Lampiran 2

DAFTAR BERAT BESI IWF

NO. UKURAN IWF BERAT 12 M1 BERAT PER 1 M1


1 100 x 50 x 5 x 7 mm 112.00 kg 9.33 kg
2 125 x 60 x 6 x 8 mm 158.40 kg 13.20 kg
3 148 x 100 x 6 x 9 mm 253.20 kg 21.10 kg
4 150 x 75 x 5 x 7 mm 168.00 kg 14.00 kg
5 175 x 90 x 5 x 8 mm 217.40 kg 18.12 kg
6 198 x 99 x 4.5 x 7 mm 218.40 kg 18.20 kg
7 200 x 100 x 5.5 x 8 mm 256.00 kg 21.33 kg
8 248 x 124 x 5 x 8 mm 308.40 kg 25.70 kg
9 250 x 125 x 6 x 9 mm 355.20 kg 29.60 kg
10 298 x 149 x 6 x 8 mm 384.00 kg 32.00 kg
11 300 x 150 x 6.5 x 9 mm 440.40 kg 36.70 kg
12 346 x 174 x 6 x 9 mm 497.00 kg 41.42 kg
13 350 x 175 x 7 x 11 mm 595.20 kg 49.60 kg
14 396 x 199 x 7 x 11 mm 679.20 kg 56.60 kg
15 400 x 200 x 8 x 13 mm 792.00 kg 66.00 kg
16 446 x 199 x 8 x 12 mm 794.40 kg 66.20 kg
17 450 x 200 x 9 x 14 mm 912.00 kg 76.00 kg
18 500 x 200 x 10 x 16 mm 1,075.00 kg 89.58 kg
19 588 x 300 x 12 x 20 mm 1,812.00 kg 151.00 kg
20 600 x 200 x 11 x 17 mm 1,272.00 kg 106.00 kg
21 700 x 300 x 13 x 24 mm 2,220.00 kg 185.00 kg
22 800 x 300 x 14 x 26 mm 2,520.00 kg 210.00 kg
23 900 x 300 x 16 x 28 mm 2,916.00 kg 243.00 kg

DAFTAR BERAT BESI SIKU " L "

NO. UKURAN BESI KANAL " L " BERAT / BATANG BERAT PER 1 M1
1 25 x 25 x 3 x 6 mm 6.72 kg 1.12 kg
2 30 x 30 x 3 x 6 mm 8.16 kg 1.36 kg
3 40 x 40 x 3 x 6 mm 11.00 kg 1.83 kg
4 40 x 40 x 4 x 6 mm 14.50 kg 2.42 kg
5 50 x 50 x 4 x 6 mm 18.50 kg 3.08 kg
6 50 x 50 x 5 x 6 mm 22.60 kg 3.77 kg
7 60 x 60 x 5 x 6 mm 27.30 kg 4.55 kg
8 60 x 60 x 6 x 6 mm 32.52 kg 5.42 kg
9 65 x 65 x 6 x 6 mm 35.46 kg 5.91 kg
10 70 x 70 x 7 x 6 mm 44.28 kg 7.38 kg
11 75 x 75 x 6 x 6 mm 41.22 kg 6.87 kg
12 75 x 75 x 8 x 6 mm 54.18 kg 9.03 kg
13 80 x 80 x 8 x 6 mm 57.96 kg 9.66 kg
14 90 x 90 x 9 x 6 mm 73.20 kg 12.20 kg
15 100 x 100 x 8 x 6 mm 73.20 kg 12.20 kg
16 100 x 100 x 10 x 6 mm 90.60 kg 15.10 kg
17 120 x 120 x 10 x 12 mm 218.40 kg 36.40 kg
18 120 x 120 x 12 x 12 mm 260.00 kg 43.33 kg
19 125 x 125 x 12 x 12 mm 280.00 kg 46.67 kg
20 130 x 130 x 9 x 12 mm 214.20 kg 35.70 kg
21 130 x 130 x 12 x 12 mm 280.00 kg 46.67 kg

KOTA BANJAR Halaman : 1+116


Lampiran 1
DAFTAR BERAT BESI KANAL " C "

NO. UKURAN BESI KANAL " C " BERAT 6 M1 BERAT PER 1 M1

6.00
1 60 x 30 x 10 x 1.6 x 6 mm 9.80 kg 1.63 kg
2 60 x 30 x 10 x 2.3 x 6 mm 13.90 kg 2.32 kg
3 75 x 35 x 15 x 1.6 x 6 mm 12.50 kg 2.08 kg
4 75 x 35 x 15 x 2.3 x 6 mm 17.40 kg 2.90 kg
5 75 x 45 x 15 x 1.6 x 6 mm 14.00 kg 2.33 kg
6 75 x 45 x 15 x 2.3 x 6 mm 19.00 kg 3.17 kg
7 100 x 50 x 20 x 2 x 6 mm 21.40 kg 3.57 kg
8 100 x 50 x 20 x 2.3 x 6 mm 24.40 kg 4.07 kg
9 100 x 50 x 20 x 3.2 x 6 mm 33.00 kg 5.50 kg
10 125 x 50 x 20 x 2 x 6 mm 23.70 kg 3.95 kg
11 125 x 50 x 20 x 2.3 x 6 mm 27.10 kg 4.52 kg
12 125 x 50 x 20 x 3.2 x 6 mm 37.00 kg 6.17 kg
13 150 x 50 x 20 x 2 x 6 mm 26.10 kg 4.35 kg
14 150 x 50 x 20 x 2.3 x 6 mm 29.76 kg 4.96 kg
15 150 x 50 x 20 x 3.2 x 6 mm 40.56 kg 6.76 kg
16 150 x 65 x 20 x 2 x 6 mm 28.92 kg 4.82 kg
17 150 x 65 x 20 x 2.3 x 6 mm 33.00 kg 5.50 kg
18 150 x 65 x 20 x 3.2 x 6 mm 45.10 kg 7.52 kg
19 200 x 75 x 20 x 2 x 6 mm 35.52 kg 5.92 kg
20 200 x 75 x 20 x 2.3 x 6 mm 40.62 kg 6.77 kg
21 200 x 75 x 20 x 3.2 x 6 mm 55.62 kg 9.27 kg

KOTA BANJAR Halaman :2+115


BUAT KWITANSI : => INDONESIA
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
To say
Terbilang/
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENA

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal
Rp. 534,364.000
Nominal

Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
To say
Terbilang/
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENA

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal
U$D. 534,364.000
Nominal

Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
To say
Terbilang/
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENA

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal
U$D. 534,364.000
Nominal

No AMOUNTH
001 #REF!
002 484,150,000.000
003
004
ISI KATA > INDONESIA atau FOREIGN

KWITANSI PEMBAYARAN/RECIVING OF PEYMENT


PATAR HUTAJULUK

PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

DOKUMEN PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 19-Oct-2020

SATTUANG SE.

KWITANSI PEMBAYARAN/RECIVING OF PEYMENT


PATAR HUTAJULUK

PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

DOKUMEN PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 19-Oct-2020

SATTUANG SE.
KWITANSI PEMBAYARAN/RECIVING OF PEYMENT
PATAR HUTAJULUK

PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

DOKUMEN PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 19-Oct-2020

SATTUANG SE.

TO SAYED
#REF!
Empat Ratus Delapan Puluh Empat Juta Seratus Lima Puluh Ribu Rupiah.
Rupiah.
Rupiah.
KWITANSI No. 1 #REF!
#REF! ### ### ### #REF!
#REF! ### ###
#REF! ### ### ### #REF! #REF!
#REF! ### #REF! Milyar

KWITANSI No. 2 Empat Ratus Delapan Puluh Empat Juta Seratus Lima Puluh Rib
484,150,000.000
484150000 0
484150000,000 0 0 0
0 Milyar

KWITANSI No. 3 Rupiah.


0.000
0 0
0,000 0 0 0
0 Milyar

KWITANSI No. 4 Rupiah.


0.000
0 0
0,000 0 0 0
0 Milyar
#REF!### ### ### #REF!
#REF! ### ###
#REF! ###### ### #REF!
BILLION AND ### #REF!

h Empat Juta Seratus Lima Puluh Ribu Rupiah.


484 4 8 4 Empat Ratus Delapan Puluh Empat Juta
484150000,000 0
4 8 4 Empat Ratus
BILLION AND 16 Juta

0,000 0
0 0 0
BILLION AND 0

0,000 0
0 0 0
BILLION AND 0
#REF! ### ### ### #REF!
#REF! ### ###
#REF! #REF! ### ### ### #REF!
Juta MILLION AND ### #REF!

150 1 5 0 Seratus Lima Puluh Ribu


150000,000 0
Delapan Puluh Empat 1 5 0 Seratus
Juta MILLION AND 6 Ribu

0,000 0
0 0 0
Juta MILLION AND 0

0,000 0
0 0 0
Juta MILLION AND 0
#REF!###### ### #REF!
#REF! ### ###
#REF! #REF! ######### #REF!
Ribu THOUSAND AND

000 0 0 0
000,000 0
Lima Puluh 0 0 0
Ribu THOUSAND AND

0 0
0,000 0
0 0 0
Ribu THOUSAND AND

0 0
0,000 0
0 0 0
Ribu THOUSAND AND
###### ### ### #REF!
### ###
#REF! #REF! ###### ### #REF!
### ###

000 0 0 0
0
0 0 0
0 0

000 0 0 0
0
0 0 0
0 0

000 0 0 0
0
0 0 0
0 0
#REF! #REF! ### Koma KOMMA
RupiaRupiah. DOLAR

Koma KOMMA
RupiaRupiah. DOLAR

Koma KOMMA
RupiaRupiah. DOLAR

Koma KOMMA
RupiaRupiah. DOLAR
SATUAN
ANGKA
1 Satu Satu ONE
2 Dua Dua TWO
3 Tiga Tiga THREE
4 Empat Empat FOUR
5 Lima Lima FIVE
6 Enam Enam SIX
7 Tujuh Tujuh SEVEN
8 Delapan Delapan EIGHT
9 Sembilan Sembilan NINE

PULUHAN
ANGKA
1 Sepuluh Sepuluh TEN
2 Dua Puluh Dua Puluh TWENTY
3 Tiga Puluh Tiga Puluh THIRTY
4 Empat Puluh Empat Puluh FOURTY
5 Lima Puluh Lima Puluh FIVETY
6 Enam Puluh Enam Puluh SIXTY
7 Tujuh Puluh Tujuh Puluh SEVENTY
8 Delapan Puluh Delapan Puluh EIGHTY
9 Sembilan Puluh Sembilan Puluh NINETY

BELASAN
ANGKA
10 Sepuluh Sepuluh TEN
11 Sebelas Sebelas ELEVEN
12 Dua Belas Dua Belas TWELVE
13 Tiga Belas Tiga Belas THIRTEEN
14 Empat Belas Empat Belas FOURTEEN
15 Lima Belas Lima Belas FIVETEEN
16 Enam Belas Enam Belas SIXTEEN
17 Tujuh Belas Tujuh Belas SEVENTEEN
18 Delapan Belas Delapan Belas EIGHTEEN
19 Sembilan Belas Sembilan Belas NINETEEN

RATUSAN
ANGKA
1 Seratus Seratus HUNDRED AND
2 Dua Ratus Dua Ratus TWO HUNDRED AND
3 Tiga Ratus Tiga Ratus THREE HUNDRED AND
4 Empat Ratus Empat Ratus FOUR HUNDRED AND
5 Lima Ratus Lima Ratus FIVE HUNDRED AND
6 Enam Ratus Enam Ratus SIX HUNDRED AND
7 Tujuh Ratus Tujuh Ratus SEVEN HUNDRED AND
8 Delapan Ratus Delapan Ratus EIGHT HUNDRED AND
9 Sembilan Ratus Sembilan Ratus NINE HUNDRED AND
DRED AND
NDRED AND
DRED AND
DRED AND

NDRED AND
NDRED AND
DRED AND
R. Kelas 1 R. Kelas 2 R. Kelas 3

Nama
NO NPSN Kabupaten/Kota Provinsi Konstruksi
Sekolah

0 SPNF SKBKab. Buton Utara Sulawesi TBETON 1


R. Kelas 4 R. Kelas 5 R. Kelas 6 R. Kelas 7 R. Kelas 8 R. Kelas 9 R. Kelas 10 R. Kelas 11 R. Kelas 12 R. Kelas 13
R. Kelas 14 R. Kelas 15 R. Kelas 16 R. Kelas 17 R. Kelas 18 R. Kelas 19 R. Kelas 20 R. Kelas 21 R. Kelas 22 R. Kelas 23
Perpustaka Lab. R.
R. Kelas 24 R. Kelas 25 R. Kelas 26 R. Kelas 27 Lab. IPA Lab Bahasa R. Kesenian
an Komputer Ketrampilan

1
R.
Tempat KM/WC KM/WC
R. Kepsek TU/Administ R. Guru R. OSIS R. UKS Kantin R. BK
Ibadah Guru Siswa
rasi

1
R. Gudang #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! R. Kelas 1 R. Kelas 2 R. Kelas 3 R. Kelas 4 R. Kelas 5 R. Kelas 6

100.00% 0.00% 0.00% 0.00% 0.00% 0.00%


R. Kelas 7 R. Kelas 8 R. Kelas 9 R. Kelas 10 R. Kelas 11 R. Kelas 12 R. Kelas 13 R. Kelas 14 R. Kelas 15 R. Kelas 16

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
R. Kelas 17 R. Kelas 18 R. Kelas 19 R. Kelas 20 R. Kelas 21 R. Kelas 22 R. Kelas 23 R. Kelas 24 R. Kelas 25 R. Kelas 26

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
R.
Perpustaka Lab. R.
R. Kelas 27 Lab. IPA Lab Bahasa R. Kesenian R. Kepsek TU/Administ R. Guru
an Komputer Ketrampilan
rasi

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00%
Tempat KM/WC KM/WC
R. OSIS R. UKS Kantin R. BK R. Gudang #REF! #REF!
Ibadah Guru Siswa

0.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! R. Kelas 1 R. Kelas 2 R. Kelas 3 R. Kelas 4 R. Kelas 5 R. Kelas 6 R. Kelas 7 R. Kelas 8

0.00% 317,037,521 - - - - - - -
R. Kelas 9 R. Kelas 10 R. Kelas 11 R. Kelas 12 R. Kelas 13 R. Kelas 14 R. Kelas 15 R. Kelas 16 R. Kelas 17

- - - - - - - - -
R. Kelas 18 R. Kelas 19 R. Kelas 20 R. Kelas 21 R. Kelas 22 R. Kelas 23 R. Kelas 24 R. Kelas 25 R. Kelas 26

- - - - - - - - -
R.
Perpustakaa Lab. R.
R. Kelas 27 Lab. IPA Lab Bahasa R. Kesenian R. Kepsek TU/Administr
n Komputer Ketrampilan
asi

- - - - - - ### - -
Tempat KM/WC
R. Guru KM/WC Guru R. OSIS R. UKS Kantin R. BK R. Gudang
Ibadah Siswa

- - ### - - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

- - - - - - - - -
#REF! #REF! #REF! #REF!

Ruang Ruang Ruang Ruang RPL RPL


Belajar Belajar Belajar Belajar Rusak Rusak
Ringan Sedang Berat Total Ringan Sedang

- - - - 0 0 0 1 0 0
Persiapan

RPL RPL REKAP


Biaya Ruang Biaya Total Biaya +
Rusak Rusak NILAI PER 5%
Belajar RPL Operasional
Berat Total SEKOLAH

0 2 ### ### ### 36,310,100 762,512,102 #REF!


R. Kelas 1 R. Kelas 2 R. Kelas 3 R. Kelas 4 R. Kelas 5 R. Kelas 6 R. Kelas 7 R. Kelas 8 R. Kelas 9 R. Kelas 10

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
R. Kelas 11 R. Kelas 12 R. Kelas 13 R. Kelas 14 R. Kelas 15 R. Kelas 16 R. Kelas 17 R. Kelas 18 R. Kelas 19 R. Kelas 20

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Perpustaka
R. Kelas 21 R. Kelas 22 R. Kelas 23 R. Kelas 24 R. Kelas 25 R. Kelas 26 R. Kelas 27 Lab. IPA Lab Bahasa
an

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
R.
Lab. R. Tempat KM/WC KM/WC
R. Kesenian R. Kepsek TU/Administ R. Guru R. OSIS
Komputer Ketrampilan Ibadah Guru Siswa
rasi

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
R. UKS Kantin R. BK R. Gudang #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! Furniture Operasional

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


IKK (BPS)
Kode
Kabupaten/Kota Th. 2016
Wilayah

Propinsi Aceh
1101 Kab. Simeulue 0.9824
1102 Kab. Aceh Singkil 0.9244
1103 Kab. Aceh Selatan 0.9385
1104 Kab. Aceh Tenggara 0.9587
1105 Kab. Aceh Timur 0.9600
1106 Kab. Aceh Tengah 0.9585
1107 Kab. Aceh Barat 0.9602
1108 Kab. Aceh Besar 0.9154
1109 Kab. Pidie 0.9186
1110 Kab. Bireuen 0.9956
1111 Kab. Aceh Utara 1.0428
1112 Kab. Aceh Barat Daya 0.8916
1113 Kab. Gayo Lues 0.9751
1114 Kab. Aceh Tamiang 0.8690
1115 Kab. Nagan Raya 0.9524
1116 Kab. Aceh Jaya 0.9050
1117 Kab. Bener Meriah 0.9460
1118 Kab. Pidie Jaya 0.8769
1171 Kota Banda Aceh 0.9457
1172 Kota Sabang 0.9614
1173 Kota Langsa 0.9625
1174 Kota Lhokseumawe 1.0112
1175 Kota Subulussalam 0.9279
Propinsi Sumatera Utara
1201 Kab. Nias 1.0931
1202 Kab. Mandailing Natal 1.0262
1203 Kab. Tapanuli Selatan 1.0556
1204 Kab. Tapanuli Tengah 0.9656
1205 Kab. Tapanuli Utara 0.9448
1206 Kab. Toba Samosir 1.0153
1207 Kab. Labuhan Batu 0.9999
1208 Kab. Asahan 1.0050
1209 Kab. Simalungun 1.0489
1210 Kab. Dairi 1.0597
1211 Kab. Karo 1.0420
1212 Kab. Deli Serdang 1.0599
1213 Kab. Langkat 0.9393
1214 Kab. Nias Selatan 1.0349
1215 Kab. Humbang Hasundutan 0.9430
1216 Kab. Pakpak Bharat 0.9700
1217 Kab. Samosir 1.0953
1218 Kab. Serdang Bedagai 0.9869
1219 Kab. Batu Bara 0.9568
1220 Kab. Padang Lawas Utara 1.0083
1221 Kab. Padang Lawas 1.0843
1222 Kab. Labuhan Batu Selatan 0.9284
1223 Kab. Labuhan Batu Utara 0.9981
1224 Kab. Nias Utara 1.0493
1225 Kab. Nias Barat 1.0777
1271 Kota Sibolga 0.9324
1272 Kota Tanjungbalai 0.9944
1273 Kota Pematang Siantar 1.0737
1274 Kota Tebing Tinggi 0.9819
1275 Kota Medan 0.9869
1276 Kota Binjai 0.9205
1277 Kota Padangsidimpuan 0.9790
1278 Kota Gunung Sitoli 1.0331
Propinsi Sumatera Barat
1301 Kab. Kepulauan Mentawai 1.4828
1302 Kab. Pesisir Selatan 0.9450
1303 Kab. Solok 0.9365
1304 Kab. Sijunjung 0.9499
1305 Kab. Tanah Datar 0.9527
1306 Kab. Padang Pariaman 0.9392
1307 Kab. Agam 0.9763
1308 Kab. Lima Puluh Kota 0.9733
1309 Kab. Pasaman 0.8909
1310 Kab. Solok Selatan 0.9661
1311 Kab. Dharmasraya 0.9692
1312 Kab. Pasaman Barat 1.0434
1371 Kota Padang 0.9790
1372 Kota Solok 0.9775
1373 Kota Sawah Lunto 0.9662
1374 Kota Padang Panjang 0.9428
1375 Kota Bukittinggi 0.9493
1376 Kota Payakumbuh 0.8976
1377 Kota Pariaman 0.9683
Propinsi Riau
1401 Kab. Kuantan Singingi 0.9003
1402 Kab. Indragiri Hulu 1.0101
1403 Kab. Indragiri Hilir 0.9663
1404 Kab. Pelalawan 0.9541
1405 Kab. Siak 1.0711
1406 Kab. Kampar 0.9372
1407 Kab. Rokan Hulu 0.8858
1408 Kab. Bengkalis 0.9874
1409 Kab. Rokan Hilir 1.0241
1410 Kab. Kepulauan Meranti 1.0553
1471 Kota Pekanbaru 0.8957
1473 Kota Dumai 1.0415
Propinsi Jambi
1501 Kab. Kerinci 0.8764
1502 Kab. Merangin 0.9531
1503 Kab. Sarolangun 0.9670
1504 Kab. Batang Hari 0.8884
1505 Kab. Muaro Jambi 0.8964
1506 Kab. Tanjung Jabung Timur 0.9860
1507 Kab. Tanjung Jabung Barat 0.9806
1508 Kab. Tebo 0.9389
1509 Kab. Bungo 0.9272
1571 Kota Jambi 0.9096
1572 Kota Sungai Penuh 0.8635
Propinsi Sumatera Selatan
1601 Kab. Ogan Komering Ulu 0.9706
1602 Kab. Ogan Komering Ilir 0.9149
1603 Kab. Muara Enim 0.9534
1604 Kab. Lahat 1.0301
1605 Kab. Musi Rawas 1.0331
1606 Kab. Musi Banyuasin 0.9980
1607 Kab. Banyu Asin 1.0241
1608 Kab. Ogan Komering Ulu Selatan 0.8719
1609 Kab. Ogan Komering Ulu Timur 1.0149
1610 Kab. Ogan Ilir 1.0495
1611 Kab. Empat Lawang 1.0368
1612 Kab. Penukal Abab Lematang Ilir 1.0332
1613 Kab. Musi Rawas Utara 1.0271
1671 Kota Palembang 0.9975
1672 Kota Prabumulih 1.0331
1673 Kota Pagar Alam 0.9913
1674 Kota Lubuklinggau 1.0760
Propinsi Bengkulu
1701 Kab. Bengkulu Selatan 0.9354
1702 Kab. Rejang Lebong 0.9926
1703 Kab. Bengkulu Utara 0.9419
1704 Kab. Kaur 0.9310
1705 Kab. Seluma 0.9440
1706 Kab. Mukomuko 1.0406
1707 Kab. Lebong 0.9677
1708 Kab. Kepahiang 0.9106
1709 Kab. Bengkulu Tengah 0.9577
1771 Kota Bengkulu 0.9961
Propinsi Lampung
1801 Kab. Lampung Barat 1.0042
1802 Kab. Tanggamus 0.9493
1803 Kab. Lampung Selatan 0.9000
1804 Kab. Lampung Timur 0.8863
1805 Kab. Lampung Tengah 0.8950
1806 Kab. Lampung Utara 0.9182
1807 Kab. Way Kanan 0.9466
1808 Kab. Tulang Bawang 0.9738
1809 Kab. Pesawaran 0.8946
1810 Kab. Pringsewu 0.9147
1811 Kab. Mesuji 1.0101
1812 Kab. Tulang Bawang Barat 1.0244
1813 Kab. Pesisir Barat 1.0023
1871 Kota Bandar Lampung 0.8818
1872 Kota Metro 0.8996
Propinsi Bangka Belitung
1901 Kab. Bangka 1.0478
1902 Kab. Belitung 0.9478
1903 Kab. Bangka Barat 1.0629
1904 Kab. Bangka Tengah 1.0343
1905 Kab. Bangka Selatan 1.0522
1906 Kab. Belitung Timur 0.9415
1971 Kota Pangkal Pinang 1.0407
Propinsi Kepulauan Riau
2101 Kab. Karimun 1.1305
2102 Kab. Bintan 1.1810
2103 Kab. Natuna 1.4363
2104 Kab. Lingga 0.9187
2105 Kab. Kepulauan Anambas 1.5426
2171 Kota Batam 1.1198
2172 Kota Tanjung Pinang 1.1080
Propinsi Dki Jakarta
3101 Kab. Kepulauan Seribu 1.3329
3171 Kota Jakarta Selatan 1.2619
3172 Kota Jakarta Timur 1.2283
3173 Kota Jakarta Pusat 1.2003
3174 Kota Jakarta Barat 1.1931
3175 Kota Jakarta Utara 1.1992
Propisi Jawa Barat
3201 Kab. Bogor 1.0990
3202 Kab. Sukabumi 0.9653
3203 Kab. Cianjur 0.9982
3204 Kab. Bandung 1.0896
3205 Kab. Garut 1.0251
3206 Kab. Tasikmalaya 0.9994
3207 Kab. Ciamis 0.9497
3208 Kab. Kuningan 0.9351
3209 Kab. Cirebon 0.9876
3210 Kab. Majalengka 1.0069
3211 Kab. Sumedang 0.9764
3212 Kab. Indramayu 0.9770
3213 Kab. Subang 1.0152
3214 Kab. Purwakarta 1.0760
3215 Kab. Karawang 1.0588
3216 Kab. Bekasi 1.0685
3217 Kab. Bandung Barat 0.9798
3218 Kab. Pangandaran 0.9503
3271 Kota Bogor 1.0258
3272 Kota Sukabumi 1.0057
3273 Kota Bandung 1.0805
3274 Kota Cirebon 0.9029
3275 Kota Bekasi 1.0345
3276 Kota Depok 1.1113
3277 Kota Cimahi 1.0359
3278 Kota Tasikmalaya 0.9418
3279 Kota Banjar 0.9501
Propinsi Jawa Tengah
3301 Kab. Cilacap 0.9413
3302 Kab. Banyumas 0.8964
3303 Kab. Purbalingga 0.9582
3304 Kab. Banjarnegara 0.9789
3305 Kab. Kebumen 0.8929
3306 Kab. Purworejo 0.9554
3307 Kab. Wonosobo 0.9526
3308 Kab. Magelang 0.9196
3309 Kab. Boyolali 0.9714
3310 Kab. Klaten 0.9469
3311 Kab. Sukoharjo 1.0019
3312 Kab. Wonogiri 0.9781
3313 Kab. Karanganyar 0.9963
3314 Kab. Sragen 0.9994
3315 Kab. Grobogan 0.9891
3316 Kab. Blora 0.9413
3317 Kab. Rembang 1.0102
3318 Kab. Pati 1.0073
3319 Kab. Kudus 0.9286
3320 Kab. Jepara 0.9347
3321 Kab. Demak 0.9886
3322 Kab. Semarang 0.9942
3323 Kab. Temanggung 0.9905
3324 Kab. Kendal 0.9890
3325 Kab. Batang 0.9414
3326 Kab. Pekalongan 0.9352
3327 Kab. Pemalang 0.9804
3328 Kab. Tegal 0.9565
3329 Kab. Brebes 0.9639
3371 Kota Magelang 0.9458
3372 Kota Surakarta 0.9920
3373 Kota Salatiga 0.9544
3374 Kota Semarang 0.9793
3375 Kota Pekalongan 0.9823
3376 Kota Tegal 0.9980
Propinsi Di Yogyakarta
3401 Kab. Kulon Progo 0.9414
3402 Kab. Bantul 0.9652
3403 Kab. Gunung Kidul 0.9710
3404 Kab. Sleman 0.9370
3471 Kota Yogyakarta 0.9381
Propinsi Jawa Timur
3501 Kab. Pacitan 0.9686
3502 Kab. Ponorogo 0.9947
3503 Kab. Trenggalek 1.0047
3504 Kab. Tulungagung 0.9389
3505 Kab. Blitar 0.9356
3506 Kab. Kediri 0.9514
3507 Kab. Malang 0.9979
3508 Kab. Lumajang 0.9820
3509 Kab. Jember 0.9497
3510 Kab. Banyuwangi 0.9538
3511 Kab. Bondowoso 0.9346
3512 Kab. Situbondo 0.9236
3513 Kab. Probolinggo 0.9653
3514 Kab. Pasuruan 0.9719
3515 Kab. Sidoarjo 1.0254
3516 Kab. Mojokerto 0.9637
3517 Kab. Jombang 0.9661
3518 Kab. Nganjuk 0.9554
3519 Kab. Madiun 0.9815
3520 Kab. Magetan 1.0135
3521 Kab. Ngawi 1.0213
3522 Kab. Bojonegoro 0.9598
3523 Kab. Tuban 0.9541
3524 Kab. Lamongan 1.0275
3525 Kab. Gresik 0.9880
3526 Kab. Bangkalan 1.0246
3527 Kab. Sampang 1.0420
3528 Kab. Pamekasan 1.0257
3529 Kab. Sumenep 1.0778
3571 Kota Kediri 0.9614
3572 Kota Blitar 0.9731
3573 Kota Malang 1.0064
3574 Kota Probolinggo 0.9359
3575 Kota Pasuruan 0.9305
3576 Kota Mojokerto 0.9282
3577 Kota Madiun 1.0077
3578 Kota Surabaya 1.0000
3579 Kota Batu 0.9861
Propinsi Banten
3601 Kab. Pandeglang 0.9357
3602 Kab. Lebak 0.9038
3603 Kab. Tangerang 1.0905
3604 Kab. Serang 0.9931
3671 Kota Tangerang 1.1204
3672 Kota Cilegon 0.9379
3673 Kota Serang 0.9287
3674 Kota Tangerang Selatan 1.0952
Propinsi Kalimantan Barat
6101 Kab. Sambas 1.1696
6102 Kab. Bengkayang 1.1078
6103 Kab. Landak 1.1138
6104 Kab. Pontianak 1.1420
6105 Kab. Sanggau 1.1454
6106 Kab. Ketapang 1.1672
6107 Kab. Sintang 1.0134
6108 Kab. Kapuas Hulu 1.2215
6109 Kab. Sekadau 1.0966
6110 Kab. Melawi 1.1541
6111 Kab. Kayong Utara 1.0987
6112 Kab. Kubu Raya 1.0999
6171 Kota Pontianak 1.0114
6172 Kota Singkawang 1.0452
Propinsi Kalimantan Tengah
6201 Kab. Kotawaringin Barat 0.9564
6202 Kab. Kotawaringin Timur 1.0386
6203 Kab. Kapuas 0.9464
6204 Kab. Barito Selatan 1.0020
6205 Kab. Barito Utara 0.9775
6206 Kab. Sukamara 1.0593
6207 Kab. Lamandau 0.9915
6208 Kab. Seruyan 0.9630
6209 Kab. Katingan 0.9973
6210 Kab. Pulang Pisau 1.0169
6211 Kab. Gunung Mas 1.0450
6212 Kab. Barito Timur 0.9980
6213 Kab. Murung Raya 1.1163
6271 Kota Palangka Raya 0.9983
Propinsi Kalimantan Selatan
6301 Kab. Tanah Laut 0.9411
6302 Kab. Kota Baru 0.9582
6303 Kab. Banjar 0.8897
6304 Kab. Barito Kuala 0.9797
6305 Kab. Tapin 0.9506
6306 Kab. Hulu Sungai Selatan 1.0025
6307 Kab. Hulu Sungai Tengah 0.9997
6308 Kab. Hulu Sungai Utara 1.0220
6309 Kab. Tabalong 0.9830
6310 Kab. Tanah Bumbu 0.9928
6311 Kab. Balangan 1.0064
6371 Kota Banjarmasin 0.9903
6372 Kota Banjar Baru 0.9963
Propinsi Kalimantan Timur
6401 Kab. Paser 1.0846
6402 Kab. Kutai Barat 1.0543
6403 Kab. Kutai Kartanegara 1.0594
6404 Kab. Kutai Timur 1.1116
6405 Kab. Berau 1.0224
6409 Kab. Penajam Paser Utara 1.0661
6411 Kab. Mahakam Hulu 1.3246
6471 Kota Balikpapan 1.1027
6472 Kota Samarinda 1.1587
6474 Kota Bontang 1.1286
Propinsi Kalimantan Utara
6501 Kab. Malinau 1.1374
6502 Kab. Bulungan 1.1657
6503 Kab. Tana Tidung 1.5497
6504 Kab. Nunukan 1.1384
6571 Kota Tarakan 1.0934
Propinsi Sulawesi Utara
7101 Kab. Bolaang Mongondow 1.0412
7102 Kab. Minahasa 1.0535
7103 Kab. Kepulauan Sangihe 1.1199
7104 Kab. Kepulauan Talaud 1.1857
7105 Kab. Minahasa Selatan 1.0117
7106 Kab. Minahasa Utara 1.0289
7107 Kab. Bolaang Mongondow Utara 1.0178
7108 Kab. Kep. Siau Tagolandang Biaro (Sitaro) 1.1175
7109 Kab. Minahasa Tenggara 0.9990
7110 Kab. Bolaang Mongondow Selatan 0.9874
7111 Kab. Bolaang Mongondow Timur 1.0346
7171 Kota Manado 0.9782
7172 Kota Bitung 1.0846
7173 Kota Tomohon 1.1103
7174 Kota Kotamobagu 1.0563
Propinsi Sulawesi Tengah
7201 Kab. Banggai Kepulauan 1.0263
7202 Kab. Banggai 0.9406
7203 Kab. Morowali 0.9947
7204 Kab. Poso 0.8794
7205 Kab. Donggala 0.8110
7206 Kab. Toli-Toli 0.9692
7207 Kab. Buol 0.9819
7208 Kab. Parigi Moutong 0.8710
7209 Kab. Tojo Una-Una 0.9894
7210 Kab. Sigi 0.8399
7211 Kab. Banggai Laut 1.0539
7212 Kab. Morowali Utara 0.9621
7271 Kota Palu 0.8770
Propinsi Sulawesi Selatan
7301 Kab. Selayar 0.9241
7302 Kab. Bulukumba 0.9133
7303 Kab. Bantaeng 0.9583
7304 Kab. Jeneponto 0.9883
7305 Kab. Takalar 0.9129
7306 Kab. Gowa 0.9144
7307 Kab. Sinjai 1.0167
7308 Kab. Maros 0.9239
7309 Kab. Pangkajene Kepulauan 0.9200
7310 Kab. Barru 0.8896
7311 Kab. Bone 0.9585
7312 Kab. Soppeng 0.9408
7313 Kab. Wajo 0.9644
7314 Kab. Sidenreng Rappang 0.9687
7315 Kab. Pinrang 0.9723
7316 Kab. Enrekang 0.9937
7317 Kab. Luwu 0.9728
7318 Kab. Tana Toraja 1.0535
7322 Kab. Luwu Utara 0.9767
7325 Kab. Luwu Timur 1.0154
7326 Kab. Toraja Utara 1.0454
7371 Kota Makassar 0.9789
7372 Kota Parepare 0.9286
7373 Kota Palopo 1.0228
Propinsi Sulawesi Tenggara
7401 Kab. Buton 1.0191
7402 Kab. Muna 1.0181
7403 Kab. Konawe 0.9525
7404 Kab. Kolaka 0.9321
7405 Kab. Konawe Selatan 0.9633
7406 Kab. Bombana 1.0151
7407 Kab. Wakatobi 1.1165
7408 Kab. Kolaka Utara 1.0253
7409 Kab. Buton Utara 1.1253
7410 Kab. Konawe Utara 0.9806
7411 Kab. Kolaka Timur 0.8994
7412 Kab. Konawe Kepulauan 1.0301
7413 Kab. Muna Barat 1.0720
7414 Kab. Buton Tengah 1.0555
7415 Kab. Buton Selatan 1.1122
7471 Kota Kendari 0.9776
7472 Kota Bau-Bau 1.0779
Propinsi Gorontalo
7501 Kab. Boalemo 0.9601
7502 Kab. Gorontalo 0.9537
7503 Kab. Pohuwato 0.9585
7504 Kab. Bone Bolango 0.9706
7505 Kab. Gorontalo Utara 0.9798
7571 Kota Gorontalo 0.9457
Propinsi Sulawesi Barat
7601 Kab. Majene 0.8961
7602 Kab. Polewali Mandar 0.9076
7603 Kab. Mamasa 1.0227
7604 Kab. Mamuju 0.9152
7605 Kab. Mamuju Utara 0.9244
7606 Kab. Mamuju Tengah 0.9085
Propinsi Bali
5101 Kab. Jembrana 1.1347
5102 Kab. Tabanan 1.1179
5103 Kab. Badung 1.1109
5104 Kab. Gianyar 1.0532
5105 Kab. Klungkung 1.0630
5106 Kab. Bangli 1.1007
5107 Kab. Karangasem 1.0998
5108 Kab. Buleleng 1.1374
5171 Kota Denpasar 1.1011
Propinsi Nusa Tenggara Barat
5201 Kab. Lombok Barat 0.9105
5202 Kab. Lombok Tengah 0.8506
5203 Kab. Lombok Timur 0.8539
5204 Kab. Sumbawa 0.8737
5205 Kab. Dompu 0.9207
5206 Kab. Bima 0.8960
5207 Kab. Sumbawa Barat 0.9237
5208 Kab. Lombok Utara 0.8159
5271 Kota Mataram 0.9111
5272 Kota Bima 0.9015
Propinsi Nusa Tenggara Timur
5301 Kab. Sumba Barat 0.9855
5302 Kab. Sumba Timur 0.9564
5303 Kab. Kupang 0.8595
5304 Kab. Timor Tengah Selatan 0.9568
5305 Kab. Timor Tengah Utara 0.8931
5306 Kab. Belu 0.8979
5307 Kab. Alor 1.0835
5308 Kab. Lembata 0.9590
5309 Kab. Flores Timur 0.9933
5310 Kab. Sikka 0.9251
5311 Kab. Ende 0.9547
5312 Kab. Ngada 0.9727
5313 Kab. Manggarai 0.9792
5314 Kab. Rote Ndao 1.0249
5315 Kab. Manggarai Barat 0.9582
5316 Kab. Sumba Tengah 0.9879
5317 Kab. Sumba Barat Daya 0.9829
5318 Kab. Nagekeo 0.9977
5319 Kab. Manggarai Timur 0.9794
5320 Kab. Sabu Raijua 1.1159
5321 Kab. Malaka 0.9430
5371 Kota Kupang 0.8691
Propinsi Maluku
8101 Kab. Maluku Tenggara Barat 1.1731
8102 Kab. Maluku Tenggara 1.2127
8103 Kab. Maluku Tengah 1.0924
8104 Kab. Buru 1.1145
8105 Kab. Kepulauan Aru 1.1265
8106 Kab. Seram Bagian Barat 1.1143
8107 Kab. Seram Bagian Timur 1.1065
8108 Kab. Maluku Barat Daya 1.3599
8109 Kab. Buru Selatan 1.2427
8171 Kota Ambon 1.1022
8172 Kota Tual 1.2916
Propinsi Maluku Utara
8201 Kab. Halmahera Barat 1.2406
8202 Kab. Halmahera Tengah 1.2631
8203 Kab. Kepulauan Sula 1.2894
8204 Kab. Halmahera Selatan 1.1130
8205 Kab. Halmahera Utara 1.1953
8206 Kab. Halmahera Timur 1.2818
8207 Kab. Pulau Morotai 1.0990
8208 Kab. Pulau Taliabu 1.2923
8271 Kota Ternate 1.2735
8272 Kota Tidore Kepulauan 1.2811
Propinsi Papua
9401 Kab. Merauke 1.7969
9402 Kab. Jayawijaya 2.8204
9403 Kab. Jayapura 1.2893
9404 Kab. Nabire 1.5200
9408 Kab. Yapen Waropen 1.4448
9409 Kab. Biak Numfor 1.5300
9410 Kab. Paniai 2.1529
9411 Kab. Puncak Jaya 4.2341
9412 Kab. Mimika 1.5616
9413 Kab. Boven Digoel 1.8124
9414 Kab. Mappi 1.9036
9415 Kab. Asmat 2.2075
9416 Kab. Yahukimo 2.2955
9417 Kab. Pegunungan Bintang 3.7997
9418 Kab. Tolikara 3.5104
9419 Kab. Sarmi 2.0031
9420 Kab. Keerom 1.5721
9426 Kab. Waropen 1.5447
9427 Kab. Supiori 1.6077
9428 Kab. Memberamo Raya 1.8207
9429 Kab. Nduga 3.2615
9430 Kab. Lanny Jaya 3.2543
9431 Kab. Memberamo Tengah 3.9284
9432 Kab. Yalimo 3.5228
9433 Kab. Puncak 4.5467
9434 Kab. Dogiyai 2.0428
9435 Kab. Intan Jaya 3.9757
9436 Kab. Deiyai 2.1881
9471 Kota Jayapura 1.5007
Propinsi Papua Barat
9101 Kab. Fak-Fak 1.4409
9102 Kab. Kaimana 1.3129
9103 Kab. Teluk Wondama 1.3324
9104 Kab. Teluk Bintuni 1.3891
9105 Kab. Manokwari 1.2366
9106 Kab. Sorong Selatan 1.2155
9107 Kab. Sorong 1.1968
9108 Kab. Raja Ampat 1.3852
9109 Kab. Tambraw 1.7504
9110 Kab. Maybrat 1.4660
9111 Kab. Manokwari Selatan 1.3453
9112 Kab. Pegunungan Arfak 2.0396
9171 Kota Sorong 1.0921
FORM PENGISIAN

Program : Pembangunan Gedung Baru


NPSN :
NAMA INSTANSI : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara
Konstruksi : BETON
12 Ruang belajar dan ruang pendukung lainnya yang ada pada saat ini:

Lebar panjang Penutup Rangka Listplank Rangka Penutup


No Ruang Jumlah Atap Atap/Kuda2 &Talang Plafond Plafond

m m % % % % %
1 R. Kelas 1 1 10.50 12.00 100% 100% 100% 100% 100%
2 R. Kelas 2
3 R. Kelas 3
4 R. Kelas 4
5 R. Kelas 5
6 R. Kelas 6
7 R. Kelas 7
8 R. Kelas 8
9 R. Kelas 9
10 R. Kelas 10
11 R. Kelas 11
12 R. Kelas 12
13 R. Kelas 13
14 R. Kelas 14
15 R. Kelas 15
16 R. Kelas 16
17 R. Kelas 17
18 R. Kelas 18
19 R. Kelas 19
20 R. Kelas 20
21 R. Kelas 21
22 R. Kelas 22
23 R. Kelas 23
24 R. Kelas 24
25 R. Kelas 25
26 R. Kelas 26
27 R. Kelas 27
28 Perpustakaan
29 Lab. IPA
30 Lab Bahasa
31 Lab. Komputer
32 R. Kesenian
33 R. Ketrampilan 1 10.50 12.00 100% 100% 100% 100% 100%
34 R. Kepsek
35 R. TU/Administrasi
36 R. Guru
37 Tempat Ibadah
38 KM/WC Guru 1 4.80 5.00 100% 100% 100% 100% 100%
39 KM/WC Siswa
40 R. OSIS
41 R. UKS
42 Kantin
43 R. BK
44 R. Gudang
45 GEDUNG MESS GURU
GEDUNG ASRAMA
46
SISWA
47 BANGSAL SEPEDA
RUMAH PENJAGA
48
SEKOLAH
RUMAH DINAS
49
KEPALA SEKOLAH
50 POS JAGA
51
52
53
54
55
56
57
ada saat ini:
Pekerjaan Yang akan Dilaksanakan
Cat Plafond Kolom Dinding Cat Dinding Kusen Pintu Daun Pintu Daun Struktur Penutup Fondasi
Ringbalk Pengisi & Jendela Jendela Bawah Lantai
Lantai
% % % % % % % % % %
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Sloof Utilitas Rabat &
Listrik Drainase Keterangan

% % %
100% 100% 100% OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
100% 100% 100% OK
OK
OK
OK
OK
100% 100% 100% OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

OK
OK
OK
OK
OK
OK
OK
OK
OK
PENGHITUNGAN VOLUME
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


1.) Pekerjaan Pendahuluan
● Pengukuran dan pemasangan bowplank ● Perhitungan Volume Pemasangan Bowplank
Volume Bowplank
0 m
Pengukuran bowplank dihitung berdasarkan
keliling keseluruhan bangunan gedung, ditambah 1
m untuk setiap ujung panjang.

● Pembersihan dan perataan lapangan 1 m 2 ● Perhitungan Volume

Pembersihan lapangan adalah membersihkan 0 m2


lapangan dan sekitarnya, tempat bangunan akan
didirikan, dengan jarak kurang lebih 3 meter dari
as bangunan (untuk bangunan gedung ) lapangan
harus dibersihkan dari humus humus tanah dan
kotoran kotoran yang ada di atasnya.

2.) PEKERJAAN TANAH


● Penggalian tanah biasa sedalam 1m ● Perhitungan Volume Volume Galian
Keliling Galian (K) = 67.5 m 52.00 m3
Lebar Galian (b) = 90 cm
= 0.9 m
Tinggi Galian (h) = 85 cm
= 0.85 m

Luas Galian (A) = b x h


= 0.9 x 0.85
= 0.765 m2

Volume galian (V) = Luas galian x Keliling


= 0.77 x 67.5
= 51.64 m3
● Pengurugan kembali 1m3 galian tanah ● Perhitungan Volume
Vol galian = 52 m2 Volume Urugan
18.00 m3
Volume urug = 1/3 (Volume Galian)
= 0.33 x 52
= 17.33 m3
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


● Urugan Tanah Bawah Lantai ● Perhitungan Volume
Luas Urugan (A) = 126 m
Volume Urugan Tanah
Tinggi Urugan (h) = 150 cm
= 1.5 m 189.00 m3

Volume Galian (V) = A x h


= 126.00 x 1.5
= 189 m3

● Urugan Pasir Bawah Pondasi ● Perhitungan Volume


Pasir Urug bawah pondasi Volume pasir urug
Lebar Pondasi (b) = 80 cm 2.70 m3
= 0.8 m

Tinggi Pondasi (b) = 5 cm


= 0.05 m

Keliling = 67.50 m

Luas Pondasi (A) = b x h


= 0.8 x 0.05
= 0.04 m2

Volume Pondasi (V) = A x K


= 0.04 x 67.50
= 2.7 m3
● Urugan Pasir Bawah Lantai ● Perhitungan Volume
Luas Urugan (A) = 126 m2 Volume pasir urug
Tinggi Urugan (h) = 5 cm 6.30 m3
= 0.05 m2

Volume Urugan (V) = A x h


= 126 x 0.05
= 6.3 m3

3.) Pekerjaan Pondasi


● Pemasangan pondasi batu belah 1PC : 4PP ● Perhitungan Volume Volume
Keliling Pondasi = 68 m 27.00 m3
Lebar Atas = 30 cm
= 0.3 m
Lebar Bawah = 80 cm
= 0.8 m
Tinggi Pondasi = 70 cm
= 0.7 m
Luas Pondasi = 0.385 m2

Volume Pondasi = Luas Pondasi x Keliling


= 0.385 x 68.00
= 26.18 m3
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL

● Pemasangan batu kosong ● Perhitungan Volume Volume


Keliling = 68 m 11.00 m3
Lebar pondasi = 20 cm
= 0.2 m
Tinggi Pondasi = 80 cm
= 0.8 m

Luas Pondasi = 0.16 m

Volume Pondasi = Luas Pondasi x Keliling


= 0.16 x 68.00
= 10.88 m3
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


4.) PEKERJAAN BETON
● SLOOF ● Perhitungan Volume Volume Sloof Utama
1.) Sloof Utama Sloof Utama 1.44 m3
Keliling Sloof = 48 m
15
2Ø10 Lebar sloof = 15 cm
= 0.15 m
Ø8-15
20 Tinggi sloof = 20 cm
0.2 m

2Ø10
Luas Sloof = Lebar x T m3
= 0.15 x 0.2
= 0.03 m2

Volume Sloof = Luas x Keliling


= 0.03 x 48
= 1.44 m3

2.) Sloof Selasar Sloof Selasar

15
Keliling Sloof (K) = 19.5 m Volume Sloof Selasar
2Ø10
Lebar sloof = 15 cm 0.59 m3
Ø8-15 = 0.15 m
20

Tinggi sloof = 20 cm
2Ø10 0.2 m

Luas Sloof = Lebar x Tinggi


= 0.15 x 0.2
= 0.03 m2

Volume Sloof = Luas x Keliling


= 0.03 x 19.5
= 0.59 m3

● KOLOM ● Perhitungan Volume


Kolom Utama Tulangan utama Volume Beton Kolom
b = 150.0 mm 1.14 m3
h = 200.0 mm
Tinggi kolom = 3800 mm
n kolom = 10.0 buah
Volume beton = 1.1 m3

Kolom Selasar ● Perhitungan Volume


Tulangan utama Volume Beton Kolom
b = 150.0 mm 0.43 m3
h = 150.0 mm
Tinggi kolom = 3800 mm
n kolom = 5.0 buah
Volume beton = 0.43 m3

Kolom Praktis ● Perhitungan Volume


Tulangan utama Volume Beton Kolom
b = 150.0 mm 0.51 m3
h = 150.0 mm
Tinggi kolom = 3800 mm
n kolom = 6.0 buah
Volume beton = 0.51 m3
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


● RING BALOK
1.) Ring Balok Utama ● Perhitungan Volume Volume Beton Ring
Keliling Ringbalk (K) = 48 m Balok Utama
15
2Ø10
Lebar Ring balok (b) = 15 cm 1.44 m3
Ø8-15 = 0.15 m
20
Tinggi ring balok (h) = 20 cm
= 0.2 m
2Ø10
Luas Ring Balok (A) = b x h
= 0.15 x 0.2
= 0.03 m2

Volume Ring Balok (V) = A x K


= 0.03 x 48
= 1.44 m3

2.) Ring Balok Selasar ● Perhitungan Volume Volume Beton Ring


Keliling Ringbalk (K) = 19.5 m Balok Selasar
Lebar Ring balok (b) = 15 cm 0.585 m3
= 0.15 m
Tinggi ring balok (h) = 20 cm
= 0.2 m
Luas Ring Balok (A) = b x h
= 0.15 x 0.2
= 0.03 m2

Volume Ring Balok (V) = A x K


= 0.03 x 19.5
= 0.59 m3

2.) Ring Balok Total ● Perhitungan Volume Volume Total


Ring Balok Total = Ring Balok Utama + Selasar 2.03 m3
= 1.44 + 0.585
= 2.03 m3
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


5.) PEKERJAAN DINDING
● Dinding 1/2 bata 1:4 ● Volume dinding 1 Volume Dinding
L1 = 22.8 m 160.00 m2
L2 = 21.15 m
Tinggi Dinding (h) = 3.8 m

Volume (V) = L1 + L2 x h
= 22.80 + 21.15 x 3.8
= 167.01

● Perhitungan Volume dinding layang-layang segitiga


Alas Dinding (a) = 8 m
Tinggi dinding (t) = 3.47 m
n dinding = 2 buah

Luas dinding (A) = 0.5 x a x t


= 0.5 x 8 x 3.47
= 13.88 m2

Volume (V) = A x n
= 13.88 x 2
= 27.76 m2

● Volume Total = Luas dinding total- Luas Kusen


= 194.77 - 24.84
= 169.94 m2

6.) Pekerjaan Plesteran ● Perhitungan Volume


● Pemasangan 1 m2 plesteran 1SP : 4Pasir Pasang Vol = 2 x Vol Dinding 320.00 m2
tebal 15 mm = 2 x 160.00
= 320 m2
Volume plesteran adalah 2 kali volume pasangan
bata yang dihitung dengan cara perhitungan luas

● Pemasangan 1 m2 acian. ● Perhitungan Volume


Vol = 2 x Vol Dinding
Volume pekerjaan acian sama dengan volume
pekerjaan plesteran dikurangi daerah yang tidak di = 2 x 160.00 320.00 m2
aci seperti dinding keramik.
= 320 m2

● Cat dinding ● Perhitungan Volume


Luas dinding (A) = 320 m2 Volume cat dinding
Volume pekerjaan cat dinding sama dengan
volume pekerjaan plesteran dikurangi daerah yang Daerah tidak di cat (A1) = 2 x 13.88 292.24 m2
tidak di cat seperti dinding keramik.
= 27.76 m2

Luas cat (A) = A - A1


= 320 - 27.76
= 292.24 m2

7.) Pekerjaan Lantai


● Lantai Keramik ● Perhitungan Volume
Volume Lantai Total
Dalam Ruangan
Panjang Lantai (P) = 6.0 m 126.00 m2
Lebar Lantai (b) = 8.0 m
Jumlah Ruangan (n) = 2.0 buah

Luas Lantai (A) = P x b x n


= 6.0 x 8.0 x 2.0
= 96.0 m2

Ruang Selasar
Panjang Lantai (P) = 12.0 m
Lebar Lantai (b) = 2.5 m

Luas Lantai (A) = P x b


Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


= 12.0 x 2.5
= 30.0 m2

● Beton Tumbuk ● Perhitungan Volume


Volume
Luas (A) = 126.0 m2
Tinggi (h) = 5.0 cm 6.30 m3
= 0.05 m2

Volume Beton Tumbuk = A x h


= 126.0 x 0.05
= 6.3 m3
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


8.) Pekerjaan Plafond
Volume
● Rangka Plafond ● Perhitungan Volume
Dalam Ruangan 175.00 m3
Panjang Ruangan (P) = 14.0 m
Lebar Ruangan (b) = 12.5 m

Luas Ruangan (A) = P x b x


= 14.0 x 12.5 x
= 175.0 m2
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


● PEK. Plafond Tripleks ( 60 X 120 cm ) ● Perhitungan Volume
Volume

Volume = 175.0 m2 175.00 m3


Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


● Pemasangan 1 m1 list langit-langit kayu profil ● Perhitungan Volume
Dalam Ruangan Volume List Plafond
L1 = 23.4 m 98.30 m
L2 = 31.2 m

Volume = L1 + L2
= 23.4 + 31.2
= 54.6 m

Luar Ruangan 1
L1 = 24.3 m
L2 = 16.4 m

Volume = L1 + L2
= 24.3 + 16.4
= 40.7 m

Kolom
Lebar kolom (b) = 15.0 cm
= 0.15 m
Tinggi kolom (h) = 15.0 cm
= 0.15 m
Jumlah Kolom (n) = 5.0 buah

Keliling (K) = 0.6 m

Volume List plafond (V) = K x n


= 0.6 x 5.0
= 3.0 m

Volume Total = 54.6 + 40.7 + 3.0


= 98.3 m

8.) Pekerjaan Atap


● Pemasangan 1 m2 genteng metal ● Perhitungan Volume
Panjang = 27.0 m 261.00 m2
Lebar = 7.0 m

Volume = 261.0 m2

● 1 M1 PASANG KONSTRUKSI NOK ● Perhitungan Volume Volume NOK


BUBUNGAN 8/12 KAYU KLS II b = 80.0 mm 0.26 m3
h = 120.0 mm
L = 27000.0 mm
Volume = bxhxL
= 0.3 m3
● 1m3 pasang kaso 5/7 kayu kelas II ● Perhitungan Volume Volume Kaso
b = 50 mm 0.31 m3
h = 70 mm
L = 4360.046 mm
n kaso = 10 buah
Vol = bxhLx2
= 0.305203 m3
Luas = Keliling x L x n kaso
= 2.09 m2
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


9.) Pekerjaan Kayu
● Kusen Pintu ● Perhitungan Volume PJ Volume Kusen
Vertikal 0.02 m3
P = 250.00 cm
= 2.5 m
L = 5 cm
= 0.05 m
t = 5 cm
= 0.05 m
n = 2.0

Volume = 0.01 m3

Vertikal
P = 90.00 cm
= 0.9 m
L = 5 cm
= 0.05 m
t = 5 cm
= 0.05 m
n = 2.0

Volume = 0.005 m3

Volume Total = 0.02 m3

● Angin-Angin ● Perhitungan Volume PJ Volume Kusen


Vertikal 0.05 m3
P = 90.00 cm
= 0.90 m
L = 5.00 cm
= 0.05 m
t = 5.00 cm
= 0.05 m

Volume = 0.002 m3

Horizontal
P = 105.00 cm
= 1.05 m
L = 5.00 cm
= 0.05 m
t = 5.00 cm
= 0.05 m

Volume = 0.003 m3

Miring
P = 123.00 cm
= 1.23 m
L = 5.00 cm
= 0.05 m
t = 5.00 cm
= 0.05 m

Volume = 0.003 m3

Volume Total = 0.008


n = 4.0

V Kusen Jaluzi = 0.0318 m3

Papan :
P = 42.00 cm
= 0.42 m
L = 5.00 cm
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


= 0.05 m
t = 2.00 cm
= 0.02 m
n = 8.0 buah
Volume = 0.003 m3
n = 4.0

V Kusen Jaluzi = 0.01344 m3

● Pemasangan 1 m1 lisplank ukuran (3 x 20) cm, ● Perhitungan Volume Volume Lisplank


kayu kelas I atau kelas II Panjang = 29 m 68.00 m
Lebar x = 3.58 m
Lebar y = 2.93 m Luas Lisplank
Lebar = 4.62 m 27.20 m2
Volume = 67.24 m
= 68.00 m

Dimensi Lisplank
L = 68.00 m
h = 0.20 m
A = (L x h ) x 2
= 27.20 m2

● Pemasangan 1 m3 konstruksi gordeng ● Perhitungan Volume Volume gording


Tinggi gording = 5 cm 1.40 m3
Lebar gording = 10 cm
Panjang gording = 14 m Luas gording
Jumlah gording = 20 buah 8400.00 m2
Volume = 1.40 m3

Luas gording = Keliling x L x n gording


= 8400.00 m2
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


● Pemasangan 1 m3 konstruksi kuda kuda kayu ● Perhitungan Volume Volume kuda kuda
Balok Tarik 5.63 m3
b = 80 mm
h = 120 mm Luas kuda kuda
L = 7000 mm 90.86 m2
Vol = bxhxL
0.0672 m3
Luas Keliling
= x L x n balok tarik
= 2.8 m2

Balok Gapit
b = 60 mm
h = 120 mm
L = 1265 mm
Vol b= x h x L x 2 x 2
= 0.036432 m3
Luas Keliling
= x L x n balok gapit
= 1.82 m2

Sekur
b = 80 mm
h = 120 mm
L = 1700 mm
Vol =b x h x L x 2
= 0.03264 m3
Luas Keliling
= x L x n sekur
= 1.36 m2

Under
b = 80 mm
h = 120 mm
L = 2530 mm
Vol = bxhxL
= 0.02 m3
Luas = Keliling x L
= 1.012 m2

Balok tekan
b = 80 mm
h = 120 mm
L = 5050 mm
Vol =b x h x L x 2
= 0.09696 m3
Luas Keliling
= x L x n balok tekan
= 4.04 m2

Volume total = 0.56 m3


Luas total = 9.09 m2
Total kuda kuda = 10 buah
Luas Kuda kuda = 90.9 m2
Volume kuda kuda = 5.6 m3
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu

SKETSA / KETERANGAN PERHITUNGAN HASIL


9.) Pekerjaan Cat
● Pengecatan bidang kayu baru (1 lapis plamuur, 1 ● Perhitungan Volume Luas Cat
lapis cat dasar, 2 lapis cat penutup) 8518.06 m2
Kusen = 0.00 m2
Lisplank = 27.20 m2
Gording = 8400.00 m2
Kuda kuda = 90.86 m2
Total = 8518.06 m2

10. Pekerjaan Kusen


1.) Kusen Pintu ● Perhitungan Volume Luas Kusen
Lebar pintu (b) = 90 cm 24.84 m2
= 0.9 m2
Tinggi Pintu (h) = 250.0 cm Luas Kusen di Cat
= 2.5 m2 49.67
Jumlah Pintu (n) = 2.0 buah

Luas Pintu = b x h x n
= 0.9 x 2.5 x 2.0
= 4.5 m2

2.) Kusen jendela depan ● Perhitungan Volume


Lebar Jendela (b) = 215 cm
= 2.15 m2
Tinggi Jendela (h) = 145.0 cm
= 1.45 m2
Jumlah Jendela (n) = 2.0 buah

Luas Pintu (A) = b x h x n


= 2.15 x 1.45 x 2.0
= 6.2 m2

3.) Kusen jendela belakang ● Perhitungan Volume


Lebar Jendela (b) = 215 cm
= 2.15 m
Tinggi Jendela (h) = 120.0 cm
= 1.2 m
Jumlah Jendela (n) = 4.0 buah

Luas Pintu (A) = b x h x n


= 2.15 x 1.20 x 4.0
= 10.3 m2

4.) Kusen Angin-Angin ● Perhitungan Volume


Lebar Angin-Angin (b) = 105 cm
= 1.05 m2
Tinggi Angin-Angin = 90.0 cm
= 0.90 m2
Jumlah Angin-Angin = 4.0 buah

Luas Angin-Angin (A) = b x h x n


= 1.05 x 0.90 x 4.0
= 3.8 m2
LAMPIRAN PERJANJIAN KERJA SAMA

NOMOR : 4152/C4.4/KU/2017
TANGGAL : 29 Mei 2017

REKAPITULASI RINCIAN ANGGARAN BIAYA (RAB)

NO. URAIAN PEKERJAAN JUMLAH (Rp)

I PEKERJAAN PERSIAPAN 500,000.00


A PEKERJAAN GEDUNG KEY~A ( 2 RUANG KELAS TEORI) 287,229,566.57
I PEKERJAAN PERSIAPAN 2,002,000.00
II PEKERJAAN TANAH 5,922,545.00
III PEKERJAAN PONDASI 23,231,054.00
IV PEKERJAAN BETON 52,938,117.70
V PEKERJAAN DINDING 45,835,515.00
VI PEKERJAAN PINTU DAN JENDELA 17,458,785.55
VII PEKERJAAN KUDA-KUDA DAN ATAP 39,492,020.92
VIII PEKERJAAN PLAFOND 33,213,475.00
IX PEKERJAAN LANTAI / KERAMIK 28,283,787.00
X PEKERJAAN PENGECATAN 17,085,374.40
XI PEKERJAAN INSTALASI LISTRIK 7,514,517.00
XII PEKERJAAN PENGGANTUNG / PENGUNCI 2,762,300.00
XIII PEKERJAAN LAIN-LAIN 11,490,075.00
B PEKERJAAN GEDUNG KEY~B ( 2 RUANG KELAS KETRAMPILAN ) 329,585,441.79
I PEKERJAAN PERSIAPAN 2,002,000.00
II PEKERJAAN TANAH 5,922,545.00
III PEKERJAAN PONDASI 31,789,630.00
IV PEKERJAAN BETON 55,435,227.24
V PEKERJAAN DINDING 45,835,515.00
VI PEKERJAAN PINTU DAN JENDELA 17,458,785.55
VII PEKERJAAN KUDA-KUDA DAN ATAP 59,814,337.90
VIII PEKERJAAN PLAFOND 33,226,250.00
IX PEKERJAAN LANTAI / KERAMIK 29,718,506.10
X PEKERJAAN PENGECATAN 18,994,080.00
XI PEKERJAAN INSTALASI LISTRIK 15,136,190.00
XII PEKERJAAN PENGGANTUNG / PENGUNCI 2,762,300.00
XIII PEKERJAAN LAIN-LAIN 11,490,075.00
C PEKERJAAN GUDANG DAN TOILET 72,386,153.03
I PEKERJAAN PERSIAPAN 1,062,600.00
II PEKERJAAN TANAH 2,254,811.33
III PEKERJAAN PONDASI 8,601,751.98
IV PEKERJAAN BETON 19,953,376.60
V PEKERJAAN DINDING 9,174,720.00
VI PEKERJAAN PINTU DAN JENDELA 3,443,180.00
VII PEKERJAAN KUDA-KUDA DAN ATAP 9,453,227.12
VIII PEKERJAAN PLAFOND 5,110,800.00
IX PEKERJAAN LANTAI / KERAMIK 3,830,246.00
X PEKERJAAN PENGECATAN 2,313,960.00
XI PEKERJAAN INSTALASI LISTRIK 1,776,000.00
XII PEKERJAAN SANITASI 5,048,890.00
XIII PEKERJAAN PENGGANTUNG / PENGUNCI 362,590.00
D PEKERJAAN INFRASTRUKTUR 74,251,537.00
I PEKERJAAN PERSIAPAN 1,500,000.00
II PEKERJAAN TANAH 11,286,087.00
III PEK INFRA STRUKTUR HALAMAN 61,465,450.00

TOTAL GEDUNG A , B , C , DAN D 763,952,698.40


ALOKASI PPN (4 %) 30,558,107.94
BIAYA PERENCANAAN (3 %) 22,918,580.95
BIAYA PENGAWASAN (2 %) 15,279,053.97
BIAYA PENGELOLAAN (1 %) 7,639,526.98
TOTAL 840,347,968.24
DIBULATKAN 840,347,000.00

Terbilang : Delapan Ratus Empat Puluh Satu Juta Dua Ratus Empat Puluh Dua Ribu

PIHAK PERTAMA PIHAK KEDUA

Drs. HASAN BISRI, MM.Pd. HASIMAANA, A.Ma, M.Pd


NIP.19640427 199203 1 001 NIP. 19611231 198401 2 015
Time Schedule " Kurva S "

Kegiatan : Pembangunan Gedung Teori


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket. Cek
(%) h1 h2 h3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4
I Pekerjaan Persiapan 2,002,000.00 0.70 0.70 0.70 100 0.70
II Pekerjaan Tanah 5,922,545.00 2.06 1.03 1.03 0.00
III Pekerjaan Pondasi 23,231,054.00 8.09 2.70 2.70 2.70 0.00
80
IV Pekerjaan Beton 52,938,117.70 18.43 4.61 4.61 4.61 4.61 0.00
V Pekerjaan Dinding 45,835,515.00 15.96 5.32 5.32 5.32 0.00
VI Pekerjaan Pintu dan Jendela 17,458,785.55 6.08 2.03 2.03 2.03 60 0.00
VII Pekerjaan Kuda Kuda dan Atap 39,492,020.92 13.75 4.58 4.58 4.58 0.00
VIII Pekerjaan Plafond 33,213,475.00 11.56 3.85 3.85 3.85 0.00
40
IX Pekerjaan Lantai/Keramik 28,283,787.00 9.85 4.92 4.92 0.00
X Pekerjaan Pengecetan 17,085,374.40 5.95 1.98 1.98 1.98 0.00
XI Pekerjaan Instalasi Listrik 7,514,517.00 2.62 1.31 1.31 20 0.00
XII Pekerjaan Penggantung / Pengunci 2,762,300.00 0.96 0.96 0.00
XIII Pekerjaan Lain Lain 11,490,075.00 4.00 2.00 2.00 0.00
0
Total Bobot 287,229,566.57 100.00
Bobot Rencana per Minggu 0.70 1.73 3.73 7.30 7.30 9.93 11.95 7.35 6.61 8.44 8.44 8.78 7.19 5.29 3.98 1.98
Komulatif Bobot Rencana per Minggu 0.697 2.425 6.15 13.456 20.76 30.69 42.64 49.98 56.59 65 73.469 82.247 89.44 94.73 98.71 100.7
Time Schedule " Kurva S "

Kegiatan : Pembangunan Gedung Keterampilan


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket. Cek
(%) M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4
I Pekerjaan Persiapan 2,002,000.00 0.61 0.61 100 0.00
II Pekerjaan Tanah 5,922,545.00 1.80 0.90 0.90 0.00
III Pekerjaan Pondasi 31,789,630.00 9.65 3.22 3.22 3.22 0.00
80
IV Pekerjaan Beton 55,435,227.24 16.82 4.20 4.20 4.20 4.20 0.00
V Pekerjaan Dinding 45,835,515.00 13.91 4.64 4.64 4.64 0.00
VI Pekerjaan Pintu dan Jendela 17,458,785.55 5.30 1.77 1.77 1.77 60 0.00
VII Pekerjaan Kuda Kuda dan Atap 59,814,337.90 18.15 6.05 6.05 6.05 0.00
VIII Pekerjaan Plafond 33,226,250.00 10.08 3.36 3.36 3.36 0.00
40
IX Pekerjaan Lantai/Keramik 29,718,506.10 9.02 4.51 4.51 0.00
X Pekerjaan Pengecetan 18,994,080.00 5.76 1.92 1.92 1.92 0.00
XI Pekerjaan Instalasi Listrik 15,136,190.00 4.59 2.30 2.30 20 0.00
XII Pekerjaan Penggantung / Pengunci 2,762,300.00 0.84 0.84 0.00
XIII Pekerjaan Lain Lain 11,490,075.00 3.49 1.74 1.74 0.00
0
Total Bobot 329,585,441.79 100.00
Bobot Rencana per Minggu 0.61 0.90 4.11 7.42 7.42 8.84 10.61 6.40 7.82 9.41 9.41 7.87 7.64 5.96 3.66 1.92
Komulatif Bobot Rencana per Minggu 0.607 1.506 5.62 13.04 20.46 29.3 39.91 46.31 54.12 63.53 72.943 80.812 88.45 94.41 98.08 100
Time Schedule " Kurva S "

Kegiatan : Pembangunan Gudang dan WC


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket. Cek
(%) M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4
I Pekerjaan Persiapan 1,062,600.00 1.47 1.47 100 0.00
II Pekerjaan Tanah 2,254,811.33 3.11 1.56 1.56 0.00
III Pekerjaan Pondasi 8,601,751.98 11.88 3.96 3.96 3.96 0.00
80
IV Pekerjaan Beton 19,953,376.60 27.57 6.89 6.89 6.89 6.89 0.00
V Pekerjaan Dinding 9,174,720.00 12.67 4.22 4.22 4.22 0.00
VI Pekerjaan Pintu dan Jendela 3,443,180.00 4.76 1.59 1.59 1.59 60 0.00
VII Pekerjaan Kuda Kuda dan Atap 9,453,227.12 13.06 4.35 4.35 4.35 0.00
VIII Pekerjaan Plafond 5,110,800.00 7.06 2.35 2.35 2.35 40 0.00
IX Pekerjaan Lantai/Keramik 3,830,246.00 5.29 2.65 2.65 0.00
X Pekerjaan Pengecetan 2,313,960.00 3.20 1.07 1.07 1.07 0.00
XI Pekerjaan Instalasi Listrik 1,776,000.00 2.45 1.23 1.23 20 0.00
XII Pekerjaan Penggantung / Pengunci 362,590.00 0.50 0.50 0.00
XIII Pekerjaan Sanitasi 5,048,890.00 6.97 2.32 2.32 2.32 0 0.00
Total Bobot 72,386,153.03 100.00
Bobot Rencana per Minggu 1.47 1.56 5.52 10.85 10.85 11.12 12.70 5.81 5.94 6.71 9.03 7.32 6.70 2.29 1.07 1.07
Komulatif Bobot Rencana per Minggu 1.468 3.025 8.54 19.396 30.25 41.36 54.07 59.88 65.82 72.52 81.554 88.878 95.58 97.87 98.93 100
Time Schedule " Kurva S "

Kegiatan : Pembangunan Infarastruktur


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket. Cek
(%) M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4
I Pekerjaan Persiapan 1,500,000.00 2.02 2.02 100 0.00
II Pekerjaan Tanah 11,286,087.00 15.20 7.60 7.60 80 0.00
60
III Pekerjaan Infrastruktur 61,465,450.00 82.78 27.59 27.593 27.593 40 0.00
Total Bobot 74,251,537.00 100.00 20
Bobot Rencana per Minggu 2.02 35.19 35.19 27.59 0.00 0
Komulatif Bobot Rencana per Minggu 2.02 37.21 72.407 100 100

Time Schedule " Kurva S "

Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara


Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket. Cek
(%) M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4
I Pekerjaan Persiapan 7,066,600.00 #REF! #REF! #REF! 100 #REF!
II Pekerjaan Tanah 25,385,988.33 #REF! #REF! ### #REF!
III Pekerjaan Pondasi 63,622,435.98 #REF! ### #REF! ### #REF!
IV Pekerjaan Beton 128,326,721.54 #REF! #REF! ### ### #REF! 80 #REF!
V Pekerjaan Dinding 100,845,750.00 #REF! ### #REF! #REF! #REF!
VI Pekerjaan Pintu dan Jendela 38,360,751.10 #REF! #REF! #REF! #REF! #REF!
VII Pekerjaan Kuda Kuda dan Atap 108,759,585.94 #REF! #REF! ### #REF! 60 #REF!
VIII Pekerjaan Plafond 71,550,525.00 #REF! ### #REF! #REF! #REF!
IX Pekerjaan Lantai/Keramik 61,832,539.10 #REF! #REF! #REF! #REF!
X Pekerjaan Pengecetan #REF! #REF! #REF! #REF! #REF! 40 #REF!
XI Pekerjaan Instalasi Listrik 24,426,707.00 #REF! #REF! #REF! #REF!
XII Pekerjaan Penggantung / Pengunci 5,887,190.00 #REF! #REF! #REF!
XIII Pekerjaan Lain Lain 22,980,150.00 #REF! #REF! #REF! 20 #REF!
XIV Pekerjaaan Sanitasi 5,048,890.00 #REF! #REF! #REF! #REF! #REF!
XV Pekerjaan Infrastruktur 61,465,450.00 #REF! #REF! #REF! #REF! #REF!
0 0.00
Total Bobot #REF! #REF!
Bobot Rencana per Minggu #REF! #REF! ### #REF! ### ### #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF!
Komulatif Bobot Rencana per Minggu #REF! #REF! ### #REF! ### ### #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF!
1
Time Schedule " Kurva S "

Kegiatan : Pembangunan Gedung Teori


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket.
(%) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
I Pekerjaan Persiapan 2,002,000.00 0.70 0.70 100
II Pekerjaan Tanah 5,922,545.00 2.06 1.03 1.03
III Pekerjaan Pondasi 23,231,054.00 8.09 2.70 2.70 2.70
80
IV Pekerjaan Beton 52,938,117.70 18.43 4.61 4.61 4.61 4.61
V Pekerjaan Dinding 45,835,515.00 15.96 5.32 5.32 5.32
VI Pekerjaan Pintu dan Jendela 17,458,785.55 6.08 2.03 2.03 2.03 60
VII Pekerjaan Kuda Kuda dan Atap 39,492,020.92 13.75 4.58 4.58 4.58
VIII Pekerjaan Plafond 33,213,475.00 11.56 3.85 3.85 3.85
40
IX Pekerjaan Lantai/Keramik 28,283,787.00 9.85 4.92 4.92
X Pekerjaan Pengecetan 17,085,374.40 5.95 1.98 1.98 1.98
XI Pekerjaan Instalasi Listrik 7,514,517.00 2.62 1.31 1.31 20
XII Pekerjaan Penggantung / Pengunci 2,762,300.00 0.96 0.96
XIII Pekerjaan Lain Lain 11,490,075.00 4.00 2.00 2.00
0
Total Bobot 287,229,566.57 100.00
Bobot Rencana per Minggu 0.70 1.03 3.73 7.30 7.30 9.93 11.95 7.35 6.61 8.44 8.44 8.78 7.19 5.29 3.98 1.98
Komulatif Bobot Rencana per Minggu 0.697 1.728 5.455 12.76 20.06 29.99 41.94 49.29 55.9 64.33 72.772 81.55 88.74 94.03 98.02 100
Bobot Realisasi per Minggu 14.42 7.92 6.89 8.29 3.69 4.69 8.12 8.12 5.84 4.84 14.18 0.00 0.00 0.00 0.00 0.00
Komulatif Bobot Ralisasi per Minggu 14.42 22.34 29.23 37.52 41.21 45.9 54.02 62.14 67.99 72.83 87.012 87.012 87.01 87.01 87.01 87.01

Ket : Kurva Realisasi


: Kurva Rencana
Time Schedule " Kurva S "

Kegiatan : Pembangunan Gedung Keterampilan


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket.
(%) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
I Pekerjaan Persiapan 2,002,000.00 0.61 0.61 100
II Pekerjaan Tanah 5,922,545.00 1.80 0.90 0.90
III Pekerjaan Pondasi 31,789,630.00 9.65 3.22 3.22 3.22
80
IV Pekerjaan Beton 55,435,227.24 16.82 4.20 4.20 4.20 4.20
V Pekerjaan Dinding 45,835,515.00 13.91 4.64 4.64 4.64
VI Pekerjaan Pintu dan Jendela 17,458,785.55 5.30 1.77 1.77 1.77 60
VII Pekerjaan Kuda Kuda dan Atap 59,814,337.90 18.15 6.05 6.05 6.05
VIII Pekerjaan Plafond 33,226,250.00 10.08 3.36 3.36 3.36
40
IX Pekerjaan Lantai/Keramik 29,718,506.10 9.02 4.51 4.51
X Pekerjaan Pengecetan 18,994,080.00 5.76 1.92 1.92 1.92
XI Pekerjaan Instalasi Listrik 15,136,190.00 4.59 2.30 2.30 20
XII Pekerjaan Penggantung / Pengunci 2,762,300.00 0.84 0.84
XIII Pekerjaan Lain Lain 11,490,075.00 3.49 1.74 1.74
0
Total Bobot 329,585,441.79 100.00
Bobot Rencana per Minggu 0.61 0.90 4.11 7.42 7.42 8.84 10.61 6.40 7.82 9.41 9.41 7.87 7.64 5.96 3.66 1.92
Komulatif Bobot Rencana per Minggu 0.607 1.506 5.62 13 20.46 29.3 39.91 46.31 54.12 63.53 72.943 80.812 88.45 94.41 98.08 100
Bobot Realisasi per Minggu 15.36 7.42 6.52 8.03 3.82 10.74 10.74 8.42 12.46 2.30 2.30 0.00 0.00 0.00 0.00 0.00
Komulatif Bobot Ralisasi per Minggu 15.36 22.78 29.3 37.33 41.15 51.89 62.63 71.05 83.51 85.81 88.102 88.102 88.1 88.1 88.1 88.1

Ket : Kurva Realisasi


: Kurva Rencana
Time Schedule " Kurva S "

Kegiatan : Pembangunan Gudang dan WC


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket.
(%) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
I Pekerjaan Persiapan 1,062,600.00 1.47 1.47 100
II Pekerjaan Tanah 2,254,811.33 3.11 1.56 1.56
III Pekerjaan Pondasi 8,601,751.98 11.88 3.96 3.96 3.96
80
IV Pekerjaan Beton 19,953,376.60 27.57 6.89 6.89 6.89 6.89
V Pekerjaan Dinding 9,174,720.00 12.67 4.22 4.22 4.22
VI Pekerjaan Pintu dan Jendela 3,443,180.00 4.76 1.59 1.59 1.59 60
VII Pekerjaan Kuda Kuda dan Atap 9,453,227.12 13.06 4.35 4.35 4.35
VIII Pekerjaan Plafond 5,110,800.00 7.06 2.35 2.35 2.35
40
IX Pekerjaan Lantai/Keramik 3,830,246.00 5.29 2.65 2.65
X Pekerjaan Pengecetan 2,313,960.00 3.20 1.07 1.07 1.07
XI Pekerjaan Instalasi Listrik 1,776,000.00 2.45 1.23 1.23 20
XII Pekerjaan Penggantung / Pengunci 362,590.00 0.50 0.50
XIII Pekerjaan Sanitasi 5,048,890.00 6.97 2.32 2.32 2.32 0
Total Bobot 72,386,153.03 100.00
Bobot Rencana per Minggu 1.47 1.56 5.52 10.85 10.85 11.12 12.70 5.81 5.94 6.71 9.03 7.32 6.70 2.29 1.07 1.07
Komulatif Bobot Rencana per Minggu 1.468 3.025 8.544 19.4 30.25 41.36 54.07 59.88 65.82 72.52 81.554 88.878 95.58 97.87 98.93 100
Bobot Realisasi per Minggu 21.80 10.56 9.00 14.64 2.99 9.52 13.05 4.41 7.89 4.55 1.07 0.00 0.00 0.00 0.00 0.00
Komulatif Bobot Ralisasi per Minggu 21.8 32.36 41.36 56 59 68.53 81.58 85.99 93.88 98.43 99.499 99.499 99.5 99.5 99.5 99.5

Ket : Kurva Realisasi


: Kurva Rencana
Time Schedule " Kurva S "

Kegiatan : Pembangunan Infarastruktur


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket.
(%) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
I Pekerjaan Persiapan 1,500,000.00 2.02 2.02 100
II Pekerjaan Tanah 11,286,087.00 15.20 15.20 80
III Pekerjaan Infrastruktur Halaman 61,465,450.00 82.78 27.59 27.59 27.59 60
40
Total Bobot 74,251,537.00 100.00
20
Bobot Rencana per Minggu 2.02 15.20 27.59 27.59 27.59 0.00 0
Komulatif Bobot Rencana per Minggu 2.0202 17.22 44.81 72.41 100 100
Cek
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cek
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cek
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cek
0.00
0.00
0.00
Time Schedule " Kurva S Realita "

Kegiatan : Pembangunan Gedung Teori


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket.
(%) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
I Pekerjaan Persiapan 2,002,000.00 0.70 0.70 100
II Pekerjaan Tanah 5,922,545.00 2.06 1.03 1.03
III Pekerjaan Pondasi 23,231,054.00 8.09 8.09
80
IV Pekerjaan Beton 52,938,117.70 18.43 4.61 4.61 4.61 4.61
V Pekerjaan Dinding 45,835,515.00 15.96 2.28 2.28 2.28 2.28 2.28 2.28 2.28
VI Pekerjaan Pintu dan Jendela 17,458,785.55 6.08 60
VII Pekerjaan Kuda Kuda dan Atap 39,492,020.92 13.75 3.44 3.44 3.44 3.44
VIII Pekerjaan Plafond 33,213,475.00 11.56 11.56
40
IX Pekerjaan Lantai/Keramik 28,283,787.00 9.85 1.41 1.41 1.41 1.41 1.41 1.41 1.41
X Pekerjaan Pengecetan 17,085,374.40 5.95
XI Pekerjaan Instalasi Listrik 7,514,517.00 2.62 2.62 20
XII Pekerjaan Penggantung / Pengunci 2,762,300.00 0.96
XIII Pekerjaan Lain Lain 11,490,075.00 4.00 1.00 1.00 1.00 1.00
0
Total Bobot 287,229,566.57 100.00
Bobot Rencana per Minggu 14.42 7.92 6.89 8.29 3.69 4.69 8.12 8.12 5.84 4.84 14.18 0.00 0.00 0.00 0.00 0.00
Komulatif Bobot Rencana per Minggu 14.42 22.34 29.23 37.52 41.21 45.9 54.02 62.14 67.99 72.83 87.012 87.012 87.01 87.01 87.01 87.01
Time Schedule " Kurva S Realita "

Kegiatan : Pembangunan Gedung Keterampilan


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket.
(%) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
I Pekerjaan Persiapan 2,002,000.00 0.61 0.61 100
II Pekerjaan Tanah 5,922,545.00 1.80 0.90 0.90
III Pekerjaan Pondasi 31,789,630.00 9.65 9.65
80
IV Pekerjaan Beton 55,435,227.24 16.82 4.20 4.20 4.20 4.20
V Pekerjaan Dinding 45,835,515.00 13.91 2.32 2.32 2.32 2.32 2.32 2.32
VI Pekerjaan Pintu dan Jendela 17,458,785.55 5.30 60
VII Pekerjaan Kuda Kuda dan Atap 59,814,337.90 18.15 6.05 6.05 6.05
VIII Pekerjaan Plafond 33,226,250.00 10.08 10.08
40
IX Pekerjaan Lantai/Keramik 29,718,506.10 9.02 1.50 1.50 1.50 1.50 1.50 1.50
X Pekerjaan Pengecetan 18,994,080.00 5.76
XI Pekerjaan Instalasi Listrik 15,136,190.00 4.59 2.30 2.30 20
XII Pekerjaan Penggantung / Pengunci 2,762,300.00 0.84
XIII Pekerjaan Lain Lain 11,490,075.00 3.49 0.87 0.87 0.87 0.87
0
Total Bobot 329,585,441.79 100.00
Bobot Rencana per Minggu 15.36 7.42 6.52 8.03 3.82 10.74 10.74 8.42 12.46 2.30 2.30 0.00 0.00 0.00 0.00 0.00
Komulatif Bobot Rencana per Minggu 15.36 22.78 29.3 37.33 41.15 51.89 62.63 71.05 83.51 85.81 88.102 88.102 88.1 88.1 88.1 88.1
Time Schedule " Kurva S "

Kegiatan : Pembangunan Gudang dan WC


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket.
(%) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
I Pekerjaan Persiapan 1,062,600.00 1.47 1.47 100
II Pekerjaan Tanah 2,254,811.33 3.11 1.56 1.56
III Pekerjaan Pondasi 8,601,751.98 11.88 11.88
80
IV Pekerjaan Beton 19,953,376.60 27.57 6.89 6.89 6.89 6.89
V Pekerjaan Dinding 9,174,720.00 12.67 2.11 2.11 2.11 2.11 2.11 2.11
VI Pekerjaan Pintu dan Jendela 3,443,180.00 4.76 4.76 60
VII Pekerjaan Kuda Kuda dan Atap 9,453,227.12 13.06 6.53 6.53
VIII Pekerjaan Plafond 5,110,800.00 7.06 3.53 3.53
40
IX Pekerjaan Lantai/Keramik 3,830,246.00 5.29 0.88 0.88 0.88 0.88 0.88 0.88
X Pekerjaan Pengecetan 2,313,960.00 3.20 1.07 1.07 1.07
XI Pekerjaan Instalasi Listrik 1,776,000.00 2.45 2.45 20
XII Pekerjaan Penggantung / Pengunci 362,590.00 0.50
XIII Pekerjaan Sanitasi 5,048,890.00 6.97 3.49 3.49 0
Total Bobot 72,386,153.03 100.00
Bobot Rencana per Minggu 21.80 10.56 9.00 14.64 2.99 9.52 13.05 4.41 7.89 4.55 1.07 0.00 0.00 0.00 0.00 0.00
Komulatif Bobot Rencana per Minggu 21.8 32.36 41.36 56 59 68.53 81.58 85.99 93.88 98.43 99.499 99.499 99.5 99.5 99.5 99.5
Time Schedule " Kurva S "

Kegiatan : Pembangunan Infarastruktur


Pekerjaan : Pembangunan Gedung SPNF-SKB Buton Utara
Lokasi : Desa Linsowu, Kec. Kulisusu, Kab. Buton Utara
Tahun : 2017

Bobot Aug-17 Sep-17 Oct-17 November 17


No Uraian pekerjaan Total (Rp) Ket.
(%) M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4
I Pekerjaan Persiapan - 0.00 0.00 100
II Pekerjaan Tanah - 0.00 0.00 80
III Pekerjaan Infrastruktur Halaman - 0.00 0 0 0 60
40
Total Bobot - 0.00
20
Bobot Rencana per Minggu 0.00 0.00 0.00 0.00 0.00 0.00 0
Komulatif Bobot Rencana per Minggu 0 0 0 0 0 0
RINCIAN ANGGARAN BIAYA

NPSN : P9957031
NAMA INSTANSI : SPNF SKB BUTON UTARA
KABUPATEN : Kab. Buton Utara
PROVINSI : Sulawesi Tenggara

Pekerjaan : PERSIAPAN

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Papan Nama Program + Papan Informasi 1.00 unit 150,000 150,000.00
2 Pek. Direksi Keet + Gudang 1.00 ls - -
3 Pengadaan Air Kerja 1.00 ls 350,000 350,000.00
4 Pembuatan Pagar kerja 1.00 ls - -

Total 500,000.00

Total 500,000.00
DAFTAR HARGA BAHAN DAN UPAH
KABUPATEN BUTON UTARA
SULAWESI TENGGARA

Kode Instansi : 0
Nama Instansi : SPNF SKB BUTON UTARA
Desa : Linsowu
Kecamatan : Kulisusu
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara
DAFTAR HARGA UPAH
HARGA
NO JENIS UPAH SATUAN
Rp.

1 Mandor org-hari
2 Kepala Tukang 136,620.00 org-hari
3 Tukang Batu 127,512.00 org-hari
4 Tukang Kayu 127,512.00 org-hari
5 Tukang Besi / Tukang Pipa 127,512.00 org-hari
6 Tukang Cat 127,512.00 org-hari
7 Tukang Las 127,512.00 org-hari
8 Tukang Listrik 127,512.00 org-hari
9 Pekerja 113,850.00 org-hari

DAFTAR HARGA BAHAN


HARGA
NO JENIS BAHAN SATUAN
Rp.

A. Bahan Agregat Kasar, Bahan Pelekat dan Bahan Jadi


1 Pasir Urug 125,000.0 M3
2 Pasir Pasang 150,000.0 M3
3 Pasir Beton 200,000.0 M3
4 Batu Kerikil Beton 450,000.00 M3
5 Batu Kali / Belah Belah 235,000.0 M3
6 Batu Karang Mati M3
7 Batu Kerikil / Split 2/3 cm 250,000.0 M3
8 Bata Merah Bakar Kelas I 700.00 Bh
9 Batako 6,000.00 Bh
10 Paving Block Warna 6 cm 138,000.00 M2
11 Cansteen 49,000.00 m
12 Paving Block Natural 6 cm 138,000.00 M2
13 Paving Block Natural 8 cm M2
14 Semen PC (50 kg) 95,000.0 Zak
15 Semen Warna 2,000.00 Kg
16 Tanah urug M3
17 Tanah urug (Pilihan) 140,000.00 M3
18 Batu Tempel M2

B. Bahan Finishing Laburan Pengisi dan Alatnya


1 Plamir Tembok 9,000.00 Kg
2 Plamir Kayu 9,000.00 Kg
3 Cat Tembok 7,000.00 Kg
4 Kuas Roll 34,000.00 Bh
5 Kuas 18,000.00 Bh
6 Minyak cat / Thinner 13,876.00 Ltr
7 Amplas 7,000.00 Lbr
8 Meni Kayu 34,000.00 Kg
9 Meni Besi 34,000.00 Kg
10 Cat Kayu 25,000.00 Kg
11 Cat Besi 7,000.00 Kg
12 Residu 13,000.00 Ltr
13 Lem Kayu 25,000.00 Kg
14 Politur 41,000.00 Kg
15 Cat Minyak 13,000.00 Kg

C. Bahan Kayu/Baja Berikut Bahan Jadinya


1 Kayu Kelas III Papan 3,000,000.00 M3
2 Kayu Kelas III Balok 3,000,000.00 M3
3 Kayu Kelas II Papan 4,000,000.00 M3
4 Kayu Kelas II Balok 4,000,000.00 M3
5 Kayu Dolken 30,000.00 Btg
6 List Plafond 20,000.00 Btg
7 Baja Ringan M²
8 Bambu Btg
9 Papan Kayu kalapi 3,500,000.00 M3
10 Balok kayu Merati 3,500,000.00 M3

D. Bahan Penutup Rangka Plafond


1 Triplek 3mm 120 x 240 85,000.00 Lbr
2 Triplek 6mm 120 x 240 150,000.00 Lbr
3 Polywood tebal 9 mm Lbr

E. Bahan Kayu Lapis


1 Multipleks 12mm 120 x 240 Lbr
2 Multipleks 18mm 120 x 240 Lbr
Multipleks 18mm 120 x 240 Lbr
Jabarwood 4 mm Lbr
F. Bahan Lantai dan Pelapis Dinding
1 Keramik 30 x 30 cm Doz
2 Keramik 40 x 40 cm 70,000.00 Doz
3 Keramik 20 x 25 cm Doz
4 Keramik 10 x 20 cm Doz
5 Keramik 20 x 20 cm Doz
6 Keramik 15 x 20 cm Doz
7 Keramik Porselen 11 x 11 cm Doz
8 Keramik Porselen 11 x 11 cm, Warna Doz
9 Keramik Porselen 10 x 20 cm, Warna Doz
10 Keramik Porselen 20 x 20 cm, Warna Doz

G. Bahan Saluran Air Kotor (Riolering)


1 Buis belah dia 20 cm Bh
2
H. Bahan Logam dan Bahan Jadinya
1 Besi Beton Polos Dia. 12 mm 35,430.00 Kg
2 Besi Beton Polos Dia. 10 mm 35,430.00 Kg
3 Besi Beton Polos Dia. 8 mm 35,430.00 Kg
4 Besi Siku 50.50.5 panjang 6 m Kg
5 Besi Strip 2x3 M²
6 Besi Strip Kg
7 Kawat Beton 26,000.00 Kg
8 Beghel U (Plat Baja U 4.40mm) bh
9 Beghel U (Besi Polos 12mm) 15,000.00 bh
10 Plat Baja 4.40mm bh
11 Baut Dia. 10mm (25 - 30 cm) bh
12 Kawat berduri M
13 Pagar BRC Ø6 mm, lengkap dengan tiang dan klem pengikat lbr
14 Almunium M²
15 Pasak Besi f 12 mm Kg
16 Ring Basket bh
17 Papan Pantul + Rangka bh

I. Bahan Kaca
1 Kaca Polos 5 mm 227,700.00 M²
2 Kaca Polos 3 mm 187,750.00 M²

J. Bahan Paku
1 Paku Biasa 25,000.0 Kg
2 Paku Tripleks 25,000.0 Kg
3 Paku Seng + karet seal 25,000.0 Kg
4 Paku Ulir bh

K. Bahan Perpipaan (Riolering dan Asineering)


1 Pipa PVC AW 0,5" btg
2 Pipa PVC AW 0,75" 57,000.00 btg
3 Pipa PVC AW 1" btg
4 Pipa PVC AW 1,5" btg
5 Pipa PVC AW 2" btg
6 Pipa PVC AW 2,5" btg
7 Pipa PVC AW 3" 145,000.00 btg
8 Pipa PVC AW 4" 300,000.00 btg
9 Pipa konduit dia 5/8 inch 2,000.00 M'
10 Pipa Galvanis 0,5" btg
11 Pipa Galvanis 0,75" btg
12 Pipa Galvanis 1" btg
13 Pipa Galvanis 1,5" btg
14 Pipa Galvanis 2" btg
15 Pipa Galvanis 3" M'
16 Pipa Galvanis 4" btg
17 Pipa GIP 1/2" btg
18 Pipa Stainless Steel Dia. 1,5 " M'
19 Elbow 4" bh
L. Bahan Sanitair dan Perpipaan
1 Kran Air bh
2 Floor Drain bh
3 Closet Jongkok 607,200.00 bh
4 Closet Duduk 2,656,500.00 bh
5 Bak Air Mandi bh
6 Bak Cuci Stainless Steel bh
7 Bak Fibreglass bh
8 Washtafel 2,277,000.00 bh
9 Urinoir bh
10 Tangki Air Kap. 2 x 600 Ltr Unit
11 Mesin Pompa Air 350 Watt
12 Water Drain + asesories Set

M. Bahan Penutup Atap


1 Genteng Tanah/Plentong ex. Jatiwangi Bh
2 Bubungan Genteng Tanah Bh
3 Seng Gelombang BJLS 0,3 87,000.0 Lbr
4 Seng Plat BJLS 30 lebar 90 cm M1
5 Atap Spandek Zyncalum 128,000.00 Lbr
6 Genteng Metal / metal roof zyncalum Lbr
7 Nok Genteng Metal Bh
8 Nok Tepi Seng Gelombang 30,000.00 m1
9 Nok Tepi Zyncalum 50,000.00 Bh
10 Nok Tepi Genteng Metal Bh
11 Nok Tepi Atap Spandek Bh
Bh
N. Bahan Alat Penggantung dan Kunci
1 Kunci Pintu 92,000.00 Bh
2 Kunci Bulat 92,000.00 Bh
3 Kunci Tanam biasa 90,000.00 Bh
4 Kunci Tanam Kamar Mandi 88,000.00 Bh
5 Kunci Pintu 2 x Putar ( lever handle ) 120,000.00 Bh
6 Sloot Tanam Bh
7 Grendel Jendela 12,000.0 Bh
8 Kait Angin 16,000.0 ps
9 Engsel Pintu 4 " 35,000.0 Bh
10 Engsel Jendela 3 " 32,000.0 Bh
11 Kunci laci set
12 Pegangan/Handle Pintu Bh
13 Knop Tarikan Bh
14 Kasur Busa Bh
15 Imitatie Lear Unit
16 Sekrup 5 cm Bh
17 Kunci Lemari Bh
18 Engsel Pita psg
19 Rel Pita psg
20 Promika Bh
21 Sekrup Pengantung Bh
22 Kasur Busa Bh
23 Kaca / Cermin muka Bh
24 Gantungan Baju Bh
25 Plank nama ruangan Set
26 Handel tarik jendela Bh
27 Grabbed Bar set

O. Bahan Jadi Penampung Tinja


1 Ijuk Kg
P. Bahan Bakar dan Pelumas
1 Minyak Solar Ltr
2 Oli Mesran 40 SAE Ltr
3 Pelumas Bakesting Ltr

Q. Alat-alat Listrik
1 Kabel 1x2,5mm NYM 11,000.00 M1
2 Kabel 2x2,5mm NYM 12,000.00 M1
3 Kabel 3x2,5mm NYM 13,000.00 M1
4 Kabel 3x2,5mm NYM 13,000.00 M1
5 Kabel 3x4mm NYY 16,000.00 M1
6 Saklar Tunggal setara Broco 37,950.00 Bh
7 Saklar Ganda setara Broco 53,130.00 Bh
8 Stop Kontak setara Broco 37,950.00 Bh
9 Lampu Pijar 58 watt + fitting 140,000.0 buah
10 Lampu Pijar 25 watt + fitting 50,000.00 Bh
11 Box Sekring 325,000.00 Bh
12 Inbowdoos 1,500.00 Bh
13 Isolasi/Seal Tape 15,000.00 Bh
14 Klem Kabel 100.00 Bh
15 MCB 50,000.00 Bh
16 Panel Box Utama Bh

1 Air 30,000 m3

R. Bahan Kimia dan Lainnya


1 Anti Rayap Ltr
2 Pupuk Kandang ls

S. Tanaman dan Lainnya


1 Tanaman Perdu/Bunga dll Btg
2 Tanama Keras (Pohon Pelindung) Btg
3 Rumput M²
4 Pembentukan Lahan Taman Unit

Alat
1 Stemper jam
2 Concrete Mixer jam
3 Concrete Vibrator jam
4 Manual Tool ls
5 Alat Semprot ls
RINCIAN ANGGARAN BIAYA
NPSN : P9957031
Nama Instansi : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara

Pekerjaan : GEDUNG KETERAMPILAN

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 26.00 m' 77,000 2,002,000.00
Total I 2,002,000.00
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 52.00 m3 96,770 5,032,040.00
2 Pek. Urugan Kembali bekas Galian A.02.11 18.00 m3 21,850 393,300.00
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.70 m3 184,150 497,205.00
Total II 5,922,545.00
III. PEK. PONDASI
1 Pek. Anti Rayap A. R m2 1,130 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 21,770 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 36,770 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 958,840 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 8,087,460 -
6 Pas. Pondasi Batu Kosong A.03.13 m3 479,860 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 27.00 m3 946,350 25,551,450.00
8 Pas. Pondasi Batu Kosong A.03.13.a 13.00 m3 479,860 6,238,180.00
9 Pas. Pondasi Batu Karang A.03.05 m3 853,970 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 ttk 22,310 -
11 Pek. Adukan Beton dudukan angkur A.07.01 m3 958,840 -
Total III 31,789,630.00
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 15/20) A.07.49 1.44 m3 8,668,040 12,481,977.60
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.59 m3 9,163,330 5,360,548.05
3 Pek. Beton Kolom Utama 1:2:3 (K1 15/20) A.07.49 1.14 m3 8,668,040 9,881,565.60
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.70 m3 9,458,910 6,621,237.00
5 Pek. Beton Kolom Praktis 1:2:3 (K5 15/15) A.07.52 0.51 m3 9,631,480 4,940,949.24
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 m3 7,974,790 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 m3 7,974,790 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 m3 7,974,790 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' m3 9,109,810 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 2.03 m3 7,974,790 16,148,949.75
11 Pek. Beton Plat Lantai Meja A.07.51 m3 6,795,150 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 m3 9,541,480 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 ttk 22,310 -
Total IV 55,435,227.24
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 154.50 m2 122,410 18,912,345.00
2 Pas. Dinding Batubata 1:2 A.04.09 m2 141,250 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 277,920 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 309.00 m2 46,920 14,498,280.00
5 Pek. Plesteran Dinding 1: 2 A.05.19 m2 93,780 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 m2 40,210 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 m2 40,210 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 m2 40,210 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 m2 40,210 -
8 Pek. Acian Dinding A.05.36 309.00 m2 40,210 12,424,890.00
Total V 45,835,515.00
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 - Unit 148,110.00 -
2 Daun Pintu P1 A.06.18 - Buah 1,055,090.00 -
3 Kusen Pintu P2 A.06.03 2.00 Unit 518,390.00 1,036,780.00
4 Daun Pintu P2 A.06.18 2.00 Buah 1,055,090.00 2,110,180.00
5 Kusen Jendela J3 A.06.10 4.00 Unit 703,530.00 2,814,120.00
6 Kusen Jendela J3a A.06.10a 2.00 Unit 626,510 1,253,020.00
7 Daun Jendela J3 A.06.27 8.00 Buah 610,060.00 4,880,480.00
8 Daun Jendela J3a A.06.27a 4.00 Buah 488,054 1,952,214.99
9 Kaca Mati A.06.32.a 2.72 m2 274,100.00 745,990.56
10 BV2 A.06.14 Buah 318,440 -
11 BV3 A.06.15 Buah 451,740 -
12 LA-LB A.06.16 4.00 Buah 666,500 2,666,000.00
Total VI 17,458,785.55
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 1.69 m3 4,902,110 8,284,565.90
2 Pas. Balok Gapit 2 (6/12) A.01.P.14 1.00 m3 4,812,750 4,812,750.00
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 m3 4,450,880 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.20 m3 2,502,210 500,442.00
5 Pek. Gording 5/10 kayu klas II A.06.36 1.40 m3 4,429,250 6,200,950.00
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 75.00 ttk 12,750 956,250.00
7 Pek. Kaso 5/7 A.06.37 m3 77,250 -
8 Pek. Reng 3/4 A.06.38 m3 77,250 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 m3 4,450,880 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 45.00 m1 62,050 2,792,250.00
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 m3 4,450,880 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 m3 4,414,000 -
13 Pek. Beghel U, Plat Baja A.01.P.09 5.00 Unit 42,750 213,750.00
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 m2 83,530 -
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 202.00 m2 157,690 31,853,380.00
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 27,130 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 27,730 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 157,690 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 m2 12,720 -
20 Pek. Nok Zyncalum 0,3mm A.08.14 28.00 m1 150,000 4,200,000.00
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 50,880 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 69,630 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 12,720 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 70,240 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 90,240 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 40,240 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 59,110 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 40,240 -
29 Pek. Residu Kayu A.11.22 m2 3,700 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 8,410 -
Total VII 59,814,337.90
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 175.00 m2 121,420 21,248,500.00
3 Pek. Penutup Plafond Tripleks, Tebal 3 mm A.09.02 175.00 m2 58,120 10,171,000.00
4 Pek. List Plafond 3/3 A.06.60 99.00 m' 18,250 1,806,750.00
Total VIII 33,226,250.00
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 228.00 m3 34,150 7,786,200.00
2 Pek. Urugan Pasir bawah lantai A.02.13 6.39 m3 184,150 1,176,718.50
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 6.39 m3 958,840 6,126,987.60
4 Pek. Lantai keramik interior 30x30 cm A.13.75 m2 143,250 -
5 Pek. keramik 40x40 cm (Dalam Ruangan) A.13.77 96.00 m2 116,100 11,145,600.00
6 Pek. Lantai keramik exterior 30x30 cm A.13.75 m2 143,250 -
7 Pek.keramik 40x40 cm (Selasar) A.13.77 30.00 m2 116,100 3,483,000.00
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 151,490 -
Total IX 29,718,506.10
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 293.00 m2 35,060 10,272,580.00
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' m2 45,300 -
3 Pek Meni Kayu Rangka Plafond A.14.12 m2 23,280.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 175.00 m2 35,060 6,135,500.00
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 50.00 m2 51,720 2,586,000.00
Total X 18,994,080.00
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 70.00 m' 36,450 2,551,500.00
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 12.00 ttk 75,750 909,000.00
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 ttk 98,600 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 3.00 ttk 103,280 309,840.00
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 3.00 ttk 88,100 264,300.00
6 Pas. Instalasi Lampu Pijar 15 W L. 01. 06 4.00 bh 154,950 619,800.00
7 Pas. Instalasi Lampu Pijar 58 W L. 01. 07 8.00 bh 247,950 1,983,600.00
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 615,650 615,650.00
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 30.00 m' 262,750 7,882,500.00
Total XI 15,136,190.00
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 31,800 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 m' 12,560 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 m' 129,530 -
4 Pas. Kran air 1/2" A.10.35 bh 1,650 -
5 Pas. Klosed Jongkok A.10.02 bh 747,150 -
6 Pas. Klosed Duduk A.10.01 bh 3,177,520 -
7 Pas. Jet Washer ls bh - -
8 Pas. Urinoir A.10.04 bh 255,170 -
9 Pas. Wastafel A.10.05 bh 2,905,140 -
10 Pas. Kitchen Zink 1 Lubang A.10.33 bh 45,760 -
Total XII -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 6.00 bh 51,500 309,000.00
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 24.00 bh 47,250 1,134,000.00
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 24.00 bh 38,880 933,120.00
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 bh 34,610 -
5 Pas. Grendel Jendela A.12.11 bh 42,510 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 2.00 bh 193,090 386,180.00
7 Pas. Handel tarik jendela ls bh - -
Total XIII 2,762,300.00
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 43.50 m2 134,180 5,836,830.00
2 Pek. Plesteran Saluran A.05.19 42.00 m2 93,780 3,938,760.00
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.50 m3 184,150 276,225.00
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 122,410 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 277,920 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.50 m3 958,840 1,438,260.00
7 Pek. Plank Nama Ruang ls Set - -
Total XIV 11,490,075.00
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 96,770 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 21,850 -
3 Pek. Urugan Pasir A.02.13 m3 184,150.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 946,350 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 34,150.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 958,840.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 122,410.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 277,920.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 255,010.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 255,010.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 128,560.00 -
Total XV -
Grand Total 329,585,441.79
RINCIAN ANGGARAN BIAYA
NPSN : P9957031
Nama Instansi : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara

Pekerjaan : GEDUNG TEORI

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 26.00 m' 77,000 2,002,000.00
Total I 2,002,000.00
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 52.00 m3 96,770 5,032,040.00
2 Pek. Urugan Kembali bekas Galian A.02.11 18.00 m3 21,850 393,300.00
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 2.70 m3 184,150 497,205.00
Total II 5,922,545.00
III. PEK. PONDASI
1 Pek. Anti Rayap A. R m2 1,130 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 21,770 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 36,770 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 958,840 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 8,087,460 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 m3 479,860 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 22.44 m3 946,350 21,236,094.00
8 Pas. Pondasi Batu Kosong A.03.13.a 11.00 m3 181,360 1,994,960.00
9 Pas. Pondasi Batu Karang A.03.05 m3 853,970 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 ttk 22,310 -
11 Pek. Adukan Beton dudukan angkur A.07.01 m3 958,840 -
Total III 23,231,054.00
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 1.44 m3 8,668,040 12,481,977.60
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 0.59 m3 9,163,330 5,406,364.70
3 Pek. Beton Kolom Utama 1:2:3 (K1 15/20) A.07.49 1.14 m3 8,668,040 9,881,565.60
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.43 m3 9,458,910 4,067,331.30
5 Pek. Beton Kolom Praktis 1:2:3 (K5 15/15) A.07.52 0.51 m3 9,631,480 4,912,054.80
6 Pek. Beton Balok Konsol Selasar 1:2:3 (K4 15/20) A.07.48 m3 7,974,790 -
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 m3 7,974,790 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 m3 7,974,790 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' m3 9,109,810 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 2.03 m3 7,974,790 16,188,823.70
11 Pek. Beton Plat Lantai Meja A.07.51 m3 6,795,150 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 m3 9,541,480 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 ttk 22,310 -
Total IV 52,938,117.70
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 154.50 m2 122,410 18,912,345.00
2 Pas. Dinding Batubata 1:2 A.04.09 m2 141,250 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 277,920 -
4 Pek. Plesteran Dinding 1 : 4 A.05.21 309.00 m2 46,920 14,498,280.00
5 Pek. Plesteran Dinding 1: 2 A.05.19 m2 93,780 -
6 Pek. Acian Kolom Utama 1 : 4 A.05.36 m2 40,210 -
7 Pek. Acian Kolom Selasar 1 : 4 A.05.36 m2 40,210 -
8 Pek. Acian Balok Konsol 1 : 4 A.05.36 m2 40,210 -
9 Pek. Acian Balok Gantung 1 : 4 A.05.36 m2 40,210 -
8 Pek. Acian Dinding 1 : 4 A.05.36 309.00 m2 40,210 12,424,890.00
Total V 45,835,515.00
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P1 A.06.02 - Unit 148,110.00 -
2 Daun Pintu P1 A.06.18 - Buah 1,055,090.00 -
3 Kusen Pintu P2 A.06.03 2.00 Unit 518,390.00 1,036,780.00
4 Daun Pintu P2 A.06.18 2.00 Buah 1,055,090.00 2,110,180.00
5 Kusen Jendela J3 A.06.10 4.00 Unit 703,530.00 2,814,120.00
6 Kusen Jendela J3a A.06.10a 2.00 Unit 626,510 1,253,020.00
7 Daun Jendela J3 A.06.27 8.00 Buah 610,060.00 4,880,480.00
8 Daun Jendela J3a A.06.27a 4.00 Buah 488,054 1,952,214.99
9 Kaca Mati A.06.32.a 2.72 m2 274,100.00 745,990.56
10 BV2 A.06.14 Buah 318,440 -
11 BV3 A.06.15 Buah 451,740 -
12 LA-LB A.06.16 4.00 Buah 666,500 2,666,000.00
Total VI 17,458,785.55
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 1.30 m3 4,902,110 6,372,743.00
2 Pas. Balok Gapit 2 (6/12) A.01.P.14 1.45 m3 4,812,750 6,978,487.50
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 m3 4,450,880 -
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.10 m3 2,502,210 255,225.42
5 Pek. Gording 5/10 kayu klas II A.06.36 1.10 m3 4,429,250 4,872,175.00
6 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 75.00 ttk 12,750 956,250.00
7 Pek. Kaso 5/7 A.06.37 m3 77,250 -
8 Pek. Reng 3/4 A.06.38 m3 77,250 -
9 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 m3 4,450,880 -
10 Pek. List Plank 3/25 Papan Klas II A.06.50 45.00 m1 62,050 2,792,250.00
11 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 m3 4,450,880 -
12 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 m3 4,414,000 -
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 5.00 Unit 42,750 213,750.00
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 202.00 m2 83,530 16,873,060.00
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 m2 157,690 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 27,130 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 m2 27,730 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 157,690 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 14.00 m2 12,720 178,080.00
20 Pek. Nok Zyncalum 0,3mm A.08.14 m1 12,720 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 50,880 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 69,630 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 12,720 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 70,240 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 90,240 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 40,240 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 m1 59,110 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 40,240 -
29 Pek. Residu Kayu A.11.22 m2 3,700 -
30 Pek. Rangka Atap Baja Ringan A.11.01 m2 8,410 -
Total VII 39,492,020.92
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 175.00 m2 121,420 21,248,500.00
2 Pek. Penutup Plafond Tripleks, Tebal 3 mm A.09.02 175.00 m2 58,120 10,171,000.00
3 Pek. List Plafond 3/3 A.06.60 98.30 m' 18,250 1,793,975.00
Total VIII 33,213,475.00
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 189.00 m3 34,150 6,454,350.00
2 Pek. Urugan Pasir bawah lantai A.02.13 6.30 m3 184,150 1,160,145.00
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 6.30 m3 958,840 6,040,692.00
4 Pek. Lantai keramik interior 30x30 cm A.13.75 m2 143,250 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 96.00 m2 116,100 11,145,600.00
6 Pek. Lantai keramik exterior 30x30 cm A.13.75 m2 143,250 -
7 Pek. Lantai keramik exterior 40x40 cm A.13.77 30.00 m2 116,100 3,483,000.00
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 151,490 -
Total IX 28,283,787.00
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 292.24 m2 35,060 10,245,934.40
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' m2 45,300 -
3 Pek Meni Kayu Rangka Plafond A.14.12 m2 23,280.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 170.00 m2 35,060 5,960,200.00
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 17.00 m2 51,720 879,240.00
Total X 17,085,374.40
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 66.26 m' 36,450 2,415,177.00
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 8.00 ttk 75,750 606,000.00
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 ttk 98,600 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 3.00 ttk 103,280 309,840.00
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 2.00 ttk 88,100 176,200.00
6 Pas. Instalasi Lampu Pijar 15 W L. 01. 06 4.00 bh 154,950 619,800.00
7 Pas. Instalasi Lampu Pijar 58 W L. 01. 07 8.00 bh 247,950 1,983,600.00
8 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 615,650 615,650.00
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 3.00 m' 262,750 788,250.00
Total XI 7,514,517.00
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 31,800 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 m' 12,560 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 m' 129,530 -
4 Pas. Kran air 1/2" A.10.35 bh 1,650 -
5 Pas. Klosed Jongkok A.10.02 bh 747,150 -
6 Pas. Klosed Duduk A.10.01 bh 3,177,520 -
7 Pas. Jet Washer ls bh - -
8 Pas. Urinoir A.10.04 bh 255,170 -
9 Pas. Wastafel A.10.05 bh 2,905,140 -
10 Pas. Kitchen Zink 1 Lubang A.10.33 bh 45,760 -
Total XII -
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 6.00 bh 51,500 309,000.00
2 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 24.00 bh 47,250 1,134,000.00
3 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 24.00 bh 38,880 933,120.00
4 Pas. Slot Pintu (2 bh/pintu)/grendel panjang A.12.10 bh 34,610 -
5 Pas. Grendel Jendela A.12.11 bh 42,510 -
6 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 2.00 bh 193,090 386,180.00
7 Pas. Handel tarik jendela ls bh - -
Total XIII 2,762,300.00
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 43.50 m2 134,180 5,836,830.00
2 Pek. Plesteran Saluran A.05.19 42.00 m2 93,780 3,938,760.00
3 Pek. Urugan Pasir bawah rabat beton A.02.13 1.50 m3 184,150 276,225.00
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 122,410 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 277,920 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 1.50 m3 958,840 1,438,260.00
7 Pek. Plank Nama Ruang ls Set - -
Total XIV 11,490,075.00
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 96,770 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 21,850 -
3 Pek. Urugan Pasir A.02.13 m3 184,150.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 946,350 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 34,150.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 958,840.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 122,410.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 277,920.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 255,010.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 255,010.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 128,560.00 -
Total XV -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
Grand Total 287,229,566.57
RINCIAN ANGGARAN BIAYA
NPSN : P9957031
Nama Instansi : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara

Pekerjaan : GUDANG + WC

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 13.80 m' 77,000 1,062,600.00
Total I 1,062,600.00
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 19.90 m3 96,770 1,925,723.00
2 Pek. Urugan Kembali bekas Galian A.02.11 6.63 m3 21,850 144,938.33
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 1.00 m3 184,150 184,150.00
Total II 2,254,811.33
III. PEK. PONDASI
1 Pek. Anti Rayap A. R m2 1,130 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 21,770 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 36,770 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 958,840 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 8,087,460 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 m3 479,860 -
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 10.80 m3 720,892 7,785,631.98
8 Pas. Pondasi Batu Kosong A.03.13.a 4.50 m3 181,360 816,120.00
9 Pas. Pondasi Batu Karang A.03.05 m3 853,970 -
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 ttk 22,310 -
11 Pek. Adukan Beton dudukan angkur A.07.01 m3 958,840 -
Total III 8,601,751.98
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 m3 8,668,040 -
2 Pek. Beton Sloof (S2 15/20) A.07.50 0.80 m3 9,163,330 7,330,664.00
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 m3 8,668,040 -
4 Pek. Beton Kolom (K2 15/15) A.07.60 0.66 m3 9,458,910 6,242,880.60
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 m3 9,631,480 -
6 Pek. Beton Balok (K4 15/20) A.07.48 0.80 m3 7,974,790 6,379,832.00
7 Pek. Beton Balok Konsol Belakang 1:2:3 (K4 15/20) A.07.48 m3 7,974,790 -
8 Pek. Beton Balok Gantung Selasar 1:2:3 (K4 15/20) A.07.48 m3 7,974,790 -
9 Pek. Balok Linetel diatas kusen (12/20) A.07.48'' m3 9,109,810 -
10 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 m3 7,974,790 -
11 Pek. Beton Canopy diatas kusen BV A.07.51 m3 6,795,150 -
12 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 m3 9,541,480 -
13 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 ttk 22,310 -
Total IV 19,953,376.60
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 45.00 m2 122,410 5,508,450.00
2 Pas. Dinding Batubata 1:2 (t=2,1m) A.04.09 m2 141,250 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 277,920 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 284,250 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 m2 93,780 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 55.00 m2 46,920 2,580,600.00
7 Pek. Acian Kolom Utama 1 : 4 A.05.36 m2 40,210 -
8 Pek. Acian Kolom Selasar 1 : 4 A.05.36 m2 40,210 -
9 Pek. Acian Balok Konsol 1 : 4 A.05.36 m2 40,210 -
10 Pek. Acian Balok Gantung 1 : 4 A.05.36 m2 40,210 -
11 Pek. Acian Dinding 1 : 4 A.05.36 27.00 m2 40,210 1,085,670.00
Total V 9,174,720.00
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu P2 A.06.03 Unit 518,390 -
2 Kusen Pintu P3 A.06.04 Unit 370,280 -
3 Kusen Pintu P5 A.06.05 Unit 377,680 -
4 Daun Pintu P2 A.06.18 2.00 Buah 1,055,090 2,110,180.00
5 Daun Pintu P3 A.06.18 Buah 1,055,090 -
6 Daun Pintu P5 A.06.19 Buah 1,186,970 -
7 BV1 ( Kaca ) A.06.13 Buah 177,730 -
8 BV2 ( Kaca ) A.06.14 Buah 318,440 -
9 BV3 ( Kaca ) A.06.15 Buah 451,740 -
10 Angin-Angin LA-LB A.06.16 2.00 Buah 666,500 1,333,000.00
11 Kaca Mati A.06.32.a m2 274,100
Total VI 3,443,180.00
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 0.42 m3 4,902,110 2,058,886.20
2 Pas. Skor angin ( 6/12) kayu kelas II A.01.P.14 0.10 m3 4,812,750 490,900.50
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 m3 4,450,880 -
4 Pek. Gording kayu klas II A.06.36 0.23 m3 4,429,250 1,018,727.50
5 Pek. Baut Ø10 mm di sambungan gording A.01.P.08" 24.00 ttk 12,750 306,000.00
6 Pek. Kaso 5/7 A.06.37 m3 77,250 -
7 Pek. Reng 3/4 A.06.38 m3 77,250 -
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 m3 4,450,880 -
9 Pek. List Plank Papan Klas II A.06.50 20.00 m1 34,100 682,000.00
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 m3 4,450,880 -
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 0.02 m3 4,414,000 88,280.00
12 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 3.00 Unit 42,750 128,250.00
13 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 54.96 m2 83,530 4,591,142.92
14 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 m2 157,690 -
15 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 m2 27,130 -
16 Pek. Penutup Atap Genteng Tanah A.08.02 m2 27,730 -
17 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 m2 157,690 -
18 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 7.00 m1 12,720 89,040.00
19 Pek. Nok Zyncalum 0,3mm A.08.14 m1 12,720 -
20 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 m1 50,880 -
21 Pek. Nok Bubungan Genteng Tanah A.08.05 m1 69,630 -
22 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 m1 12,720 -
23 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 m1 70,240 -
24 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 m1 90,240 -
25 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 m1 40,240 -
26 Pek. Nok Tepi Genteng Tanah A.08.33 m1 59,110 -
27 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 m1 40,240 -
28 Pek. Residu Kayu A.11.22 m2 3,700 -
29 Pek. Rangka Atap Baja Ringan A.11.01 m2 8,410 -
Total VII 9,453,227.12
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 17.00 m2 121,420 2,064,140.00
2 Pek. Penutup Plafond Tripleks, Tebal 3 mm A.09.02 43.00 m2 58,120 2,499,160.00
3 Pek. List Plafond A.06.60 30.00 m' 18,250 547,500.00
Total VIII 5,110,800.00
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 5.52 m3 34,150 188,508.00
2 Pek. Urugan Pasir bawah lantai A.02.13 1.00 m3 184,150 184,150.00
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 0.70 m3 958,840 671,188.00
4 Pek. Lantai keramik interior 30x30 cm A.13.75 m2 143,250 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 15.00 m2 116,100 1,741,500.00
6 Pek. Lantai keramik exterior 30x30 cm .. Bermotif ( anti sliip ) A.13.75 m2 143,250 -
7 Pek. Lantai keramik exterior 40x40 cm .. Bermotif ( anti sliip ) A.13.77 9.00 m2 116,100 1,044,900.00
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 106,860 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 151,490 -
Total IX 3,830,246.00
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
X. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding berikut plamir A.14.25 41.00 m2 35,060 1,437,460.00
2 Pek. Cat Minyak untuk Plint 10 cm A.14.30'' m2 45,300 -
3 Pek Meni Kayu Rangka Plafond A.14.12 m2 23,280.00 -
4 Pek. Cat Plafond berikut plamir A.14.26 25.00 m2 35,060 876,500.00
5 Pek. Cat Kayu berikut meni dan plamir A.14.30 m2 51,720 -
6 Pek. Meni Besi A.14.13 m2 13,830 -
7 Pek. Cat Besi A.14.31 m2 47,370 -
Total X 2,313,960.00
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 3.00 m' 36,450 109,350.00
2 Pas. Instalasi Titik Lampu 2x2,5 NYM L. 01. 02 ttk 75,750 -
3 Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM L. 01. 03 ttk 98,600 -
4 Pas. Instalasi Titik Saklar Double 3x2,5 NYM L. 01. 04 ttk 103,280 -
5 Pas. Instalasi Lampu Pijar L. 01. 06 bh 154,950 -
6 Pas. MCB + Box Sekring L. 01. 08 1.00 bh 615,650 615,650.00
7 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 4.00 m' 262,750 1,051,000.00
Total XI 1,776,000.00
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 7.00 m' 31,800 222,600.00
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 m' 12,560 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 10.00 m' 129,530 1,295,300.00
4 Pas. Kran air 1/2" A.10.35 1.00 bh 1,650 1,650.00
5 Pas. Klosed Jongkok A.10.02 1.00 bh 747,150 747,150.00
6 Pas. Klosed Duduk A.10.01 bh 3,177,520 -
7 Pas. Jet Washer ls bh - -
8 Pas. Urinoir A.10.04 bh 255,170 -
9 Pas. Wastafel A.10.05 bh 2,905,140 -
10 Pek. Floordrain A.10.36 bh 1,270 -
11 Pas. Grabbed Bar Ø 1 " (staniless) ls set - -
12 Pek. Sept Pek. Septictank + Rembesan A.10.08 1.00 bh 682,190 682,190.00
13 Pek. 1 bh Bak Mandi Batu Bata Vol 0,3 m3 + Pas Keramik 20x20 A.10.37 Unit 25,265,230 -
14 Pek. Tank Air ls 1.00 bh 2,100,000 2,100,000.00
Total XII 5,048,890.00
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu A.12.05 3.00 bh 51,500 154,500.00
2 Pas. Kunci Pintu 2 X Putar ( lever handle ) A.12.14 1.00 bh 193,090 193,090.00
3 Pas. Gantungan Baju Km/wc (2 kait) ls 1.00 bh 15,000 15,000.00
Total XIII 362,590.00
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B m2 134,180 -
2 Pek. Plesteran Saluran A.05.19 m2 93,780 -
3 Pek. Urugan Pasir bawah rabat beton A.02.13 m3 184,150 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 122,410 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 277,920 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 m3 958,840 -
7 Pek. Plank Nama Ruang ls Set - -
Total XIV -
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 96,770 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 21,850 -
3 Pek. Urugan Pasir A.02.13 m3 184,150.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 946,350 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 34,150.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 958,840.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 122,410.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 277,920.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 255,010.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 255,010.00 -
12 Pek. Pemasangan Hand Railing, pipa Ø 1,5 " A.01.P.11 m' 128,560.00 -
Total XV -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
Grand Total 72,386,153.03
PROGRAM BLOCK GRANT PEMBANGUNAN
UNIT SEKOLAH BARU SMP NEGERI
Dengan Mekanisme Partisipasi Masyarakat

Kode Sekolah : 0.000


Sekolah : 0.000
Desa : 0.000
Kecamatan : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara

Pekerjaan : RUMAH PENJAGA SEKOLAH

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 28.30 m' 77,000 2,179,100.00
Total I 2,179,100.00
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 22.97 m3 96,770 2,223,051.24
2 Pek. Urugan Kembali bekas Galian A.02.11 11.49 m3 21,850 250,974.84
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 3.69 m3 184,150 679,274.11
Total II 3,153,300.18
III. PEK. PONDASI
1 Pek. Anti Rayap A. R m2 1,130 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 21,770 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 36,770 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 958,840 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 8,087,460 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 7.37 m3 479,860 3,537,240.00
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 35.37 m3 946,350 33,473,345.85
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a 7.37 m3 181,360 1,336,877.10
9 Pas. Pondasi Batu Karang A.03.05 35.37 m3 853,970 30,205,772.87
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 btg 22,310 -
11 Pek. Adukan Beton dudukan angkur A.07.01 m3 958,840 -
Total III 68,553,235.83
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 4.09 m3 8,668,040 35,452,283.60
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 1.02 m3 9,163,330 9,383,249.92
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 3.60 m3 8,668,040 31,204,944.00
4 Pek. Beton Kolom Selasar 1:2:3 (K2 20/20) A.07.60 0.56 m3 9,458,910 5,296,989.60
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/12) A.07.52 0.50 m3 9,631,480 4,854,265.92
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.50 1.68 m3 9,163,330 15,394,394.40
7 Pek. Balok Linetel diatas kusen (12/20) A.07.48 1.21 m3 7,974,790 9,617,596.74
8 Pek. Beton Ring Balok 1:2:3 (R3 12/25) A.07.48 1.96 m3 7,974,790 15,646,537.98
9 Pek. Beton Plat Lantai Meja A.07.51 m3 6,795,150 -
10 Pek. Beton Canopy A.07.51 m3 6,795,150 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 2.57 m3 9,541,480 24,559,769.52
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 m3 22,310 -
Total IV 151,410,031.68
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 219.20 m2 122,410 26,832,394.41
2 Pas. Dinding Batubata 1:2 A.04.09 m2 141,250 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 277,920 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 284,250 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 m2 93,780 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 438.40 m2 46,920 20,569,821.84
7 Pek. Acian Dinding 1: 2 A.05.36 m2 40,210 -
8 Pek. Acian Dinding 1 : 4 A.05.36 438.40 m2 40,210 17,628,144.42
Total V 65,030,360.67
VI. PEKERJAAN PINTU DAN JENDELA
1 Jendela J5 3.00 unit -
2 BV1 1.00 unit -
3 Kusen & Daun Pintu P2 / P2A 3.00 unit -
4 Kusen & Daun Pintu P3 1.00 unit -
Total VI -
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 1.62 m3 4,902,110 7,921,809.76
2 Pas. Balok Gapit 6/12 A.01.P.14 0.35 m3 4,812,750 1,694,088.00
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.21 m3 4,450,880 930,233.92
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.35 m3 2,502,210 875,773.50
5 Pek. Gording 5/10 kayu klas II A.06.36 2.03 m3 4,429,250 8,991,377.50
6 Pek. Kaso 5/7 A.06.37 2.18 m3 77,250 168,173.25
7 Pek. Reng 3/4 A.06.38 1.22 m3 77,250 94,245.00
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.09 m3 4,450,880 387,226.56
9 Pek. List Plank 3/30 Papan Klas II A.06.50 83.00 m1 62,050 5,150,150.00
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.52 m3 4,450,880 2,314,457.60
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 m3 4,414,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.14 m3 4,050,760 567,106.40
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 Unit 42,750 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 367.69 lbr 83,530 30,712,978.64
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 lbr 157,690 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 lbr 27,130 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 bh 27,730 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 lbr 157,690 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 29.20 lbr 12,720 371,424.00
20 Pek. Nok Zyncalum 0,3mm A.08.14 lbr 12,720 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 bh 50,880 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 bh 69,630 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 bh 12,720 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 bh 70,240 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 bh 90,240 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 bh 40,240 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 bh 59,110 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 bh 40,240 -
29 Pek. Talang Jurai A.11.20 m¹ 130,870 -
30 Pek. Residu Kayu A.11.22 m2 3,700 -
31 Pek. Rangka Atap Baja Ringan A.11.01 m2 8,410 -
Total VII 60,179,044.13
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 3.40 m3 121,420 413,313.68
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 300.70 m2 58,120 17,476,451.52
3 Pek. List Plafond 4/4 A.06.60 316.41 m' 18,250 5,774,537.25
Total VIII 23,664,302.45
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 m3 34,150 -
2 Pek. Urugan Pasir bawah lantai A.02.13 m3 184,150 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 958,840 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 m2 143,250 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 116,100 -
6 Pek. Lantai keramik exterior 30x30 cm A.13.75 m2 143,250 -
7 Pek. Lantai keramik exterior 40x40 cm A.13.77 m2 116,100 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 106,860 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 151,490 -
10 Pek. Panggung : -
- Pasangan Bata A.04.11 m2 122,410 -
- Pasangan Batako A.04.12 m2 277,920 -
- Urugan Tanah A.02.11 m3 21,850 -
- Urugan Pasir A.02.13 m3 184,150 -
- Beton Lantai Kerja A.07.01 m3 958,840 -
- Pek. Kuku Keramik -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Plamur Tembok A.14.14 m2 12,070 -
2 Pek. Cat Dinding A.14.25 m2 35,060 -
3 Pek. Cat Plafond A.14.26 m2 35,060 -
4 Pek. Meni Kayu A.14.12 m2 23,280 -
5 Pek. Cat Kayu A.14.30 m2 51,720 -
6 Pek. Meni Besi A.14.13 m2 13,830 -
7 Pek. Cat Besi A.14.31 m2 47,370 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 55.52 m' 36,450 2,023,704.00
2 Pas. Instalasi Titik Lampu 2x1,5 NYM L. 01. 02 m' 75,750 -
3 Pas. Instalasi Titik Saklar Tunggal 2x1,5 NYM L. 01. 03 ttk 98,600 -
4 Pas. Instalasi Titik Saklar Double 3x1,5 NYM L. 01. 04 ttk 103,280 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 ttk 88,100 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 bh 154,950 -
7 Pas. Instalasi Lampu TL 1x20 watt L. 01. 07 bh 221,950 -
8 Pas. MCB + Box Sekring L. 01. 08 bh 615,650 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 m' 262,750 -
10 Pas. Panel Box Utama +MCB L. 01. 10 bh 86,150 -
Total XI 2,023,704.00
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 31,800 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 m' 12,560 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 m' 129,530 -
4 Pas. Instalasi Pipa PVC 3" saluran Air Kotor A.10.31 m' 77,210 -
5 Pas. Kran air 1/2" A.10.35 bh 1,650 -
6 Pas. Klosed Jongkok A.10.02 bh 747,150 -
7 Pas. Klosed Duduk A.10.01 bh 3,177,520 -
8 Pas. Jet Washer ls bh 60,000 -
9 Pas. Urinoir A.10.04 bh 255,170 -
10 Pas. Wastafel A.10.05 bh 2,905,140 -
11 Pas. Kitchen Zink 1 Lubang A.10.33 bh 45,760 -
12 Pek. Floordrain A.10.36 bh 1,270 -
13 Pas. Grabbed Bar ls bh 600,000 -
14 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 bh 682,190 -
15 Pek. Septictank + Rembesan A.10.37 1.00 Unit 25,265,230 25,265,230.00
16 Pas. Kaca Muka ls bh 200,000 -
Total XII 25,265,230.00
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 bh 51,500 -
2 Pas. Engsel Pintu 3" (3bh/pintu) A.12.06 bh 47,250 -
3 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 bh 47,250 -
4 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 bh 38,880 -
5 Pas. Slot Tanam Pintu (2 bh/pintu) A.12.10 bh 34,610 -
6 Pas. Grendel Jendela model Spring Knob A.12.11 bh 42,510 -
7 Pas. Kunci Pintu 2 X Putar A.12.14 bh 193,090 -
8 Pas. Handel Pintu (2 bh/pintu) A.12.12 bh 76,270
9 Pas. Kunci Bulat Km/wc A.12.04 bh 157,000 -
10 Pas. Gantungan Baju Km/wc (2 kait) ls 1.00 bh 50,000 50,000.00
Total XIII 50,000.00
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 52.25 m' 134,180 7,011,307.54
2 Pek. Plesteran Saluran A.05.19 84.73 m2 93,780 7,945,979.40
3 Pek. Urugan Tanah dibawah Rabat Beton A.02.12 m3 34,150 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 122,410 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 277,920 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 6.16 m3 958,840 5,910,769.18
7 Pek. Plank Nama Ruang ls 1.00 Set 200,000 200,000.00
Total XIV 21,068,056.12
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m3 96,770 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 21,850 -
3 Pek. Urugan Pasir A.02.13 m3 184,150.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 946,350 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 34,150.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 958,840.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 122,410.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 277,920.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 255,010.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 255,010.00 -
12 Pek. Pemasangan Hand Railing A.01.P.11 m' 128,560.00 -
Total XV -
Grand Total 422,576,365.06
#REF!
Dengan Mekanisme Partisipasi Masyarakat

NPSN : 0
Nama Sekolah : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara

Pekerjaan : FURNITURE

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Kode Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. GEDUNG KANTOR DAN ADMINISTRASI
1 Meja Pimpinan M-6 1.00 bh - -
2 Meja Kerja M-7 2.00 bh - -
3 Meja Guru M-8 11.00 bh - -
4 Meja Tamu M-13 2.00 bh - -
5 Lemari Buku/Simpan L-1 1.00 bh - -
6 Lemari Kaca Geser L-2 1.00 bh - -
7 Lemari Arsip L-3 1.00 bh - -
8 Lemari Kunci L-15 1.00 bh - -
9 Lemari Locker L-16 1.00 bh - -
10 Kursi Pimpinan K-4 1.00 bh - -
11 Kursi Kerja K-5 13.00 bh - -
12 Kursi Lipat/Hadap K-6 4.00 bh - -
13 Kursi Tamu K-8 8.00 bh - -
14 Papan Tulis Gantung P-1 1.00 bh - -
15 whiteboard Gantung P-4 1.00 bh - -
16 Papan Statistik P-6 2.00 bh - -
17 Papan Jadwal P-7 1.00 bh - -
18 Papan Pameran P-8 2.00 bh - -
19 Tungku Tiang Bendera U-4 1.00 bh - -
20 Kotak Sampah KS 4.00 bh - -
Total I -
II. GEDUNG TEORI / RUANG KELAS UNIT 1
1 Meja Siswa Tunggal M-1 96.00 bh - -
2 Meja Kerja/Guru M-7 3.00 bh - -
3 Lemari Administrasi L-5 3.00 bh - -
4 Kursi Siswa Tunggal K-1 96.00 bh - -
5 Kursi Kerja/Guru K-5 3.00 bh - -
6 Papan Tulis Gantung P-1 3.00 bh - -
7 Papan Absensi P-10 3.00 bh - -
8 Kotak Sampah KS 3.00 bh - -
Total II -
III. GEDUNG TEORI / RUANG KELAS UNIT 2
1 Meja Siswa Tunggal M-1 96.00 bh - -
2 Meja Kerja/Guru M-7 3.00 bh - -
3 Lemari Administrasi L-5 3.00 bh - -
4 Kursi Siswa Tunggal K-1 120.00 bh - -
5 Kursi Kerja/Guru K-5 3.00 bh - -
6 Papan Tulis Gantung P-1 3.00 bh - -
7 Papan Absensi P-10 3.00 bh - -
8 Kotak Sampah KS 3.00 bh - -
Total III -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Sat
( Rp ) ( Rp )
IV. GEDUNG PERPUSTAKAAN DAN MEDIA
1 Meja Baca Individu M-3 6.00 bh - -
2 Meja Baca Kelompok M-4 10.00 bh - -
3 Meja Baca Serbaguna M-5 1.00 bh - -
4 Meja Kerja M-7 1.00 bh - -
5 Meja Sirkulasi M-10 1.00 bh - -
6 Meja Ketik M-12 1.00 bh - -
7 Lemari Buku L-1 6.00 bh - -
8 Lemari Katalog L-11 1.00 bh - -
9 Lemari Kardek L-12 1.00 bh - -
10 Kursi Siswa Tunggal K-1 28.00 bh - -
11 Kursi Bulat Pendek K-3 1.00 bh - -
12 Kursi Kerja K-5 1.00 bh - -
13 Whiteboard Gantung P-4 1.00 bh - -
14 Papan Pameran P-8 1.00 bh - -
15 Rak Tas R-1 3.00 bh - -
16 Rak Buku Satu Muka R-2 3.00 bh - -
17 Rak Buku Dua Muka R-3 2.00 bh - -
18 Rak Majalah R-6 1.00 bh - -
19 Rak Atlas R-7 1.00 bh - -
20 Rak Ensiklopedia R-8 1.00 bh - -
21 Rak Koran R-9 1.00 bh - -
22 Rak Dorong R-10 2.00 bh - -
23 Kotak Sampah KS 1.00 bh - -
Total IV -
V. RUANG LABORATORIUM BAHASA
1 Meja Baca Kelompok M-4 6.00 bh - -
2 Meja Kerja M-7 3.00 bh - -
3 Lemari Kaca Geser L-2 1.00 bh - -
4 Lemari Besi L-8 1.00 bh - -
5 Lemari Kaca Tinggi L-13 5.00 bh - -
6 Kursi Putar K-7 33.00 bh - -
7 Papan Tulis Gantung P-1 1.00 bh - -
8 Kotak Sampah KS 1.00 bh - -
Total V -
VI. RUANG SAINS, IPA, KOMPUTER
1 Meja Baca Serbaguna M-5 20.00 bh - -
2 Meja Kerja M-7 2.00 bh - -
3 Meja Demonstrasi M-11 1.00 bh - -
4 Lemari Kaca Geser L-2 3.00 bh -
5 Lemari Alat Peraga L-6 1.00 bh - -
6 Lemari Besi L-8 2.00 bh - -
7 Lemari Kertas Kerja L-10 1.00 bh - -
8 Lemari Gantung/P3K L-14 1.00 bh - -
9 Lemari Asam L-20 1.00 bh - -
10 Kursi Siswa Tunggal K-1 2.00 bh - -
11 Kursi Bulat Tinggi K-2 40.00 bh - -
12 Kursi Kerja K-5 4.00 bh - -
13 Papan Tulis Gantung P-1 1.00 bh - -
14 Kotak Sampah KS 2.00 bh - -
Total VI -
VII. RUANG KETERAMPILAN DAN KESENIAN
1 Meja Baca Serbaguna M-5 20.00 bh - -
2 Meja Kerja M-7 1.00 bh - -
3 Meja Demonstrasi M-11 1.00 bh - -
4 Lemari Arsip L-3 1.00 bh - -
5 Lemari Alat Peraga L-6 1.00 bh - -
6 Lemari Besi L-8 1.00 bh - -
7 Lemari Kertas Kerja L-10 1.00 bh - -
8 Lemari Gantung/P3K L-14 1.00 bh - -
9 Lemari Locker L-16 1.00 bh - -
10 Kursi Bulat Tinggi K-2 41.00 bh - -
11 Kursi Kerja K-5 1.00 bh - -
12 Papan Tulis Gantung P-1 1.00 bh - -
13 Kotak Sampah KS 2.00 bh - -
Total VII -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Sat
( Rp ) ( Rp )
VIII. RG, BK, UKS & OSIS, PRAMUKA
1 Meja Baca Serbaguna M-5 6.00 bh - -
2 Meja Kerja M-7 3.00 bh - -
3 Meja Tamu M-13 2.00 bh - -
4 Lemari Buku L-1 1.00 bh - -
5 Lemari Kaca Geser L-2 1.00 bh - -
6 Lemari Pembatas L-4 1.00 bh - -
7 Lemari Obat L-7 1.00 bh - -
8 Kursi Siswa Tunggal K-1 15.00 bh - -
9 Kursi Kerja K-5 3.00 bh - -
10 Kursi Tamu K-8 4.00 bh - -
11 Whiteboard Gantung P-4 1.00 bh - -
12 Papan Jadwal P-7 1.00 bh - -
13 Papan Piket P-9 1.00 bh - -
14 Filling Kabinet 4 Laci U-1 1.00 bh - -
15 Tungku Tiang Bendera U-4 1.00 bh - -
16 Dipan Diperiksa U-6 1.00 bh - -
17 Kotak Sampah KS 1.00 bh - -
Total VIII -
IX. ASRAMA SISWA
1 Meja Siswa Tunggal M-1 16.00 bh - -
2 Meja Baca Serbaguna M-5 2.00 bh - -
3 Lemari Pakaian Siswa L-19 8.00 bh - -
4 Kursi Siswa Tunggal K-1 28.00 bh - -
5 Rak Piring R-11 1.00 bh - -
6 Dipan Tidur Tingkat U-9 8.00 bh - -
7 Kotak Sampah KS 3.00 bh - -
Total IX -
X. GUDANG,KANTIN DAN KOPERASI
1 Meja Baca Serbaguna M-5 3.00 bh - -
2 Meja Kerja M-7 3.00 bh - -
3 Lemari Buku L-1 2.00 bh - -
4 Lemari Alat Peraga L-6 1.00 bh - -
5 Kursi Siswa Tunggal K-1 1.00 bh - -
6 Kursi Bulat Pendek K-3 12.00 bh - -
7 Kursi Kerja K-5 3.00 bh - -
8 Rak Buku Satu Muka R-2 2.00 bh - -
9 Rak Gudang R-4 1.00 bh - -
10 Rak Piring R-11 1.00 bh - -
11 Kotak Sampah KS 1.00 bh - -
Total X -
XI. MESS GURU
1 Meja Guru M-8 10.00 bh - -
2 Lemari Pakaian Guru L-17 10.00 bh - -
3 Kursi Siswa Tunggal K-1 10.00 bh - -
4 Dipan Tidur Tunggal U-7 6.00 bh - -
5 Dipan Tidur Ganda U-8 2.00 bh - -
6 Kotak Sampah KS 5.00 bh - -
Total XI -

XII. KM/WC SISWA


1 Kotak Sampah (ditoilet disabilitas) KS 1.00 bh - -

Total XII -
Grand Total -
RINCIAN ANGGARAN BIAYA

NPSN : P9957031
Nama Instansi : SPNF SKB Buton Utara
Kabupaten : Buton Utara
Propinsi : Sulawesi Tenggara

Pekerjaan : INFRASTRUKTUR

NO URAIAN PEKERJAAN VOLUME SATUAN HARGA JUMLAH


I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Lapangan dan Perataan 1.00 LS 1,500,000.00 1,500,000.00
Sub Total 1,500,000.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah 37.50 m3 96,770.00 3,628,875.00
2 Pek. Penimbunan Tanah di padatkan 20.90 m3 219,230.00 4,581,907.00
3 Pek. Urugan Pasir 16.70 m3 184,150.00 3,075,305.00
Sub Total 11,286,087.00
III PEK. INFRASTRUKTUR
Pemasangan 1 m2 paving block natural tebal 6 cm
1 217.00 m2 255,010.00 55,337,170.00
2 Pek. Pemasangan Casteen 58.00 m' 105,660.00 6,128,280.00
Sub Total 61,465,450.00

JUMLAH TOTAL Rp 74,251,537.00


ANALISA HARGA SATUAN PEKERJAAN - KAB/KOTA BUTON UTARA. - PROPINSI SULAWESI TENGGARA

I. PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan / M2
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
A Upah :
Pekerja 0.1000 Hr x Rp. 113,850.00 11,385.00
Mandor 0.0500 Hr x Rp. 0.00 0.00
B Jumlah 11,385.00

2 Pekerjaan Pengukuran M¹
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
A Bahan :
Bahan Kayu Klas Kuat IV 0.0120 M3 3,627,300.00 43,527.60
Paku Biasa 2" - 5" 0.0200 Kg 30,235.12 604.70
Kayu papan 3/20, Kelas IV 0.0070 M3 3,627,300.00 25,391.10
Total Bahan 69,523.40

B Upah :
Pekerja 0.1000 OH 113,850.00 11,385.00
Tukang Kayu 0.1000 OH 127,512.00 12,751.20
Kepala Tukang 0.0100 OH 136,620.00 1,366.20
Mandor / Juru Ukur 0.0050 OH 0.00 0.00
Total Upah 25,502.40
C Jumlah (A + B) 95,025.80

II. PEKERJAAN TANAH


1 Pekerjaan Galian Tanah Biasa Kedalaman 0,20 m / M³
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
A Upah :
Pekerja 0.4500 Hr x Rp. 113,850.00 51,232.50
Mandor 0.0250 Hr x Rp. 0.00 0.00
B Jumlah 51,232.50

2 Pekerjaan Urugan tanah kembali / M3


Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
A Upah :
Pekerja 0.2500 Hr x Rp. 113,850.00 28,462.50
Mandor 0.0083 Hr x Rp. 0.00 0.00
B Jumlah 28,462.50

3 Urugan Pasir Bawah Lantai / M³


Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
A Bahan :
Pasir urug 1.2000 M3 125,000.00 150,000.00
Total Bahan 150,000.00
B Upah :
Pekerja 0.3000 Hr x Rp. 113,850.00 34,155.00
Mandor 0.0100 Hr x Rp. 0.00 0.00
Total Upah 34,155.00
C Jumlah (A + B) 184,155.00

Daftar Analisa Pekerjaan Hal : 130


ANALISA HARGA SATUAN PEKERJAAN - KAB/KOTA BUTON UTARA. - PROPINSI SULAWESI TENGGARA

III PEK INFRA STRUKTUR HALAMAN


1 Pemasangan 1 m2 paving block natural tebal 6 cm
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
Bahan :
Paving block 6 cm 1.01 M2 138,000.00 139,380.00
Pasir beton 0.05 M3 51,500.00 2,575.00
Total Bahan 141,955.00
Upah :
Pekerja 0.25 OH 113,850.00 28,462.50
Tukang Batu 0.50 OH 136,620.00 68,310.00
Kepala Tukang 0.05 OH 136,620.00 6,831.00
Mandor 0.0013 OH 0.00 0.00
Total Upah 103,603.50
C Jumlah (A + B) 245,558.50

1 Pek. Pemasangan Casteen 1m


Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
Bahan :
Casteen 1.01 m' 49,000.00 49,490.00
Pasir Urung 0.045 M3 259,089.58 11,659.03
Total Bahan 61,149.03
Upah :
Pekerja 0.40 OH 113,850.00 45,540.00
Tukang Batu 0.20 OH 136,620.00 27,324.00
Kepala Tukang 0.025 OH 136,620.00 3,415.50
Mandor 0.0200 OH 0.00 0.00
Total Upah 76,279.50
C Jumlah (A + B) 137,428.53

2 Pekerjaan Taman 1 m2
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
Bahan :
Bata Merah 140.00 Buah 553.77 77,527.80
Pasir Pasang 0.12 M3 259,089.58 31,608.93
Semen Portland 18.50 Kg 3,080.00 56,980.00

Total Bahan 109,136.73


Upah :
Pekerja 0.25 OH 113,850.00 28,462.50
Tukang Batu 0.50 OH 127,512.00 63,756.00
Kepala Tukang 0.05 OH 136,620.00 6,831.00
Mandor 0.0013 OH 0.00 0.00
Total Upah 99,049.50
C Jumlah (A + B) 208,186.23

Daftar Analisa Pekerjaan Hal : 131


ANALISA HARGA SATUAN PEKERJAAN - KAB/KOTA BUTON UTARA. - PROPINSI SULAWESI TENGGARA

3 Pek Plester + Aci Taman 1 : 4 (t=15 mm) /M²


Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
Bahan :
PC 6.2400 kg x Rp. 3,080.00 19,219.20
Pasir 0.0240 m' x Rp. 259,089.58 6,218.15
Total Bahan 25,437.35
Upah :
Pekerja 0.3000 Hr x Rp. 113,850.00 34,155.00
Tukang Batu 0.1500 Hr x Rp. 127,512.00 19,126.80
Kepala Tukang 0.0150 Hr x Rp. 136,620.00 2,049.30
Mandor 0.0150 Hr x Rp. 0.00 0.00
Total Upah 55,331.10
C Jumlah (A + B) 80,768.45

IV PEKERJAAN CAT
1 Pengecatan Tembok Baru (1 lapis Plamir, 1 Lapis Cat Dasar,
1 Lapis cat Penutup)
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
Bahan :
Cat dasar 0.0500 Kg x Rp. 77,643.57 3,882.18
Cat penutup 1 kali 0.0500 Kg x Rp. 70,913.72 3,545.69
Total Bahan 7,427.86
Upah :
Pekerja 0.0200 Hr x Rp. 113,850.00 2,277.00
Tukang Cat 0.0400 Hr x Rp. 127,512.00 5,100.48
Kepala Tukang Cat 0.0063 Hr x Rp. 136,620.00 860.71
Mandor 0.0025 Hr x Rp. 0.00 0.00
Total Upah 8,238.19
C Jumlah (A + B) 15,666.05

Daftar Analisa Pekerjaan Hal : 132


Time Schedule " Kurva S "
Kegiatan :
Pekerjaan :
Lokasi :
Tahun :

Waktu Pelaksaaan Pekerjaan


No Uraian pekerjaan Total (Rp) Bobot (%) Jan-19 Feb-19 Mar-19 Apr-19 Ket
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
I Pekerjaan Persiapan
1 Pek. Papan Nama Proyek Rp 300,000 0.10% 0.10%
2 Pek. Pemasangan Bowplank Rp 1,000,000 0.34% 0.34%
3 Pek. Air Kerja Rp 700,000 0.23% 0.23%
II Pekerjaan Tanah
1 Pek. Galian Tanah Pondasi Rp 5,032,040 1.69% 0.84% 0.84%
2 Pek. Urugan Kembali bekas Galian Rp 393,300 0.13% 0.13%
90%
3 Pek. Urugan Pasir Bawah Pondasi Rp 497,205 0.17% 0.17%
II Pekerjaan Pondasi
1 Pas. Pondasi Batu Kosong Rp 6,238,180 2.09% 1.05% 1.05%
2 Pas. Pondasi Batu Kali 1 Pc : 4 Ps Rp 25,551,450 8.56% 4.28% 4.28%
III Pekerjaan Beton
1 Pekerjaan Sloof Rp 17,842,526 5.98% 2.99% 2.99% 80%
2 Pekerjaan Kolom Rp 21,443,752 7.19% 3.59% 3.59%
3 Pekerjaan Ring Balok Rp 16,148,950 5.41% 2.71% 2.71%
IV Pekerjaan Dinding
1 Pas. Dinding Batubata 1:4 Rp 18,912,345 6.34% 2.11% 2.11% 2.11%
2 Pek. Plesteran Dinding 1 : 4 Rp 14,498,280 4.86% 2.43% 2.43% 70%
3 Pek. Acian Dinding Rp 12,424,890 4.16% 4.16%
V Pekerjaan Pintu dan Jendela
1 Pekerjaan Pintu Rp 3,000,000 1.01% 0.50% 0.50%
2 Pekerjaan Jendela Rp 5,000,000 1.68% 0.84% 0.84%
3 Pekerjaan Angin Angin Rp 1,000,000 0.34% 0.17% 0.17% 60%
VI Pekerjaan Kuda Kuda dan Atap
1 Pek Kuda-kuda 8/12 kayu kls II Rp 8,284,566 2.78% 1.39% 1.39%
2 Pas. Balok Gapit 2 (6/12) Rp 4,812,750 1.61% 0.81% 0.81%
3 Pek. Skoor Angin 6/12 kayu klas II Rp 500,442 0.17% 0.08% 0.08%
4 Pek. Gording 5/10 kayu klas II Rp 6,200,950 2.08% 2.08%
50%
5 Pek. Baut Ø10 mm di sambungan gording Rp 956,250 0.32% 0.32%
6 Pek. List Plank 3/25 Papan Klas II Rp 2,792,250 0.94% 0.94%
7 Pek. Beghel U, Plat Baja Rp 213,750 0.07% 0.07%
8 Pek. Penutup Atap Zyncalum 0,3mm Rp 31,853,380 10.68% 10.68%
9 Pek. Nok Zyncalum 0,3mm Rp 4,200,000 1.41% 1.41%
VII Pekerjaan Plafond 40%
1 Pek. Rangka Plafond Kayu 5/7 Kls II Rp 21,248,500 7.12% 3.56% 3.56%
2 Pek. Penutup Plafond Tripleks, Tebal 3 mm Rp 10,171,000 3.41% 3.41%
3 Pek. List Plafond 3/3 Rp 1,806,750 0.61% 0.61%
VIII Pekerjaan Lantai Keramik
1 Pek. Urugan Tanah bawah lantai Rp 7,786,200 2.61% 2.61% 30%
2 Pek. Urugan Pasir bawah lantai Rp 1,176,719 0.39% 0.39%
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 Rp 6,126,988 2.05% 2.05%
4 Pek. keramik 40x40 cm (Dalam Ruangan) Rp 11,145,600 3.74% 1.87% 1.87%
5 Pek.keramik 40x40 cm (Selasar) Rp 3,483,000 1.17% 0.58% 0.58%
IX Pekerjaan Instalasi Listrik 20%
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM Rp 2,551,500 0.86% 0.43% 0.43%
2 Pas. Instalasi Titik Lampu 2x2,5 NYM Rp 909,000 0.30% 0.30%
3 Pas. Instalasi Titik Saklar Double 3x2,5 NYM Rp 309,840 0.10% 0.10%
4 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM Rp 264,300 0.09% 0.09%
5 Pas. Instalasi Lampu Pijar 15 W Rp 619,800 0.21% 0.21%
6 Pas. Instalasi Lampu Pijar 58 W Rp 1,983,600 0.66% 10%
0.66%
X Pekerjaan Pengecetan
1 Pek. Cat Dinding berikut plamir Rp 10,272,580 3.44% 1.72% 1.72%
2 Pek. Cat Plafond berikut plamir Rp 6,135,500 2.06% 1.03% 1.03%
3 Pek. Cat Kayu berikut meni dan plamir Rp 2,586,000 0.87% 0.87%
Total Bobot Rp 298,374,131 100.00% 0%
Bobot Rencana Per Minggu 1.51% 1.14% 5.33% 5.33% 5.60% 6.58% 9.92% 8.76% 10.99% 5.68% 14.66% 6.77% 8.91% 2.45% 3.62% 2.75%
Komulatif Bobot Rencana Per Minggu 1.51% 2.66% 7.98% 13.31% 18.91% 25.49% 35.41% 44.17% 55.15% 60.84% 75.50% 82.27% 91.18% 93.63% 97.25% 100.00%

Mengetahui Dibuat Oleh


PPK (Instansi) Konsultan Perencana

Nama PPK Nama Direktur


NIP. Direktur
Analisa Satuan Pekerjaan

ANALISA SATUAN PEKERJAAN


STANDAR NASIONAL INDONESIA
TAHUN 2008

Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A.01.06 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK
BAHAN :
Kayu Kelas III Balok 0.0100 m3 3,000,000.00 30,000.00
Paku Biasa 0.0200 Kg 25,000.00 500.00
Kayu Kayu Kelas III Papan 3/20 0.0070 m3 3,000,000.00 21,000.00
Jumlah Bahan 51,500.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
P PK05 Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
P PK03 Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
LL01 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 77,002.40
A001 Dibulatkan 77,000.00
A.02.03 A 1 M3 GALIAN TANAH KERAS KEDALAMAN MAX 1 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.6250 Oh 113,850.00 71,156.25
Mandor 0.0620 Oh - -
Jumlah Pekerja 71,156.25
Jumlah Bahan + Pekerja 71,156.25
Dibulatkan 71,150.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.8500 Oh 113,850.00 96,772.50
P PK05 Mandor 0.0550 Oh - -
Jumlah Pekerja 96,772.50
Jumlah Bahan + Pekerja 96,772.50
A001 Dibulatkan 96,770.00
A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.5260 Oh 113,850.00 59,885.10
P PK05 Mandor 0.0520 Oh - -
Jumlah Pekerja 59,885.10
Jumlah Bahan + Pekerja 59,885.10
A001 Dibulatkan 59,880.00
A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.7350 Oh 113,850.00 83,679.75
P PK05 Mandor 0.0730 Oh - -
Jumlah Pekerja 83,679.75
Jumlah Bahan + Pekerja 83,679.75
A001 Dibulatkan 83,670.00
A.02.11 1 M3 URUGAN TANAH KEMBALI
BAHAN :
Tanah Urug 1.2000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.1920 Oh 113,850.00 21,859.20
P PK05 Mandor 0.0190 Oh - -
Jumlah Pekerja 21,859.20
Jumlah Bahan + Pekerja 21,859.20
A001 Dibulatkan 21,850.00
A.02.12 1 M3 URUGAN TANAH DIPADATKAN
BAHAN :
Tanah Urug 1.2000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 34,155.00
Jumlah Bahan + Pekerja 34,155.00
A001 Dibulatkan 34,150.00
A.02.13 1 M3 URUGAN PASIR
BAHAN :
Pasir Urug 1.2000 m³ 125,000.00 150,000.00
Jumlah Bahan 150,000.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
P PK05 Mandor 0.0100 Oh - -
Jumlah Pekerja 34,155.00
Jumlah Bahan + Pekerja 184,155.00
A001 Dibulatkan 184,150.00
A.02.22 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)
BAHAN :
Page 135 of 199
Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Tanah Urug (didatangkan) 1.2000 m³ 140,000.00 168,000.00

Jumlah Bahan 168,000.00


UPAH :
Pekerja 0.4500 Oh 113,850.00 51,232.50
Mandor 0.0450 Oh - -
P PK05 Alat Bantu (sewa Stamper) 0.1250 Oh - -
Jumlah Pekerja 51,232.50
Jumlah Bahan + Pekerja 219,232.50
A001 Dibulatkan 219,230.00
A.03.02 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps
BAHAN :
Batu Kali / Belah Belah 1.1000 m³ 235,000.00 258,500.00
Semen PC (50 kg) 267.0000 Kg 1,900.00 507,300.00
Pasir Pasang 0.4270 m³ 150,000.00 64,050.00
Jumlah Bahan 829,850.00
UPAH :
Pekerja 1.5000 Oh 113,850.00 170,775.00
Tukang Batu 0.6000 Oh 127,512.00 76,507.20
Kepala Tukang 0.0600 Oh 136,620.00 8,197.20
P PK05 Mandor 0.0350 Oh - -
Jumlah Pekerja 255,479.40
Jumlah Bahan + Pekerja 1,085,329.40
A001 Dibulatkan 1,085,320.00
A.03.03 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps
BAHAN :
Batu Kali / Belah Belah 1.1000 m³ 235,000.00 258,500.00
Semen PC (50 kg) 202.0000 Kg 1,900.00 383,800.00
Pasir Pasang 0.4850 m³ 150,000.00 72,750.00
Jumlah Bahan 715,050.00
UPAH :
Pekerja 1.5000 Oh 113,850.00 170,775.00
Tukang Batu 0.6000 Oh 127,512.00 76,507.20
Kepala Tukang 0.0600 Oh 136,620.00 8,197.20
P PK05 Mandor 0.0350 Oh - -
Jumlah Pekerja 255,479.40
Jumlah Bahan + Pekerja 970,529.40
A001 Dibulatkan 970,520.00
A.03.04 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps
BAHAN :
Batu Kali / Belah Belah 1.2000 m³ 235,000.00 282,000.00
Semen PC (50 kg) 163.0000 Kg 1,900.00 309,700.00
Pasir Pasang 0.5200 m³ 150,000.00 78,000.00
Jumlah Bahan 669,700.00
UPAH :
Pekerja 1.5000 Oh 113,850.00 170,775.00
Tukang Batu 0.7500 Oh 127,512.00 95,634.00
Kepala Tukang 0.0750 Oh 136,620.00 10,246.50
P PK05 Mandor 0.0750 Oh - -
Jumlah Pekerja 276,655.50
Jumlah Bahan + Pekerja 946,355.50
A001 Dibulatkan 946,350.00
A.03.05 1 M3 PASANG PONDASI BATU KARANG MATI 1 Pc : 4 Ps
BAHAN :
Batu Kali / Belah Belah 1.1000 m³ 235,000.00 258,500.00
Semen PC (50 kg) 136.0000 Kg 1,900.00 258,400.00
Pasir Pasang 0.5440 m³ 150,000.00 81,600.00
Jumlah Bahan 598,500.00
UPAH :
Pekerja 1.5000 Oh 113,850.00 170,775.00
Tukang Batu 0.6000 Oh 127,512.00 76,507.20
Kepala Tukang 0.0600 Oh 136,620.00 8,197.20
P PK05 Mandor 0.0350 Oh - -
Jumlah Pekerja 255,479.40
Jumlah Bahan + Pekerja 853,979.40
A001 Dibulatkan 853,970.00
A.03.13 1 M3 PASANG BATU KOSONG ( AANSTAMPING ), JENIS BATU KALI
BAHAN :
Batu Kali / Belah Belah 1.2000 m³ 235,000.00 282,000.00
Pasir Urug 0.4320 m³ 125,000.00 54,000.00
Jumlah Bahan 336,000.00
UPAH :
Pekerja 0.7800 Oh 113,850.00 88,803.00
Tukang Batu 0.3900 Oh 127,512.00 49,729.68
Kepala Tukang 0.0390 Oh 136,620.00 5,328.18
P PK05 Mandor 0.0390 Oh - -
Jumlah Pekerja 143,860.86
Jumlah Bahan + Pekerja 479,860.86
A001 Dibulatkan 479,860.00
A.03.13.a 1 M3 PASANG BATU KOSONG ( AANSTAMPING ), JENIS BATU KARANG MATI
BAHAN :
Batu Karang Mati 1.2000 m³ - -
Pasir Urug 0.3000 m³ 125,000.00 37,500.00
Jumlah Bahan 37,500.00
UPAH :
Pekerja 0.7800 Oh 113,850.00 88,803.00
Tukang Batu 0.3900 Oh 127,512.00 49,729.68
Kepala Tukang 0.0390 Oh 136,620.00 5,328.18
P PK05 Mandor 0.0200 Oh - -
Jumlah Pekerja 143,860.86
Jumlah Bahan + Pekerja 181,360.86
A001 Dibulatkan 181,360.00
A.04.09 1 M2 PASANGAN DINDING BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps
BAHAN :

Page 136 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Bata Merah Bakar Kelas I 70.0000 bh 700.00 49,000.00
Semen PC (50 kg) 18.9500 Kg 1,900.00 36,005.00
Pasir Pasang 0.0380 m³ 150,000.00 5,700.00
Jumlah Bahan 90,705.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 50,549.40
Jumlah Bahan + Pekerja 141,254.40
A001 Dibulatkan 141,250.00
1 M Pasang Cansteen
BAHAN :
Cansteen 1.0100 m 49,000.00 49,490.00
Pasir Urug 0.0450 m3 125,000.00 5,625.00
Jumlah Bahan 55,115.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
Mandor 0.0050 Oh - -
Jumlah Pekerja 50,549.40
Jumlah Bahan + Pekerja 105,664.40
Dibulatkan 105,660.00
A.04.10 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 2 Ps
BAHAN :
Batako 35.0000 bh 6,000.00 210,000.00
Semen PC (50 kg) 9.4750 Kg 1,900.00 18,002.50
Pasir Pasang 0.0380 m³ 150,000.00 5,700.00
Jumlah Bahan 233,702.50
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 50,549.40
Jumlah Bahan + Pekerja 284,251.90
A001 Dibulatkan 284,250.00
A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps
BAHAN :
Bata Merah Bakar Kelas I 70.0000 bh 700.00 49,000.00
Semen PC (50 kg) 9.6800 Kg 1,900.00 18,392.00
Pasir Pasang 0.0450 m³ 150,000.00 6,750.00
Jumlah Bahan 74,142.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 48,272.40
Jumlah Bahan + Pekerja 122,414.40
A001 Dibulatkan 122,410.00
A.04.12 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 4 Ps
BAHAN :
Batako 35.0000 bh 6,000.00 210,000.00
Semen PC (50 kg) 5.7500 Kg 1,900.00 10,925.00
Pasir Pasang 0.0430 m³ 150,000.00 6,450.00
Jumlah Bahan 227,375.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0150 Oh - -
Jumlah Pekerja 50,549.40
Jumlah Bahan + Pekerja 277,924.40
A001 Dibulatkan 277,920.00
A.05.19 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM
BAHAN :
Semen PC (50 kg) 15.5000 Kg 1,900.00 29,450.00
Pasir Pasang 0.0130 m³ 150,000.00 1,950.00
Jumlah Bahan 31,400.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Batu 0.2000 Oh 127,512.00 25,502.40
Kepala Tukang 0.0200 Oh 136,620.00 2,732.40
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 62,389.80
Jumlah Bahan + Pekerja 93,789.80
A001 Dibulatkan 93,780.00
A.05.21 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps
BAHAN :
Semen PC (50 kg) 0.1450 Kg 1,900.00 275.50
Pasir Pasang 0.0180 m³ 150,000.00 2,700.00
Jumlah Bahan 2,975.50
UPAH :
Pekerja 0.2000 Oh 113,850.00 22,770.00
Tukang Batu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0150 Oh - -
Jumlah Pekerja 43,946.10
Jumlah Bahan + Pekerja 46,921.60
A001 Dibulatkan 46,920.00
A.05.36 1 M2 ACIAN PC

Page 137 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
BAHAN :
BA34 Semen PC (50 kg) 0.0350 zak 95,000.00 3,325.00
Jumlah Bahan 3,325.00
UPAH :
P PK02 Pekerja 0.2000 org 113,850.00 22,770.00
P PK04 Tukang Batu 0.1000 org 127,512.00 12,751.20
P PK06 Kepala Tukang batu 0.0100 org 136,620.00 1,366.20
P PK19 Mandor 0.0050 org - -
Jumlah Pekerja 36,887.40
Jumlah Bahan + Pekerja 40,212.40
Jumlah 40,212.40
A077 Dibulatkan 40,210.00
A.06.01 1 M3 PEKERJAAN KUSEN PINTU DAN JENDELA KAYU KLS II
BAHAN :
Kayu Kelas II Balok 1.1000 m³ 4,000,000.00 4,400,000.00
Paku Biasa 1.2500 Kg 25,000.00 31,250.00
Lem kayu 0.0500 Kg 25,000.00 1,250.00
Jumlah Bahan 4,400,000.00
UPAH :
Pekerja 6.0000 Oh 113,850.00 683,100.00
Tukang Kayu 15.0000 Oh 127,512.00 1,912,680.00
Kepala Tukang 3.0000 Oh 136,620.00 409,860.00
P PK05 Mandor 0.5000 Oh - -
Jumlah Pekerja 3,005,640.00
Jumlah Bahan + Pekerja 7,405,640.00
A001 Dibulatkan 7,405,640.00
A.06.02 1 UNIT PEK. KUSEN PINTU P1 (L=170 cm) + JALUZI
BAHAN :
Pek. Kusen pintu P1 + Jaluzi 0.02000 m³ 7,405,640.00 148,112.80
Jumlah Bahan 148,112.80
A001 Dibulatkan 148,110.00
A.06.03 1 UNIT PEK. KUSEN PINTU P2 (L=90 cm) + JALUZI
BAHAN :
Pek. Kusen pintu P2 + Jaluzi 0.0700 m³ 7,405,640.00 518,394.80
Jumlah Bahan 518,394.80
A001 Dibulatkan 518,390.00
A.06.04 1 UNIT PEK. KUSEN PINTU P3 (L=70 cm)
BAHAN :
Pek. Kusen pintu P3 0.0500 m³ 7,405,640.00 370,282.00
Jumlah Bahan + Pekerja 370,282.00
A001 Dibulatkan 370,280.00
A.06.05 1 UNIT PEK. KUSEN PINTU P5 (L=100 cm)
BAHAN :
Pek. Kusen pintu P5 0.0510 m³ 7,405,640.00 377,687.64
Jumlah Bahan 377,687.64
A001 Dibulatkan 377,680.00
A.06.06 1 UNIT PEK. KUSEN PINTU JENDELA PJ1/PJ1A + JALUZI
BAHAN :
Kusen Pintu Jendela PJ1 + Jaluzi 0.1010 m³ 7,405,640.00 747,969.64
Jumlah Bahan 747,969.64
A001 Dibulatkan 747,960.00
A.06.07 1 UNIT PEK. KUSEN PINTU JENDELA PJ2 + JALUZI
BAHAN :
Kusen Pintu Jendela PJ2 + Jaluzi 0.1010 m³ 7,405,640.00 747,969.64
Jumlah Bahan 747,969.64
A001 Dibulatkan 747,960.00
A.06.08 1 UNIT PEK. KUSEN PINTU JENDELA PJ3 + JALUZI
BAHAN :
Kusen Pintu Jendela PJ3 + Jaluzi 0.1630 m³ 7,405,640.00 1,207,119.32
Jumlah Bahan 1,207,119.32
A001 Dibulatkan 1,207,110.00
A.06.09 1 UNIT PEK. KUSEN JENDELA J2 + JALUZI
BAHAN :
Kusen Jendela J2 + Jaluzi 0.0690 m³ 7,405,640.00 510,989.16
Jumlah Bahan 510,989.16
A001 Dibulatkan 510,980.00
A.06.10 1 UNIT PEK. KUSEN JENDELA J3 + JALUZI
BAHAN :
Kusen Jendela J3 + Jaluzi 0.0950 m³ 7,405,640.00 703,535.80
Jumlah Bahan 703,535.80
A001 Dibulatkan 703,530.00
A.06.11 1 UNIT PEK. KUSEN JENDELA J4 + JALUZI
BAHAN :
Kusen Jendela J4 + Jaluzi 0.1470 m³ 7,405,640.00 1,088,629.08
Jumlah Bahan 1,088,629.08
A001 Dibulatkan 1,088,620.00
A.06.12 1 UNIT PEK. KUSEN JENDELA J
BAHAN :
Kusen Jendela J 0.0300 m³ 7,405,640.00 222,169.20
Jumlah Bahan 222,169.20
A001 Dibulatkan 222,160.00
A.06.13 1 UNIT PEK. KUSEN BOUVENLICH BV1
BAHAN :
Kusen Bouvenlich BV1 0.0240 m³ 7,405,640.00 177,735.36
Jumlah Bahan 177,735.36
A001 Dibulatkan 177,730.00
A.06.14 1 UNIT PEK. KUSEN BOUVENLICH BV2
BAHAN :
Kusen Bouvenlich BV2 0.0430 m³ 7,405,640.00 318,442.52
Jumlah Bahan 318,442.52
A001 Dibulatkan 318,440.00
A.06.15 1 UNIT PEK. KUSEN BOUVENLICH BV3
BAHAN :
Kusen Bouvenlich BV3 0.0610 m³ 7,405,640.00 451,744.04

Page 138 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan 451,744.04
A001 Dibulatkan 451,740.00
A.06.16 1 UNIT PEK. KUSEN ANGIN-ANGIN LA-LB + JALUZI
BAHAN :
Kusen Angin-Angin LA-LB + Jaluzi 0.0900 m³ 7,405,640.00 666,507.60
Jumlah Bahan 666,507.60
A001 Dibulatkan 666,500.00
A.06.17 1 M2 PEKERJAAN DAUN PINTU PANEL KAYU LOKAL KLS II
BAHAN :
Kayu Kelas II Papan 0.0400 m³ 4,000,000.00 160,000.00
Lem Kayu 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 161,250.00
UPAH :
Pekerja 1.0000 Oh 113,850.00 113,850.00
Tukang Kayu 2.5000 Oh 127,512.00 318,780.00
Kepala Tukang 0.2500 Oh 136,620.00 34,155.00
P PK05 Mandor 0.0500 Oh - -
Jumlah Pekerja 466,785.00
Jumlah Bahan + Pekerja 628,035.00
A001 Dibulatkan 628,030.00
A.06.18 1 BH PASANGAN DAUN PINTU PANIL
BAHAN :
Pintu Panil 1.6800 m2 628,030.00 1,055,090.40
Jumlah Bahan 1,055,090.40
A001 Dibulatkan 1,055,090.00
A.06.19 1 BH PASANGAN DAUN PINTU PANIL P5
BAHAN :
Pintu Panil 1.8900 m2 628,030.00 1,186,976.70
Jumlah Bahan 1,186,976.70
A001 Dibulatkan 1,186,970.00
A.06.20 1 M2 PEKERJAAN DAUN PINTU TRIPLEKS RANGKAP, RANGKA KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0196 m³ 4,000,000.00 78,400.00
Paku Biasa Tripleks 0.0300 kg 25,000.00 750.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Tripleks 6 mm 1.0000 lbr 150,000.00 150,000.00
Jumlah Bahan 236,650.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Kayu 2.0000 Oh 127,512.00 255,024.00
Kepala Tukang 0.2000 Oh 136,620.00 27,324.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 350,658.00
Jumlah Bahan + Pekerja 587,308.00
A001 Dibulatkan 587,300.00
A.06.21 1 BH PASANGAN DAUN PINTU TRIPLEKS P3
BAHAN :
Pintu Tripleks P3 1.2600 m2 587,300.00 739,998.00
Jumlah Bahan 739,998.00
A001 Dibulatkan 739,990.00
A.06.22 1 M2 PEKERJAAN DAUN JENDELA + KACA
BAHAN :
Kayu Kelas II Papan 0.1000 m³ 4,000,000.00 400,000.00
Kaca Polos 5 mm 1.1000 m2 227,700.00 250,470.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Jumlah Bahan 657,970.00
UPAH :
Pekerja 0.8000 Oh 113,850.00 91,080.00
Tukang Kayu 2.0000 Oh 127,512.00 255,024.00
Kepala Tukang 0.2000 Oh 136,620.00 27,324.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 373,428.00
Jumlah Bahan + Pekerja 1,031,398.00
A001 Dibulatkan 1,031,390.00
A.06.23 1 BH PASANGAN DAUN JENDELA + KACA (PJ1 dan PJ2)
BAHAN :
Daun Jendela + Kaca (PJ1 dan PJ2) 0.5070 m2 1,031,390.00 522,914.73
Jumlah Bahan 522,914.73
A001 Dibulatkan 522,910.00
A.06.24 1 BH PASANGAN DAUN JENDELA + KACA PJ3
BAHAN :
Daun Jendela + Kaca PJ3 1.2480 m2 1,031,390.00 1,287,174.72
Jumlah Bahan 1,287,174.72
A001 Dibulatkan 1,287,170.00
A.06.25 1 BH PASANGAN DAUN PINTU + KACA PJ3
BAHAN :
Daun Pintu + Kaca PJ3 1.6800 m2 1,031,390.00 1,732,735.20
Jumlah Bahan 1,732,735.20
A001 Dibulatkan 1,732,730.00
A.06.26 1 BH PASANGAN DAUN JENDELA + KACA J2
BAHAN :
Daun Jendela + Kaca J2 0.5070 m2 1,031,390.00 522,914.73
Jumlah Bahan 522,914.73
A001 Dibulatkan 522,910.00
A.06.27 1 BH PASANGAN DAUN JENDELA + KACA J3
BAHAN :
Daun Jendela + Kaca J3 0.5915 m2 1,031,390.00 610,067.19
Jumlah Bahan 610,067.19
Dibulatkan 610,060.00
A.06.28 1 BH PASANGAN DAUN JENDELA + KACA J4
BAHAN :
Daun Jendela + Kaca J4 1.2480 m2 1,031,390.00 1,287,174.72
Jumlah Bahan 1,287,174.72
Dibulatkan 1,287,170.00

Page 139 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A.06.29 1 BH PASANGAN DAUN JENDELA + KACA J5
BAHAN :
Daun Jendela + Kaca J5 0.8050 m2 1,031,390.00 830,268.95
Jumlah Bahan 830,268.95
Dibulatkan 830,260.00
A.06.30 1 BH PASANGAN DAUN JENDELA + KACA J6
BAHAN :
Daun Jendela + Kaca J6 0.5980 m2 1,031,390.00 616,771.22
Jumlah Bahan 616,771.22
Dibulatkan 616,770.00
A.06.31 1 UNIT PEK. KUSEN JENDELA J5
BAHAN :
Kusen Jendela J5 0.0310 m³ 7,405,640.00 229,574.84
Jumlah Bahan 229,574.84
Dibulatkan 229,570.00
A.06.32 1 UNIT PEK. KUSEN JENDELA J6
BAHAN :
Kusen Jendela J6 0.0490 m³ 7,405,640.00 362,876.36
Jumlah Bahan 362,876.36
Dibulatkan 362,870.00
A.06.32.a 1 M2 PASANG KACA TEBAL 5 MM
BAHAN :
- m³ 4,000,000.00 -
Kaca Polos 5 mm 1.1000 m2 227,700.00 250,470.00
Paku Biasa Tripleks 0.0300 kg 25,000.00 750.00
Jumlah Bahan 251,220.00
UPAH :
Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 - Oh - -
Jumlah Pekerja 22,883.85
Jumlah Bahan + Pekerja 274,103.85
A001 Dibulatkan 274,100.00
A.06.33 1 M1 PASANG KONSTRUKSI NOK BUBUNGAN 6/12 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 1.1000 m³ 4,000,000.00 4,400,000.00
Paku Biasa 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 4,401,250.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 49,638.60
Jumlah Bahan + Pekerja 4,450,888.60
A001 Dibulatkan 4,450,880.00
A.06.34 1 M3 PASANG KONSTRUKSI SKOOR ANGIN 6/12 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.6000 m³ 4,000,000.00 2,400,000.00
Paku Biasa 1.2540 kg 25,000.00 31,350.00
Jumlah Bahan 2,431,350.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.2600 Oh 127,512.00 33,153.12
Kepala Tukang 0.0260 Oh 136,620.00 3,552.12
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 70,860.24
Jumlah Bahan + Pekerja 2,502,210.24
A001 Dibulatkan 2,502,210.00
A.06.35 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA 8/12 KAYU KAYU LOKAL KLS II
BAHAN :
Kayu Kls. II Balok 1.2000 m³ 4,000,000.00 4,800,000.00
Paku Biasa 1.2500 kg 25,000.00 31,250.00
Jumlah Bahan 4,831,250.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.2600 Oh 127,512.00 33,153.12
Kepala Tukang 0.0260 Oh 136,620.00 3,552.12
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 70,860.24
Jumlah Bahan + Pekerja 4,902,110.24
A001 Dibulatkan 4,902,110.00
A.06.36 1 M3 PASANG KONSTRUKSI GORDING 5/10 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 1.1000 m³ 4,000,000.00 4,400,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Jumlah Bahan 4,403,750.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 4,429,252.40
A001 Dibulatkan 4,429,250.00
A.06.37 1 M3 PASANG KASO 5/7 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0120 m³ 4,000,000.00 48,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Jumlah Bahan 51,750.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20

Page 140 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 77,252.40
A001 Dibulatkan 77,250.00
A.06.38 1 M3 PASANG RENG 3/4 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0120 m³ 4,000,000.00 48,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Jumlah Bahan 51,750.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 77,252.40
A001 Dibulatkan 77,250.00
A.06.39 1 M1 PASANG KONSTRUKSI NOK TEPI PAPAN 6/12 KAYU KLS II
BAHAN :
Kayu Kelas II Papan 1.0000 m³ 4,000,000.00 4,000,000.00
Paku Biasa 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 4,001,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 49,638.60
Jumlah Bahan + Pekerja 4,050,763.60
A001 Dibulatkan 4,050,760.00
A.06.44 1 M2 PASANG RANGKA PLAFOND BALOK 5/7 KAYU LOKAL KLS II
BAHAN :
Kayu Kls II, Kaso 5/7 Rangka Plafon 0.0155 m³ 4,000,000.00 62,000.00
Paku Biasa 0.2000 kg 25,000.00 5,000.00
Jumlah Bahan 62,000.00
UPAH :
Pekerja 0.1500 Oh 113,850.00 17,077.50
Tukang Kayu 0.3000 Oh 127,512.00 38,253.60
Kepala Tukang 0.0300 Oh 136,620.00 4,098.60
P PK05 Mandor 0.0100 Oh - -
Jumlah Pekerja 59,429.70
Jumlah Bahan + Pekerja 121,429.70
A001 Dibulatkan 121,420.00
A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 25) cm, KAYU LOKAL KLS II
BAHAN :
Kayu Kelas II Papan 0.0110 m³ 4,000,000.00 44,000.00
Paku Biasa 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 45,250.00
UPAH :
Pekerja 0.1100 Oh 113,850.00 12,523.50
Tukang Kayu 0.0100 Oh 127,512.00 1,275.12
Kepala Tukang 0.0220 Oh 136,620.00 3,005.64
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 16,804.26
Jumlah Bahan + Pekerja 62,054.26
A001 Dibulatkan 62,050.00
A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 3/3
BAHAN :
List Plafond 3/3 1.0500 m' 5,000.00 5,250.00
Paku Biasa 0.0100 kg 25,000.00 250.00
Jumlah Bahan 5,500.00
UPAH :
Pekerja 0.0500 Oh 113,850.00 5,692.50
Tukang Kayu 0.0500 Oh 127,512.00 6,375.60
Kepala Tukang 0.0050 Oh 136,620.00 683.10
P PK05 Mandor Oh - -
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 18,251.20
A001 Dibulatkan 18,250.00
A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen PC (50 kg) 218.0000 kg 1,900.00 414,200.00
Pasir Beton 0.5200 M3 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.8700 m³ 250,000.00 217,500.00
Jumlah Bahan 735,700.00
UPAH :
Pekerja 1.6500 Oh 113,850.00 187,852.50
Tukang Batu 0.2500 Oh 127,512.00 31,878.00
Kepala Tukang 0.0250 Oh 136,620.00 3,415.50
P PK05 Mandor 0.0800 Oh - -
Jumlah Pekerja 223,146.00
Jumlah Bahan + Pekerja 958,846.00
A001 Dibulatkan 958,840.00
A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr
BAHAN :
Semen PC (50 kg) 336.0000 kg 1,900.00 638,400.00
Pasir Beton 0.5400 m3 200,000.00 108,000.00
Batu Kerikil / Split 2/3 cm 0.8100 m³ 250,000.00 202,500.00
Jumlah Bahan 948,900.00
UPAH :
Pekerja 2.0000 Oh 113,850.00 227,700.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70

Page 141 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
P PK05 Mandor 1.0000 Oh - -
Jumlah Pekerja 277,110.90
Jumlah Bahan + Pekerja 1,226,010.90
A001 Dibulatkan 1,226,010.00
A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
BAHAN :
Besi Beton Polos 1.0500 kg 35,430.00 37,201.50
Kawat Beton 0.0150 kg 26,000.00 390.00
Jumlah Bahan 37,591.50
UPAH :
Pekerja 0.0070 Oh 113,850.00 796.95
Tukang Besi 0.0070 Oh 127,512.00 892.58
P PK05 Kepala Tukang 0.0007 Oh 136,620.00 95.63
P PK05 Mandor 0.0003 Oh - -
Jumlah Pekerja 1,785.17
Jumlah Bahan + Pekerja 39,376.67
A001 Dibulatkan 39,370.00
A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASI
BAHAN :
Kayu Kelas III Papan 0.0400 m³ 3,000,000.00 120,000.00
Paku Biasa 0.3000 m³ 25,000.00 7,500.00
Minyak Bekisting 0.1000 ltr - -
Jumlah Bahan 127,500.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.2600 Oh 127,512.00 33,153.12
P PK05 Kepala Tukang 0.0260 Oh 136,620.00 3,552.12
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 70,860.24
Jumlah Bahan + Pekerja 198,360.24
A001 Dibulatkan 198,360.00
A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOF
BAHAN :
Kayu Kelas III Papan 0.0044 m³ 3,000,000.00 13,200.00
Paku Biasa 0.3000 m³ 25,000.00 7,500.00
Minyak Bekisting 0.1000 m³ - -
Jumlah Bahan 20,700.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.2600 Oh 127,512.00 33,153.12
P PK05 Kepala Tukang 0.0260 Oh 136,620.00 3,552.12
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 70,860.24
Jumlah Bahan + Pekerja 91,560.24
A001 Dibulatkan 91,560.00
A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM
BAHAN :
Kayu Kelas III Papan 0.0040 m³ 3,000,000.00 12,000.00
Paku Biasa 0.4000 kg 25,000.00 10,000.00
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0015 m³ 3,000,000.00 4,500.00
Jumlah Bahan 26,500.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.3300 Oh 127,512.00 42,078.96
P PK05 Kepala Tukang 0.0330 Oh 136,620.00 4,508.46
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 80,742.42
Jumlah Bahan + Pekerja 107,242.42
A001 Dibulatkan 107,240.00
A.07.31 1 m2 PASANG BEKISTING UNTUK BALOK
BAHAN :
Kayu Kelas III Papan 0.0040 m³ 3,000,000.00 12,000.00
Paku Biasa 0.4000 kg 25,000.00 10,000.00
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0018 m³ 3,000,000.00 5,400.00
Kayu Dolken 2.0000 btg 30,000.00 60,000.00
Jumlah Bahan 87,400.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Kayu 0.3300 Oh 127,512.00 42,078.96
P PK05 Kepala Tukang 0.0330 Oh 136,620.00 4,508.46
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 83,019.42
Jumlah Bahan + Pekerja 170,419.42
A001 Dibulatkan 170,410.00
A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAI
BAHAN :
Kayu Kelas III Papan 0.0020 m³ 3,000,000.00 6,000.00
Paku Biasa 0.4000 kg 25,000.00 10,000.00
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0015 m³ 3,000,000.00 4,500.00
Polywood tebal 9 mm 0.3500 lbr - -
Kayu Dolken 4.0000 btg 30,000.00 120,000.00
Jumlah Bahan 140,500.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Kayu 0.3300 Oh 127,512.00 42,078.96
P PK05 Kepala Tukang 0.0330 Oh 136,620.00 4,508.46
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 83,019.42
Jumlah Bahan + Pekerja 223,519.42
A001 Dibulatkan 223,510.00
A.07.33 1 m2 PASANG BEKISTING UNTUK DINDING

Page 142 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
BAHAN :
Kayu Kelas III Papan 0.0300 m³ 3,000,000.00 90,000.00
Paku Biasa 0.4000 kg 25,000.00 10,000.00
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0200 m³ 4,000,000.00 80,000.00
Polywood tebal 9 mm 0.3500 lbr - -
Kayu Dolken 3.0000 btg 30,000.00 90,000.00
Formtie / Penjaga Jarak Berkisar / Spacer 4.0000 bh -
Jumlah Bahan 270,000.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Kayu 0.3300 Oh 127,512.00 42,078.96
P PK05 Kepala Tukang 0.0330 Oh 136,620.00 4,508.46
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 83,019.42
Jumlah Bahan + Pekerja 353,019.42
A001 Dibulatkan 353,010.00
A.07.47 1 M3 MEMBUAT SOFI-SOFI 12/15 (220,80 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM 190.1393
BAHAN :
Kayu Kelas III Papan 0.3700 m³ 3,000,000.00 1,110,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
Besi Beton Polos Dia. 10 mm 152.6578 kg 35,430.00 5,408,665.07
Besi Beton Polos Dia. 8 mm 37.4815 kg 35,430.00 1,327,968.89
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 8,855,333.96
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,541,485.14
Dibulatkan 9,541,480.00
A.07.48 1 M3 MEMBUAT RING BALOK 15/20 (145,92 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Papan 0.3700 m³ 3,000,000.00 1,110,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
Besi Beton Polos Dia. 10 mm 92.5867 kg 35,430.00 3,280,345.60
Besi Beton Polos Dia. 8 mm 53.3333 kg 35,430.00 1,889,600.00
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 7,288,645.60
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 7,974,796.78
Dibulatkan 7,974,790.00
A.07.48'' 1 M3 MEMBUAT RING BALOK 12/20 (177,9556 Kg Besi + Bekesting) 177.9556
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Papan 0.3700 m³ 3000000 1,110,000.00
Paku Biasa 1.5000 kg 25000 37,500.00
Pelumas Bekesting 0.4000 lt 0 -
Besi Beton Polos Dia. 10 mm 115.7333 kg 35430 4,100,432.00
Besi Beton Polos Dia. 8 mm 62.2222 kg 35430 2,204,533.33
Kawat Beton 2.2500 kg 26000 58,500.00
Semen PC (50 kg) 6.4600 zak 95000 613,700.00
Pasir Beton 0.5200 m³ 200000 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250000 195,000.00
Jumlah Bahan 8,423,665.33
UPAH :
Tukang Batu 0.3500 org 127512 44,629.20
Tukang Kayu 1.0400 org 127512 132,612.48
Tukang Besi 1.0500 org 127512 133,887.60
Kepala Tukang 0.2450 org 136620 33,471.90
Pekerja 3.0000 org 113850 341,550.00
Mandor 0.1225 org 0 -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,109,816.51
Dibulatkan 9,109,810.00
A.07.49 1 M3 MEMBUAT KOLOM 20/25 (169,67 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.3700 m³ 3,000,000.00 1,110,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
5.88 Besi Beton Polos Dia. 12 mm 122.8200 kg 35,430.00 4,351,512.60
4.19 Besi Beton Polos Dia. 8 mm 42.6667 kg 35,430.00 1,511,680.00

Page 143 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 7,981,892.60
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 8,668,043.78
Dibulatkan 8,668,040.00
A.07.50 1 M3 MEMBUAT SLOOF SELASAR 15/20 (188,88 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.2900 m³ 3,000,000.00 870,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
3.70 Besi Beton Polos Dia. 12 mm 132.9067 kg 35,430.00 4,708,883.20
2.64 Besi Beton Polos Dia. 8 mm 53.3333 kg 35,430.00 1,889,600.00
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 8,477,183.20
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,163,334.38
Jumlah 9,163,334.38
Dibulatkan 9,163,330.00
A.07.51 1 M3 PEK. BETON BERTULANG PLAT MEJA, adukan 1 : 2 : 3
BAHAN :
Kayu Kelas III Bekesting 0.3300 m3 3,000,000.00 990,000.00
Paku Biasa 3.0000 kg 25,000.00 75,000.00
Besi Beton Polos Dia. 10 mm 110.0000 kg 35,430.00 3,897,300.00
Kawat Beton 3.0000 kg 26,000.00 78,000.00
Semen PC (50 kg) 6.4600 Zak 95,000.00 613,700.00
Pasir Beton 0.5200 m3 200,000.00 104,000.00
Kerikil beton 0.7800 m3 450,000.00 351,000.00
Jumlah Bahan 6,109,000.00
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 6,795,151.18
Jumlah 6,795,151.18
Dibulatkan 6,795,150.00
A.07.52 1 M3 MEMBUAT KOLOM 12/15 (197 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM 190.1393
BAHAN :
Kayu Kelas III Bekesting 0.4000 m³ 3,000,000.00 1,200,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
20.42 Besi Beton Polos Dia. 10 mm 152.6578 kg 35,430.00 5,408,665.07
10.13 Besi Beton Polos Dia. 6 mm 37.4815 kg 35,430.00 1,327,968.89
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 8,945,333.96
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,631,485.14
Dibulatkan 9,631,480.00
A.07.60 1 M3 MEMBUAT KOLOM SELASAR 15/15 (181,88 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.4400 m³ 3,000,000.00 1,320,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
8.33 Besi Beton Polos Dia. 10 mm 122.6222 kg 35,430.00 4,344,505.33
4.13 Besi Beton Polos Dia. 8 mm 59.2593 kg 35,430.00 2,099,555.56
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00

Page 144 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 8,772,760.89
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,458,912.07
Dibulatkan 9,458,910.00
A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen PC (50 kg) 232.0000 kg 1,900.00 440,800.00
Pasir Beton 0.5200 lbr 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Besi Beton Polos Dia. 10 mm 137.3610 Kg 35,430.00 4,866,700.23
Kawat Beton 1.9623 Kg 26,000.00 51,019.80
Kayu Kelas III Bekesting 0.2450 m³ 3,000,000.00 735,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Minyak Bekisting 1.4000 Ltr - -
Kayu Kelas III Balok 0.0700 m³ 3,000,000.00 210,000.00
Jumlah Bahan 6,606,270.03
UPAH :
Pekerja 6.4697 Oh 113,850.00 736,579.90
Tukang Batu 0.2500 Oh 127,512.00 31,878.00
Tukang Kayu 4.0260 Oh 127,512.00 513,363.31
Tukang Besi 1.0073 Oh 127,512.00 128,444.62
Kepala Tukang 0.5192 Oh 136,620.00 70,929.55
Mandor 0.1924 Oh - -
Jumlah Pekerja 1,481,195.39
Jumlah Bahan + Pekerja 8,087,465.42
Dibulatkan 8,087,460.00
A.08.02 1 M2 PASANG ATAP GENTENG TANAH
BAHAN :
Genteng Tanah 25.0000 buah - -
Jumlah Bahan -
UPAH :
Pekerja 0.1500 Oh 113,850.00 17,077.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 27,733.86
Jumlah Bahan + Pekerja 27,733.86
A001 Dibulatkan 27,730.00
A.08.03 1 M2 PASANG ATAP SPANDEK / GALVALYUM 0,3mm
BAHAN :
Atap Spandek/Galvalyum 1.0200 Lbr 128,000.00 130,560.00
Paku Seng +seal 0.2000 Kg 25,000.00 5,000.00
Jumlah Bahan 135,560.00
UPAH :
Pekerja 0.1200 Oh 113,850.00 13,662.00
Tukang Kayu 0.0600 Oh 127,512.00 7,650.72
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 22,132.44
Jumlah Bahan + Pekerja 157,692.44
A001 Dibulatkan 157,690.00
A.08.05 1 M2 PASANG NOK BUBUNGAN GENTENG TANAH
BAHAN :
Bubungan Genteng Tanah 5.0000 Bh - -
Semen PC (50 kg) 0.1600 zak 95,000.00 15,200.00
Pasir Pasang 0.0320 m3 150,000.00 4,800.00
Jumlah Bahan 20,000.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
P PK05 Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 49,638.60
Jumlah Bahan + Pekerja 69,638.60
A001 Dibulatkan 69,630.00
A.08.06 1 M2 PASANG NOK BUBUNGAN GENTENG METAL
BAHAN :
Nok Genteng Metal 1.1000 buah - -
Paku Seng + karet seal 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 1,250.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
P PK05 Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 49,638.60
Jumlah Bahan + Pekerja 50,888.60
A001 Dibulatkan 50,880.00
A.08.11 1 M2 PASANG ATAP SENG GELOMBANG BJLS 0,3 mm
BAHAN :
Seng Gelombang BJLS 0,3 0.7000 lbr 87,000.00 60,900.00
Paku Seng 0.0200 kg 25,000.00 500.00
Jumlah Bahan 61,400.00
UPAH :
Pekerja 0.1200 Oh 113,850.00 13,662.00
Tukang Kayu 0.0600 Oh 127,512.00 7,650.72

Page 145 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 22,132.44
Jumlah Bahan + Pekerja 83,532.44
A001 Dibulatkan 83,530.00
A.08.12 1 M2 PASANG ATAP ZYNCALUM 0,3 mm
BAHAN :
Atap Spandex Zyncalum 1.0200 lbr 128,000.00 130,560.00
Paku Seng + karet seal 0.2000 kg 25,000.00 5,000.00
Jumlah Bahan 135,560.00
UPAH :
Pekerja 0.1200 Oh 113,850.00 13,662.00
Tukang Kayu 0.0600 Oh 127,512.00 7,650.72
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 22,132.44
Jumlah Bahan + Pekerja 157,692.44
A001 Dibulatkan 157,690.00
A.08.13 1 M2 PASANG ATAP GENTENG METAL 0,3 mm
BAHAN :
Genteng Metal/metal roof 1.6200 lbr - -
Paku Seng + karet seal 0.2000 kg 25,000.00 5,000.00
Jumlah Bahan 5,000.00
UPAH :
Pekerja 0.1200 Oh 113,850.00 13,662.00
Tukang Kayu 0.0600 Oh 127,512.00 7,650.72
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 22,132.44
Jumlah Bahan + Pekerja 27,132.44
A001 Dibulatkan 27,130.00
A.08.14 1 M' PASANG NOK SENG POLOS 0,3 mm
BAHAN :
Seng Plat Polos 0.3000 lbr - -
Paku Seng + karet seal 0.0400 kg 25,000.00 1,000.00
Jumlah Bahan 1,000.00
UPAH :
Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.0700 Oh 127,512.00 8,925.84
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 11,726.55
Jumlah Bahan + Pekerja 12,726.55
A001 Dibulatkan 12,720.00
A.08.30 1 M1 PASANG NOK TEPI SENG GELOMBANG
BAHAN :
Nok Tepi Seng Gelombang 1.0000 m¹ 30,000.00 30,000.00
Paku Seng + karet seal 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 31,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 70,243.86
A001 Dibulatkan 70,240.00
A.08.31 1 M1 PASANG NOK TEPI ZYNCALUM
BAHAN :
Nok Tepi Zyncalum 1.0000 Bh 50,000.00 50,000.00
Paku Seng + karet seal 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 51,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 90,243.86
A001 Dibulatkan 90,240.00
A.08.32 1 M1 PASANG NOK TEPI GENTENG METAL
BAHAN :
Nok Tepi Genteng Metal 1.0000 Bh - -
Paku Seng + karet seal 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 1,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 40,243.86
A001 Dibulatkan 40,240.00
A.08.33 1 M1 PASANG NOK TEPI GENTENG TANAH
BAHAN :
Nok Tepi Genteng Metal 1.0000 Bh - -
Semen PC (50 kg) 0.1600 zak 95,000.00 15,200.00
Pasir Pasang 0.0320 m3 150,000.00 4,800.00
Jumlah Bahan 20,000.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -

Page 146 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 59,118.86
A001 Dibulatkan 59,110.00
A.08.34 1 M1 PASANG NOK TEPI ATAP SPANDEK/GALVALYUM
BAHAN :
Nok Tepi Atap Spandek 1.0000 Bh - -
Paku Seng 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 1,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 40,243.86
A001 Dibulatkan 40,240.00
A.09.02 1 M2 PASANG PLAFOND TRIPLEKS , TEBAL 3 mm
BAHAN :
Tripleks 3 mm 0.3750 lbr 85,000.00 31,875.00
Paku Biasa 0.0300 kg 25,000.00 750.00
Jumlah Bahan 32,625.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
P PK05 Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 58,127.40
A001 Dibulatkan 58,120.00
A.10.01 MEMASANG 1 BUAH KLOSET DUDUK
BAHAN :
Kloset Duduk 1.0000 bh 2,656,500.00 2,656,500.00
Perlengkapan 0.0600 harga kloset 2,656,500.00 159,390.00
Jumlah Bahan 2,815,890.00
UPAH :
P PK05 Pekerja 2.1000 Oh 113,850.00 239,085.00
P PK05 Tukang Batu 0.9600 Oh 127,512.00 122,411.52
Kepala Tukang 0.0010 Oh 136,620.00 136.62
Mandor 0.1600 Oh - -
Jumlah Pekerja 361,633.14
Jumlah Bahan + Pekerja 3,177,523.14
Dibulatkan 3,177,520.00
A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN
BAHAN :
Kloset Jongkok 1.0000 bh 607,200.00 607,200.00
Semen PC (50 kg) 6.0000 kg 1,900.00 11,400.00
Pasir Pasang 0.0100 m³ 150,000.00 1,500.00
Jumlah Bahan 620,100.00
P PK05 UPAH :
P PK05 Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.3000 Oh 127,512.00 38,253.60
Kepala Tukang 0.1500 Oh 136,620.00 20,493.00
Mandor 0.0800 Oh - -
Jumlah Pekerja 127,056.60
A001 Jumlah Bahan + Pekerja 747,156.60
Dibulatkan 747,150.00
A.10.04 MEMASANG 1 BUAH URINOIR
BAHAN :
Urinoir 1.0000 bh - -
P PK05 Perlengkapan 0.3000 hrg urinoir - -
P PK05 Semen PC (50 kg) 6.0000 kg 1,900.00 11,400.00
Pasir Pasang 0.0100 m³ 150,000.00 1,500.00
Jumlah Bahan 12,900.00
UPAH :
Pekerja 1.0000 Oh 113,850.00 113,850.00
A001 Tukang Batu 0.9000 Oh 127,512.00 114,760.80
Kepala Tukang 0.1000 Oh 136,620.00 13,662.00
Mandor 0.1000 Oh - -
Jumlah Pekerja 242,272.80
Jumlah Bahan + Pekerja 255,172.80
Dibulatkan 255,170.00
A.10.05 MEMASANG 1 BUAH WASTAFEL
P PK05 BAHAN :
P PK05 Wastafel 1.0000 bh 2,277,000.00 2,277,000.00
Perlengkapan 0.1200 hrg kloset 2,277,000.00 273,240.00
Semen PC (50 kg) 6.0000 kg 1,900.00 11,400.00
Pasir Pasang 0.0100 m³ 150,000.00 1,500.00
Jumlah Bahan 2,563,140.00
A001 UPAH :
Pekerja 1.2000 Oh 113,850.00 136,620.00
Tukang Batu 1.4500 Oh 127,512.00 184,892.40
Kepala Tukang 0.1500 Oh 136,620.00 20,493.00
Mandor 0.1000 Oh - -
Jumlah Pekerja 342,005.40
Jumlah Bahan + Pekerja 2,905,145.40
P PK05 Dibulatkan 2,905,140.00
A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3
BAHAN :
Bak Fibreglass 1.0000 bh - -
Perlengkapan 0.1800 hrg bak - -
A001 Jumlah Bahan -
UPAH :
Pekerja 1.8000 Oh 113,850.00 204,930.00
Tukang Batu 0.6000 Oh 127,512.00 76,507.20

Page 147 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Kepala Tukang 0.5400 Oh 136,620.00 73,774.80
Mandor 0.1100 Oh - -
Jumlah Pekerja 355,212.00
Jumlah Bahan + Pekerja 355,212.00
P PK05 Dibulatkan 355,210.00
A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3
BAHAN :
Bata Merah Bakar Kelas I 110.0000 bh 700.00 77,000.00
Semen PC (50 kg) 80.0000 kg 1,900.00 152,000.00
A001 Pasir Pasang 0.3000 m³ 150,000.00 45,000.00
Keramik 20 x 20 cm 216.0000 bh - -
Semen Warna 6.0000 kg 2,000.00 12,000.00
Jumlah Bahan 286,000.00
UPAH :
Pekerja 2.0000 Oh 113,850.00 227,700.00
Tukang Batu 1.0000 Oh 127,512.00 127,512.00
Kepala Tukang 0.3000 Oh 136,620.00 40,986.00
Mandor 0.1500 Oh - -
P PK05 Jumlah Pekerja 396,198.00
P PK05 Jumlah Bahan + Pekerja 682,198.00
Dibulatkan 682,190.00
A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM
BAHAN :
Bata Merah Bakar Kelas I 0.1450 bh 700.00 101.50
P PK05 Semen PC (50 kg) 44.0000 kg 1,900.00 83,600.00
P PK05 Pasir Pasang 0.0700 m3 150,000.00 10,500.00
Batu Kerikil / Split 2/3 cm 0.0700 m³ 250,000.00 17,500.00
Besi Beton Polos Dia. 10 mm 1.6000 kg 35,430.00 56,688.00
Pasir Beton 0.0600 m3 200,000.00 12,000.00
Jumlah Bahan 180,389.50
A001 UPAH :
Pekerja 3.2000 Oh 113,850.00 364,320.00
Tukang Batu 1.0150 Oh 127,512.00 129,424.68
Kepala Tukang 0.0015 Oh 136,620.00 204.93
Mandor 0.0160 Oh - -
Jumlah Pekerja 493,949.61
Jumlah Bahan + Pekerja 674,339.11
Dibulatkan 674,330.00
P PK05 A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM
P PK05 BAHAN :
Bata Merah Bakar Kelas I 0.2500 m3 700.00 175.00
Semen PC (50 kg) 77.0000 kg 1,900.00 146,300.00
Pasir Pasang 0.1300 m3 150,000.00 19,500.00
Batu Kerikil / Split 2/3 cm 0.0200 m³ 250,000.00 5,000.00
A001 Besi Beton Polos Dia. 10 mm 2.6000 kg 35,430.00 92,118.00
Pasir Beton 0.0900 m3 200,000.00 18,000.00
Jumlah Bahan 281,093.00
UPAH :
Pekerja 1.4200 Oh 113,850.00 161,667.00
Tukang Batu 0.4730 Oh 127,512.00 60,313.18
Kepala Tukang 0.0470 Oh 136,620.00 6,421.14
Mandor 0.0710 Oh - -
Jumlah Pekerja 228,401.32
Jumlah Bahan + Pekerja 509,494.32
Dibulatkan - 509,490.00
A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM
BAHAN :
Bata Merah Bakar Kelas I 0.3710 m3 700.00 259.70
A001 Semen PC (50 kg) 114.0000 kg 1,900.00 216,600.00
Pasir Pasang 0.1840 m3 150,000.00 27,600.00
Batu Kerikil / Split 2/3 cm 0.0330 m³ 250,000.00 8,250.00
Besi Beton Polos Dia. 10 mm 4.8500 kg 35,430.00 171,835.50
Pasir Beton 0.1200 m3 200,000.00 24,000.00
Jumlah Bahan 448,545.20
UPAH :
Pekerja 2.1600 Oh 113,850.00 245,916.00
Tukang 0.1000 Oh 127,512.00 12,751.20
Tukang Batu 0.7200 Oh 127,512.00 91,808.64
P PK05 Kepala Tukang 0.0720 Oh 136,620.00 9,836.64
P PK05 Mandor 0.1080 Oh - -
Jumlah Pekerja 360,312.48
Jumlah Bahan + Pekerja 808,857.68
A001 Dibulatkan 808,850.00
A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"
BAHAN :
Pipa Galvanis 0,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 113,850.00 6,147.90
Tukang Batu 0.0900 Oh 127,512.00 11,476.08
P PK05 Kepala Tukang 0.0090 Oh 136,620.00 1,229.58
P PK05 Mandor 0.0270 Oh - -
Jumlah Pekerja 18,853.56
Jumlah Bahan + Pekerja 18,853.56
A001 Dibulatkan 18,850.00
A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"
BAHAN :
Pipa Galvanis 0,75" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 113,850.00 6,147.90
Tukang Batu 0.0900 Oh 127,512.00 11,476.08

Page 148 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Kepala Tukang 0.0090 Oh 136,620.00 1,229.58
P PK05 Mandor 0.0270 Oh - -
Jumlah Pekerja 18,853.56
Jumlah Bahan + Pekerja 18,853.56
A001 Dibulatkan 18,850.00
A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"
BAHAN :
Pipa Galvanis 1" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 113,850.00 6,147.90
Tukang Batu 0.0900 Oh 127,512.00 11,476.08
Kepala Tukang 0.0090 Oh 136,620.00 1,229.58
Mandor 0.0270 Oh - -
P PK05 Jumlah Pekerja 18,853.56
Jumlah Bahan + Pekerja 18,853.56
Dibulatkan 18,850.00
A001 A.10.22.a MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5"
BAHAN :
Pipa Galvanis 1,5" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 113,850.00 12,295.80
Tukang Batu 0.1800 Oh 127,512.00 22,952.16
Kepala Tukang 0.0180 Oh 136,620.00 2,459.16
Mandor 0.0054 Oh - -
Jumlah Pekerja 37,707.12
Jumlah Bahan + Pekerja 37,707.12
Dibulatkan 37,700.00
A001 A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 2"
BAHAN :
Pipa Galvanis 2" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 113,850.00 12,295.80
Tukang Batu 0.1800 Oh 127,512.00 22,952.16
Kepala Tukang 0.0180 Oh 136,620.00 2,459.16
Mandor 0.0054 Oh - -
Jumlah Pekerja 37,707.12
Jumlah Bahan + Pekerja 37,707.12
Dibulatkan 37,700.00
A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3"
BAHAN :
A001 Pipa Galvanis 3" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 113,850.00 12,295.80
Tukang Batu 0.1800 Oh 127,512.00 22,952.16
Kepala Tukang 0.0180 Oh 136,620.00 2,459.16
Mandor 0.0054 Oh - -
Jumlah Pekerja 37,707.12
Jumlah Bahan + Pekerja 37,707.12
P PK05 Dibulatkan 37,700.00
A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4"
BAHAN :
Pipa Galvanis 4" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
A001 Jumlah Bahan -
UPAH :
Pekerja 0.1350 Oh 113,850.00 15,369.75
Tukang Batu 0.2250 Oh 127,512.00 28,690.20
Kepala Tukang 0.0225 Oh 136,620.00 3,073.95
Mandor 0.0068 Oh - -
Jumlah Pekerja 47,133.90
Jumlah Bahan + Pekerja 47,133.90
Dibulatkan 47,130.00
A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"
P PK05 BAHAN :
Pipa PVC AW 0,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0360 Oh 113,850.00 4,098.60
Tukang Batu 0.0600 Oh 127,512.00 7,650.72
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
Jumlah Pekerja 12,569.04
Jumlah Bahan + Pekerja 12,569.04
Dibulatkan 12,560.00
A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"
BAHAN :
P PK05 Pipa PVC AW 0,75" 1.0000 m' 14,250.00 14,250.00
Perlengkapan 0.3500 hrg pipa 14,250.00 4,987.50
Jumlah Bahan 19,237.50
UPAH :
Pekerja 0.0360 Oh 113,850.00 4,098.60
A001 Tukang Batu 0.0600 Oh 127,512.00 7,650.72
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
Jumlah Pekerja 12,569.04

Page 149 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan + Pekerja 31,806.54
Dibulatkan 31,800.00
A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1"
BAHAN :
P PK05 Pipa PVC AW 1" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0360 Oh 113,850.00 4,098.60
A001 Tukang Batu 0.0600 Oh 127,512.00 7,650.72
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
Jumlah Pekerja 12,569.04
Jumlah Bahan + Pekerja 12,569.04
Dibulatkan 12,560.00
A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5"
BAHAN :
Pipa PVC AW 1,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 0.0360 Oh 113,850.00 4,098.60
Tukang Batu 0.0600 Oh 127,512.00 7,650.72
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
A001 Jumlah Pekerja 12,569.04
Jumlah Bahan + Pekerja 12,569.04
Dibulatkan 12,560.00
A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2"
BAHAN :
Pipa PVC AW 2" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 0.0540 Oh 113,850.00 6,147.90
Tukang Batu 0.0900 Oh 127,512.00 11,476.08
Kepala Tukang 0.0090 Oh 136,620.00 1,229.58
Mandor 0.0027 Oh - -
A001 Jumlah Pekerja 18,853.56
Jumlah Bahan + Pekerja 18,853.56
Dibulatkan 18,850.00
A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5"
BAHAN :
Pipa PVC AW 2,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0360 Oh 113,850.00 4,098.60
Tukang Batu 0.0600 Oh 127,512.00 7,650.72
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
Jumlah Pekerja 12,569.04
Jumlah Bahan + Pekerja 12,569.04
Dibulatkan 12,560.00
A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"
BAHAN :
Pipa PVC AW 3" 1.0000 m' 36,250.00 36,250.00
Perlengkapan 0.3500 hrg pipa 36,250.00 12,687.50
Jumlah Bahan 48,937.50
UPAH :
Pekerja 0.0810 Oh 113,850.00 9,221.85
Tukang Batu 0.1350 Oh 127,512.00 17,214.12
P PK05 Kepala Tukang 0.0135 Oh 136,620.00 1,844.37
Mandor 0.0041 Oh - -
Jumlah Pekerja 28,280.34
Jumlah Bahan + Pekerja 77,217.84
Dibulatkan 77,210.00
A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"
BAHAN :
Pipa PVC AW 4" 1.0000 m' 75,000.00 75,000.00
Perlengkapan 0.3500 hrg pipa 75,000.00 26,250.00
Jumlah Bahan 101,250.00
UPAH :
Pekerja 0.0810 Oh 113,850.00 9,221.85
Tukang Batu 0.1350 Oh 127,512.00 17,214.12
Kepala Tukang 0.0135 Oh 136,620.00 1,844.37
Mandor 0.0041 Oh - -
P PK05 Jumlah Pekerja 28,280.34
Jumlah Bahan + Pekerja 129,530.34
Dibulatkan 129,530.00
A001 A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL
BAHAN :
Bak Cuci Stainless Steel 1.0000 bh - -
Water Drain + asesories 1.0000 Set - -
Jumlah Bahan -
UPAH :
Pekerja 0.0300 Oh 113,850.00 3,415.50
Tukang Batu 0.3000 Oh 127,512.00 38,253.60
Kepala Tukang 0.0300 Oh 136,620.00 4,098.60
Mandor 0.0015 Oh - -
Jumlah Pekerja 45,767.70
Jumlah Bahan + Pekerja 45,767.70
Dibulatkan 45,760.00
A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"

Page 150 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
BAHAN :
Kran Air 1.0000 bh - -
A001 Seal tape 0.0250 bh 15,000.00 375.00
Jumlah Bahan 375.00
UPAH :
Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Batu - Oh 127,512.00 -
Kepala Tukang 0.0010 Oh 136,620.00 136.62
Mandor 0.0005 Oh - -
Jumlah Pekerja 1,275.12
Jumlah Bahan + Pekerja 1,650.12
Dibulatkan 1,650.00
A.10.36 MEMASANG 1 BH FLOOR DRAIN
P PK05 BAHAN :
Floor Drain 1.0000 bh - -

Jumlah Bahan -
UPAH :
A001 Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Batu - Oh 127,512.00 -
Kepala Tukang 0.0010 Oh 136,620.00 136.62
Mandor 0.0005 Oh - -
Jumlah Pekerja 1,275.12
Jumlah Bahan + Pekerja 1,275.12
Dibulatkan 1,270.00
A.10.37 1 UNIT SEPTICTANK 4,8 X 2,1 X 2,4 M + REMBESANNYA
Galian tanah 17.1360 m³ 59,885.10 1,026,191.07
Pasir Urug 0.5600 m³ 125,000.00 70,000.00
Lantai kerja 3.7500 m³ 958,846.00 3,595,672.50
Pas. bata 1 PC : 2 PS + Plesteran 60.0000 m² 141,250.00 8,475,000.00
Plasteran Dinding 60.0000 m² 93,780.00 5,626,800.00
P PK05 Plat beton penutup 0.5000 m³ 8,087,460.00 4,043,730.00
Pipa PVC AW 4" 9.0000 m' 75,000.00 675,000.00
Pipa GIP 2" 2.0000 m1 - -
Galian tanah untuk rembesan 5.6250 m³ 59,885.10 336,853.69
Pas. injuk 20.0000 m² - -
A001 Urugan kerikil 3,5 cm 2.5000 m³ 250,000.00 625,000.00
Pipa PVC AW 4" 10.0000 m' 75,000.00 750,000.00
Urugan kembali perataan tanah 1.8750 m³ 21,859.20 40,986.00
Jumlah Bahan 25,265,233.26
UPAH :
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Jumlah -
Jumlah 25,265,233.26
Dibulatkan 25,265,230.00
A.11.01 1 M2 PASANG RANGKA ATAP BAJA RINGAN
BAHAN :
A001 Baja Ringan 1.1000 m2 - -
Jumlah Bahan -
UPAH :
Pekerja 0.0600 Oh 113,850.00 6,831.00
Tukang Besi 0.0060 Oh 127,512.00 765.07
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0003 Oh - -
Jumlah Pekerja 8,415.79
Jumlah Bahan + Pekerja 8,415.79
Dibulatkan 8,410.00
A.11.09 1 M2 PASANG PINTU ALUMINIUM
BAHAN :
Pintu Alluminium 1.0000 m2 - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 1.0500 Oh 113,850.00 119,542.50
Tukang Besi 1.0500 Oh 127,512.00 133,887.60
Kepala Tukang 0.1050 Oh 136,620.00 14,345.10
Mandor 0.0052 Oh - -
A001 Jumlah Pekerja 267,775.20
Jumlah Bahan + Pekerja 267,775.20
Dibulatkan 267,770.00
A.11.12 1 M2 PASANG TERALIS BESI
BAHAN :
Besi Plat 2x3 1.0000 m2 - -
Jumlah Bahan -
UPAH :
Pekerja 1.2000 Oh 113,850.00 136,620.00
Tukang Kayu 1.2000 Oh 127,512.00 153,014.40
P PK05 Kepala Tukang 0.0120 Oh 136,620.00 1,639.44
Mandor 0.0006 Oh - -
Jumlah Pekerja 291,273.84
Jumlah Bahan + Pekerja 291,273.84
Dibulatkan 291,270.00
A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 30
LL64 BAHAN :
BT64 Seng Plat 3 x 6 bjls 28 0.5000 lbr - -
BT18 Paku Biasa Tripleks 0.0150 kg 25,000.00 375.00
Kayu Kelas II Papan 0.0096 m3 4,000,000.00 38,400.00
LL65 Meni Besi/Flincote 0.2500 kg 7,000.00 1,750.00
LL66 Jumlah Bahan 40,525.00
BT67 UPAH :
Pekerja 0.1500 Oh 113,850.00 17,077.50
Tukang Kayu 0.4000 Oh 127,512.00 51,004.80

Page 151 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Kepala Tukang 0.0250 Oh 136,620.00 3,415.50
Mandor 0.0013 Oh - -
A080 Jumlah Pekerja 71,497.80
Jumlah Bahan + Pekerja 112,022.80
Dibulatkan 112,020.00
A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28
BAHAN :
BT64 Seng Plat 3 x 6 bjls 28 0.5000 lbr - -
BT18 Paku Biasa Tripleks 0.0150 kg 25,000.00 375.00
Kayu Kelas II Papan 0.0190 m3 4,000,000.00 76,000.00
Meni Besi/Flincote 0.3000 kg 7,000.00 2,100.00
Jumlah Bahan 78,475.00
BT67 UPAH :
Pekerja 0.0400 Oh 113,850.00 4,554.00
Tukang Kayu 0.4000 Oh 127,512.00 51,004.80
Kepala Tukang 0.0250 Oh 136,620.00 3,415.50
Mandor 0.0013 Oh - -
A081 Jumlah Pekerja 58,974.30
Jumlah Bahan + Pekerja 137,449.30
Dibulatkan 137,440.00
A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28
BAHAN :
BT64 Seng Plat 3 x 6 bjls 28 0.3000 lbr - -
BT18 Paku Biasa Tripleks 0.1000 kg 25,000.00 2,500.00
Kayu Kelas II Papan 0.0190 m3 4,000,000.00 76,000.00
Besi Strip 0.5000 kg - -
Jumlah Bahan 78,500.00
BT67 UPAH :
Pekerja 0.1500 Oh 113,850.00 17,077.50
Tukang Kayu 0.2500 Oh 127,512.00 31,878.00
Kepala Tukang 0.0250 Oh 136,620.00 3,415.50
Mandor 0.0013 Oh - -
A082 Jumlah Pekerja 52,371.00
Jumlah Bahan + Pekerja 130,871.00
Dibulatkan 130,870.00
A.11.22 1 M2 PEK. RESIDU/TEER RANGKA ATAP/KUDA-KUDA/GORDING
BAHAN :
Teer/residu 0.0300 ltr 13,000.00 390.00
Jumlah Bahan 390.00
UPAH :
A001 Pekerja 0.0080 Oh 113,850.00 910.80
Tukang Kayu 0.0060 Oh 127,512.00 765.07
LL99 Kepala Tukang 0.0120 Oh 136,620.00 1,639.44
BN02 Mandor 0.0060 Oh - -
Jumlah Pekerja 3,315.31
Jumlah Bahan + Pekerja 3,705.31
LLL01 Dibulatkan 3,700.00
P PK05 A.12.02 1 BUAH PASANG KUNCI TANAM BIASA
BAHAN :
Kunci Tanam biasa 1.0000 bh 90,000.00 90,000.00
Jumlah Bahan 90,000.00
UPAH :
A001 Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
Mandor 0.0050 Oh - -
Jumlah Pekerja 66,260.70
Jumlah Bahan + Pekerja 156,260.70
Dibulatkan 156,260.00
P PK05 A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI
BAHAN :
Kunci Tanam Kamar Mandi 1.0000 bh 88,000.00 88,000.00
Jumlah Bahan 88,000.00
UPAH :
A001 Pekerja 0.0050 Oh 113,850.00 569.25
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0050 Oh 136,620.00 683.10
Mandor 0.0025 Oh - -
Jumlah Pekerja 65,008.35
Jumlah Bahan + Pekerja 153,008.35
Dibulatkan 153,000.00
P PK05 A.12.04 1 BUAH PASANG KUNCI BULAT
BAHAN :
Kunci Bulat 1.0000 bh 92,000.00 92,000.00
Jumlah Bahan 92,000.00
UPAH :
A001 Pekerja 0.0050 Oh 113,850.00 569.25
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0050 Oh 136,620.00 683.10
Mandor 0.0003 Oh - -
Jumlah Pekerja 65,008.35
Jumlah Bahan + Pekerja 157,008.35
Dibulatkan 157,000.00
P PK05 A.12.05 1 BUAH PASANG ENGSEL PINTU
BAHAN :
Engsel Pintu 1.0000 bh 35,000.00 35,000.00
Jumlah Bahan 35,000.00
UPAH :
A001 Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
Mandor 0.0008 Oh - -
Jumlah Pekerja 16,508.25
Jumlah Bahan + Pekerja 51,508.25

Page 152 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Dibulatkan 51,500.00
P PK05 A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
BAHAN :
Engsel Jendela 1.0000 bh 32,000.00 32,000.00
Jumlah Bahan 32,000.00
UPAH :
A001 Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
Mandor 0.0005 Oh - -
Jumlah Pekerja 15,255.90
Jumlah Bahan + Pekerja 47,255.90
Dibulatkan 47,250.00
P PK05 A.12.09 1 BUAH PASANG KAIT ANGIN
BAHAN :
Kait Angin 1.0000 ps 16,000.00 16,000.00
Jumlah Bahan 16,000.00
UPAH :
A001 Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
Mandor 0.0008 Oh - -
Jumlah Pekerja 22,883.85
Jumlah Bahan + Pekerja 38,883.85
Dibulatkan 38,880.00
P PK05 A.12.10 1 BUAH PASANG SLOOT TANAM
BAHAN :
Sloot Tanam 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0200 Oh 113,850.00 2,277.00
Tukang Kayu 0.2000 Oh 127,512.00 25,502.40
Kepala Tukang 0.0500 Oh 136,620.00 6,831.00
Mandor 0.0025 Oh - -
Jumlah Pekerja 34,610.40
Jumlah Bahan + Pekerja 34,610.40
Dibulatkan 34,610.00
P PK05 A.12.11 1 BUAH PASANG GRENDEL JENDELA
BAHAN :
Grendel Jendela/Spring Knob 1.0000 bh 12,000.00 12,000.00
Jumlah Bahan 12,000.00
UPAH :
A001 Pekerja 0.0200 Oh 113,850.00 2,277.00
Tukang Kayu 0.2000 Oh 127,512.00 25,502.40
Kepala Tukang 0.0200 Oh 136,620.00 2,732.40
Mandor 0.0010 Oh - -
Jumlah Pekerja 30,511.80
Jumlah Bahan + Pekerja 42,511.80
Dibulatkan 42,510.00
P PK05 A.12.12 1 BUAH PASANG PEGANGAN PINTU + KUNCI PINTU 2 X PUTAR
BAHAN :
Kunci Tanam 2 x Putar 1.0000 bh 120,000.00 120,000.00
Pegangan/Handle Pintu 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0500 Oh 113,850.00 5,692.50
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0500 Oh 136,620.00 6,831.00
Mandor 0.0025 Oh - -
Jumlah Pekerja 76,279.50
Jumlah Bahan + Pekerja 76,279.50
Dibulatkan 76,270.00
A.12.14 1 BUAH PASANG KUNCI PINTU 2 X PUTAR ( lever handle )
BAHAN :
P PK05 Kunci Pintu 2 x Putar ( lever handle ) 1.0000 bh 120,000.00 120,000.00
Jumlah Bahan 120,000.00
UPAH :
Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
A001 Kepala Tukang 0.0600 Oh 136,620.00 8,197.20
Mandor 0.0030 Oh - -
Jumlah Pekerja 73,091.70
Jumlah Bahan + Pekerja 193,091.70
Dibulatkan 193,090.00
A.12.17 1 M2 PASANG KACA, TEBAL 5 MM
BAHAN :
Kaca Polos 5 mm 1.1000 m2 227,700.00 250,470.00
Jumlah Bahan 250,470.00
UPAH :
Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0008 Oh - -
Jumlah Pekerja 22,883.85
Jumlah Bahan + Pekerja 273,353.85
A001 Dibulatkan 273,350.00
A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU
BAHAN :
P PK05 Besi Siku 50.50.5 panjang 6 m 1.0000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.0600 Oh 113,850.00 6,831.00
A001 Tukang Besi 0.0040 org 127,512.00 510.05
Kepala tukang besi profil 0.0010 org 136,620.00 136.62

Page 153 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Mandor 0.0002 org - -
Peralatan ( Alat las, dll) 0.1250 lot 7,477.67 934.71
Jumlah Pekerja 8,412.38
Jumlah Bahan + Pekerja 8,412.38
Dibulatkan 8,410.00
A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPING KAWAT DURI
Galian Tanah 0.4500 m³ 96,770.00 43,546.50
P PK05 Urugan Pasir 10 cm' 0.0080 m³ 184,150.00 1,473.20

Beton Tumbuk 0.0433 m³ 958,840.00 41,549.73


A001 Besi Siku 50.50.5 panjang 6 m 0.1000 btg - -
Kawat Duri 8.0000 m1 - -
Pengecatan 0.3333 m² 47,370.00 15,790.00
Jumlah 102,359.43
Jumlah 102,359.43
Dibulatkan 102,350.00
A.12.34a 1 M1 Pagar BRC Ø 6 mm, lengkap dengan tiang
Galian Tanah 0.0433 m³ 96,770.00 4,193.37
Beton Tumbuk 0.0433 m³ 958,840.00 41,549.73
BRC lengkap dengan tiang + klem pengikat. 0.4340 lbr - -

Pekerja 0.0750 Oh 113,850.00 8,538.75


Tukang Batu 0.0250 Oh 127,512.00 3,187.80

Jumlah 57,469.65
Dibulatkan 57,460.00

A.13.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM


BAHAN :
P PK05 LantaiKeramik 10 x 20 cm 50.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
BAHAN :
P PK05 Lantai Keramik 20 x 20 cm 25.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A.13.45 1 M2 PASANG LANTAI KERAMIK 20 X 25 CM
BAHAN :
P PK05 Lantai Keramik 20 x 25 cm 20.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A.13.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM
BAHAN :
P PK05 Ubin Keramik 15 x 20 cm 35.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A.13.47 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM
BAHAN :
P PK05 Keramik 30 x 30 cm 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00

Page 154 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A.13.48 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ANTISLIP
BAHAN :
P PK05 Ubin Keramik 30 x 30 cm Antislip 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH
BAHAN :
Keramik Porselen 11 x 11 cm 83.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 19,660.00
UPAH :
P PK05 Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0500 Oh 136,620.00 6,831.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 141,174.00
A001 Jumlah Bahan + Pekerja 160,834.00
Dibulatkan 160,830.00
A.13.59 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA
BAHAN :
Keramik Porselen 11 x 11 cm, Warna 83.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 19,660.00
UPAH :
P PK05 Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0500 Oh 136,620.00 6,831.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 141,174.00
A001 Jumlah Bahan + Pekerja 160,834.00
Dibulatkan 160,830.00
A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA
BAHAN :
Keramik Porselen 10 x 20 cm, Warna 50.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.4500 Oh 127,512.00 57,380.40
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 131,838.30
Jumlah Bahan + Pekerja 151,498.30
Dibulatkan 151,490.00
A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA
BAHAN :
Keramik Porselen 20 x 20 cm, Warna 25.0000 bh - -
Semen Abu-abu 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.4500 Oh 127,512.00 57,380.40
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
A001 Mandor 0.0300 Oh - -
Jumlah Pekerja 131,838.30
Jumlah Bahan + Pekerja 151,498.30
Dibulatkan 151,490.00
A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM,
BAHAN :
Keramik 10 x 20 cm 50.0000 bh - -
Semen Abu-abu 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00

Page 155 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Tukang Batu 0.4500 Oh 127,512.00 57,380.40
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 131,838.30
Jumlah Bahan + Pekerja 151,498.30
Dibulatkan 151,490.00
A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM,
BAHAN :
Keramik 20 x 20 cm 25.0000 bh - -
Semen Abu-abu 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 87,209.10
Jumlah Bahan + Pekerja 106,869.10
Dibulatkan 106,860.00
A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM,
BAHAN :
Keramik 10 x 20 cm 50.0000 bh - -
Semen Abu-abu 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.1250 Oh 127,512.00 15,939.00
Kepala Tukang 0.0125 Oh 136,620.00 1,707.75
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 85,956.75
Jumlah Bahan + Pekerja 105,616.75
Dibulatkan 105,610.00
A.13.74 1 M2 PASANG DINDING BATU TEMPEL
P PK05 BAHAN :
Batu Tempel 1.0500 m2 - -
Semen Abu-abu 11.7500 kg 1,900.00 22,325.00
Pasir Pasang 0.0350 m3 150,000.00 5,250.00
Jumlah Bahan 27,575.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 147,572.90
Dibulatkan 147,570.00
A001 A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS
BAHAN :
Lantai Keramik 30 x 30 cm 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A001 A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP
BAHAN :
Lantai Keramik 30 x 30 cm Warna/Corak/Anti Slip 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A001 A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
BAHAN :
Keramik 40 x 40 cm 4.0000 bh 11,666.67 46,666.67
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 69,926.67
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Batu 0.1250 Oh 127,512.00 15,939.00
Kepala Tukang 0.0130 Oh 136,620.00 1,776.06
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 46,177.56
Jumlah Bahan + Pekerja 116,104.23

Page 156 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Dibulatkan 116,100.00
A001 A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM,
BAHAN :
Keramik 20 x 25 cm 20.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.4500 Oh 127,512.00 57,380.40
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 131,838.30
Jumlah Bahan + Pekerja 151,498.30
Dibulatkan 151,490.00
P PK05 A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM)
BAHAN :
Paving Block Warna 6 cm 1.0100 m2 138,000.00 139,380.00
Pasir Beton 0.1000 m³ 200,000.00 20,000.00
Jumlah Bahan 159,380.00
A001 UPAH :
Pekerja 0.2500 org 113,850.00 28,462.50
Tukang Batu 0.5000 org 127,512.00 63,756.00
Kepala Tukang Batu 0.0250 org 136,620.00 3,415.50
Mandor 0.0030 org - -
Jumlah Pekerja 95,634.00
Jumlah Bahan + Pekerja 255,014.00
Jumlah 255,014.00
Dibulatkan 255,010.00
A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM)
BAHAN :
P PK05 Paving Block Warna 8 cm 1.0100 m2 49,000.00 49,490.00
Pasir Beton 0.1000 m³ 200,000.00 20,000.00
Jumlah Bahan 69,490.00
UPAH :
Pekerja 0.2500 org 113,850.00 28,462.50
A001 Tukang Batu 0.5000 org 127,512.00 63,756.00
Kepala Tukang Batu 0.0250 org 136,620.00 3,415.50
Mandor 0.0030 org - -
Jumlah Pekerja 95,634.00
Jumlah Bahan + Pekerja 165,124.00
Jumlah 165,124.00
Dibulatkan 165,120.00
A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM)
BAHAN :
Paving Block Natural 6 cm 1.0100 m² 138,000.00 139,380.00
Pasir Beton 0.1000 m³ 200,000.00 20,000.00
Jumlah Bahan 159,380.00
UPAH :
Pekerja 0.2500 org 113,850.00 28,462.50
P PK05 Tukang Batu 0.5000 org 127,512.00 63,756.00
Kepala Tukang Batu 0.0250 org 136,620.00 3,415.50
Mandor 0.0030 org - -
Jumlah Pekerja 95,634.00
Jumlah Bahan + Pekerja 255,014.00
Jumlah 255,014.00
Dibulatkan 255,010.00
A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM)
BAHAN :
Paving Block Natural 8 cm 1.0100 m² - -
Pasir Beton 0.1000 m³ 200,000.00 20,000.00
Jumlah Bahan 20,000.00
UPAH :
Pekerja 0.2500 org 113,850.00 28,462.50
Tukang Batu 0.5000 org 127,512.00 63,756.00
P PK05 Kepala Tukang Batu 0.0250 org 136,620.00 3,415.50
Mandor 0.0030 org - -
Jumlah Pekerja 95,634.00
Jumlah Bahan + Pekerja 115,634.00
A001 Jumlah 115,634.00
Dibulatkan 115,630.00
A.14.12 1 M2 MENI KAYU
BAHAN :
Cat Meni Kayu 0.3500 Kg 34,000.00 11,900.00
Jumlah Bahan 11,900.00
P PK05 UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Cat - Oh 127,512.00 -
Kepala Tukang - Oh 136,620.00 -
Mandor 0.0060 Oh - -
A001 Jumlah Pekerja 11,385.00
Jumlah Bahan + Pekerja 23,285.00
Dibulatkan 23,280.00
A.14.13 1 M2 MENI BESI
BAHAN :
Cat Meni BESI 0.3500 Kg 7,000.00 2,450.00
Jumlah Bahan 2,450.00
P PK05 UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Cat - Oh 127,512.00 -
Kepala Tukang - Oh 136,620.00 -
Mandor 0.0060 Oh - -
A001 Jumlah Pekerja 11,385.00

Page 157 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan + Pekerja 13,835.00
Dibulatkan 13,830.00
A.14.14 1 M2 PLAMUR TEMBOK
BAHAN :
Plamir Tembok 0.1000 ltr 9,000.00 900.00
Jumlah Bahan 900.00
UPAH :
P PK05 Pekerja 0.0200 Oh 113,850.00 2,277.00
Tukang Cat 0.0630 Oh 127,512.00 8,033.26
Kepala Tukang 0.0063 Oh 136,620.00 860.71
Mandor 0.0025 Oh - -
Jumlah Pekerja 11,170.96
A001 Jumlah Bahan + Pekerja 12,070.96
Dibulatkan 12,070.00
A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)
BAHAN :
P PK05 Cat Tembok 0.1750 kg 7,000.00 1,225.00
Plamir Tembok 0.1600 kg 9,000.00 1,440.00
Kuas Roll 0.0100 bh 34,000.00 340.00
Ampelas 0.5000 lbr 7,000.00 3,500.00
Jumlah Bahan 6,505.00
A001 UPAH :
Pekerja 0.1040 org 113,850.00 11,840.40
Tukang Cat 0.0182 org 127,512.00 2,320.72
Kepala Tukang cat 0.0090 org 136,620.00 1,229.58
Mandor 0.0045 org - -
Jumlah Pekerja 15,390.70
Jumlah Bahan + Pekerja 21,895.70
Jumlah 21,895.70
Dibulatkan 21,890.00
P PK05 A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)
BAHAN :
Cat Tembok 0.2000 kg 7,000.00 1,400.00
Plamir Tembok 0.1600 kg 9,000.00 1,440.00
Kuas Roll 0.0100 bh 34,000.00 340.00
A001 Ampelas 0.5000 lbr 7,000.00 3,500.00
Jumlah Bahan 6,680.00
UPAH :
Pekerja 0.2000 org 113,850.00 22,770.00
Tukang Cat 0.0280 org 127,512.00 3,570.34
Kepala Tukang cat 0.0150 org 136,620.00 2,049.30
Mandor 0.0090 org - -
Jumlah Pekerja 28,389.64
P PK05 Jumlah Bahan + Pekerja 35,069.64
Jumlah 35,069.64
Dibulatkan 35,060.00
A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI
BAHAN :
Meni kayu 0.1670 kg 34,000.00 5,678.00
Plamir kayu 0.0830 kg 9,000.00 747.00
P PK05 Cat Kayu 0.2000 kg 25,000.00 5,000.00
Ampelas 0.4000 lbr 7,000.00 2,800.00
Minyak cat / Thinner 0.1500 ltr 13,876.00 2,081.40
Kwas 0.0500 bh 18,000.00 900.00
Jumlah Bahan 17,206.40
A001 UPAH :
Pekerja 0.2000 org 113,850.00 22,770.00
Tukang Cat 0.0600 org 127,512.00 7,650.72
Kepala Tukang cat 0.0300 org 136,620.00 4,098.60
Mandor 0.0100 org - -
Jumlah Pekerja 34,519.32
Jumlah Bahan + Pekerja 51,725.72
Jumlah 51,725.72
Dibulatkan 51,720.00
A.14.30'' 1 M2 PENGECATAN BIDANG DINDING ( PLINT )
BAHAN :
Cat Kayu / Besi / Cat minyak 0.2000 kg 25000 5,000.00
Ampelas 0.4000 lbr 7000 2,800.00
Minyak Thinner 0.1500 ltr 13876 2,081.40
Kwas 0.0500 bh 18000 900.00
Jumlah Bahan 10,781.40
UPAH :
Pekerja 0.2000 org 113850 22,770.00
Tukang Cat 0.0600 org 127512 7,650.72
Kepala Tukang cat 0.0300 org 136620 4,098.60
Mandor 0.0100 org 0 -
Jumlah Pekerja 34,519.32
Jumlah Bahan + Pekerja 45,300.72
Jumlah 45,300.72
Dibulatkan 45,300.00
A.14.31 1 M2 PENGECATAN BESI (3X)
BAHAN :
P PK05 Meni Besi/Flincote 0.1670 kg 34,000.00 5,678.00
Cat Besi 0.2000 kg 7,000.00 1,400.00
Ampelas 0.4000 lbr 7,000.00 2,800.00
Minyak cat / Thinner 0.1500 ltr 13,876.00 2,081.40
Kwas 0.0500 bh 18,000.00 900.00
A001 Jumlah Bahan 12,859.40
UPAH :
Pekerja 0.2000 org 113,850.00 22,770.00
Tukang Cat 0.0600 org 127,512.00 7,650.72
Kepala Tukang cat 0.0300 org 136,620.00 4,098.60
Mandor 0.0100 org - -
Jumlah Pekerja 34,519.32

Page 158 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan + Pekerja 47,378.72
Jumlah 47,378.72
P PK05 Dibulatkan 47,370.00
B6 MENANAM 1 BATANG TANAMAN BERIKUT PELINDUNGNYA
Tanaman Keras 1.0000 btg - -
Bambu 1.0000 btg - -
Pekerja 0.4000 org 113,850.00 45,540.00
Mandor 0.0050 org - -
Jumlah 45,540.00
Jumlah 45,540.00
Dibulatkan 45,540.00
E 13 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK
Tukang Kayu 0.0400 org 127,512.00 5,100.48
Kepala Tukang 0.0040 org 136,620.00 546.48
Pekerja 1.8000 org 113,850.00 204,930.00
Mandor 0.0430 org - -
Untuk tanah biasa dihitung = 1, 25 x analis E. 13
Untuk tanah biasa dihitung = 1, 50x analis E. 13
Untuk tanah biasa dihitung = 2, 00 x analis E. 13
Jumlah -
Jumlah -
Dibulatkan -
M.01 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 3M' ( ASUMSI LEBAR JEMBATAN 3M' & TANPA TIANG)
Kayu Bulat f 30 cm 7.5000 btg -
Paku Biasa 0.5600 kg 25,000.00 14,000.00
Pasak Besi f 12 mm 2.8000 kg - -
Tukang Kayu 1.2000 org 127,512.00 153,014.40
Kepala Tukang Kayu 0.1200 org 136,620.00 16,394.40
Pekerja 4.8000 org 113,850.00 546,480.00
Mandor 0.0120 org - -
Alat Bantu 0.0100 ls 4,029.82 40.30
Jumlah 40.30
Jumlah 40.30
Dibulatkan 40.00
M.02 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 6M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 18.0000 btg -
Paku Biasa 1.1200 kg 25,000.00 28,000.00
Pasak Besi f 12 mm 5.6000 kg - -
Tukang Kayu 1.4000 org 127,512.00 178,516.80
Kepala Tukang Kayu 0.1400 org 136,620.00 19,126.80
Pekerja 5.3000 org 113,850.00 603,405.00
Mandor 0.0140 org - -
Alat Bantu 0.0100 ls 4,029.82 40.30
Jumlah 40.30
Jumlah 40.30
Dibulatkan 40.00
M.03 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 9M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 28.5000 btg -
Paku Biasa 1.6800 kg 25,000.00 42,000.00
Pasak Besi f 12 mm 8.4000 kg - -
Tukang Kayu 1.7000 org 127,512.00 216,770.40
Kepala Tukang Kayu 7.0000 org 136,620.00 956,340.00
Pekerja 5.9000 org 113,850.00 671,715.00
Mandor 0.0170 org - -
Alat Bantu 0.0100 ls 4,029.82 40.30
Jumlah 40.30
Jumlah 40.30
Dibulatkan 40.00
M.04 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 12M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 39.0000 btg -
Paku Biasa 1.6800 kg 25,000.00 42,000.00
Pasak Besi f 12 mm 11.2000 kg - -
Tukang Kayu 2.1000 org 127,512.00 267,775.20
Kepala Tukang Kayu 0.2100 org 136,620.00 28,690.20
Pekerja 6.3000 org 113,850.00 717,255.00
Mandor 0.0210 org - -
Alat Bantu 0.0100 ls 4,029.82 40.30
Jumlah 40.30
Jumlah 40.30
Dibulatkan 40.00
A7.R. UPAH ANGKUTAN 1 ZAK SEMEN PC ( BID. PENGAIRAN )

Jumlah -
Jumlah -
Dibulatkan -
A6 ONGKOS ANGKUT 1 M3 TANAH ( BID. PENGAIRAN )
Sejauh 30 meter
Pekerja 0.3300 org 113,850.00 37,570.50
Mandor 0.0100 org -
Lebih dari 30 meter

Jumlah -
Jumlah -
Dibulatkan -
A. R 1 M2 PEK. ANTI RAYAP
BAHAN :
Bahan Anti Rayap 0.0900 Ltr - -
Alat Semprot 0.0500 lsm - -
Jumlah Bahan -
UPAH :
Pekerja 0.0100 Oh 113,850.00 1,138.50
Jumlah Pekerja 1,138.50
Jumlah Bahan + Pekerja 1,138.50
A001 Dibulatkan 1,130.00

Page 159 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
A. B 1 M1 PEK. ANGKUR BESI Dia. 10 - 45 cm
BAHAN :
Besi Beton Polos Dia. 10 mm 0.2667 M1 2,952.50 787.33
Jumlah Bahan 787.33
UPAH :
Pekerja 0.0100 Oh 113,850.00 1,138.50
Jumlah Pekerja 1,138.50
Jumlah Bahan + Pekerja 1,925.83
Dibulatkan 1,920.00
A. B 1 M2 PEKERJAAN SALURAN AIR PASANGAN BT BATA ad 1 : 4
BAHAN :
Bata Merah Bakar Kelas I 70.0000 bh 700.00 49,000.00
Semen PC (50 kg) 18.9500 kg 1,900.00 36,005.00
Pasir Pasang 0.0430 m3 150,000.00
Jumlah Bahan 85,005.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00
Mandor 0.0050 Oh -
Jumlah Pekerja 49,183.20
Jumlah Bahan + Pekerja 134,188.20
Dibulatkan 134,180.00
L. 01. 01 1 M1 PAS. INSTALASI LISTRIK KABEL UTAMA 3x2,5 NYM
BAHAN :
Kabel 3x2,5mm NYM 1.0000 m' 13,000.00 13,000.00
Pipa konduit dia 5/8 inch 1.0000 m' 2,000.00 2,000.00
Klem kabel 3.0000 bh 100.00 300.00
Isolasi 0.0500 bh 15,000.00 750.00
Jumlah Bahan 16,050.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 36,451.92
Dibulatkan 36,450.00
L. 01. 02 1 TITIK INSTALASI TITIK LAMPU 2x2,5 NYM
BAHAN :
Kabel 2x2,5mm NYM 3.5000 m' 12,000.00 42,000.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Klem kabel 16.0000 bh 100.00 1,600.00
Isolasi 0.0500 bh 15,000.00 750.00
Tedoos 1.0000 bh 3,000.00 3,000.00
Jumlah Bahan 55,350.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 75,751.92
Dibulatkan 75,750.00
L. 01. 03 1 Titik Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM
BAHAN :
Saklar Tunggal 1.0000 bh 37,950.00 37,950.00
Kabel 2x2,5mm NYM 2.5000 m' 12,000.00 30,000.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Inbouwdoos 1.0000 bh 1,500.00 1,500.00
Jumlah Bahan 78,200.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 98,601.92
Dibulatkan 98,600.00
L. 01. 04 1 Titik Instalasi Titik Saklar Double 3x2,5 NYM
BAHAN :
Saklar Double 1.0000 bh 53,130.00 53,130.00
Kabel 3x2,5mm NYM 1.5000 m' 13,000.00 19,500.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Inbouwdoos 1.0000 bh 1,500.00 1,500.00
Jumlah Bahan 82,880.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 103,281.92
Dibulatkan 103,280.00
L. 01. 05 1 Titik Pas. Instalasi Titik Stop Kontak 3x2,5 NYM
BAHAN :
Stop Kontak 1.0000 bh 37,950.00 37,950.00
Kabel 3x2,5mm NYM 1.5000 m' 13,000.00 19,500.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Inbouwdoos 1.0000 bh 1,500.00 1,500.00
Jumlah Bahan 67,700.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 88,101.92
Dibulatkan 88,100.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 58 w
BAHAN :
Lampu Pijar 58 w 1.0000 bh 140,000.00 140,000.00
Kabel 1x2,5mm NYM 6.5000 m' 11,000.00 71,500.00
Pipa konduit dia 5/8 inch 6.0000 m' 2,000.00 12,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Klem kabel 3.0000 bh 100.00 300.00

Page 160 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Tedoos 1.0000 bh 3,000.00 3,000.00
Jumlah Bahan 227,550.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 247,951.92
Dibulatkan 247,950.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 58 w
BAHAN :
Lampu Pijar 58 w 1.0000 bh 140,000.00 140,000.00
Kabel 1x2,5mm NYM 6.5000 m' 11,000.00 71,500.00
Pipa konduit dia 5/8 inch 6.0000 m' 2,000.00 12,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Klem kabel 3.0000 bh 100.00 300.00
Tedoos 1.0000 bh 3,000.00 3,000.00
Jumlah Bahan 227,550.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 247,951.92
Dibulatkan 247,950.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 15 w
BAHAN :
Lampu Pijar 15 w 1.0000 bh 50,000.00 50,000.00
Kabel 1x2,5mm NYM 6.5000 m' 11,000.00 71,500.00
Pipa konduit dia 5/8 inch 6.0000 m' 2,000.00 12,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Klem kabel 3.0000 bh 100.00 300.00
Tedoos 1.0000 bh -
Jumlah Bahan 134,550.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 154,951.92
Dibulatkan 154,950.00
L. 01. 07 1 Titik Pas. Instalasi Lampu TL 2x40 Watt + fitting
BAHAN :
Lampu TL 2x40 Watt + fitting 1.0000 bh 140,000.00 140,000.00
Kabel 1x2,5mm NYM 4.5000 m' 11,000.00 49,500.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Klem kabel 3.0000 bh 100.00 300.00
Tedoos 1.0000 bh 3,000.00 3,000.00
Jumlah Bahan 201,550.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 221,951.92
Dibulatkan 221,950.00
L. 01. 08 1 Titik Pas. MCB + Box Sekring
BAHAN :
MCB 4.0000 bh 50,000.00 200,000.00
Kabel 1x2,5mm NYM 4.5000 m' 11,000.00 49,500.00
Pipa konduit dia 5/8 inch 10.0000 m' 2,000.00 20,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Box Sekring 1.0000 bh 325,000.00 325,000.00
Jumlah Bahan 595,250.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 615,651.92
Dibulatkan 615,650.00
L. 01. 09 1 M1 Pas. Kabel Antar Bangunan 3x4mm NYY
BAHAN :
Kabel 3x4mm NYY 10.0000 m' 16,000.00 160,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Jumlah Bahan 160,750.00
UPAH :
Tukang 0.8000 Oh 127,512.00 102,009.60
Jumlah Pekerja 102,009.60
Jumlah Bahan + Pekerja 262,759.60
Dibulatkan 262,750.00
L. 01. 10 1 Bh pasang Panel Box Utama +MCB
BAHAN :
Panel Box Utama 1.0000 bh - -
MCB 6.0000 bh 50,000.00 300,000.00
Kabel 3x2,5mm NYM 5.0000 m' 13,000.00 65,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Jumlah Bahan 65,750.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 86,151.92
Dibulatkan 86,150.00
S.D.U 1 M' PAS. SALURAN DRAINASE UTAMA
BAHAN :
Batu kali 0.5000 m3 235,000.00 117,500.00
Plesteran 3.0000 m² 93,780.00 281,340.00
Kabel 3x2,5mm NYM 5.0000 m' 13,000.00 65,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Jumlah Bahan 464,590.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Pekerja 0.2500 Oh 113,850.00 28,462.50

Page 161 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 48,864.42
Jumlah Bahan + Pekerja 513,454.42
Dibulatkan 513,450.00
A.02.23 1 M2 PASANG GEBALAN RUMPUT
BAHAN :
LL42 Lempengan Rumput 1.0000 m² - -
Pupuk Kandang 1.0000 ls - -
Tanah Urug (Tebal 20 cm) 0.2000 m3 - -
Jumlah Bahan -
UPAH :
P PK02 Upah Pasang 1.0000 org 113,850.00 113,850.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 113,850.00
A052 Dibulatkan 113,850.00
A.01.P.01 1 BH TANAM POHON PELINDUNG
BAHAN :
LL42 Pohon Pelindung 1.0000 btg - -
Pupuk kandang 1.0000 ls - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 113,850.00 113,850.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 113,850.00
A052 Dibulatkan 113,850.00
A.01.P.02 1 M2 PEMBUATAN TAMAN
BAHAN :
LL42 Pembentukan Lahan Taman 1.0000 Unit - -
Pupuk Kandang 1.0000 ls - -
Pohon Perdu/Bunga dll 1.0000 btg - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 113,850.00 113,850.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 113,850.00
A052 Dibulatkan 113,850.00
A.01.P.03 1 BH PENANAMAN POHON HIAS
BAHAN :
LL42 Pohon Hias 1.0000 btg - -
Pupuk Kandang 1.0000 krg - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 113,850.00 113,850.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 113,850.00
A052 Dibulatkan 113,850.00
A.01.P.04 1 M' SELASAR PENGHUBUNG BANGUNAN DENGAN ATAP
BAHAN :
LL42 Kayu Kelas II Balok (Selasar Penghubung) 0.0459 m3 4,000,000.00 183,600.00
Seng Gelombang BJLS 0,3 3.3000 lbr 87,000.00 287,100.00
Seng Plat BJLS 30 lebar 90 cm 0.3000 lbr - -
Rabat Beton 0.0230 m3 958,840.00 22,053.32
Paku Seng 0.0200 kg 25,000.00 500.00
Mur - Baut dia 10 mm panjang 30 cm 1.6700 bh - -
Jumlah Bahan 493,253.32
UPAH :
P PK02 Pekerja 0.7500 oh 113,850.00 85,387.50
P PK19 Tukang Kayu 0.5000 oh 127,512.00 63,756.00
Jumlah Pekerja 149,143.50
Jumlah Bahan + Pekerja 642,396.82
A052 Dibulatkan 642,390.00
A.01.P.05 1 M' PEKERJAAN PANCANG CERUCUK BAMBU
BAHAN :
LL42 Bambu 1.0000 m¹ - -
-
-
-
-
-
Jumlah Bahan -
UPAH :
P PK02 Pekerja 1.4286 oh 113,850.00 162,646.11
P PK19 Tukang Kayu oh -
Jumlah Pekerja 162,646.11
Jumlah Bahan + Pekerja 162,646.11
A052 Dibulatkan 162,640.00
A.01.P.06 1 BTG (pj = 45cm) PEKERJAAN PEMASANGAN ANGKUR BESI DIA. 10mm
BAHAN :
LL42 Besi Beton Polos Dia. 10 mm 0.3085 kg 35,430.00 10,930.16
Jumlah Bahan 10,930.16
UPAH :
P PK02 Pekerja 0.1000 oh 113,850.00 11,385.00
P PK19 Tukang Kayu oh -
Jumlah Pekerja 11,385.00
Jumlah Bahan + Pekerja 22,315.16
A052 Dibulatkan 22,310.00
A.01.P.07 1 BH PEKERJAAN BEGHEL U POJOK (BESI POLOS 12MM) + BAUT DIA.10
BAHAN :
LL42 Beghel U Besi Polos Dia. 12mm 1.0000 bh 15,000.00 15,000.00
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan 15,000.00

Page 162 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
UPAH :
P PK02 Pekerja oh 113,850.00 -
P PK19 Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 27,751.20
A052 Dibulatkan 27,750.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10
BAHAN :
LL42 Beghel U Besi Plat Baja U 4.40mm 1.0000 bh - -
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja oh 113,850.00 -
P PK19 Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 12,751.20
A052 Dibulatkan 12,750.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10
BAHAN :
Beghel U Besi Plat Baja U 4.40mm 1.0000 bh - -
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan -
UPAH :
Pekerja oh 113,850.00 -
Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 12,751.20
Dibulatkan 12,750.00
A.01.P.08" 2 BH PEKERJAAN BAUT DIA.10 mm Sambungan gording 5/10 atau 6/12 cm per titik
BAHAN :
Baut Dia. 10mm 2.0000 bh - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja oh 113,850.00 -
P PK19 Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 12,751.20
A052 Dibulatkan 12,750.00
A.01.P.09 1 SET PEK BEGHEL, BEGHEL U, PLAT BAJA, BAUT UNTUK 1 BH KUDA2-KUDA
BAHAN :
LL42 Beghel U (Plat Baja U 4.40mm) 3.0000 bh - -
Beghel U (Besi Polos 12mm) 2.0000 bh 15,000.00 30,000.00
Plat Baja 4.40mm 8.0000 bh - -
Baut Dia. 10mm (25-30cm) 22.0000 bh - -
Jumlah Bahan 30,000.00
UPAH :
P PK02 Pekerja oh 113,850.00 -
P PK19 Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 42,751.20
A052 Dibulatkan 42,750.00
A.01.P.10 1 BH PEKERJAAN TIANG DAN RING BASKET BALL KOMPLIT
BAHAN :
Galian tanah 1.2000 m3 96,770.00 116,124.00
Cor beton tumbuk Ad 1:3:5 0.5000 m3 958,840.00 479,420.00
Tiang pipa galvanis dia 3" 1.0000 btg - -
Papan plank komplit rangka 1.0000 bh - -
Ring Basket 1.0000 Set - -
Jumlah Bahan 595,544.00
UPAH :
Pekerja oh 113,850.00 -
Tukang 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 608,295.20
Dibulatkan 608,290.00
A.01.P.11 1 M1 PEKERJAAN HAND RAILING
BAHAN :
Cor beton tumbuk Ad 1:3:5 0.0120 m3 1,226,010.00 14,712.12
Pipa Stainless Steel Dia. 1,5" 1.3200 m¹ - -
Jumlah Bahan 14,712.12
UPAH :
Pekerja 1.0000 oh 113,850.00 113,850.00
Tukang oh 127,512.00 -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 128,562.12
Dibulatkan 128,560.00
A.01.P.12 1 TITIK PEKERJAAN PANCANG CERUCUK BAMBU
BAHAN :
Bambu 0.5000 btg - -
Kayu Kelas III Papan 0.0033 m3 3,000,000.00 10,000.00
Kawat Beton (Pengikat) 0.0150 kg 26,000.00 390.00
Jumlah Bahan 10,390.00
UPAH :
Pekerja 0.1000 oh 113,850.00 11,385.00
Tukang oh 127,512.00 -
Jumlah Pekerja 11,385.00
Jumlah Bahan + Pekerja 21,775.00
Dibulatkan 21,770.00
A.01.P.13 1 TITIK PEKERJAAN PANCANG CERUCUK KAYU DOLKEN
BAHAN :
Kayu Dolken Dia. 8 cm 0.5000 btg 30,000.00 15,000.00
Kayu Kelas III Papan 0.0033 m3 3,000,000.00 10,000.00
Kawat Beton (Pengikat) 0.0150 kg 26,000.00 390.00
Jumlah Bahan 25,390.00

Page 163 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)
UPAH :
Pekerja 0.1000 oh 113,850.00 11,385.00
Tukang oh 127,512.00 -
Jumlah Pekerja 11,385.00
Jumlah Bahan + Pekerja 36,775.00
Dibulatkan 36,770.00
A.01.P.14 1 M³ PEKERJAAN BALOK GAPIT
BAHAN :
Kayu Kls. II Balok 1.2000 m³ 4,000,000.00 4,800,000.00
Jumlah Bahan 4,800,000.00
UPAH :
Pekerja oh 113,850.00 -
Tukang 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 4,812,751.20
Dibulatkan 4,812,750.00
A.01.P.15 1 M³ PEKERJAAN TATAKAN GORDING/KLOS KAYU
BAHAN :
Kayu Kls. II Balok 1.1000 m³ 4,000,000.00 4,400,000.00
Paku Biasa 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 4,401,250.00
UPAH :
Pekerja oh 113,850.00 -
Tukang 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 4,414,001.20
Dibulatkan 4,414,000.00
A.01.P.16 1 M1 PEKERJAAN PINTU GERBANG BESI
BAHAN :
Pintu Gerbang Besi 1.0000 m1 - -
Jumlah Bahan -
UPAH :
Pekerja oh 113,850.00 -
Tukang oh 127,512.00 -
Jumlah Pekerja -
Jumlah Bahan + Pekerja -
Dibulatkan -

PEMBUATAN PARTISI MATERIAL KAYU

1 M3 PEKERJAAN KUSEN PINTU

Bahan

1.2 M3 Kayu Kls. II 4,000,000.00 4,800,000.00

1.25 Kg Paku 10 cm 25,000.00 31,250.00

1 Kg Lem kayu 25,000.00 25,000.00

Upah

18 Org/Tukang kayu 127,512.00 2,295,216.00

1.8 Org/Kepala Tukang 136,620.00 245,916.00

6 Org/Pekerja 113,850.00 683,100.00

0.3 Org/Mandor Rp Rp -

Alat bantu Rp -

Total Rp 8,080,482.00

1 UNIT PEK. KUSEN PINTU (L=3.00 cm)

0.111328 M3 Pek. Kusen pintu & jendela Rp 8,080,482.00 Rp 899,583.90

Dibulatkan 899,580.00

1 M2 PEKERJAAN DAUN PINTU TRIPLEKS RANGKAP, RANGKA KAYU KLS II

BAHAN :

Kayu Kls. II Balok 0.0196 m³ 4,000,000.00 78,400.00

Paku Biasa Tripleks 0.03 kg 25,000.00 750.00

Lem Kayu 0.3 kg 25,000.00 7,500.00

Tripleks 6 mm 2 lbr 150,000.00 300,000.00


Jumlah Bahan 386,650.00

UPAH :

Pekerja 0.6 Oh 113,850.00 68,310.00

Tukang Kayu 2 Oh 127,512.00 255,024.00

Kepala Tukang 0.2 Oh 0 0

Mandor 0.03 Oh 0 0
Jumlah Pekerja 323,334.00

Jumlah Bahan + Pekerja 709,984.00


Dibulatkan 709,980.00

1 BH PASANGAN DAUN PINTU TRIPLEKS 6 mm

Page 164 of 199


Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

Pekerjaan 1 2 3 4 5 6=(3x5)

BAHAN :

Pintu Tripleks 1.8760 m2 709,980.00 1,331,922.48

Jumlah Bahan 1,331,922.48

Dibulatkan 1,331,920.00

1 M2 MENGECAT KAYU

A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI

BAHAN :

Meni kayu 0.167 kg 34000 5,678.00

Plamir kayu 0.083 kg 9000 747.00

Cat Kayu 0.2 kg 25000 5,000.00

Ampelas 0.4 lbr 7000 2,800.00

Minyak cat / Thinner 0.15 ltr 13876 2,081.40

Kwas 0.05 bh 18000 900.00

Jumlah Bahan 17,206.40

UPAH :

Pekerja 0.2 org 113850 22,770.00

Tukang Cat 0.06 org 127512 7,650.72

Kepala Tukang cat 0.03 org 136620 4,098.60


Mandor 0.0100 org 0 -

Jumlah Pekerja 34,519.32

Jumlah Bahan + Pekerja 51,725.72

Jumlah 51,725.72

Dibulatkan 51,720.00

Page 165 of 199


Analisa Harga Satuan Furniture

ANALISA HARGA SATUAN FURNITURE

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
M-1 1 UNIT MEJA SISWA TUNGGAL
BAHAN :
Kayu Kelas II 0.0500 m3 4,000,000.00 200,000.00
Paku Ulir 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.0500 kg 25,000.00 1,250.00
Politur 0.5000 kg 41,000.00 20,500.00
Jumlah Bahan 229,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 357,162.00
Dibulatkan 357,160.00
M-3 1 UNIT MEJA BACA INDIVIDU
BAHAN :
Kayu Kelas II 0.0708 m3 4,000,000.00 283,280.00
Paku Ulir 36.0000 bh - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1500 kg 25,000.00 3,750.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 340,580.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 468,092.00
Dibulatkan 468,090.00
M-4 1 UNIT MEJA BACA KELOMPOK
BAHAN :
Kayu Kelas II 0.0263 m3 4,000,000.00 105,280.00
Paku Ulir 24.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 154,330.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 281,842.00
Dibulatkan 281,840.00
M-5 1 UNIT MEJA BACA SERBAGUNA
BAHAN :
Kayu Kelas II 0.0312 m3 4,000,000.00 124,960.00
Paku Ulir 24.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 174,010.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 301,522.00
Dibulatkan 301,520.00
M-6 1 UNIT MEJA PIMPINAN
BAHAN :
Kayu Kelas II 0.1700 m3 4,000,000.00 680,000.00
Knop Tarikan 1.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 729,050.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 856,562.00
Dibulatkan 856,560.00

Page 166 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
M-7 1 UNIT MEJA KERJA
BAHAN :
Kayu Kelas II 0.1200 m3 4,000,000.00 480,000.00
Paku Ulir 20.0000 bh - -
Amplas 4.0000 lbr 7,000.00 28,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.0500 kg 25,000.00 1,250.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 552,950.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 680,462.00
Dibulatkan 680,460.00
M-8 1 UNIT MEJA GURU
BAHAN :
Kayu Kelas II 0.0432 m3 4,000,000.00 172,800.00
Paku Ulir 12.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.0500 kg 25,000.00 1,250.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 219,700.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 347,212.00
Dibulatkan 347,210.00
M-10 1 UNIT MEJA SIRKULASI
BAHAN :
Kayu Kelas II 0.1800 m3 4,000,000.00 720,000.00
Knop Tarikan 1.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 779,300.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 906,812.00
Dibulatkan 906,810.00
M-11 1 UNIT MEJA PERAGA / DEMONSTRASI
BAHAN :
Kayu Kelas II 0.1720 m3 4,000,000.00 688,000.00
Knop Tarikan 3.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 747,300.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 874,812.00
Dibulatkan 874,810.00
M-12 1 UNIT MEJA KETIK
BAHAN :
Kayu Kelas II 0.0500 m3 4,000,000.00 200,000.00
Knop Tarikan 1.0000 bh - -
Paku Ulir 24.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1500 kg 25,000.00 3,750.00
Politur 0.5000 kg 41,000.00 20,500.00
Jumlah Bahan 232,150.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 359,662.00
Dibulatkan 359,660.00

Page 167 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
K-1 1 UNIT KURSI SISWA TUNGGAL
BAHAN :
Kayu Kelas II 0.0200 m3 4,000,000.00 80,000.00
Paku Ulir 25.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.0300 kg 25,000.00 750.00
Politur 0.5000 kg 41,000.00 20,500.00
Jumlah Bahan 116,150.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 243,662.00
Dibulatkan 243,660.00
K-2 1 UNIT KURSI BULAT TINGGI
BAHAN :
Kayu Kelas II 0.0027 m3 4,000,000.00 10,800.00
Besi Pipa Galvanis 1/2" 4.5000 m' - -
Baut dia.10 cm 4.0000 bh - -
Amplas 0.5000 lbr 7,000.00 3,500.00
Dempul besi 0.0500 kg 7,000.00 350.00
Lem Kayu 0.0200 kg 25,000.00 500.00
Politur 0.1000 kg 41,000.00 4,100.00
Cat besi 0.2000 kg Err:509 Err:509
Jumlah Bahan Err:509
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah Err:509
Dibulatkan Err:509
K-3 1 UNIT KURSI BULAT PENDEK
BAHAN :
Kayu Kelas II 0.0027 m3 4,000,000.00 10,800.00
Besi Pipa Galvanis 1/2" 3.5000 m' - -
Baut dia.10 cm 4.0000 bh - -
Amplas 0.5000 lbr 7,000.00 3,500.00
Dempul besi 0.0500 kg 7,000.00 350.00
Lem Kayu 0.0200 kg 25,000.00 500.00
Politur 0.1000 kg 41,000.00 4,100.00
Cat besi 0.2000 kg Err:509 Err:509
Jumlah Bahan Err:509
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah Err:509
Dibulatkan Err:509
K-5 1 UNIT KURSI KERJA
BAHAN :
Kayu Kelas II 0.0134 m3 4,000,000.00 53,760.00
Paku Ulir 20.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.0300 kg 25,000.00 750.00
Politur 0.2500 kg 41,000.00 10,250.00
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Karet Busa 1.0000 bh - -
Imitatie Lear 1.0000 unit - -
Jumlah Bahan 122,160.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 249,672.00
Dibulatkan 249,670.00

Page 168 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
L-1 1 UNIT LEMARI BUKU
BAHAN :
Kayu Kelas II 0.1190 m3 4,000,000.00 476,000.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.3200 m2 187,750.00 247,830.00
Engsel Pita 4.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 901,530.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,029,042.00
Dibulatkan 1,029,040.00
L-2 1 UNIT LEMARI KACA GESER
BAHAN :
Kayu Kelas II 0.2176 m3 4,000,000.00 870,400.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.7000 m2 187,750.00 319,175.00
Rel Pita 4.8000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,367,275.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,494,787.00
Dibulatkan 1,494,780.00
L-3 1 UNIT LEMARI ARSIP
BAHAN :
Kayu Kelas II 0.1800 m3 4,000,000.00 720,000.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Grendel 2.0000 bh 12,000.00 24,000.00
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 921,700.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,049,212.00
Dibulatkan 1,049,210.00
L-4 1 UNIT LEMARI PEMBATAS
BAHAN :
Kayu Kelas II 0.1048 m3 4,000,000.00 419,200.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Engsel Pita 4.0000 psg - -
Grendel 2.0000 bh 12,000.00 24,000.00
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 620,900.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00

Page 169 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Jumlah Bahan + Upah 748,412.00
Dibulatkan 748,410.00
L-5 1 UNIT LEMARI ADMINISTRASI
BAHAN :
Kayu Kelas II 0.1190 m3 4,000,000.00 476,000.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.3200 m2 187,750.00 247,830.00
Engsel Pita 4.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 901,530.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,029,042.00
Dibulatkan 1,029,040.00
L-6 1 UNIT LEMARI ALAT PERAGA
BAHAN :
Kayu Kelas II 0.2925 m3 4,000,000.00 1,170,176.00
Knop Tarikan 3.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 50.0000 bh - -
Besi dia 8 mm 15.0000 m1 35,430.00 531,450.00
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,836,826.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,964,338.00
Dibulatkan 1,964,330.00
L-7 1 UNIT LEMARI OBAT
BAHAN :
Kayu Kelas II 0.2788 m3 4,000,000.00 1,115,200.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 1.3200 m2 187,750.00 247,830.00
Engsel Pita 4.0000 psg - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,498,230.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,625,742.00
Dibulatkan 1,625,740.00
L-10 1 UNIT LEMARI KERTAS KERJA
BAHAN :
Kayu Kelas II 0.2925 m3 4,000,000.00 1,170,176.00
Knop Tarikan 30.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 100.0000 bh - -
Besi dia 8 mm 15.0000 m1 35,430.00 531,450.00
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,836,826.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00

Page 170 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Jumlah Bahan + Upah 1,964,338.00
Dibulatkan 1,964,330.00

Page 171 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
L-11 1 UNIT LEMARI KATALOK
BAHAN :
Kayu Kelas II 0.2925 m3 4,000,000.00 1,170,176.00
Knop Tarikan 30.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 80.0000 bh - -
Besi dia 8 mm 15.0000 m1 35,430.00 531,450.00
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,836,826.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,964,338.00
Dibulatkan 1,964,330.00
L-12 1 UNIT LEMARI KARDEK
BAHAN :
Kayu Kelas II 0.1000 m3 4,000,000.00 400,000.00
Knop Tarikan 8.0000 bh - -
Paku Ulir 25.0000 bh - -
sekrup 5 cm 25.0000 bh - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.0500 kg 9,000.00 450.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.5000 kg 41,000.00 20,500.00
Jumlah Bahan 486,950.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 614,462.00
Dibulatkan 614,460.00
L-13 1 UNIT LEMARI KACA TINGGI
BAHAN :
Kayu Kelas II 0.2588 m3 4,000,000.00 1,035,200.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 1.5300 m2 187,750.00 287,257.50
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,500,157.50
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,627,669.50
Dibulatkan 1,627,660.00
L-14 1 UNIT LEMARI GANTUNG/P3K
BAHAN :
Kayu Kelas II 0.1075 m3 4,000,000.00 430,080.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 0.4800 m2 187,750.00 90,120.00
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 683,900.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 811,412.00
Dibulatkan 811,410.00

Page 172 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
L-15 1 UNIT LEMARI KUNCI
BAHAN :
Kayu Kelas II 0.1075 m3 4,000,000.00 430,080.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Sekrup Penggantung 12.0000 bh - -
Kaca 3mm 0.4800 m2 187,750.00 90,120.00
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 683,900.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 811,412.00
Dibulatkan 811,410.00
L-16 1 UNIT LEMARI LOCKER
BAHAN :
Kayu Kelas II 0.1392 m3 4,000,000.00 556,800.00
Knop Tarikan 12.0000 bh - -
Paku Ulir 48.0000 bh - -
sekrup 5 cm 24.0000 bh - -
Kunci Lemari 2.0000 bh - -
Engsel Pita 24.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 734,500.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 862,012.00
Dibulatkan 862,010.00
L-17/19 1 UNIT LEMARI PAKAIAN
BAHAN :
Kayu Kelas II 0.1800 m3 4,000,000.00 720,000.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Grendel 2.0000 bh 12,000.00 24,000.00
Tripleks 4mm 2.0000 lbr 85,000.00 170,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,006,700.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,134,212.00
Dibulatkan 1,134,210.00
L-20 1 UNIT LEMARI ASAM
BAHAN :
Kayu Kelas II 0.1075 m3 4,000,000.00 430,080.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Pipa PVC AW 4" 1.0000 m1 75,000.00 75,000.00
Elbow PVC 4" 1.0000 bh - -
Engsel pita 4.0000 psg - -
Aluminium 1.0000 m2 - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 597,780.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 725,292.00

Page 173 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Dibulatkan 725,290.00

Page 174 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
P-1 1 UNIT PAPAN TULIS GANTUNG
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.2500 kg 25,000.00 6,250.00
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Multiplex 9 mm 1.0000 lbr - -
Jumlah Bahan 156,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 284,162.00
Dibulatkan 284,160.00
P-4 1 UNIT WHITE BOARD GANTUNG/STANDAR
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.2500 kg 25,000.00 6,250.00
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 156,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 284,162.00
Dibulatkan 284,160.00
P-6 1 UNIT PAPAN STATISTIK
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.2000 kg 25,000.00 5,000.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 148,400.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 275,912.00
Dibulatkan 275,910.00
P-7 1 UNIT PAPAN JADWAL
BAHAN :
Kayu Kelas II 0.0250 m3 4,000,000.00 100,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 127,150.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 254,662.00
Dibulatkan 254,660.00
P-8 1 UNIT PAPAN PAMERAN
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.2200 kg 25,000.00 5,500.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Multiplex 9 mm 1.0000 lbr - -
Jumlah Bahan 148,900.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 276,412.00
Dibulatkan 276,410.00

Page 175 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
P-9 1 UNIT PAPAN JADWAL
BAHAN :
Kayu Kelas II 0.0220 m3 4,000,000.00 88,000.00
Paku Biasa 0.1300 kg 25,000.00 3,250.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 114,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 242,162.00
Dibulatkan 242,160.00
P-10 1 UNIT PAPAN ABSENSI
BAHAN :
Kayu Kelas II 0.0230 m3 4,000,000.00 92,000.00
Paku Biasa 0.1250 kg 25,000.00 3,125.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 118,525.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 246,037.00
Dibulatkan 246,030.00
R-1 1 UNIT RAK TAS DAN BUKU
BAHAN :
Kayu Kelas II 0.1256 m3 4,000,000.00 502,400.00
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 680,100.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 807,612.00
Dibulatkan 807,610.00
R-2 1 UNIT RAK BUKU SATU MUKA
BAHAN :
Kayu Kelas II 0.1072 m3 4,000,000.00 428,800.00
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 606,500.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 734,012.00
Dibulatkan 734,010.00
R-3 1 UNIT RAK BUKU DUA MUKA
BAHAN :
Kayu Kelas II 0.1504 m3 4,000,000.00 601,600.00
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 772,300.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 899,812.00

Page 176 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Dibulatkan 899,810.00

Page 177 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
R-4 1 UNIT RAK GUDANG
BAHAN :
Kayu Kelas II 0.1504 m3 4,000,000.00 601,600.00
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 lbr - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 2.0000 kg 7,000.00 14,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 772,300.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 899,812.00
Dibulatkan 899,810.00
R-6 1 UNIT RAK MAJALAH
BAHAN :
Kayu Kelas II 0.0780 m3 4,000,000.00 311,960.00
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1500 kg 25,000.00 3,750.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 364,610.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 492,122.00
Dibulatkan 492,120.00
R-7 1 UNIT RAK ATLAS
BAHAN :
Kayu Kelas II 0.1100 m3 4,000,000.00 440,000.00
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1500 kg 25,000.00 3,750.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 492,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 620,162.00
Dibulatkan 620,160.00
R-8 1 UNIT RAK ENSIKLOPEDIA
BAHAN :
Kayu Kelas II 0.0273 m3 4,000,000.00 109,296.00
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 150,446.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 277,958.00
Dibulatkan 277,950.00
R-9 1 UNIT RAK KORAN
BAHAN :
Kayu Kelas II 0.0528 m3 4,000,000.00 211,200.00
Baut dia.10 cm 1.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Cat besi 0.1500 kg Err:509 Err:509
Jumlah Bahan Err:509
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah Err:509

Page 178 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
Dibulatkan Err:509

Page 179 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
R-10 1 UNIT RAK DORONG
BAHAN :
Kayu Kelas II 0.2176 m3 4,000,000.00 870,400.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Rel Pita 4.8000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,048,100.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,175,612.00
Dibulatkan 1,175,610.00
U-6 1 UNIT DIPAN DIPERIKSA
BAHAN :
Besi Pipa Galvanis dia. 1" 4.5000 m' - -
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Cat besi 1.0000 kg Err:509 Err:509
Jumlah Bahan Err:509
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah Err:509
Dibulatkan Err:509
U-7 1 UNIT DIPAN TIDUR TUNGGAL
BAHAN :
Kayu Kelas II 0.2176 m3 4,000,000.00 870,400.00
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Cat Kayu 1.0000 kg 25,000.00 25,000.00
Jumlah Bahan 916,400.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,043,912.00
Dibulatkan 1,043,910.00
U-8 1 UNIT DIPAN TIDUR GANDA
BAHAN :
Kayu Kelas II 0.4352 m3 4,000,000.00 1,740,800.00
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Cat Kayu 1.0000 kg 25,000.00 25,000.00
Jumlah Bahan 1,786,800.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,914,312.00
Dibulatkan 1,914,310.00

Page 180 of 199


Analisa Harga Satuan Furniture

NO. URAIAN KOEF SAT. Harga Satuan JUMLAH

1 2 3 4 5 6=(3x5)
U-9 1 UNIT DIPAN TIDUR TINGKAT
BAHAN :
Kayu Kelas II 0.6000 m3 4,000,000.00 2,400,000.00
Multiplex 12 mm 2.0000 lbr - -
Kasur Busa 2.0000 bh - -
Amplas 5.0000 lbr 7,000.00 35,000.00
Cat Kayu 2.0000 kg 25,000.00 50,000.00
Jumlah Bahan 2,485,000.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 2,612,512.00
Dibulatkan 2,612,510.00
KS 1 UNIT KOTAK SAMPAH
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.1000 kg 25,000.00 2,500.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.3000 kg 41,000.00 12,300.00
Cat Kayu 1.0000 kg 25,000.00 25,000.00
Jumlah Bahan 170,200.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 297,712.00
Dibulatkan 297,710.00

Page 181 of 199


Harga Satuan Pekerjaan

HARGA SATUAN PEKERJAAN

KODE URAIAN JUMLAH

1 2 3

A.01.06 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK 77,000.00


A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M 96,770.00
A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M 59,880.00
A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 M 83,670.00
A.02.03 a 1 M3 GALIAN TANAH KERAS KEDALAMAN MAX 1 M
A.02.11 1 M3 URUGAN TANAH KEMBALI 21,850.00
A.02.12 1 M3 URUGAN TANAH DIPADATKAN 34,150.00
A.02.13 1 M3 URUGAN PASIR 184,150.00
A.02.22 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR) 219,230.00
A.02.23 1 M2 PASANG GEBALAN RUMPUT 113,850.00
A.03.02 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps 1,085,320.00
A.03.03 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps 970,520.00
A.03.04 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps 946,350.00
A.03.05 1 M3 PASANG PONDASI BATU KARANG MATI 1 Pc : 4 Ps 853,970.00
A.03.13 1 M3 PASANG BATU KOSONG ( AANSTAMPING ), JENIS BATU KALI 479,860.00
A.03.13.a 1 M3 PASANG BATU KOSONG ( AANSTAMPING ), JENIS BATU KARANG MATI 181,360.00
A.04.09 1 M2 PASANGAN DINDING BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps 141,250.00
A.04.10 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 2 Ps 284,250.00
A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps 122,410.00
A.04.13 1 M Pasang Cansteen 105,660.00
A.04.12 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 4 Ps 277,920.00
A.05.19 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM 93,780.00
A.05.21 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM 46,920.00
A.05.36 1 M2 ACIAN DINDING 40,210.00
A.06.01 1 M3 PEKERJAAN KUSEN PINTU DAN JENDELA KAYU KLS II 7,405,640.00
A.06.02 1 UNIT PEK. KUSEN PINTU P1 (L=170 cm) + JALUZI 148,110.00
A.06.03 1 UNIT PEK. KUSEN PINTU P2 (L=90 cm) + JALUZI 518,390.00
A.06.03a 1 UNIT PEK. KUSEN PINTU P2 (L=90 cm), antar ruang kelas 451,740.00
A.06.04 1 UNIT PEK. KUSEN PINTU P3 (L=70 cm) 370,280.00
A.06.05 1 UNIT PEK. KUSEN PINTU P5 (L=100 cm) 377,680.00
A.06.06 1 UNIT PEK. KUSEN PINTU JENDELA PJ1/PJ1A + JALUZI 747,960.00
A.06.07 1 UNIT PEK. KUSEN PINTU JENDELA PJ2 + JALUZI 747,960.00
A.06.08 1 UNIT PEK. KUSEN PINTU JENDELA PJ3 + JALUZI 1,207,110.00
A.06.09 1 UNIT PEK. KUSEN JENDELA J2 + JALUZI 510,980.00
A.06.10 1 UNIT PEK. KUSEN JENDELA J3 + JALUZI 703,530.00
A.06.10a 1 UNIT PEK. KUSEN JENDELA J3a + JALUZI (KUSEN DEPAN RKB/RBL) 626,510.00
A.06.11 1 UNIT PEK. KUSEN JENDELA J4 + JALUZI 1,088,620.00
A.06.12 1 UNIT PEK. KUSEN JENDELA J 222,160.00
A.06.13 1 UNIT PEK. KUSEN BOUVENLICH BV1 177,730.00
A.06.14 1 UNIT PEK. KUSEN BOUVENLICH BV2 318,440.00
A.06.15 1 UNIT PEK. KUSEN BOUVENLICH BV3 451,740.00
A.06.16 1 UNIT PEK. KUSEN ANGIN-ANGIN LA-LB + JALUZI 666,500.00
A.06.17 1 M2 PEKERJAAN DAUN PINTU PANEL KAYU LOKAL KLS II 628,030.00
A.06.18 1 BH PASANGAN DAUN PINTU PANIL 1,055,090.00
A.06.19 1 BH PASANGAN DAUN PINTU PANIL P5 1,186,970.00
A.06.20 1 M2 PEKERJAAN DAUN PINTU TRIPLEKS RANGKAP, RANGKA KAYU KLS II 587,300.00
A.06.21 1 BH PASANGAN DAUN PINTU TRIPLEKS P3 739,990.00
A.06.22 1 M2 PEKERJAAN DAUN JENDELA + KACA 1,031,390.00
A.06.23 1 BH PASANGAN DAUN JENDELA + KACA (PJ1 dan PJ2) 522,910.00
A.06.24 1 BH PASANGAN DAUN JENDELA + KACA PJ3 1,287,170.00
A.06.25 1 BH PASANGAN DAUN PINTU + KACA PJ3 1,732,730.00
A.06.26 1 BH PASANGAN DAUN JENDELA + KACA J2 522,910.00
A.06.27 1 BH PASANGAN DAUN JENDELA + KACA J3 610,060.00
A.06.27a 1 BH PASANGAN DAUN JENDELA + KACA J3a 488,053.75
A.06.28 1 BH PASANGAN DAUN JENDELA + KACA J4 1,287,170.00
A.06.29 1 BH PASANGAN DAUN JENDELA + KACA J5 830,260.00
A.06.30 1 BH PASANGAN DAUN JENDELA + KACA J6 616,770.00
A.06.31 1 UNIT PEK. KUSEN JENDELA J5 229,570.00
A.06.32 1 UNIT PEK. KUSEN JENDELA J6 362,870.00
A.06.32.a 1 M2 PASANG KACA TEBAL 5 MM 274,100.00
A.06.33 1 M1 PASANG KONSTRUKSI NOK BUBUNGAN 6/12 KAYU KLS II 4,450,880.00
Page 182 of 199
Harga Satuan Pekerjaan

KODE URAIAN JUMLAH

1 2 3
A.06.34 1 M3 PASANG KONSTRUKSI SKOOR ANGIN 6/12 KAYU KLS II 2,502,210.00
A.06.35 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA 8/12 KAYU KAYU LOKAL KLS II 4,902,110.00
A.06.36 1 M3 PASANG KONSTRUKSI GORDING 5/10 KAYU KLS II 4,429,250.00

Page 183 of 199


Harga Satuan Pekerjaan

KODE URAIAN JUMLAH

1 2 3
A.06.37 1 M3 PASANG KASO 5/7 KAYU KLS II 77,250.00
A.06.38 1 M3 PASANG RENG 3/4 KAYU KLS II 77,250.00
A.06.39 1 M1 PASANG KONSTRUKSI NOK TEPI PAPAN 6/12 KAYU KLS II 4,050,760.00
A.06.44 1 M2 PASANG RANGKA PLAFOND BALOK 5/7 KAYU LOKAL KLS II 121,420.00
A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU LOKAL KLS II 62,050.00
A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4 18,250.00
A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr 958,840.00
A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr 1,226,010.00
A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR 39,370.00
A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASI 198,360.00
A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOF 91,560.00
A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM 107,240.00
A.07.31 1 m2 PASANG BEKISTING UNTUK BALOK 170,410.00
A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAI 223,510.00
A.07.33 1 m2 PASANG BEKISTING UNTUK DINDING 353,010.00
A.07.47 1 M3 MEMBUAT SOFI-SOFI 12/15 (220,80 Kg Besi + Bekesting) 9,541,480.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.07.48 1 M3 MEMBUAT RING BALOK 15/20 (145,92 Kg Besi + Bekesting) 7,974,790.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
A.07.49 1 M3 MEMBUAT KOLOM 20/25 (169,67 Kg Besi + Bekesting) 8,668,040.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.07.50 1 M3 MEMBUAT SLOOF 15/20 (274,22 Kg Besi + Bekesting) 9,163,330.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.07.51 1 M3 PEK. BETON BERTULANG PLAT MEJA, adukan 1 : 2 : 3 6,795,150.00
A.07.52 1 M3 MEMBUAT KOLOM 12/15 (197 Kg Besi + Bekesting) 9,631,480.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.07.60 1 M3 MEMBUAT KOLOM SELASAR 15/15 (181,88 Kg Besi + Bekesting) 9,458,910.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm 8,087,460.00
A.08.02 1 M2 PASANG ATAP GENTENG TANAH 27,730.00
A.08.03 1 M2 PASANG ATAP SPANDEK / GALVALYUM 0,3mm 157,690.00
A.08.05 1 M2 PASANG NOK BUBUNGAN GENTENG TANAH 69,630.00
A.08.06 1 M2 PASANG NOK BUBUNGAN GENTENG METAL 50,880.00
A.08.11 1 M2 PASANG ATAP SENG GELOMBANG BJLS 0,3 mm 83,530.00
A.08.12 1 M2 PASANG ATAP ZYNCALUM 0,3 mm 157,690.00
A.08.13 1 M2 PASANG ATAP GENTENG METAL 0,3 mm 27,130.00
A.08.14 1 M' PASANG NOK SENG POLOS 0,3 mm 12,720.00
A.08.30 1 M1 PASANG NOK TEPI SENG GELOMBANG 70,240.00
A.08.31 1 M1 PASANG NOK TEPI ZYNCALUM 90,240.00
A.08.32 1 M1 PASANG NOK TEPI GENTENG METAL 40,240.00
A.08.33 1 M1 PASANG NOK TEPI GENTENG TANAH 59,110.00
A.08.34 1 M1 PASANG NOK TEPI ATAP SPANDEK/GALVALYUM 40,240.00
A.09.02 1 M2 PASANG PLAFOND TRIPLEKS , TEBAL 3 mm 58,120.00
A.10.01 MEMASANG 1 BUAH KLOSET DUDUK 3,177,520.00
A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN 747,150.00
A.10.04 MEMASANG 1 BUAH URINOIR 255,170.00
A.10.05 MEMASANG 1 BUAH WASTAFEL 2,905,140.00
A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3 355,210.00
A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3 682,190.00
A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM 674,330.00
A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM 509,490.00
A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM 808,850.00
A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5" -
A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75" 18,850.00
A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1" 18,850.00
A.10.22.a MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5" 37,700.00
A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 2" 37,700.00
A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3" 37,700.00
A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4" 47,130.00
A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" 12,560.00
A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75" 31,800.00
A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1" 12,560.00
A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5" 12,560.00

Page 184 of 199


Harga Satuan Pekerjaan

KODE URAIAN JUMLAH

1 2 3
A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2" 18,850.00
A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5" 12,560.00
A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" 77,210.00
A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" 129,530.00
A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL 45,760.00
A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" 1,650.00
A.10.36 MEMASANG 1 BH FLOOR DRAIN 1,270.00
A.10.37 1 UNIT SEPTICTANK 4,8 X 2,1 X 2,4 M + REMBESANNYA 25,265,230.00
A.11.01 1 M2 PASANG RANGKA ATAP BAJA RINGAN 8,410.00
A.11.09 1 M2 PASANG PINTU ALUMINIUM 267,770.00
A.11.12 1 M2 PASANG TERALIS BESI 291,270.00
A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 28 112,020.00
A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28 137,440.00
A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28 130,870.00
A.11.22 1 M2 PEK. RESIDU/TEER RANGKA ATAP/KUDA-KUDA/GORDING 3,700.00
A.12.02 1 BUAH PASANG KUNCI TANAM BIASA 156,260.00
A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI 153,000.00
A.12.04 1 BUAH PASANG KUNCI BULAT 157,000.00
A.12.05 1 BUAH PASANG ENGSEL PINTU 51,500.00
A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU 47,250.00
A.12.09 1 BUAH PASANG KAIT ANGIN 38,880.00
A.12.10 1 BUAH PASANG SLOOT TANAM 34,610.00
A.12.11 1 BUAH PASANG GRENDEL JENDELA 42,510.00
A.12.12 1 BUAH PASANG PEGANGAN PINTU + KUNCI PINTU 2 X PUTAR 76,270.00
A.12.14 1 BUAH PASANG KUNCI PINTU 2 X PUTAR ( lever handle ) 193,090.00
A.12.17 1 M2 PASANG KACA, TEBAL 5 MM 273,350.00
A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU 8,410.00
A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPING KAWAT DURI 102,350.00
A.12.34a 1 M1 PEK.PAGAR BRC Ø 6 mm 57,460.00
A.13.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM 143,250.00
A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 143,250.00
A.13.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM 143,250.00
A.13.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM 143,250.00
A.13.47 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM 143,250.00
A.13.48 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ANTISLIP 143,250.00
A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH 160,830.00
A.13.59 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA 160,830.00
A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA 151,490.00
A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA 151,490.00
A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, 151,490.00
A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, 106,860.00
A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, 105,610.00
A.13.74 1 M2 PASANG DINDING BATU TEMPEL 147,570.00
A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS 143,250.00
A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP 143,250.00
A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM 116,100.00
A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, 151,490.00
A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM) 255,010.00
A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM) 165,120.00
A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM) 255,010.00
A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM) 115,630.00
A.14.12 1 M2 MENI KAYU 23,280.00
A.14.13 1 M2 MENI BESI 13,830.00
A.14.14 1 M2 PLAMUR TEMBOK 12,070.00
A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x) 35,060.00
A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x) 35,060.00
A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI 51,720.00
A.14.31 1 M2 PENGECATAN BESI (2X) 47,370.00
A. R 1 M2 PEK. ANTI RAYAP 1,130.00

Page 185 of 199


Harga Satuan Pekerjaan

KODE URAIAN JUMLAH

1 2 3
A. B 1 M2 PEKERJAAN SALURAN AIR PASANGAN BT BATA ad 1 : 4 134,180.00
L. 01. 01 1 M1 PAS. INSTALASI LISTRIK KABEL UTAMA 3x2,5 NYM 36,450.00
L. 01. 02 1 TITIK INSTALASI TITIK LAMPU 2x2,5 NYM 75,750.00
L. 01. 03 1 Titik Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM 98,600.00
L. 01. 04 1 Titik Instalasi Titik Saklar Double 3x2,5 NYM 103,280.00
L. 01. 05 1 Titik Pas. Instalasi Titik Stop Kontak 3x2,5 NYM 88,100.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 58 w 247,950.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 15 w 154,950.00
L. 01. 07 1 Titik Pas. Instalasi Lampu TL 2x40 Watt + fitting 221,950.00
L. 01. 08 1 Titik Pas. MCB + Box Sekring 615,650.00
L. 01. 09 1 M1 Pas. Kabel Antar Bangunan 3x4mm NYY 262,750.00
L. 01. 10 1 Bh pasang Panel Box Utama +MCB 86,150.00
S.D.U 1 M' PAS. SALURAN DRAINASE UTAMA 513,450.00
A.01.P.01 1 BH TANAM POHON PELINDUNG 113,850.00
A.01.P.02 1 M2 PEMBUATAN TAMAN 113,850.00
A.01.P.03 1 BH PENANAMAN POHON HIAS 113,850.00
A.01.P.04 1 M' SELASAR PENGHUBUNG BANGUNAN DENGAN ATAP 642,390.00
A.01.P.06 1 BTG (pj = 45cm) PEKERJAAN PEMASANGAN ANGKUR BESI DIA. 10mm 22,310.00
A.01.P.07 1 BH PEKERJAAN BEGHEL U POJOK (BESI POLOS 12MM) + BAUT DIA.10 27,750.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10 12,750.00
A.01.P.08" 2 BH PEKERJAAN BAUT DIA.10 mm Sambungan gording 5/10 atau 6/12 cm per titik 12,750.00
A.01.P.09 1 SET PEK BEGHEL, BEGHEL U, PLAT BAJA, BAUT UNTUK 1 BH KUDA2-KUDA 42,750.00
A.01.P.10 1 BH PEKERJAAN TIANG DAN RING BASKET BALL KOMPLIT ### 608,290.00
A.01.P.11 1 M1 PEKERJAAN HAND RAILING 128,560.00
A.01.P.12 1 TITIK PEKERJAAN PANCANG CERUCUK BAMBU 21,770.00
A.01.P.13 1 TITIK PEKERJAAN PANCANG CERUCUK KAYU DOLKEN 36,770.00
A.01.P.14 1 M³ PEKERJAAN BALOK GAPIT 4,812,750.00
A.01.P.15 1 M³ PEKERJAAN TATAKAN GORDING/KLOS KAYU 4,414,000.00
A.01.P.16 1 M1 PEKERJAAN PINTU GERBANG BESI -

Page 186 of 199


PROGRAM BLOCK GRANT PEMBANGUNAN
UNIT SEKOLAH BARU SMP NEGERI
Dengan Mekanisme Partisipasi Masyarakat

Kode Sekolah :
Sekolah : 0.000
Desa : 0.000
Kecamatan : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara

Pekerjaan : Gedung Kantor

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp )
1 2 3 4 5 6 7
I. PEK. PERSIAPAN
1 Pek. Pemasangan Bowplank A.01.06 m' 77,000 -
Total I -
II. PEK. TANAH
1 Pek. Galian Tanah Pondasi A.02.01 m3 96,770 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 21,850 -
3 Pek. Urugan Pasir Bawah Pondasi A.02.13 3.69 m3 184,150 679,274.11
Total II 679,274.11
III. PEK. PONDASI
1 Pek. Anti Rayap A. R m 2
1,130 -
2 Pek. Pancang Cerucuk Bambu A.01.P.12 ttk 21,770 -
3 Pek. Pancang Cerucuk Dolken Dia. 8 cm A.01.P.13 ttk 36,770 -
4 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 958,840 -
5 Pek. Pondasi Tapak Beton 1:2:3 A.07.75 m3 8,087,460 -
6 Pas. Pondasi Batu Kosong Batu Kali / Aanstamping A.03.13 7.37 m 3
479,860 3,537,240.00
7 Pas. Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 35.37 m3 946,350 33,473,345.85
8 Pas. Pondasi Batu Kosong Batu Karang / Aanstamping A.03.13.a 7.37 m3 181,360 1,336,877.10
9 Pas. Pondasi Batu Karang A.03.05 35.37 m3 853,970 30,205,772.87
10 Pek. Angkur Besi ø10 pada Pondasi (pj = 45 cm) A.01.P.06 btg 22,310 -
11 Pek. Adukan Beton dudukan angkur A.07.01 m3 958,840 -
Total III 68,553,235.83
IV. PEKERJAAN BETON
1 Pek. Beton Sloof Utama 1:2:3 (S1 20/25) A.07.49 4.09 m3 8,668,040 35,452,283.60
2 Pek. Beton Sloof Selasar 1:2:3 (S2 15/20) A.07.50 1.02 m3 9,163,330 9,383,249.92
3 Pek. Beton Kolom Utama 1:2:3 (K1 20/25) A.07.49 3.60 m3 8,668,040 31,204,944.00
4 Pek. Beton Kolom Selasar 1:2:3 (K2 15/15) A.07.60 0.56 m3 9,458,910 5,296,989.60
5 Pek. Beton Kolom Praktis 1:2:3 (K5 12/15) A.07.52 0.50 m3 9,631,480 4,854,265.92
6 Pek. Beton Balok Konsol 1:2:3 (K4 15/20) A.07.50 1.68 m3 9,163,330 15,394,394.40
7 Pek. Balok Linetel diatas kusen (12/20) A.07.48 1.21 m 3
7,974,790 9,617,596.74
8 Pek. Beton Ring Balok 1:2:3 (R3 15/20) A.07.48 1.96 m3 7,974,790 15,646,537.98
9 Pek. Beton Plat Lantai Meja A.07.51 m3 6,795,150 -
10 Pek. Beton Canopy A.07.51 m3 6,795,150 -
11 Pek. Beton Sofi-sofi 1:2:3 (S6 12/15) A.07.47 2.57 m3 9,541,480 24,559,769.52
12 Pek. Angkur Besi ø10 pada Dinding (pj = 45 cm) A.01.P.06 m3 22,310 -
Total IV 151,410,031.68
V. PEKERJAAN DINDING
1 Pas. Dinding Batubata 1:4 A.04.11 219.20 m2 122,410 26,832,394.41
2 Pas. Dinding Batubata 1:2 A.04.09 m2 141,250 -
3 Pas. Dinding Batako 1:4 A.04.12 m2 277,920 -
4 Pas. Dinding Batako 1:2 A.04.10 m2 284,250 -
5 Pek. Plesteran Dinding 1: 2 A.05.19 m2 93,780 -
6 Pek. Plesteran Dinding 1 : 4 A.05.21 438.40 m2 46,920 20,569,821.84
7 Pek. Acian Dinding 1: 2 A.05.36 m2 40,210 -
8 Pek. Acian Dinding 1 : 4 A.05.36 438.40 m2 40,210 17,628,144.42
Total V 65,030,360.67
VI. PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu Jendela PJ1 / PJ1A kantor A.06.06 3.00 Unit 747,960 2,243,880.00
2 Kusen Pintu P2 kantor A.06.03 3.00 Unit 518,390 1,555,170.00
3 Kusen Pintu P3 kantor A.06.04 5.00 Unit 370,280 1,851,400.00
4 Kusen Jendela J3 kantor A.06.10 5.00 Unit 703,530 3,517,650.00
5 Daun Pintu PJ1 / PJ1A kantor A.06.18 3.00 Buah 1,055,090 3,165,270.00
6 Daun Jendela PJ1 / PJ1A kantor A.06.23 3.00 Buah 522,910 1,568,730.00
7 Daun Pintu P2 kantor A.06.18 3.00 Buah 1,055,090 3,165,270.00
8 Daun Pintu P3 kantor A.06.18 5.00 Buah 1,055,090 5,275,450.00
9 Daun Jendela J3 kantor A.06.27 10.00 Buah 610,060 6,100,600.00
10 BV1 kantor A.06.13 6.00 Buah 177,730 1,066,380.00
11 BV2 kantor A.06.14 1.00 Buah 318,440 318,440.00
12 Angin-Angin LA-LB kantor A.06.16 4.00 Buah 666,500 2,666,000.00
13 Kaca Mati kantor A.06.32.a 15.21 m2 274,100 4,169,061.00
1 Kusen Pintu P1 Kelas A.06.02 3.00 Unit 148,110 444,330.00
2 Kusen Jendela J3 Kelas A.06.10 15.00 Unit 703,530 10,552,950.00
3 Daun Pintu P1 Kelas A.06.18 6.00 Buah 1,055,090 6,330,540.00
4 Daun Jendela J3 Kelas A.06.27 30.00 Buah 610,060 18,301,800.00
5 Angin-Angin LA-LB Kelas A.06.16 4.00 Buah 666,500 2,666,000.00
6 Kaca Mati Kelas A.06.32.a 7.61 m 2
274,100 2,084,530.50
1 Kusen Pintu P1 perpus A.06.02 1.00 Unit 148,110 148,110.00
2 Kusen Pintu P2 perpus A.06.03 3.00 Unit 518,390 1,555,170.00
3 Kusen Jendela J3 perpus A.06.10 5.00 Unit 703,530 3,517,650.00
4 Daun Pintu P1 perpus A.06.18 2.00 Buah 1,055,090 2,110,180.00
5 Daun Pintu P2 perpus A.06.18 3.00 Buah 1,055,090 3,165,270.00
6 Daun Jendela J3 perpus A.06.27 10.00 Buah 610,060 6,100,600.00
7 BV2 perpus A.06.14 1.00 Buah 318,440 318,440.00
8 BV3 perpus A.06.15 1.00 Buah 451,740 451,740.00
9 Angin-Angin LA-LB perpus A.06.16 4.00 Buah 666,500 2,666,000.00
10 Kaca Mati perpus A.06.32.a 2.54 m2 274,100 694,843.50
1 Kusen Pintu P1 lab bahasa A.06.02 1.00 Unit 148,110 148,110.00
2 Kusen Pintu P2 lab bahasa A.06.03 2.00 Unit 518,390 1,036,780.00
3 Kusen Jendela J lab bahasa A.06.12 2.00 Unit 222,160 444,320.00
4 Kusen Jendela J3 lab bahasa A.06.10 7.00 Unit 703,530 4,924,710.00
5 Daun Pintu P1 lab bahasa A.06.18 2.00 Buah 1,055,090 2,110,180.00
6 Daun Pintu P2 lab bahasa A.06.18 2.00 Buah 1,055,090 2,110,180.00
7 Daun Jendela J3 lab bahasa A.06.27 14.00 Buah 610,060 8,540,840.00
8 BV2 lab bahasa A.06.14 1.00 Buah 318,440 318,440.00
9 BV3 lab bahasa A.06.15 1.00 Buah 451,740 451,740.00
10 Angin-Angin LA-LB lab bahasa A.06.16 4.00 Buah 666,500 2,666,000.00
11 Kaca Mati lab bahasa A.06.32.a 4.68 m2 274,100 1,282,788.00
1 Kusen Pintu P1 lab ipa A.06.02 1.00 Unit 148,110 148,110.00
2 Kusen Pintu P2 lab ipa A.06.03 2.00 Unit 518,390 1,036,780.00
3 Kusen Jendela J3 lab ipa A.06.10 7.00 Unit 703,530 4,924,710.00
4 Daun Pintu P1 lab ipa A.06.18 2.00 Buah 1,055,090 2,110,180.00
5 Daun Pintu P2 lab ipa A.06.18 2.00 Buah 1,055,090 2,110,180.00
6 Daun Jendela J3 lab ipa A.06.27 14.00 Buah 610,060 8,540,840.00
7 BV2 lab ipa A.06.14 1.00 Buah 318,440 318,440.00
8 BV3 lab ipa A.06.15 1.00 Buah 451,740 451,740.00
9 Angin-Angin LA-LB lab ipa A.06.16 4.00 Buah 666,500 2,666,000.00
10 Kaca Mati lab ipa A.06.32.a 3.55 m2 274,100 972,780.90
Kusen & Daun Pintu P1 kesenian/ketrampilan -
Kusen & Daun Pintu P2 / P2A kesenian/ketrampilan -
Jendela J3 kesenian/ketrampilan -
BV2 kesenian/ketrampilan A.06.14 318,440 -
BV3 kesenian/ketrampilan A.06.15 451,740 -
LA-LB kesenian/ketrampilan A.06.16 666,500 -
Kusen & Daun Pintu Jendela PJ2 / PJ2A uks -
Jendela J3 uks -
LA-LB uks A.06.16 666,500 -
1 Kusen Pintu Jendela PJ3 / PJ3A mushola A.06.08 2.00 Unit 1,207,110 2,414,220.00
2 Kusen Jendela J4 mushola A.06.11 4.00 Unit 1,088,620 4,354,480.00
3 Daun Pintu PJ3 / PJ3A mushola A.06.25 4.00 Buah 1,732,730 6,930,920.00
4 Daun Jendela PJ3 / PJ3A mushola A.06.24 4.00 Buah 1,287,170 5,148,680.00
5 Daun Jendela J4 mushola A.06.28 8.00 Buah 1,287,170 10,297,360.00
6 Kaca Mati mushola A.06.32.a 27.39 m 2
274,100 7,506,392.96
Kusen & Daun Pintu Jendela PJ2 / PJ2A Gudang Kantin Kop -
Jendela J3 Gudang Kantin Kop -
LA-LB Gudang Kantin Kop A.06.16 666,500 -
1 Kusen Pintu P2 kmwc A.06.03 4.00 Unit 518,390 2,073,560.00
2 Kusen Pintu P3 kmwc A.06.04 4.00 Unit 370,280 1,481,120.00
3 Kusen Pintu P5 kmwc A.06.05 1.00 Unit 377,680 377,680.00
4 Daun Pintu P2 kmwc A.06.18 4.00 Buah 1,055,090 4,220,360.00
5 Daun Pintu P3 kmwc A.06.18 4.00 Buah 1,055,090 4,220,360.00
6 Daun Pintu P5 kmwc A.06.19 1.00 Buah 1,186,970 1,186,970.00
7 BV1 kmwc A.06.13 2.00 Buah 177,730 355,460.00
8 BV2 kmwc A.06.14 2.00 Buah 318,440 636,880.00
9 0 kmwc A.06.15 - Buah 451,740 -
10 ### kmwc A.06.16 Err:509 Buah 666,500 Err:509
Kusen & Daun Pintu Jendela PJ2A r.dinas kepsek -
Kusen & Daun Pintu P2 / P2A r.dinas kepsek -
Kusen & Daun Pintu P3 r.dinas kepsek -
Jendela J5 r.dinas kepsek -
Jendela J6 r.dinas kepsek -
BV1 r.dinas kepsek -
Kusen & Daun Pintu Jendela PJ2A r.dinas guru / mess guru -
Kusen & Daun Pintu P2 / P2A r.dinas guru / mess guru -
Kusen & Daun Pintu P3 r.dinas guru / mess guru -
LA-LB r.dinas guru / mess guru A.06.16 666,500 -
Jendela J5 r.penjaga -
BV1 r.penjaga -
Kusen & Daun Pintu P2 / P2A r.penjaga -
Kusen & Daun Pintu P3 r.penjaga -
Kusen & Daun Pintu Jendela PJ1 / PJ1A asrama -
Kusen & Daun Pintu P2 / P2A asrama -
Kusen & Daun Pintu P3 asrama -
Jendela J2 asrama -
BV1 asrama -
LA-LB asrama A.06.16 666,500 -
Total VI Err:509
VII. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek Kuda-kuda 8/12 kayu kls II A.06.35 1.62 m3 4,902,110 7,921,809.76
2 Pas. Balok Gapit 6/12 A.01.P.14 0.35 m3 4,812,750 1,694,088.00
3 Pek Nok bubungan 6/12 kayu kls II A.06.33 0.21 m3 4,450,880 930,233.92
4 Pek. Skoor Angin 6/12 kayu klas II A.06.34 0.35 m3 2,502,210 875,773.50
5 Pek. Gording 5/10 kayu klas II A.06.36 2.03 m3 4,429,250 8,991,377.50
6 Pek. Kaso 5/7 A.06.37 2.18 m3 77,250 168,173.25
7 Pek. Reng 3/4 A.06.38 1.22 m3 77,250 94,245.00
8 Pek. Papan Ruiter / Papan Nok 3/10 kayu kls II A.06.33 0.09 m3 4,450,880 387,226.56
9 Pek. List Plank 3/30 Papan Klas II A.06.50 83.00 m3 62,050 5,150,150.00
10 Pek. Balok Tembok / Mur Plat 6/12 kayu kls II A.06.33 0.52 m3 4,450,880 2,314,457.60
11 Pek. Klos kayu/Tatakan Gording 8/12 kayu kls II A.01.P.15 m3 4,414,000 -
12 Papan Nok Tepi 3/30 kelas 2 A.06.39 0.14 m3 4,050,760 567,106.40
13 Pek. Beghel U, Plat Baja, Baut untuk 1 bh kuda-kuda A.01.P.09 Unit 42,750 -
14 Pek. Penutup Atap Seng Gelombang BJLS 0,3mm A.08.11 367.69 lbr 83,530 30,712,978.64
15 Pek. Penutup Atap Zyncalum 0,3mm A.08.12 lbr 157,690 -
16 Pek. Penutup Atap Genteng Metal 0,3mm A.08.13 lbr 27,130 -
17 Pek. Penutup Atap Genteng Tanah A.08.02 bh 27,730 -
18 Pek. Penutup Atap Spandek / Galvalyum 0,3mm A.08.03 lbr 157,690 -
19 Pek. Nok Seng Gelombang BJLS 0,3mm A.08.14 29.20 lbr 12,720 371,424.00
20 Pek. Nok Zyncalum 0,3mm A.08.14 lbr 12,720 -
21 Pek. Nok Bubungan Genteng Metal 0,3mm A.08.06 bh 50,880 -
22 Pek. Nok Bubungan Genteng Tanah A.08.05 bh 69,630 -
23 Pek. Nok Spandek / Galvalyum 0,3mm A.08.14 bh 12,720 -
24 Pek. Nok Tepi Seng Gelombang BJLS 0,3mm A.08.30 bh 70,240 -
25 Pek. Nok Tepi Zyncalum 0,3mm A.08.31 bh 90,240 -
26 Pek. Nok Tepi Genteng Metal 0,3mm A.08.32 bh 40,240 -
27 Pek. Nok Tepi Genteng Tanah A.08.33 bh 59,110 -
28 Pek. Nok Tepi Spandek / Galvalyum 0,3mm A.08.34 bh 40,240 -
29 Pek. Talang Jurai A.11.20 m¹ 130,870 -
30 Pek. Residu Kayu A.11.22 ltr 3,700 -
31 Pek. Rangka Atap Baja Ringan A.11.01 m2 8,410 -
Total VII 60,179,044.13
VIII. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu 5/7 Kls II A.06.44 3.40 m3 121,420 413,313.68
2 Pek. Penutup Plafond Tripleks, Tebal 4mm A.09.02 300.70 m2 58,120 17,476,451.52
3 Pek. List Plafond 4/4 A.06.60 316.41 m' 18,250 5,774,537.25
Total VIII 23,664,302.45
IX. PEKERJAAN LANTAI / KERAMIK
1 Pek. Urugan Tanah bawah lantai A.02.12 m 3
34,150 -
2 Pek. Urugan Pasir bawah lantai A.02.13 m3 184,150 -
3 Pek. Beton Tumbuk Lantai Kerja 1: 3 : 5 A.07.01 m3 958,840 -
4 Pek. Lantai keramik interior 30x30 cm A.13.75 m2 143,250 -
5 Pek. Lantai keramik interior 40x40 cm A.13.77 m2 116,100 -
6 Pek. Lantai keramik exterior 30x30 cm A.13.75 m2 143,250 -
7 Pek. Lantai keramik exterior 40x40 cm A.13.77 m 2
116,100 -
8 Pek. Dinding keramik 20x20 cm A.13.68 m2 106,860 -
9 Pek. Lantai keramik Mozaik 20x20 cm A.13.63 m2 151,490 -
10 Pek. Panggung : -
- Pasangan Bata A.04.11 m2 122,410 -
- Pasangan Batako A.04.12 m2 277,920 -
- Urugan Tanah A.02.11 m3 21,850 -
- Urugan Pasir A.02.13 m3 184,150 -
- Beton Lantai Kerja A.07.01 m3 958,840 -
- Pek. Kuku Keramik -
Total IX -
X. PEKERJAAN PENGECATAN
1 Pek. Plamur Tembok A.14.14 m2 12,070 -
2 Pek. Cat Dinding A.14.25 m2 35,060 -
3 Pek. Cat Plafond A.14.26 m2 35,060 -
4 Pek. Meni Kayu A.14.12 m2 23,280 -
5 Pek. Cat Kayu A.14.30 m2 51,720 -
6 Pek. Meni Besi A.14.13 m2 13,830 -
7 Pek. Cat Besi A.14.31 m2 47,370 -
Total X -
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik Kabel Utama 3x2,5 NYM L. 01. 01 55.52 m' 36,450 2,023,704.00
2 Pas. Instalasi Titik Lampu 2x1,5 NYM L. 01. 02 m' 75,750 -
3 Pas. Instalasi Titik Saklar Tunggal 2x1,5 NYM L. 01. 03 ttk 98,600 -
4 Pas. Instalasi Titik Saklar Double 3x1,5 NYM L. 01. 04 ttk 103,280 -
5 Pas. Instalasi Titik Stop Kontak 3x2,5 NYM L. 01. 05 ttk 88,100 -
6 Pas. Instalasi Lampu Pijar L. 01. 06 bh 154,950 -
7 Pas. Instalasi Lampu TL 1x20 watt L. 01. 07 bh 221,950 -
8 Pas. MCB + Box Sekring L. 01. 08 bh 615,650 -
9 Pas. Kabel Antar Bangunan 3x4mm NYY L. 01. 09 m' 262,750 -
10 Pas. Panel Box Utama +MCB L. 01. 10 bh 86,150 -
Total XI 2,023,704.00
XII. PEKERJAAN SANITASI
1 Pas. Instalasi Pipa PVC 3/4" saluran Air Bersih A.10.26 m' 31,800 -
2 Pas. Instalasi Pipa PVC 1/2" saluran Air Bersih A.10.25 m' 12,560 -
3 Pas. Instalasi Pipa PVC 4" saluran Air Kotor A.10.32 m' 129,530 -
4 Pas. Instalasi Pipa PVC 3" saluran Air Kotor A.10.31 m' 77,210 -
5 Pas. Kran air 1/2" A.10.35 bh 1,650 -
6 Pas. Klosed Jongkok A.10.02 bh 747,150 -
7 Pas. Klosed Duduk A.10.01 bh 3,177,520 -
8 Pas. Jet Washer ls bh 60,000 -
9 Pas. Urinoir A.10.04 bh 255,170 -
10 Pas. Wastafel A.10.05 bh 2,905,140 -
11 Pas. Kitchen Zink 1 Lubang A.10.33 bh 45,760 -
12 Pek. Floordrain A.10.36 bh 1,270 -
13 Pas. Grabbed Bar ls bh 600,000 -
14 Pek. 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 A.10.08 bh 682,190 -
15 Pek. Septictank + Rembesan A.10.37 1.00 Unit 25,265,230 25,265,230.00
16 Pas. Kaca Muka ls bh 200,000 -
Total XII 25,265,230.00
XIII. PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Engsel Pintu 4" (3bh/pintu) A.12.05 bh 51,500 -
2 Pas. Engsel Pintu 3" (3bh/pintu) A.12.06 bh 47,250 -
3 Pas. Engsel Jendela 3" (2bh/jendela) A.12.06 bh 47,250 -
4 Pas. Kait / Hak Angin (2bh/jendela) A.12.09 bh 38,880 -
5 Pas. Slot Tanam Pintu (2 bh/pintu) A.12.10 bh 34,610 -
6 Pas. Grendel Jendela model Spring Knob A.12.11 bh 42,510 -
7 Pas. Kunci Pintu 2 X Putar A.12.14 bh 193,090 -
8 Pas. Handel Pintu (2 bh/pintu) A.12.12 bh 76,270
9 Pas. Kunci Bulat Km/wc A.12.04 bh 157,000 -
10 Pas. Gantungan Baju Km/wc (2 kait) ls 1.00 bh 50,000 50,000.00
Total XIII 50,000.00
XIV. PEKERJAAN LAIN-LAIN
1 Pas. Bata Saluran Keliling Bangunan A. B 52.25 m' 134,180 7,011,307.54
2 Pek. Plesteran Saluran A.05.19 84.73 m2 93,780 7,945,979.40
3 Pek. Urugan Tanah dibawah Rabat Beton A.02.12 m3 34,150 -
4 Pek. Pasangan Batubata dudukan Rabat Beton A.04.11 m' 122,410 -
5 Pek. Pasangan Batako dudukan Rabat Beton A.04.12 m' 277,920 -
6 Pek. Rabat Beton Keliling Bangunan A.07.01 6.16 m3 958,840 5,910,769.18
7 Pek. Plank Nama Ruang ls 1.00 Set 200,000 200,000.00
Total XIV 21,068,056.12
XV. PEK. RAMPA + HAND RAILING
1 Pek. Galian Tanah A.02.01 m 3
96,770 -
2 Pek. Urugan Kembali bekas Galian A.02.11 m3 21,850 -
3 Pek. Urugan Pasir A.02.13 m3 184,150.00 -
4 Pek. Pasangan Pondasi Batu Kali 1 Pc : 4 Ps A.03.04 m3 946,350 -
5 Pek. Urugan Tanah Bawah Beton A.02.12 m3 34,150.00 -
6 Pek. Beton Tumbuk 1: 3 : 5 A.07.01 m3 958,840.00 -
7 Pek. Canstien Pasangan Bata A.04.11 m2 122,410.00 -
8 Pek. Canstien Pasangan Batako A.04.12 m2 277,920.00 -
9 Pek. Pasangan Paving Block Warna (6 cm) A.13.83 m3 255,010.00 -
10 Pek. Pasangan Paving Block Natural (6 cm) A.13.86 m2 255,010.00 -
12 Pek. Pemasangan Hand Railing A.01.P.11 m' 128,560.00 -
Total XV -
Grand Total Err:509
Gedung Kantor Gedung Kelas
No Kode Nama Furniture Jumlah No Kode Nama Furniture
1 M-6 Meja Pimpinan 1 1 M-1 Meja Siswa Tunggal
2 M-7 Meja Kerja 2 2 M-7 Meja Kerja/Guru
3 M-8 Meja Guru 11 3 L-5 Lemari Administrasi
4 M-13 Meja Tamu 2 4 K-1 Kursi Siswa Tunggal
5 L-1 Lemari Buku/Simpan 1 5 K-5 Kursi Kerja/Guru
6 L-2 Lemari Kaca Geser 1 6 P-1 Papan Tulis Gantung
7 L-3 Lemari Arsip 1 7 P-10 Papan Absensi
8 L-15 Lemari Kunci 1 8 KS Kotak Sampah
9 L-16 Lemari Locker 1
10 K-4 Kursi Pimpinan 1 Gedung Perpustakaan
11 K-5 Kursi Kerja 13 No Kode Nama Furniture
12 K-6 Kursi Lipat/Hadap 4 1 M-3 Meja Baca Individu
13 K-8 Kursi Tamu 8 2 M-4 Meja Baca Kelompok
14 P-1 Papan Tulis Gantung 1 3 M-5 Meja Baca Serbaguna
15 P-4 whiteboard Gantung 1 4 M-7 Meja Kerja
16 P-6 Papan Statistik 2 5 M-10 Meja Sirkulasi
17 P-7 Papan Jadwal 1 6 M-12 Meja Ketik
18 P-8 Papan Pameran 2 7 L-1 Lemari Buku
19 U-4 Tungku Tiang Bendera 1 8 L-11 Lemari Katalog
20 KS Kotak Sampah 4 9 L-12 Lemari Kardek
10 K-1 Kursi Siswa Tunggal
Gedung Kesenian/Keterampilan 11 K-3 Kursi Bulat Pendek
No Kode Nama Furniture Jumlah 12 K-5 Kursi Kerja
1 M-5 Meja Baca Serbaguna 20 13 P-4 Whiteboard Gantung
2 M-7 Meja Kerja 1 14 P-8 Papan Pameran
3 M-11 Meja Demonstrasi 1 15 R-1 Rak Tas
4 L-3 Lemari Arsip 1 16 R-2 Rak Buku Satu Muka
5 L-6 Lemari Alat Peraga 1 17 R-3 Rak Buku Dua Muka
6 L-8 Lemari Besi 1 18 R-6 Rak Majalah
7 L-10 Lemari Kertas Kerja 1 19 R-7 Rak Atlas
8 L-14 Lemari Gantung/P3K 1 20 R-8 Rak Ensiklopedia
9 L-16 Lemari Locker 1 21 R-9 Rak Koran
10 K-2 Kursi Bulat Tinggi 41 22 R-10 Rak Dorong
11 K-5 Kursi Kerja 1 23 KS Kotak Sampah
12 P-1 Papan Tulis Gantung 1
13 KS Kotak Sampah 2 Gedung Kantin/Koperasi
No Kode Nama Furniture
Mess Guru 1 M-5 Meja Baca Serbaguna
No Kode Nama Furniture Jumlah 2 M-7 Meja Kerja
1 M-8 Meja Guru 10 3 L-1 Lemari Buku
2 L-17 Lemari Pakaian Guru 10 4 L-6 Lemari Alat Peraga
3 K-1 Kursi Siswa Tunggal 10 5 K-1 Kursi Siswa Tunggal
4 U-7 Dipan Tidur Tunggal 6 6 K-3 Kursi Bulat Pendek
5 U-8 Dipdan Tidur Ganda 2 7 K-5 Kursi Kerja
6 KS Kotak Sampah 5 8 R-2 Rak Buku Satu Muka
9 R-4 Rak Gudang
10 R-11 Rak Piring
11 KS Kotak Sampah
Kelas Gedung Lab. Bahasa Gedung Asrama Siswa
Jumlah No Kode Nama Furniture Jumlah No Kode
96 1 M-4 Meja Baca Kelompok 6 1 M-1
3 2 M-7 Meja Kerja 3 2 M-5
3 3 L-2 Lemari Kaca Geser 1 3 L-19
96 4 L-8 Lemari Besi 1 4 K-1
3 5 L-13 Lemari Kaca Tinggi 5 5 R-11
3 6 K-7 Kursi Putar 34 6 U-9
3 7 P-1 Papan Tulis Gantung 1 7 KS
3 8 KS Kotak Sampah 1

pustakaan Gedung Lab Sains/IPA


Jumlah No Kode Nama Furniture Jumlah
6 1 M-5 Meja Baca Serbaguna 20
10 2 M-7 Meja Kerja 2
1 3 M-11 Meja Demonstrasi 1
1 4 L-2 Lemari Kaca Geser 3
1 5 L-6 Lemari Alat Peraga 1
1 6 L-8 Lemari Besi 2
6 7 L-10 Lemari Kertas Kerja 1
1 8 L-14 Lemari Gantung/P3K 1
1 9 L-20 Lemari Asam 1
28 10 K-1 Kursi Siswa Tunggal 2
1 11 K-2 Kursi Bulat Tinggi 40
1 12 K-5 Kursi Kerja 4
1 13 P-1 Papan Tulis Gantung 1
1 14 KS Kotak Sampah 2
3
3 Gedung Osis Pramuka
2 No Kode Nama Furniture Jumlah
1 1 M-5 Meja Baca Serbaguna 6
1 2 M-7 Meja Kerja 3
1 3 M-13 Meja Tamu 2
1 4 L-1 Lemari Buku 1
2 5 L-2 Lemari Kaca Geser 1
1 6 L-4 Lemari Pembatas 1
7 L-7 Lemari Obat 1
n/Koperasi 8 K-1 Kursi Siswa Tunggal 15
Jumlah 9 K-5 Kursi Kerja 3
3 10 K-8 Kursi Tamu 4
3 11 P-4 Whiteboard Gantung 1
2 12 P-7 Papan Jadwal 1
1 13 P-9 Papan Piket 1
1 14 U-1 Filling Kabinet 4 Laci 1
12 15 U-4 Tungku Tiang Bendera 1
3 16 U-6 Dipan Diperiksa 1
2 17 KS Kotak Sampah 1
1
1
1
Gedung Asrama Siswa
Nama Furniture Jumlah
Meja Siswa Tunggal 16
Meja Baca Serbaguna 2
Lemari Pakaian Siswa 8
Kursi Siswa Tunggal 28
Rak Piring 1
Dipan Tidur Tingkat 8
Kotak Sampah 3
CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3

1. Beton Kolom Praktis 12 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 6 jarak 15 cm

Panjang 1 m3 ukuran 12 x 15 cm = 1 : 0,12 : 0,15 = 55.56 m1


Besi 4 batang dia. 10 = 4 x 55,56 x 0,62 kg = 152.66 kg ( A)
Besi beugel dia. 6 jarak 15 cm = ( 55,56 : 0,15 ) x ( 0,08+0,08+0,1+0,1+0,1) x 0, 22 kg = 37.48 kg ( B )

BERAT BESI BETON UNTUK UKURAN 12 x 15 CM1 DALAM 1 M3 = 190.14 kg/m3 ( A + B )

2. Beton Kolom Selasar 15 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 15 cm = ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 10 = 4 x 44,44 x 0,62 kg = 122.62 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 44,44 : 0,15 ) x( ( 4 x 0,10 )+0,1) x 0, 40 kg = 59.26 kg ( B )

BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 = 181.88 kg/m3 ( A + B )

3. Beton Sloof Selasar 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm = ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 132.91 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,10 ) + ( 2 x 0,15 ) x 0, 40 kg = 53.33 kg ( B )

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3 = 186.24 kg/m3 ( A + B )

4. Beton Sloof Utama 20 X 25 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 25 cm = ( 1 : 0.20 : 0.25 ) = 20.00 m1
Besi 6 batang dia. 12 = 6 x 20,00 x 0,89 kg = 122.82 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 20,00 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,20 ) x 0, 40 kg = 42.67 kg ( B )

BERAT BESI BETON UNTUK 20 x 25 CM1 DALAM 1 M3 = 165.49 kg/m3 ( A + B )

5. Beton Kolom Utama 20 X 25 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 25 cm = ( 1 : 0.20 : 0.25 ) = 20.00 m1
Besi 6 batang dia. 12 = 6 x 20,00 x 0,89 kg = 122.82 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 20,00 : 0.15 ) x (( 2 x 0.15 ) + ( 2 X 0,20 )) X 0,40 kg = 42.67 kg ( C )

BERAT BESI BETON UNTUK UKURAN 20 x 25 CM DALAM 1 M3 = 165.49 kg/m3 ( A + B + C )

6. Beton Balok Linetel 12 X 20 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 12 x 20 cm = ( 1 : 0.12 : 0.20 ) = 41.67 m1
Besi 4 batang dia. 10 = 4 x 41,67 x 0,62 kg = 115.73 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 41,67 : 0.15 ) x (( 2 x 0.08 ) + ( 2 X 0,15 )+0,1) X 0,40 kg = 62.22 kg ( C )
BERAT BESI BETON UNTUK UKURAN 12 x 20 CM DALAM 1 M3 = 177.96 kg/m3 ( A + B + C )

7. Beton Ring Balok 15 X 20 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm = ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 10 = 4 x 33,33 x 0,62 kg = 92.59 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0.15 ) x (( 2 x 0.1 ) + ( 2 X 0,15 )+0,1) X 0,40 kg = 53.33 kg ( C )

BERAT BESI BETON UNTUK UKURAN 15 x 20 CM DALAM 1 M3 = 145.92 kg/m3 ( A + B )

8. Beton Sofi-Sofi 12 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 6 jarak 15 cm
Panjang 1 m3 ukuran 12 x 15 cm = ( 1 : 0.12 : 0.15 ) = 55.56 m1
Besi 4 batang dia. 10 = 4 x 55,56 x 0,62 kg = 152.66 kg ( A)
Besi beugel dia. 6 jarak 15 mm = ( 55,56 : 0.15 ) x (( 2 x 0.08 ) + ( 2 X 0,10 )+0,1) X 0,22 kg = 37.48 kg ( C )

BERAT BESI BETON UNTUK UKURAN 12 x 15 CM DALAM 1 M3 = 190.14 kg/m3 ( A + B )


No. Gedung Type Kusen Volume Satuan No.
1 Kusen Pintu Jendela PJ1 / PJ1A 3.00 Unit 1
2 Daun Pintu PJ1 / PJ1A 3.00 Buah 2
3 Daun Jendela PJ1 / PJ1A 3.00 Buah 3
4 Kaca Mati 15.21 M2 4
5 Kusen Pintu P2 3.00 Unit 5
6 Daun Pintu P2 3.00 Buah 6

R
7 TO
Kusen Pintu P3 5.00 Unit 7
N
8 Daun Pintu P3 5.00 Buah 8
A
K

9 Kusen Jendela J3 5.00 Unit 9


10 Daun Jendela J3 10.00 Buah 10
11 BV1 6.00 Buah
12 BV2 1.00 Buah 1
13 Angin-Angin LA-LB 4.00 Buah 2
3
1 Kusen Pintu P1 3.00 Unit 4
2 Daun Pintu P1 6.00 Buah 5
)

3 Kusen Jendela J3 15.00 Unit 6


1
IT

4 Daun Jendela J3 30.00 Buah 7


N
U

5 Kaca Mati 7.61 M2 8


B

6 Kusen Pintu P2 2.00 Unit 9


K
(R

7 Daun Pintu P2 2.00 Buah 10


8 Angin-Angin LA-LB 4.00 Buah
1
1 Kusen Pintu P1 3.00 Unit 2
2 Daun Pintu P1 6.00 Buah 3
3 Kusen Jendela J3 15.00 Unit 4
)
2

4 Daun Jendela J3 30.00 Buah 5


IT
N

5 Kaca Mati 7.61 M2 6


U

6 Kusen Pintu P2 2.00 Unit


B
K

7 Daun Pintu P2 2.00 Buah No.


(R

8 Partisi 1.00 Unit 1


9 Angin-Angin LA-LB 4.00 Buah 2
3
1 Kusen Pintu P1 1.00 Unit 4
2 Daun Pintu P1 2.00 Buah 5
3 Kusen Pintu P2 2.00 Unit 6
4 Daun Pintu P2 2.00 Buah 7
PA

5 Kusen Jendela J3 7.00 Unit 8


.I

6 Daun Jendela J3 14.00 Buah 9


B
LA

7 Kaca Mati 3.55 M2 10


8 BV2 1.00 Buah 11
9 BV3 1.00 Buah
10 Angin-Angin LA-LB 4.00 Buah
Gedung Type Kusen Volume Satuan
Kusen Pintu P1 1.00 Unit
Daun Pintu P1 2.00 Buah
Kusen Pintu P2 3.00 Unit
N
A

Daun Pintu P2 3.00 Buah


A
K

Kusen Jendela J3 5.00 Unit


A
ST

Daun Jendela J3 10.00 Buah


PU

Kaca Mati 2.54 M2


R

BV2 1.00 Buah


PE

BV3 1.00 Buah


Angin-Angin LA-LB 4.00 Buah

Kusen Pintu P2 4.00 Unit


Daun Pintu P2 4.00 Buah
Kusen Pintu P3 4.00 Unit
Daun Pintu P3 4.00 Buah
Kusen Pintu P5 1.00 Unit
C
/W

Daun Pintu P5 1.00 Buah


M
K

BV1 2.00 Buah


BV2 2.00 Buah
BV3 2.00 Buah
Angin-Angin LA-LB 4.00 Buah

Kusen Pintu Jendela PJ3 / PJ3A 2.00 Unit


Daun Pintu PJ3 / PJ3A 4.00 Buah
H
A

Daun Jendela PJ3 / PJ3A 4.00 Buah


LL
O

Kusen Jendela J4 4.00 Unit


SH

Daun Jendela J4 8.00 Buah


U
M

Kaca Mati 27.39 M2

Gedung Type Kusen Volume Satuan


Kusen Pintu P1 1.00 Unit
Daun Pintu P1 2.00 Buah
Kusen Pintu P2 2.00 Unit
Daun Pintu P2 2.00 Buah
SA

Kusen Jendela J 2.00 Unit


A
H

Kusen Jendela J3 7.00 Unit


A
.B

Daun Jendela J3 14.00 Buah


B
LA

Kaca Mati 4.68 M2


BV2 1.00 Buah
BV3 1.00 Buah
Angin-Angin LA-LB 4.00 Buah