAT PELINDUNG DIRI
SARUNG TANGAN LAS Unit 1 150,000.00
MASKER PENUTUP MULUT (50 Pcs) Pcs 3 50,000.00
SAFETY SHOES (KARET) Bh 10 70,000.00
SAFETY SHOES (Kings) Bh 3 400,000.00
Jumlah
Harga Jumlah
Satuan Harga
(Rp) (Rp)
150,000.00 150,000.00
150,000.00 300,000.00
150,000.00
300,000.00
150,000.00 150,000.00
700,000.00 700,000.00
150,000.00 150,000.00
50,000.00 150,000.00
70,000.00 700,000.00
400,000.00 1,200,000.00 850,000.00 17.00
TERBILANG : SATU MILYAR ENAM RATUS ENAM PULUH DELAPAN JUTA TIGA RATUS EMPAT PULUH SATU RIBU RUPIAH
9 PEKERJAAN PEMADATAN TANAH 1m3
6,9,2 Bahan -
Upah :
0.03 Oh Pekerja @ Rp 115,000
0 Oh Tukang Gali @ Rp 145,000
0 Oh Kepala Tukang Gali @ Rp 150,000
8 URUGAN KEMBALI 1m3
6,8,2 Bahan -
Upah :
0.192 Oh Pekerja @ Rp 115,000
0 Oh Tukang Gali @ Rp 145,000
0 Oh Kepala Tukang Gali @ Rp 150,000
0.019 Oh Mandor Lapangan @ Rp 150,000
Rp 3,450 Rp 3,795 Rp 1,265
Rp 3,450
Rp -
Rp - Rp 3,450
Rp 24,930 Rp 27,423
Rp 22,080
Rp -
Rp -
Rp 2,850 Rp 24,930
Rp 31,218
HARGA PAKET SAMBUNGAN RUMAH
A TENAGA
Pekerja L.01 OH
Tukang Pipa L.02 OH
Mandor L.04 OH
D Jumlah
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Clamp Sadle Dia 90 mm x 1/2 " 1
Socket Dia 1/2" 1
Pipa Galvanis Dia 1/2" 2
Knie PE Dia 1/2" 3
Foucet Elbow PE Dia 1/2" 3
Fix Coupling Kuningan Dia 1/2" 2
Water Mater Dia 1/2" 1
Gate Valve Kuningan Dia 1/2" 1
Double Naple Kuningan Dia 1/2" 1
Tee PE Dia 1/2" 1
Stop Kran Dia 1/2" 1
PIPA HDPE Dia 1/2" 5
Box Penutup Plastik Water Meter 1
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10%)
F Harga Satuan Pekerjaan (D+E)
NGAN RUMAH
Bh 59,500.00 59,500.00
Bh 10,000.00 10,000.00
M 45,233.33 90,466.67
Bh 15,000.00 45,000.00
Bh 10,350.00 31,050.00
Bh 25,000.00 50,000.00
Bh 297,000.00 297,000.00
Bh 39,850.00 39,850.00
Bh 20,000.00 20,000.00
Bh 22,200.00 22,200.00
Bh 36,900.00 36,900.00
M 10,257.50 51,287.50
Bh 52,200.00 52,200.00
JUMLAH TENAGA KERJA 805,454.17
805,454.17
10% x D (maksimum) 80,545.42
885,999.58
UPAH
PIPA G
MEDIUM SNI DRAT
NO INCH DIAMETER SAT
HARGA SATUAN (HS)
1 1/2 " 20 44,833.33 M'
2 3" 90 298,166.67 M'
3 6" 160 691,666.67 M'
PIPA
S-10
NO INCH DIAMETER SAT
HARGA SATUAN (HS)
1 1/2 " 20 8,125.00 M'
UPAH TENAGA KERJA DAN HARGA SATUAN MATERIAL/BAHAN
TAHUN 2019 KECAMATAN MUNTOK
PIPA GALVANIS
KAPASITY 1 FUSO HARGA PENGIRIMAN
SAT
BATANG HP/ M1
10,000 Btg 400.00
450 Btg 8,888.89
175 Btg 22,857.14
PIPA HDPE
KAPASITY 1 FUSO HARGA PENGIRIMAN
SAT
BATANG HP/ M1
200 ROL 1,200.00
A SATUAN MATERIAL/BAHAN
MATAN MUNTOK
S-10
NO INCH DIAMETER SAT
HARGA SATUAN (HS)
1 1/2 " 20 4,790.00 M'
2 3/4 " 25 7,208.33 M'
3 1" 32 10,508.33 M'
4 1 1/4 " 40 15,366.67 M'
5 1 1/2 " 50 23,886.67 M'
6 2" 63 37,363.33 M'
7 3" 90 75,896.67 M'
8 4" 110 114,048.33 M'
9 6" 160 241,503.33 M'
10 8" 200 394,850.00 M'
11 10 " 250 613,125.00 M'
12 12 " 315 977,400.00 M'
S-12
NO INCH DIAMETER SAT
HARGA SATUAN (HS)
1 1/2 " 20 0.00 M'
2 3/4 " 25 0.00 M'
3 1" 32 0.00 M'
4 1 1/4 " 40 0.00 M'
5 1 1/2 " 50 20,415.00 M'
6 2" 63 30,395.00 M'
7 3" 90 63,066.67 M'
8 4" 110 91,938.33 M'
9 6" 160 196,973.33 M'
10 8" 200 320,825.00 M'
11 10 " 250 508,650.00 M'
12 12 " 315 800,325.00 M'
HARGA AKSESORIS
JENIS AKSESORIS SAT
1 TEE 3″ 90 M'
4" Ke 3" 110,90,110 M'
TEE REDUCER
2 6″ Ke 3" 160, 90,160 M'
3″ 90 M'
ELBOW 90
3 6″ 160 M'
4″ Ke 3" 110 Ke 3 M'
REDUCER
4 6″ Ke 3" 160, 90 M'
3″ 90 M'
DOP
5 6″ 160 M'
3″ 90 M'
Stub End +Flange Galvanis
6 6″ 160 M'
UPAH TENAGA KERJA DAN HARGA SATUAN MATERIAL/BAHAN
TAHUN 2019 KECAMATAN MUNTOK
PIPA UPVC
KAPASITY 1 FUSO HARGA PENGIRIMAN TOTAL HARGA (TH)
SAT
BATANG HP/ M1 HS+HP
10,000 Btg 400.00 5,190.00
7,000 Btg 571.43 7,779.76
4,800 Btg 833.33 11,341.67
3,500 Btg 1,142.86 16,509.52
1,700 Btg 2,352.94 26,239.61
1,000 Btg 4,000.00 41,363.33
450 Btg 8,888.89 84,785.56
350 Btg 11,428.57 125,476.90
175 Btg 22,857.14 264,360.48
115 Btg 34,782.61 429,632.61
75 Btg 53,333.33 666,458.33
45 Btg 88,888.89 1,066,288.89
PIPA UPVC
KAPASITY 1 FUSO HARGA PENGIRIMAN TOTAL HARGA
SAT
BATANG HP HS+HP
10,000 Btg - -
7,000 Btg - -
4,800 Btg - -
3,500 Btg - -
1,700 Btg 2,352.94 22,767.94
1,000 Btg 4,000.00 34,395.00
450 Btg 8,888.89 71,955.56
350 Btg 11,428.57 103,366.90
175 Btg 22,857.14 219,830.48
115 Btg 34,782.61 355,607.61
75 Btg 53,333.33 561,983.33
45 Btg 88,888.89 889,213.89
HARGA AKSESORIS
TOTAL HARGA (TH) PPN 10%+ TH
226,633.33 249,296.67
282,865.00 311,151.50
887,676.67 976,444.33
149,143.33 164,057.67
669,743.33 736,717.67
126,740.00 139,414.00
305,590.00 336,149.00
72,455.00 79,700.50
216,950.00 238,645.00
762,210.00 838,431.00
1,764,453.33 1,940,898.67
AN MATERIAL/BAHAN
MUNTOK
A TENAGA
Pekerja L.01 OH 0,054 115,000.00
Tukang batu L.02 OH 0,09 145,000.00
Kepala tukang L.03 OH 0,009 150,000.00
Mandor L.04 OH 0,027 150,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1/2” M 1,20 45,233.33
Perlengkapan % 35,00 15,831.67
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0,054 115,000.00
Tukang batu L.02 OH 0,09 145,000.00
Kepala tukang L.03 OH 0,009 150,000.00
Mandor L.04 OH 0,027 150,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 90” M 1,20 307,055.56
Perlengkapan % 35,00 107,469.44
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 90"
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0,054 115,000.00
Tukang batu L.02 OH 0,09 145,000.00
Kepala tukang L.03 OH 0,009 150,000.00
Mandor L.04 OH 0,027 150,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 160” M 1,20 714,523.81
Perlengkapan % 35,00 250,083.33
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
6,210.00
#VALUE!
1,350,000.00
4,050,000.00
24,660.00
54,280.00
15,831.67 0.35
70,111.67
94,771.67
9,477.17
104,248.83
Jumlah
Harga
(Rp)
6,210.00
#VALUE!
1,350,000.00
4,050,000.00
24,660.00
368,466.67
107,469.44
475,936.11
500,596.11
50,059.61
550,655.72
Jumlah
Harga
(Rp)
6,210.00
#VALUE!
1,350,000.00
4,050,000.00
24,660.00
857,428.57
250,083.33
1,107,511.90
1,132,171.90
113,217.19
1,245,389.10
ANALISA DIHIT
A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC Ø 90 mm
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0,094 115,000.00
Tukang pipa L.02 OH 0,047 145,000.00
Mandor L.04 OH 0,009 150,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 90 mm m Rp 1.00 93,264.11
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari
D Jumlah (A+B+C)
E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0,105 115,000.00
Tukang pipa L.02 OH 0,053 145,000.00
Mandor L.04 OH 0,011 150,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 110 mm m 1.00 138,024.60
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
hari 0,010
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.12 115,000.00
Tukang pipa L.02 OH 0.06 145,000.00
Mandor L.04 OH 0.01 150,000.00
B BAHAN
Pipa PVC Ø 160 mm m 1.00 290,796.52
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
hari 0,010
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
Satuan Harga
(Rp) (Rp)
115,000.00 10,810.00
145,000.00 6,815,000.00
150,000.00 1,350,000.00
18,975.00
93,264.11 93,264.11
93,264.11
112,239.11
11,223.91
123,463.02
Harga Jumlah
Satuan Harga
(Rp) (Rp)
115,000.00 12,075.00
145,000.00 7,685,000.00
150,000.00 1,650,000.00
21,410.00
138,024.60 138,024.60
138,024.60
159,434.60
15,943.46
175,378.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
115,000.00 13,570.00
145,000.00 8,555.00
150,000.00 1,800.00
23,925.00
290,796.52 290,796.52
290,796.52
314,721.52
31,472.15
346,193.68
A.8.4.3.16 (K3) Pemasangan 1 buah Tee Ø 90 mm
A TENAGA
Pekerja L.01 OH 0.11
Tukang pipa L.02 OH 0.05
Mandor L.04 OH 0.01
A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011
A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011
A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011
0.02
1 575,703.33 575,703.33
JUMLAH HARGA BAHAN 575,703.33
0.019
0.01
1 327,580.00 327,580.00
JUMLAH HARGA BAHAN 327,580.00
0.019
1 1,007,398.33 1,007,398.33
JUMLAH HARGA BAHAN 1,007,398.33
0.019
A TENAGA
Pekerja L.01 OH 0.11
Tukang pipa L.02 OH 0.05
Mandor L.04 OH 0.01
A TENAGA
Pekerja L.01 OH 0.11
Tukang pipa L.02 OH 0.05
Mandor L.04 OH 0.01
115,000.00 12,190.00
145,000.00 7,685.00
150,000.00 1,650.00
21,525.00
169,785.00 169,785.00
H HARGA BAHAN 169,785.00
AH HARGA ALAT
191,310.00
(maksimum) 19,131.00
210,441.00
bow 90° Ø 90 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
115,000.00 12,190.00
145,000.00 7,685.00
150,000.00 1,650.00
21,525.00
762,776.67 762,776.67
H HARGA BAHAN 762,776.67
AH HARGA ALAT
784,301.67
(maksimum) 78,430.17
862,731.83
A.8.4.3.16 (K3) Pemasangan 1 buah Reducer Ø 110 Ke 90 mm
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
12,190.00
7,685.00
1,650.00
21,525.00
144,393.33
144,393.33
165,918.33
16,591.83
182,510.17
mm
Jumlah
Harga
(Rp)
12,190.00
7,685.00
1,650.00
21,525.00
349,396.67
349,396.67
370,921.67
37,092.17
408,013.83
A.8.4.3.16 (K3) Pemasangan 1 buah Dop 90 mm
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
12,190.00
7,685.00
1,650.00
21,525.00
83,545.00
83,545.00
105,070.00
10,507.00
115,577.00
Jumlah
Harga
(Rp)
12,190.00
7,685.00
1,650.00
21,525.00
250,085.00
250,085.00
271,610.00
27,161.00
298,771.00
A.8.4.3.16 (K3) Pemasangan 1 buah Stub End +Flange Galvanis 90 mm
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
12,190.00
7,685.00
1,650.00
21,525.00
858,220.00
858,220.00
879,745.00
87,974.50
967,719.50
160 mm
Jumlah
Harga
(Rp)
12,190.00
7,685.00
1,650.00
21,525.00
1,985,573.33
1,985,573.33
2,007,098.33
200,709.83
2,207,808.17
Pas.Valve 90 mm
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
Pas.Valve 160 mm
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
12,190.00
7,685.00
1,650.00
21,525.00
1,804,000.00
1,804,000.00
1,825,525.00
182,552.50
2,008,077.50
Jumlah
Harga
(Rp)
12,190.00
7,685.00
1,650.00
21,525.00
4,318,000.00
4,318,000.00
4,339,525.00
433,952.50
4,773,477.50
Pas.Valve 90 mm
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
Pas.Valve 160 mm
Harga
Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.11 115,000.00
Tukang pipa L.02 OH 0.05 145,000.00
Mandor L.04 OH 0.01 150,000.00
12,190.00
7,685.00
1,650.00
21,525.00
2,184,000.00
2,184,000.00
2,205,525.00
220,552.50
2,426,077.50
Jumlah
Harga
(Rp)
12,190.00
7,685.00
1,650.00
21,525.00
4,200,000.00
4,200,000.00
4,221,525.00
422,152.50
4,643,677.50