NO. UKURAN BESI KANAL " L " BERAT / BATANG BERAT PER 1 M1
1 25 x 25 x 3 x 6 mm 6.72 kg 1.12 kg
2 30 x 30 x 3 x 6 mm 8.16 kg 1.36 kg
3 40 x 40 x 3 x 6 mm 11.00 kg 1.83 kg
4 40 x 40 x 4 x 6 mm 14.50 kg 2.42 kg
5 50 x 50 x 4 x 6 mm 18.50 kg 3.08 kg
6 50 x 50 x 5 x 6 mm 22.60 kg 3.77 kg
7 60 x 60 x 5 x 6 mm 27.30 kg 4.55 kg
8 60 x 60 x 6 x 6 mm 32.52 kg 5.42 kg
9 65 x 65 x 6 x 6 mm 35.46 kg 5.91 kg
10 70 x 70 x 7 x 6 mm 44.28 kg 7.38 kg
11 75 x 75 x 6 x 6 mm 41.22 kg 6.87 kg
12 75 x 75 x 8 x 6 mm 54.18 kg 9.03 kg
13 80 x 80 x 8 x 6 mm 57.96 kg 9.66 kg
14 90 x 90 x 9 x 6 mm 73.20 kg 12.20 kg
15 100 x 100 x 8 x 6 mm 73.20 kg 12.20 kg
16 100 x 100 x 10 x 6 mm 90.60 kg 15.10 kg
17 120 x 120 x 10 x 12 mm 218.40 kg 36.40 kg
18 120 x 120 x 12 x 12 mm 260.00 kg 43.33 kg
19 125 x 125 x 12 x 12 mm 280.00 kg 46.67 kg
20 130 x 130 x 9 x 12 mm 214.20 kg 35.70 kg
21 130 x 130 x 12 x 12 mm 280.00 kg 46.67 kg
6.00
1 60 x 30 x 10 x 1.6 x 6 mm 9.80 kg 1.63 kg
2 60 x 30 x 10 x 2.3 x 6 mm 13.90 kg 2.32 kg
3 75 x 35 x 15 x 1.6 x 6 mm 12.50 kg 2.08 kg
4 75 x 35 x 15 x 2.3 x 6 mm 17.40 kg 2.90 kg
5 75 x 45 x 15 x 1.6 x 6 mm 14.00 kg 2.33 kg
6 75 x 45 x 15 x 2.3 x 6 mm 19.00 kg 3.17 kg
7 100 x 50 x 20 x 2 x 6 mm 21.40 kg 3.57 kg
8 100 x 50 x 20 x 2.3 x 6 mm 24.40 kg 4.07 kg
9 100 x 50 x 20 x 3.2 x 6 mm 33.00 kg 5.50 kg
10 125 x 50 x 20 x 2 x 6 mm 23.70 kg 3.95 kg
11 125 x 50 x 20 x 2.3 x 6 mm 27.10 kg 4.52 kg
12 125 x 50 x 20 x 3.2 x 6 mm 37.00 kg 6.17 kg
13 150 x 50 x 20 x 2 x 6 mm 26.10 kg 4.35 kg
14 150 x 50 x 20 x 2.3 x 6 mm 29.76 kg 4.96 kg
15 150 x 50 x 20 x 3.2 x 6 mm 40.56 kg 6.76 kg
16 150 x 65 x 20 x 2 x 6 mm 28.92 kg 4.82 kg
17 150 x 65 x 20 x 2.3 x 6 mm 33.00 kg 5.50 kg
18 150 x 65 x 20 x 3.2 x 6 mm 45.10 kg 7.52 kg
19 200 x 75 x 20 x 2 x 6 mm 35.52 kg 5.92 kg
20 200 x 75 x 20 x 2.3 x 6 mm 40.62 kg 6.77 kg
21 200 x 75 x 20 x 3.2 x 6 mm 55.62 kg 9.27 kg
Nominal
Rp. 534,364.000
Nominal
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
To say
Terbilang/
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENA
Nominal
U$D. 534,364.000
Nominal
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
To say
Terbilang/
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENA
Nominal
U$D. 534,364.000
Nominal
No AMOUNTH
001 #REF!
002 484,150,000.000
003
004
ISI KATA > INDONESIA atau FOREIGN
SATTUANG SE.
SATTUANG SE.
KWITANSI PEMBAYARAN/RECIVING OF PEYMENT
PATAR HUTAJULUK
SATTUANG SE.
TO SAYED
#REF!
Empat Ratus Delapan Puluh Empat Juta Seratus Lima Puluh Ribu Rupiah.
Rupiah.
Rupiah.
KWITANSI No. 1 #REF!
#REF! ### ### ### #REF!
#REF! ### ###
#REF! ### ### ### #REF! #REF!
#REF! ### #REF! Milyar
KWITANSI No. 2 Empat Ratus Delapan Puluh Empat Juta Seratus Lima Puluh Rib
484,150,000.000
484150000 0
484150000,000 0 0 0
0 Milyar
0,000 0
0 0 0
BILLION AND 0
0,000 0
0 0 0
BILLION AND 0
#REF! ### ### ### #REF!
#REF! ### ###
#REF! #REF! ### ### ### #REF!
Juta MILLION AND ### #REF!
0,000 0
0 0 0
Juta MILLION AND 0
0,000 0
0 0 0
Juta MILLION AND 0
#REF!###### ### #REF!
#REF! ### ###
#REF! #REF! ######### #REF!
Ribu THOUSAND AND
000 0 0 0
000,000 0
Lima Puluh 0 0 0
Ribu THOUSAND AND
0 0
0,000 0
0 0 0
Ribu THOUSAND AND
0 0
0,000 0
0 0 0
Ribu THOUSAND AND
###### ### ### #REF!
### ###
#REF! #REF! ###### ### #REF!
### ###
000 0 0 0
0
0 0 0
0 0
000 0 0 0
0
0 0 0
0 0
000 0 0 0
0
0 0 0
0 0
#REF! #REF! ### Koma KOMMA
RupiaRupiah. DOLAR
Koma KOMMA
RupiaRupiah. DOLAR
Koma KOMMA
RupiaRupiah. DOLAR
Koma KOMMA
RupiaRupiah. DOLAR
SATUAN
ANGKA
1 Satu Satu ONE
2 Dua Dua TWO
3 Tiga Tiga THREE
4 Empat Empat FOUR
5 Lima Lima FIVE
6 Enam Enam SIX
7 Tujuh Tujuh SEVEN
8 Delapan Delapan EIGHT
9 Sembilan Sembilan NINE
PULUHAN
ANGKA
1 Sepuluh Sepuluh TEN
2 Dua Puluh Dua Puluh TWENTY
3 Tiga Puluh Tiga Puluh THIRTY
4 Empat Puluh Empat Puluh FOURTY
5 Lima Puluh Lima Puluh FIVETY
6 Enam Puluh Enam Puluh SIXTY
7 Tujuh Puluh Tujuh Puluh SEVENTY
8 Delapan Puluh Delapan Puluh EIGHTY
9 Sembilan Puluh Sembilan Puluh NINETY
BELASAN
ANGKA
10 Sepuluh Sepuluh TEN
11 Sebelas Sebelas ELEVEN
12 Dua Belas Dua Belas TWELVE
13 Tiga Belas Tiga Belas THIRTEEN
14 Empat Belas Empat Belas FOURTEEN
15 Lima Belas Lima Belas FIVETEEN
16 Enam Belas Enam Belas SIXTEEN
17 Tujuh Belas Tujuh Belas SEVENTEEN
18 Delapan Belas Delapan Belas EIGHTEEN
19 Sembilan Belas Sembilan Belas NINETEEN
RATUSAN
ANGKA
1 Seratus Seratus HUNDRED AND
2 Dua Ratus Dua Ratus TWO HUNDRED AND
3 Tiga Ratus Tiga Ratus THREE HUNDRED AND
4 Empat Ratus Empat Ratus FOUR HUNDRED AND
5 Lima Ratus Lima Ratus FIVE HUNDRED AND
6 Enam Ratus Enam Ratus SIX HUNDRED AND
7 Tujuh Ratus Tujuh Ratus SEVEN HUNDRED AND
8 Delapan Ratus Delapan Ratus EIGHT HUNDRED AND
9 Sembilan Ratus Sembilan Ratus NINE HUNDRED AND
DRED AND
NDRED AND
DRED AND
DRED AND
NDRED AND
NDRED AND
DRED AND
R. Kelas 1 R. Kelas 2 R. Kelas 3
Nama
NO NPSN Kabupaten/Kota Provinsi Konstruksi
Sekolah
1
R.
Tempat KM/WC KM/WC
R. Kepsek TU/Administ R. Guru R. OSIS R. UKS Kantin R. BK
Ibadah Guru Siswa
rasi
1
R. Gudang #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! R. Kelas 1 R. Kelas 2 R. Kelas 3 R. Kelas 4 R. Kelas 5 R. Kelas 6
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
R. Kelas 17 R. Kelas 18 R. Kelas 19 R. Kelas 20 R. Kelas 21 R. Kelas 22 R. Kelas 23 R. Kelas 24 R. Kelas 25 R. Kelas 26
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
R.
Perpustaka Lab. R.
R. Kelas 27 Lab. IPA Lab Bahasa R. Kesenian R. Kepsek TU/Administ R. Guru
an Komputer Ketrampilan
rasi
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.00% 0.00%
Tempat KM/WC KM/WC
R. OSIS R. UKS Kantin R. BK R. Gudang #REF! #REF!
Ibadah Guru Siswa
0.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
#REF! R. Kelas 1 R. Kelas 2 R. Kelas 3 R. Kelas 4 R. Kelas 5 R. Kelas 6 R. Kelas 7 R. Kelas 8
0.00% 317,037,521 - - - - - - -
R. Kelas 9 R. Kelas 10 R. Kelas 11 R. Kelas 12 R. Kelas 13 R. Kelas 14 R. Kelas 15 R. Kelas 16 R. Kelas 17
- - - - - - - - -
R. Kelas 18 R. Kelas 19 R. Kelas 20 R. Kelas 21 R. Kelas 22 R. Kelas 23 R. Kelas 24 R. Kelas 25 R. Kelas 26
- - - - - - - - -
R.
Perpustakaa Lab. R.
R. Kelas 27 Lab. IPA Lab Bahasa R. Kesenian R. Kepsek TU/Administr
n Komputer Ketrampilan
asi
- - - - - - ### - -
Tempat KM/WC
R. Guru KM/WC Guru R. OSIS R. UKS Kantin R. BK R. Gudang
Ibadah Siswa
- - ### - - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
- - - - - - - - -
#REF! #REF! #REF! #REF!
- - - - 0 0 0 1 0 0
Persiapan
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
R. Kelas 11 R. Kelas 12 R. Kelas 13 R. Kelas 14 R. Kelas 15 R. Kelas 16 R. Kelas 17 R. Kelas 18 R. Kelas 19 R. Kelas 20
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Perpustaka
R. Kelas 21 R. Kelas 22 R. Kelas 23 R. Kelas 24 R. Kelas 25 R. Kelas 26 R. Kelas 27 Lab. IPA Lab Bahasa
an
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
R.
Lab. R. Tempat KM/WC KM/WC
R. Kesenian R. Kepsek TU/Administ R. Guru R. OSIS
Komputer Ketrampilan Ibadah Guru Siswa
rasi
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
R. UKS Kantin R. BK R. Gudang #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! Furniture Operasional
Propinsi Aceh
1101 Kab. Simeulue 0.9824
1102 Kab. Aceh Singkil 0.9244
1103 Kab. Aceh Selatan 0.9385
1104 Kab. Aceh Tenggara 0.9587
1105 Kab. Aceh Timur 0.9600
1106 Kab. Aceh Tengah 0.9585
1107 Kab. Aceh Barat 0.9602
1108 Kab. Aceh Besar 0.9154
1109 Kab. Pidie 0.9186
1110 Kab. Bireuen 0.9956
1111 Kab. Aceh Utara 1.0428
1112 Kab. Aceh Barat Daya 0.8916
1113 Kab. Gayo Lues 0.9751
1114 Kab. Aceh Tamiang 0.8690
1115 Kab. Nagan Raya 0.9524
1116 Kab. Aceh Jaya 0.9050
1117 Kab. Bener Meriah 0.9460
1118 Kab. Pidie Jaya 0.8769
1171 Kota Banda Aceh 0.9457
1172 Kota Sabang 0.9614
1173 Kota Langsa 0.9625
1174 Kota Lhokseumawe 1.0112
1175 Kota Subulussalam 0.9279
Propinsi Sumatera Utara
1201 Kab. Nias 1.0931
1202 Kab. Mandailing Natal 1.0262
1203 Kab. Tapanuli Selatan 1.0556
1204 Kab. Tapanuli Tengah 0.9656
1205 Kab. Tapanuli Utara 0.9448
1206 Kab. Toba Samosir 1.0153
1207 Kab. Labuhan Batu 0.9999
1208 Kab. Asahan 1.0050
1209 Kab. Simalungun 1.0489
1210 Kab. Dairi 1.0597
1211 Kab. Karo 1.0420
1212 Kab. Deli Serdang 1.0599
1213 Kab. Langkat 0.9393
1214 Kab. Nias Selatan 1.0349
1215 Kab. Humbang Hasundutan 0.9430
1216 Kab. Pakpak Bharat 0.9700
1217 Kab. Samosir 1.0953
1218 Kab. Serdang Bedagai 0.9869
1219 Kab. Batu Bara 0.9568
1220 Kab. Padang Lawas Utara 1.0083
1221 Kab. Padang Lawas 1.0843
1222 Kab. Labuhan Batu Selatan 0.9284
1223 Kab. Labuhan Batu Utara 0.9981
1224 Kab. Nias Utara 1.0493
1225 Kab. Nias Barat 1.0777
1271 Kota Sibolga 0.9324
1272 Kota Tanjungbalai 0.9944
1273 Kota Pematang Siantar 1.0737
1274 Kota Tebing Tinggi 0.9819
1275 Kota Medan 0.9869
1276 Kota Binjai 0.9205
1277 Kota Padangsidimpuan 0.9790
1278 Kota Gunung Sitoli 1.0331
Propinsi Sumatera Barat
1301 Kab. Kepulauan Mentawai 1.4828
1302 Kab. Pesisir Selatan 0.9450
1303 Kab. Solok 0.9365
1304 Kab. Sijunjung 0.9499
1305 Kab. Tanah Datar 0.9527
1306 Kab. Padang Pariaman 0.9392
1307 Kab. Agam 0.9763
1308 Kab. Lima Puluh Kota 0.9733
1309 Kab. Pasaman 0.8909
1310 Kab. Solok Selatan 0.9661
1311 Kab. Dharmasraya 0.9692
1312 Kab. Pasaman Barat 1.0434
1371 Kota Padang 0.9790
1372 Kota Solok 0.9775
1373 Kota Sawah Lunto 0.9662
1374 Kota Padang Panjang 0.9428
1375 Kota Bukittinggi 0.9493
1376 Kota Payakumbuh 0.8976
1377 Kota Pariaman 0.9683
Propinsi Riau
1401 Kab. Kuantan Singingi 0.9003
1402 Kab. Indragiri Hulu 1.0101
1403 Kab. Indragiri Hilir 0.9663
1404 Kab. Pelalawan 0.9541
1405 Kab. Siak 1.0711
1406 Kab. Kampar 0.9372
1407 Kab. Rokan Hulu 0.8858
1408 Kab. Bengkalis 0.9874
1409 Kab. Rokan Hilir 1.0241
1410 Kab. Kepulauan Meranti 1.0553
1471 Kota Pekanbaru 0.8957
1473 Kota Dumai 1.0415
Propinsi Jambi
1501 Kab. Kerinci 0.8764
1502 Kab. Merangin 0.9531
1503 Kab. Sarolangun 0.9670
1504 Kab. Batang Hari 0.8884
1505 Kab. Muaro Jambi 0.8964
1506 Kab. Tanjung Jabung Timur 0.9860
1507 Kab. Tanjung Jabung Barat 0.9806
1508 Kab. Tebo 0.9389
1509 Kab. Bungo 0.9272
1571 Kota Jambi 0.9096
1572 Kota Sungai Penuh 0.8635
Propinsi Sumatera Selatan
1601 Kab. Ogan Komering Ulu 0.9706
1602 Kab. Ogan Komering Ilir 0.9149
1603 Kab. Muara Enim 0.9534
1604 Kab. Lahat 1.0301
1605 Kab. Musi Rawas 1.0331
1606 Kab. Musi Banyuasin 0.9980
1607 Kab. Banyu Asin 1.0241
1608 Kab. Ogan Komering Ulu Selatan 0.8719
1609 Kab. Ogan Komering Ulu Timur 1.0149
1610 Kab. Ogan Ilir 1.0495
1611 Kab. Empat Lawang 1.0368
1612 Kab. Penukal Abab Lematang Ilir 1.0332
1613 Kab. Musi Rawas Utara 1.0271
1671 Kota Palembang 0.9975
1672 Kota Prabumulih 1.0331
1673 Kota Pagar Alam 0.9913
1674 Kota Lubuklinggau 1.0760
Propinsi Bengkulu
1701 Kab. Bengkulu Selatan 0.9354
1702 Kab. Rejang Lebong 0.9926
1703 Kab. Bengkulu Utara 0.9419
1704 Kab. Kaur 0.9310
1705 Kab. Seluma 0.9440
1706 Kab. Mukomuko 1.0406
1707 Kab. Lebong 0.9677
1708 Kab. Kepahiang 0.9106
1709 Kab. Bengkulu Tengah 0.9577
1771 Kota Bengkulu 0.9961
Propinsi Lampung
1801 Kab. Lampung Barat 1.0042
1802 Kab. Tanggamus 0.9493
1803 Kab. Lampung Selatan 0.9000
1804 Kab. Lampung Timur 0.8863
1805 Kab. Lampung Tengah 0.8950
1806 Kab. Lampung Utara 0.9182
1807 Kab. Way Kanan 0.9466
1808 Kab. Tulang Bawang 0.9738
1809 Kab. Pesawaran 0.8946
1810 Kab. Pringsewu 0.9147
1811 Kab. Mesuji 1.0101
1812 Kab. Tulang Bawang Barat 1.0244
1813 Kab. Pesisir Barat 1.0023
1871 Kota Bandar Lampung 0.8818
1872 Kota Metro 0.8996
Propinsi Bangka Belitung
1901 Kab. Bangka 1.0478
1902 Kab. Belitung 0.9478
1903 Kab. Bangka Barat 1.0629
1904 Kab. Bangka Tengah 1.0343
1905 Kab. Bangka Selatan 1.0522
1906 Kab. Belitung Timur 0.9415
1971 Kota Pangkal Pinang 1.0407
Propinsi Kepulauan Riau
2101 Kab. Karimun 1.1305
2102 Kab. Bintan 1.1810
2103 Kab. Natuna 1.4363
2104 Kab. Lingga 0.9187
2105 Kab. Kepulauan Anambas 1.5426
2171 Kota Batam 1.1198
2172 Kota Tanjung Pinang 1.1080
Propinsi Dki Jakarta
3101 Kab. Kepulauan Seribu 1.3329
3171 Kota Jakarta Selatan 1.2619
3172 Kota Jakarta Timur 1.2283
3173 Kota Jakarta Pusat 1.2003
3174 Kota Jakarta Barat 1.1931
3175 Kota Jakarta Utara 1.1992
Propisi Jawa Barat
3201 Kab. Bogor 1.0990
3202 Kab. Sukabumi 0.9653
3203 Kab. Cianjur 0.9982
3204 Kab. Bandung 1.0896
3205 Kab. Garut 1.0251
3206 Kab. Tasikmalaya 0.9994
3207 Kab. Ciamis 0.9497
3208 Kab. Kuningan 0.9351
3209 Kab. Cirebon 0.9876
3210 Kab. Majalengka 1.0069
3211 Kab. Sumedang 0.9764
3212 Kab. Indramayu 0.9770
3213 Kab. Subang 1.0152
3214 Kab. Purwakarta 1.0760
3215 Kab. Karawang 1.0588
3216 Kab. Bekasi 1.0685
3217 Kab. Bandung Barat 0.9798
3218 Kab. Pangandaran 0.9503
3271 Kota Bogor 1.0258
3272 Kota Sukabumi 1.0057
3273 Kota Bandung 1.0805
3274 Kota Cirebon 0.9029
3275 Kota Bekasi 1.0345
3276 Kota Depok 1.1113
3277 Kota Cimahi 1.0359
3278 Kota Tasikmalaya 0.9418
3279 Kota Banjar 0.9501
Propinsi Jawa Tengah
3301 Kab. Cilacap 0.9413
3302 Kab. Banyumas 0.8964
3303 Kab. Purbalingga 0.9582
3304 Kab. Banjarnegara 0.9789
3305 Kab. Kebumen 0.8929
3306 Kab. Purworejo 0.9554
3307 Kab. Wonosobo 0.9526
3308 Kab. Magelang 0.9196
3309 Kab. Boyolali 0.9714
3310 Kab. Klaten 0.9469
3311 Kab. Sukoharjo 1.0019
3312 Kab. Wonogiri 0.9781
3313 Kab. Karanganyar 0.9963
3314 Kab. Sragen 0.9994
3315 Kab. Grobogan 0.9891
3316 Kab. Blora 0.9413
3317 Kab. Rembang 1.0102
3318 Kab. Pati 1.0073
3319 Kab. Kudus 0.9286
3320 Kab. Jepara 0.9347
3321 Kab. Demak 0.9886
3322 Kab. Semarang 0.9942
3323 Kab. Temanggung 0.9905
3324 Kab. Kendal 0.9890
3325 Kab. Batang 0.9414
3326 Kab. Pekalongan 0.9352
3327 Kab. Pemalang 0.9804
3328 Kab. Tegal 0.9565
3329 Kab. Brebes 0.9639
3371 Kota Magelang 0.9458
3372 Kota Surakarta 0.9920
3373 Kota Salatiga 0.9544
3374 Kota Semarang 0.9793
3375 Kota Pekalongan 0.9823
3376 Kota Tegal 0.9980
Propinsi Di Yogyakarta
3401 Kab. Kulon Progo 0.9414
3402 Kab. Bantul 0.9652
3403 Kab. Gunung Kidul 0.9710
3404 Kab. Sleman 0.9370
3471 Kota Yogyakarta 0.9381
Propinsi Jawa Timur
3501 Kab. Pacitan 0.9686
3502 Kab. Ponorogo 0.9947
3503 Kab. Trenggalek 1.0047
3504 Kab. Tulungagung 0.9389
3505 Kab. Blitar 0.9356
3506 Kab. Kediri 0.9514
3507 Kab. Malang 0.9979
3508 Kab. Lumajang 0.9820
3509 Kab. Jember 0.9497
3510 Kab. Banyuwangi 0.9538
3511 Kab. Bondowoso 0.9346
3512 Kab. Situbondo 0.9236
3513 Kab. Probolinggo 0.9653
3514 Kab. Pasuruan 0.9719
3515 Kab. Sidoarjo 1.0254
3516 Kab. Mojokerto 0.9637
3517 Kab. Jombang 0.9661
3518 Kab. Nganjuk 0.9554
3519 Kab. Madiun 0.9815
3520 Kab. Magetan 1.0135
3521 Kab. Ngawi 1.0213
3522 Kab. Bojonegoro 0.9598
3523 Kab. Tuban 0.9541
3524 Kab. Lamongan 1.0275
3525 Kab. Gresik 0.9880
3526 Kab. Bangkalan 1.0246
3527 Kab. Sampang 1.0420
3528 Kab. Pamekasan 1.0257
3529 Kab. Sumenep 1.0778
3571 Kota Kediri 0.9614
3572 Kota Blitar 0.9731
3573 Kota Malang 1.0064
3574 Kota Probolinggo 0.9359
3575 Kota Pasuruan 0.9305
3576 Kota Mojokerto 0.9282
3577 Kota Madiun 1.0077
3578 Kota Surabaya 1.0000
3579 Kota Batu 0.9861
Propinsi Banten
3601 Kab. Pandeglang 0.9357
3602 Kab. Lebak 0.9038
3603 Kab. Tangerang 1.0905
3604 Kab. Serang 0.9931
3671 Kota Tangerang 1.1204
3672 Kota Cilegon 0.9379
3673 Kota Serang 0.9287
3674 Kota Tangerang Selatan 1.0952
Propinsi Kalimantan Barat
6101 Kab. Sambas 1.1696
6102 Kab. Bengkayang 1.1078
6103 Kab. Landak 1.1138
6104 Kab. Pontianak 1.1420
6105 Kab. Sanggau 1.1454
6106 Kab. Ketapang 1.1672
6107 Kab. Sintang 1.0134
6108 Kab. Kapuas Hulu 1.2215
6109 Kab. Sekadau 1.0966
6110 Kab. Melawi 1.1541
6111 Kab. Kayong Utara 1.0987
6112 Kab. Kubu Raya 1.0999
6171 Kota Pontianak 1.0114
6172 Kota Singkawang 1.0452
Propinsi Kalimantan Tengah
6201 Kab. Kotawaringin Barat 0.9564
6202 Kab. Kotawaringin Timur 1.0386
6203 Kab. Kapuas 0.9464
6204 Kab. Barito Selatan 1.0020
6205 Kab. Barito Utara 0.9775
6206 Kab. Sukamara 1.0593
6207 Kab. Lamandau 0.9915
6208 Kab. Seruyan 0.9630
6209 Kab. Katingan 0.9973
6210 Kab. Pulang Pisau 1.0169
6211 Kab. Gunung Mas 1.0450
6212 Kab. Barito Timur 0.9980
6213 Kab. Murung Raya 1.1163
6271 Kota Palangka Raya 0.9983
Propinsi Kalimantan Selatan
6301 Kab. Tanah Laut 0.9411
6302 Kab. Kota Baru 0.9582
6303 Kab. Banjar 0.8897
6304 Kab. Barito Kuala 0.9797
6305 Kab. Tapin 0.9506
6306 Kab. Hulu Sungai Selatan 1.0025
6307 Kab. Hulu Sungai Tengah 0.9997
6308 Kab. Hulu Sungai Utara 1.0220
6309 Kab. Tabalong 0.9830
6310 Kab. Tanah Bumbu 0.9928
6311 Kab. Balangan 1.0064
6371 Kota Banjarmasin 0.9903
6372 Kota Banjar Baru 0.9963
Propinsi Kalimantan Timur
6401 Kab. Paser 1.0846
6402 Kab. Kutai Barat 1.0543
6403 Kab. Kutai Kartanegara 1.0594
6404 Kab. Kutai Timur 1.1116
6405 Kab. Berau 1.0224
6409 Kab. Penajam Paser Utara 1.0661
6411 Kab. Mahakam Hulu 1.3246
6471 Kota Balikpapan 1.1027
6472 Kota Samarinda 1.1587
6474 Kota Bontang 1.1286
Propinsi Kalimantan Utara
6501 Kab. Malinau 1.1374
6502 Kab. Bulungan 1.1657
6503 Kab. Tana Tidung 1.5497
6504 Kab. Nunukan 1.1384
6571 Kota Tarakan 1.0934
Propinsi Sulawesi Utara
7101 Kab. Bolaang Mongondow 1.0412
7102 Kab. Minahasa 1.0535
7103 Kab. Kepulauan Sangihe 1.1199
7104 Kab. Kepulauan Talaud 1.1857
7105 Kab. Minahasa Selatan 1.0117
7106 Kab. Minahasa Utara 1.0289
7107 Kab. Bolaang Mongondow Utara 1.0178
7108 Kab. Kep. Siau Tagolandang Biaro (Sitaro) 1.1175
7109 Kab. Minahasa Tenggara 0.9990
7110 Kab. Bolaang Mongondow Selatan 0.9874
7111 Kab. Bolaang Mongondow Timur 1.0346
7171 Kota Manado 0.9782
7172 Kota Bitung 1.0846
7173 Kota Tomohon 1.1103
7174 Kota Kotamobagu 1.0563
Propinsi Sulawesi Tengah
7201 Kab. Banggai Kepulauan 1.0263
7202 Kab. Banggai 0.9406
7203 Kab. Morowali 0.9947
7204 Kab. Poso 0.8794
7205 Kab. Donggala 0.8110
7206 Kab. Toli-Toli 0.9692
7207 Kab. Buol 0.9819
7208 Kab. Parigi Moutong 0.8710
7209 Kab. Tojo Una-Una 0.9894
7210 Kab. Sigi 0.8399
7211 Kab. Banggai Laut 1.0539
7212 Kab. Morowali Utara 0.9621
7271 Kota Palu 0.8770
Propinsi Sulawesi Selatan
7301 Kab. Selayar 0.9241
7302 Kab. Bulukumba 0.9133
7303 Kab. Bantaeng 0.9583
7304 Kab. Jeneponto 0.9883
7305 Kab. Takalar 0.9129
7306 Kab. Gowa 0.9144
7307 Kab. Sinjai 1.0167
7308 Kab. Maros 0.9239
7309 Kab. Pangkajene Kepulauan 0.9200
7310 Kab. Barru 0.8896
7311 Kab. Bone 0.9585
7312 Kab. Soppeng 0.9408
7313 Kab. Wajo 0.9644
7314 Kab. Sidenreng Rappang 0.9687
7315 Kab. Pinrang 0.9723
7316 Kab. Enrekang 0.9937
7317 Kab. Luwu 0.9728
7318 Kab. Tana Toraja 1.0535
7322 Kab. Luwu Utara 0.9767
7325 Kab. Luwu Timur 1.0154
7326 Kab. Toraja Utara 1.0454
7371 Kota Makassar 0.9789
7372 Kota Parepare 0.9286
7373 Kota Palopo 1.0228
Propinsi Sulawesi Tenggara
7401 Kab. Buton 1.0191
7402 Kab. Muna 1.0181
7403 Kab. Konawe 0.9525
7404 Kab. Kolaka 0.9321
7405 Kab. Konawe Selatan 0.9633
7406 Kab. Bombana 1.0151
7407 Kab. Wakatobi 1.1165
7408 Kab. Kolaka Utara 1.0253
7409 Kab. Buton Utara 1.1253
7410 Kab. Konawe Utara 0.9806
7411 Kab. Kolaka Timur 0.8994
7412 Kab. Konawe Kepulauan 1.0301
7413 Kab. Muna Barat 1.0720
7414 Kab. Buton Tengah 1.0555
7415 Kab. Buton Selatan 1.1122
7471 Kota Kendari 0.9776
7472 Kota Bau-Bau 1.0779
Propinsi Gorontalo
7501 Kab. Boalemo 0.9601
7502 Kab. Gorontalo 0.9537
7503 Kab. Pohuwato 0.9585
7504 Kab. Bone Bolango 0.9706
7505 Kab. Gorontalo Utara 0.9798
7571 Kota Gorontalo 0.9457
Propinsi Sulawesi Barat
7601 Kab. Majene 0.8961
7602 Kab. Polewali Mandar 0.9076
7603 Kab. Mamasa 1.0227
7604 Kab. Mamuju 0.9152
7605 Kab. Mamuju Utara 0.9244
7606 Kab. Mamuju Tengah 0.9085
Propinsi Bali
5101 Kab. Jembrana 1.1347
5102 Kab. Tabanan 1.1179
5103 Kab. Badung 1.1109
5104 Kab. Gianyar 1.0532
5105 Kab. Klungkung 1.0630
5106 Kab. Bangli 1.1007
5107 Kab. Karangasem 1.0998
5108 Kab. Buleleng 1.1374
5171 Kota Denpasar 1.1011
Propinsi Nusa Tenggara Barat
5201 Kab. Lombok Barat 0.9105
5202 Kab. Lombok Tengah 0.8506
5203 Kab. Lombok Timur 0.8539
5204 Kab. Sumbawa 0.8737
5205 Kab. Dompu 0.9207
5206 Kab. Bima 0.8960
5207 Kab. Sumbawa Barat 0.9237
5208 Kab. Lombok Utara 0.8159
5271 Kota Mataram 0.9111
5272 Kota Bima 0.9015
Propinsi Nusa Tenggara Timur
5301 Kab. Sumba Barat 0.9855
5302 Kab. Sumba Timur 0.9564
5303 Kab. Kupang 0.8595
5304 Kab. Timor Tengah Selatan 0.9568
5305 Kab. Timor Tengah Utara 0.8931
5306 Kab. Belu 0.8979
5307 Kab. Alor 1.0835
5308 Kab. Lembata 0.9590
5309 Kab. Flores Timur 0.9933
5310 Kab. Sikka 0.9251
5311 Kab. Ende 0.9547
5312 Kab. Ngada 0.9727
5313 Kab. Manggarai 0.9792
5314 Kab. Rote Ndao 1.0249
5315 Kab. Manggarai Barat 0.9582
5316 Kab. Sumba Tengah 0.9879
5317 Kab. Sumba Barat Daya 0.9829
5318 Kab. Nagekeo 0.9977
5319 Kab. Manggarai Timur 0.9794
5320 Kab. Sabu Raijua 1.1159
5321 Kab. Malaka 0.9430
5371 Kota Kupang 0.8691
Propinsi Maluku
8101 Kab. Maluku Tenggara Barat 1.1731
8102 Kab. Maluku Tenggara 1.2127
8103 Kab. Maluku Tengah 1.0924
8104 Kab. Buru 1.1145
8105 Kab. Kepulauan Aru 1.1265
8106 Kab. Seram Bagian Barat 1.1143
8107 Kab. Seram Bagian Timur 1.1065
8108 Kab. Maluku Barat Daya 1.3599
8109 Kab. Buru Selatan 1.2427
8171 Kota Ambon 1.1022
8172 Kota Tual 1.2916
Propinsi Maluku Utara
8201 Kab. Halmahera Barat 1.2406
8202 Kab. Halmahera Tengah 1.2631
8203 Kab. Kepulauan Sula 1.2894
8204 Kab. Halmahera Selatan 1.1130
8205 Kab. Halmahera Utara 1.1953
8206 Kab. Halmahera Timur 1.2818
8207 Kab. Pulau Morotai 1.0990
8208 Kab. Pulau Taliabu 1.2923
8271 Kota Ternate 1.2735
8272 Kota Tidore Kepulauan 1.2811
Propinsi Papua
9401 Kab. Merauke 1.7969
9402 Kab. Jayawijaya 2.8204
9403 Kab. Jayapura 1.2893
9404 Kab. Nabire 1.5200
9408 Kab. Yapen Waropen 1.4448
9409 Kab. Biak Numfor 1.5300
9410 Kab. Paniai 2.1529
9411 Kab. Puncak Jaya 4.2341
9412 Kab. Mimika 1.5616
9413 Kab. Boven Digoel 1.8124
9414 Kab. Mappi 1.9036
9415 Kab. Asmat 2.2075
9416 Kab. Yahukimo 2.2955
9417 Kab. Pegunungan Bintang 3.7997
9418 Kab. Tolikara 3.5104
9419 Kab. Sarmi 2.0031
9420 Kab. Keerom 1.5721
9426 Kab. Waropen 1.5447
9427 Kab. Supiori 1.6077
9428 Kab. Memberamo Raya 1.8207
9429 Kab. Nduga 3.2615
9430 Kab. Lanny Jaya 3.2543
9431 Kab. Memberamo Tengah 3.9284
9432 Kab. Yalimo 3.5228
9433 Kab. Puncak 4.5467
9434 Kab. Dogiyai 2.0428
9435 Kab. Intan Jaya 3.9757
9436 Kab. Deiyai 2.1881
9471 Kota Jayapura 1.5007
Propinsi Papua Barat
9101 Kab. Fak-Fak 1.4409
9102 Kab. Kaimana 1.3129
9103 Kab. Teluk Wondama 1.3324
9104 Kab. Teluk Bintuni 1.3891
9105 Kab. Manokwari 1.2366
9106 Kab. Sorong Selatan 1.2155
9107 Kab. Sorong 1.1968
9108 Kab. Raja Ampat 1.3852
9109 Kab. Tambraw 1.7504
9110 Kab. Maybrat 1.4660
9111 Kab. Manokwari Selatan 1.3453
9112 Kab. Pegunungan Arfak 2.0396
9171 Kota Sorong 1.0921
FORM PENGISIAN
m m % % % % %
1 R. Kelas 1 1 10.50 12.00 100% 100% 100% 100% 100%
2 R. Kelas 2
3 R. Kelas 3
4 R. Kelas 4
5 R. Kelas 5
6 R. Kelas 6
7 R. Kelas 7
8 R. Kelas 8
9 R. Kelas 9
10 R. Kelas 10
11 R. Kelas 11
12 R. Kelas 12
13 R. Kelas 13
14 R. Kelas 14
15 R. Kelas 15
16 R. Kelas 16
17 R. Kelas 17
18 R. Kelas 18
19 R. Kelas 19
20 R. Kelas 20
21 R. Kelas 21
22 R. Kelas 22
23 R. Kelas 23
24 R. Kelas 24
25 R. Kelas 25
26 R. Kelas 26
27 R. Kelas 27
28 Perpustakaan
29 Lab. IPA
30 Lab Bahasa
31 Lab. Komputer
32 R. Kesenian
33 R. Ketrampilan 1 10.50 12.00 100% 100% 100% 100% 100%
34 R. Kepsek
35 R. TU/Administrasi
36 R. Guru
37 Tempat Ibadah
38 KM/WC Guru 1 4.80 5.00 100% 100% 100% 100% 100%
39 KM/WC Siswa
40 R. OSIS
41 R. UKS
42 Kantin
43 R. BK
44 R. Gudang
45 GEDUNG MESS GURU
GEDUNG ASRAMA
46
SISWA
47 BANGSAL SEPEDA
RUMAH PENJAGA
48
SEKOLAH
RUMAH DINAS
49
KEPALA SEKOLAH
50 POS JAGA
51
52
53
54
55
56
57
ada saat ini:
Pekerjaan Yang akan Dilaksanakan
Cat Plafond Kolom Dinding Cat Dinding Kusen Pintu Daun Pintu Daun Struktur Penutup Fondasi
Ringbalk Pengisi & Jendela Jendela Bawah Lantai
Lantai
% % % % % % % % % %
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Sloof Utilitas Rabat &
Listrik Drainase Keterangan
% % %
100% 100% 100% OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
100% 100% 100% OK
OK
OK
OK
OK
100% 100% 100% OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
PENGHITUNGAN VOLUME
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu
Keliling = 67.50 m
2Ø10
Luas Sloof = Lebar x T m3
= 0.15 x 0.2
= 0.03 m2
15
Keliling Sloof (K) = 19.5 m Volume Sloof Selasar
2Ø10
Lebar sloof = 15 cm 0.59 m3
Ø8-15 = 0.15 m
20
Tinggi sloof = 20 cm
2Ø10 0.2 m
Volume (V) = L1 + L2 x h
= 22.80 + 21.15 x 3.8
= 167.01
Volume (V) = A x n
= 13.88 x 2
= 27.76 m2
Ruang Selasar
Panjang Lantai (P) = 12.0 m
Lebar Lantai (b) = 2.5 m
Volume = L1 + L2
= 23.4 + 31.2
= 54.6 m
Luar Ruangan 1
L1 = 24.3 m
L2 = 16.4 m
Volume = L1 + L2
= 24.3 + 16.4
= 40.7 m
Kolom
Lebar kolom (b) = 15.0 cm
= 0.15 m
Tinggi kolom (h) = 15.0 cm
= 0.15 m
Jumlah Kolom (n) = 5.0 buah
Volume = 261.0 m2
Volume = 0.01 m3
Vertikal
P = 90.00 cm
= 0.9 m
L = 5 cm
= 0.05 m
t = 5 cm
= 0.05 m
n = 2.0
Volume = 0.005 m3
Volume = 0.002 m3
Horizontal
P = 105.00 cm
= 1.05 m
L = 5.00 cm
= 0.05 m
t = 5.00 cm
= 0.05 m
Volume = 0.003 m3
Miring
P = 123.00 cm
= 1.23 m
L = 5.00 cm
= 0.05 m
t = 5.00 cm
= 0.05 m
Volume = 0.003 m3
Papan :
P = 42.00 cm
= 0.42 m
L = 5.00 cm
Provinsi : Sulawesi Tenggara Kegiatan : PEMBANGUNAN GEDUNG SPNF-SKB BUTON UTARA
Kabupaten : Buton Utara Pekerjaan : PEMBANGUNAN RUANG KETERAMPILAN
Kecamatan : Kulisusu
Desa : Linsowu
Dimensi Lisplank
L = 68.00 m
h = 0.20 m
A = (L x h ) x 2
= 27.20 m2
Balok Gapit
b = 60 mm
h = 120 mm
L = 1265 mm
Vol b= x h x L x 2 x 2
= 0.036432 m3
Luas Keliling
= x L x n balok gapit
= 1.82 m2
Sekur
b = 80 mm
h = 120 mm
L = 1700 mm
Vol =b x h x L x 2
= 0.03264 m3
Luas Keliling
= x L x n sekur
= 1.36 m2
Under
b = 80 mm
h = 120 mm
L = 2530 mm
Vol = bxhxL
= 0.02 m3
Luas = Keliling x L
= 1.012 m2
Balok tekan
b = 80 mm
h = 120 mm
L = 5050 mm
Vol =b x h x L x 2
= 0.09696 m3
Luas Keliling
= x L x n balok tekan
= 4.04 m2
Luas Pintu = b x h x n
= 0.9 x 2.5 x 2.0
= 4.5 m2
NOMOR : 4152/C4.4/KU/2017
TANGGAL : 29 Mei 2017
Terbilang : Delapan Ratus Empat Puluh Satu Juta Dua Ratus Empat Puluh Dua Ribu
NPSN : P9957031
NAMA INSTANSI : SPNF SKB BUTON UTARA
KABUPATEN : Kab. Buton Utara
PROVINSI : Sulawesi Tenggara
Pekerjaan : PERSIAPAN
Total 500,000.00
Total 500,000.00
DAFTAR HARGA BAHAN DAN UPAH
KABUPATEN BUTON UTARA
SULAWESI TENGGARA
Kode Instansi : 0
Nama Instansi : SPNF SKB BUTON UTARA
Desa : Linsowu
Kecamatan : Kulisusu
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara
DAFTAR HARGA UPAH
HARGA
NO JENIS UPAH SATUAN
Rp.
1 Mandor org-hari
2 Kepala Tukang 136,620.00 org-hari
3 Tukang Batu 127,512.00 org-hari
4 Tukang Kayu 127,512.00 org-hari
5 Tukang Besi / Tukang Pipa 127,512.00 org-hari
6 Tukang Cat 127,512.00 org-hari
7 Tukang Las 127,512.00 org-hari
8 Tukang Listrik 127,512.00 org-hari
9 Pekerja 113,850.00 org-hari
I. Bahan Kaca
1 Kaca Polos 5 mm 227,700.00 M²
2 Kaca Polos 3 mm 187,750.00 M²
J. Bahan Paku
1 Paku Biasa 25,000.0 Kg
2 Paku Tripleks 25,000.0 Kg
3 Paku Seng + karet seal 25,000.0 Kg
4 Paku Ulir bh
Q. Alat-alat Listrik
1 Kabel 1x2,5mm NYM 11,000.00 M1
2 Kabel 2x2,5mm NYM 12,000.00 M1
3 Kabel 3x2,5mm NYM 13,000.00 M1
4 Kabel 3x2,5mm NYM 13,000.00 M1
5 Kabel 3x4mm NYY 16,000.00 M1
6 Saklar Tunggal setara Broco 37,950.00 Bh
7 Saklar Ganda setara Broco 53,130.00 Bh
8 Stop Kontak setara Broco 37,950.00 Bh
9 Lampu Pijar 58 watt + fitting 140,000.0 buah
10 Lampu Pijar 25 watt + fitting 50,000.00 Bh
11 Box Sekring 325,000.00 Bh
12 Inbowdoos 1,500.00 Bh
13 Isolasi/Seal Tape 15,000.00 Bh
14 Klem Kabel 100.00 Bh
15 MCB 50,000.00 Bh
16 Panel Box Utama Bh
1 Air 30,000 m3
Alat
1 Stemper jam
2 Concrete Mixer jam
3 Concrete Vibrator jam
4 Manual Tool ls
5 Alat Semprot ls
RINCIAN ANGGARAN BIAYA
NPSN : P9957031
Nama Instansi : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara
Pekerjaan : GUDANG + WC
NPSN : 0
Nama Sekolah : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara
Pekerjaan : FURNITURE
Total XII -
Grand Total -
RINCIAN ANGGARAN BIAYA
NPSN : P9957031
Nama Instansi : SPNF SKB Buton Utara
Kabupaten : Buton Utara
Propinsi : Sulawesi Tenggara
Pekerjaan : INFRASTRUKTUR
I. PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan / M2
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
A Upah :
Pekerja 0.1000 Hr x Rp. 113,850.00 11,385.00
Mandor 0.0500 Hr x Rp. 0.00 0.00
B Jumlah 11,385.00
2 Pekerjaan Pengukuran M¹
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
A Bahan :
Bahan Kayu Klas Kuat IV 0.0120 M3 3,627,300.00 43,527.60
Paku Biasa 2" - 5" 0.0200 Kg 30,235.12 604.70
Kayu papan 3/20, Kelas IV 0.0070 M3 3,627,300.00 25,391.10
Total Bahan 69,523.40
B Upah :
Pekerja 0.1000 OH 113,850.00 11,385.00
Tukang Kayu 0.1000 OH 127,512.00 12,751.20
Kepala Tukang 0.0100 OH 136,620.00 1,366.20
Mandor / Juru Ukur 0.0050 OH 0.00 0.00
Total Upah 25,502.40
C Jumlah (A + B) 95,025.80
2 Pekerjaan Taman 1 m2
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
Bahan :
Bata Merah 140.00 Buah 553.77 77,527.80
Pasir Pasang 0.12 M3 259,089.58 31,608.93
Semen Portland 18.50 Kg 3,080.00 56,980.00
IV PEKERJAAN CAT
1 Pengecatan Tembok Baru (1 lapis Plamir, 1 Lapis Cat Dasar,
1 Lapis cat Penutup)
Harga Satuan Jumlah Harga
No Uraian Koefisien satuan
(Rp) (Rp)
Bahan :
Cat dasar 0.0500 Kg x Rp. 77,643.57 3,882.18
Cat penutup 1 kali 0.0500 Kg x Rp. 70,913.72 3,545.69
Total Bahan 7,427.86
Upah :
Pekerja 0.0200 Hr x Rp. 113,850.00 2,277.00
Tukang Cat 0.0400 Hr x Rp. 127,512.00 5,100.48
Kepala Tukang Cat 0.0063 Hr x Rp. 136,620.00 860.71
Mandor 0.0025 Hr x Rp. 0.00 0.00
Total Upah 8,238.19
C Jumlah (A + B) 15,666.05
Pekerjaan 1 2 3 4 5 6=(3x5)
A.01.06 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK
BAHAN :
Kayu Kelas III Balok 0.0100 m3 3,000,000.00 30,000.00
Paku Biasa 0.0200 Kg 25,000.00 500.00
Kayu Kayu Kelas III Papan 3/20 0.0070 m3 3,000,000.00 21,000.00
Jumlah Bahan 51,500.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
P PK05 Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
P PK03 Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
LL01 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 77,002.40
A001 Dibulatkan 77,000.00
A.02.03 A 1 M3 GALIAN TANAH KERAS KEDALAMAN MAX 1 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.6250 Oh 113,850.00 71,156.25
Mandor 0.0620 Oh - -
Jumlah Pekerja 71,156.25
Jumlah Bahan + Pekerja 71,156.25
Dibulatkan 71,150.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.8500 Oh 113,850.00 96,772.50
P PK05 Mandor 0.0550 Oh - -
Jumlah Pekerja 96,772.50
Jumlah Bahan + Pekerja 96,772.50
A001 Dibulatkan 96,770.00
A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.5260 Oh 113,850.00 59,885.10
P PK05 Mandor 0.0520 Oh - -
Jumlah Pekerja 59,885.10
Jumlah Bahan + Pekerja 59,885.10
A001 Dibulatkan 59,880.00
A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 M
BAHAN :
-
Jumlah Bahan -
UPAH :
Pekerja 0.7350 Oh 113,850.00 83,679.75
P PK05 Mandor 0.0730 Oh - -
Jumlah Pekerja 83,679.75
Jumlah Bahan + Pekerja 83,679.75
A001 Dibulatkan 83,670.00
A.02.11 1 M3 URUGAN TANAH KEMBALI
BAHAN :
Tanah Urug 1.2000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.1920 Oh 113,850.00 21,859.20
P PK05 Mandor 0.0190 Oh - -
Jumlah Pekerja 21,859.20
Jumlah Bahan + Pekerja 21,859.20
A001 Dibulatkan 21,850.00
A.02.12 1 M3 URUGAN TANAH DIPADATKAN
BAHAN :
Tanah Urug 1.2000 m³ - -
Jumlah Bahan -
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 34,155.00
Jumlah Bahan + Pekerja 34,155.00
A001 Dibulatkan 34,150.00
A.02.13 1 M3 URUGAN PASIR
BAHAN :
Pasir Urug 1.2000 m³ 125,000.00 150,000.00
Jumlah Bahan 150,000.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
P PK05 Mandor 0.0100 Oh - -
Jumlah Pekerja 34,155.00
Jumlah Bahan + Pekerja 184,155.00
A001 Dibulatkan 184,150.00
A.02.22 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)
BAHAN :
Page 135 of 199
Analisa Satuan Pekerjaan
Kode1KoKode3 NO. URAIAN KOEF SAT. Harga Satuan JUMLAH
Pekerjaan 1 2 3 4 5 6=(3x5)
Tanah Urug (didatangkan) 1.2000 m³ 140,000.00 168,000.00
Pekerjaan 1 2 3 4 5 6=(3x5)
Bata Merah Bakar Kelas I 70.0000 bh 700.00 49,000.00
Semen PC (50 kg) 18.9500 Kg 1,900.00 36,005.00
Pasir Pasang 0.0380 m³ 150,000.00 5,700.00
Jumlah Bahan 90,705.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 50,549.40
Jumlah Bahan + Pekerja 141,254.40
A001 Dibulatkan 141,250.00
1 M Pasang Cansteen
BAHAN :
Cansteen 1.0100 m 49,000.00 49,490.00
Pasir Urug 0.0450 m3 125,000.00 5,625.00
Jumlah Bahan 55,115.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
Mandor 0.0050 Oh - -
Jumlah Pekerja 50,549.40
Jumlah Bahan + Pekerja 105,664.40
Dibulatkan 105,660.00
A.04.10 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 2 Ps
BAHAN :
Batako 35.0000 bh 6,000.00 210,000.00
Semen PC (50 kg) 9.4750 Kg 1,900.00 18,002.50
Pasir Pasang 0.0380 m³ 150,000.00 5,700.00
Jumlah Bahan 233,702.50
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 50,549.40
Jumlah Bahan + Pekerja 284,251.90
A001 Dibulatkan 284,250.00
A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps
BAHAN :
Bata Merah Bakar Kelas I 70.0000 bh 700.00 49,000.00
Semen PC (50 kg) 9.6800 Kg 1,900.00 18,392.00
Pasir Pasang 0.0450 m³ 150,000.00 6,750.00
Jumlah Bahan 74,142.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 48,272.40
Jumlah Bahan + Pekerja 122,414.40
A001 Dibulatkan 122,410.00
A.04.12 1 M2 PASANGAN DINDING BATAKO 1/2 BATA, 1 Pc : 4 Ps
BAHAN :
Batako 35.0000 bh 6,000.00 210,000.00
Semen PC (50 kg) 5.7500 Kg 1,900.00 10,925.00
Pasir Pasang 0.0430 m³ 150,000.00 6,450.00
Jumlah Bahan 227,375.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0150 Oh - -
Jumlah Pekerja 50,549.40
Jumlah Bahan + Pekerja 277,924.40
A001 Dibulatkan 277,920.00
A.05.19 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM
BAHAN :
Semen PC (50 kg) 15.5000 Kg 1,900.00 29,450.00
Pasir Pasang 0.0130 m³ 150,000.00 1,950.00
Jumlah Bahan 31,400.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Batu 0.2000 Oh 127,512.00 25,502.40
Kepala Tukang 0.0200 Oh 136,620.00 2,732.40
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 62,389.80
Jumlah Bahan + Pekerja 93,789.80
A001 Dibulatkan 93,780.00
A.05.21 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps
BAHAN :
Semen PC (50 kg) 0.1450 Kg 1,900.00 275.50
Pasir Pasang 0.0180 m³ 150,000.00 2,700.00
Jumlah Bahan 2,975.50
UPAH :
Pekerja 0.2000 Oh 113,850.00 22,770.00
Tukang Batu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0150 Oh - -
Jumlah Pekerja 43,946.10
Jumlah Bahan + Pekerja 46,921.60
A001 Dibulatkan 46,920.00
A.05.36 1 M2 ACIAN PC
Pekerjaan 1 2 3 4 5 6=(3x5)
BAHAN :
BA34 Semen PC (50 kg) 0.0350 zak 95,000.00 3,325.00
Jumlah Bahan 3,325.00
UPAH :
P PK02 Pekerja 0.2000 org 113,850.00 22,770.00
P PK04 Tukang Batu 0.1000 org 127,512.00 12,751.20
P PK06 Kepala Tukang batu 0.0100 org 136,620.00 1,366.20
P PK19 Mandor 0.0050 org - -
Jumlah Pekerja 36,887.40
Jumlah Bahan + Pekerja 40,212.40
Jumlah 40,212.40
A077 Dibulatkan 40,210.00
A.06.01 1 M3 PEKERJAAN KUSEN PINTU DAN JENDELA KAYU KLS II
BAHAN :
Kayu Kelas II Balok 1.1000 m³ 4,000,000.00 4,400,000.00
Paku Biasa 1.2500 Kg 25,000.00 31,250.00
Lem kayu 0.0500 Kg 25,000.00 1,250.00
Jumlah Bahan 4,400,000.00
UPAH :
Pekerja 6.0000 Oh 113,850.00 683,100.00
Tukang Kayu 15.0000 Oh 127,512.00 1,912,680.00
Kepala Tukang 3.0000 Oh 136,620.00 409,860.00
P PK05 Mandor 0.5000 Oh - -
Jumlah Pekerja 3,005,640.00
Jumlah Bahan + Pekerja 7,405,640.00
A001 Dibulatkan 7,405,640.00
A.06.02 1 UNIT PEK. KUSEN PINTU P1 (L=170 cm) + JALUZI
BAHAN :
Pek. Kusen pintu P1 + Jaluzi 0.02000 m³ 7,405,640.00 148,112.80
Jumlah Bahan 148,112.80
A001 Dibulatkan 148,110.00
A.06.03 1 UNIT PEK. KUSEN PINTU P2 (L=90 cm) + JALUZI
BAHAN :
Pek. Kusen pintu P2 + Jaluzi 0.0700 m³ 7,405,640.00 518,394.80
Jumlah Bahan 518,394.80
A001 Dibulatkan 518,390.00
A.06.04 1 UNIT PEK. KUSEN PINTU P3 (L=70 cm)
BAHAN :
Pek. Kusen pintu P3 0.0500 m³ 7,405,640.00 370,282.00
Jumlah Bahan + Pekerja 370,282.00
A001 Dibulatkan 370,280.00
A.06.05 1 UNIT PEK. KUSEN PINTU P5 (L=100 cm)
BAHAN :
Pek. Kusen pintu P5 0.0510 m³ 7,405,640.00 377,687.64
Jumlah Bahan 377,687.64
A001 Dibulatkan 377,680.00
A.06.06 1 UNIT PEK. KUSEN PINTU JENDELA PJ1/PJ1A + JALUZI
BAHAN :
Kusen Pintu Jendela PJ1 + Jaluzi 0.1010 m³ 7,405,640.00 747,969.64
Jumlah Bahan 747,969.64
A001 Dibulatkan 747,960.00
A.06.07 1 UNIT PEK. KUSEN PINTU JENDELA PJ2 + JALUZI
BAHAN :
Kusen Pintu Jendela PJ2 + Jaluzi 0.1010 m³ 7,405,640.00 747,969.64
Jumlah Bahan 747,969.64
A001 Dibulatkan 747,960.00
A.06.08 1 UNIT PEK. KUSEN PINTU JENDELA PJ3 + JALUZI
BAHAN :
Kusen Pintu Jendela PJ3 + Jaluzi 0.1630 m³ 7,405,640.00 1,207,119.32
Jumlah Bahan 1,207,119.32
A001 Dibulatkan 1,207,110.00
A.06.09 1 UNIT PEK. KUSEN JENDELA J2 + JALUZI
BAHAN :
Kusen Jendela J2 + Jaluzi 0.0690 m³ 7,405,640.00 510,989.16
Jumlah Bahan 510,989.16
A001 Dibulatkan 510,980.00
A.06.10 1 UNIT PEK. KUSEN JENDELA J3 + JALUZI
BAHAN :
Kusen Jendela J3 + Jaluzi 0.0950 m³ 7,405,640.00 703,535.80
Jumlah Bahan 703,535.80
A001 Dibulatkan 703,530.00
A.06.11 1 UNIT PEK. KUSEN JENDELA J4 + JALUZI
BAHAN :
Kusen Jendela J4 + Jaluzi 0.1470 m³ 7,405,640.00 1,088,629.08
Jumlah Bahan 1,088,629.08
A001 Dibulatkan 1,088,620.00
A.06.12 1 UNIT PEK. KUSEN JENDELA J
BAHAN :
Kusen Jendela J 0.0300 m³ 7,405,640.00 222,169.20
Jumlah Bahan 222,169.20
A001 Dibulatkan 222,160.00
A.06.13 1 UNIT PEK. KUSEN BOUVENLICH BV1
BAHAN :
Kusen Bouvenlich BV1 0.0240 m³ 7,405,640.00 177,735.36
Jumlah Bahan 177,735.36
A001 Dibulatkan 177,730.00
A.06.14 1 UNIT PEK. KUSEN BOUVENLICH BV2
BAHAN :
Kusen Bouvenlich BV2 0.0430 m³ 7,405,640.00 318,442.52
Jumlah Bahan 318,442.52
A001 Dibulatkan 318,440.00
A.06.15 1 UNIT PEK. KUSEN BOUVENLICH BV3
BAHAN :
Kusen Bouvenlich BV3 0.0610 m³ 7,405,640.00 451,744.04
Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan 451,744.04
A001 Dibulatkan 451,740.00
A.06.16 1 UNIT PEK. KUSEN ANGIN-ANGIN LA-LB + JALUZI
BAHAN :
Kusen Angin-Angin LA-LB + Jaluzi 0.0900 m³ 7,405,640.00 666,507.60
Jumlah Bahan 666,507.60
A001 Dibulatkan 666,500.00
A.06.17 1 M2 PEKERJAAN DAUN PINTU PANEL KAYU LOKAL KLS II
BAHAN :
Kayu Kelas II Papan 0.0400 m³ 4,000,000.00 160,000.00
Lem Kayu 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 161,250.00
UPAH :
Pekerja 1.0000 Oh 113,850.00 113,850.00
Tukang Kayu 2.5000 Oh 127,512.00 318,780.00
Kepala Tukang 0.2500 Oh 136,620.00 34,155.00
P PK05 Mandor 0.0500 Oh - -
Jumlah Pekerja 466,785.00
Jumlah Bahan + Pekerja 628,035.00
A001 Dibulatkan 628,030.00
A.06.18 1 BH PASANGAN DAUN PINTU PANIL
BAHAN :
Pintu Panil 1.6800 m2 628,030.00 1,055,090.40
Jumlah Bahan 1,055,090.40
A001 Dibulatkan 1,055,090.00
A.06.19 1 BH PASANGAN DAUN PINTU PANIL P5
BAHAN :
Pintu Panil 1.8900 m2 628,030.00 1,186,976.70
Jumlah Bahan 1,186,976.70
A001 Dibulatkan 1,186,970.00
A.06.20 1 M2 PEKERJAAN DAUN PINTU TRIPLEKS RANGKAP, RANGKA KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0196 m³ 4,000,000.00 78,400.00
Paku Biasa Tripleks 0.0300 kg 25,000.00 750.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Tripleks 6 mm 1.0000 lbr 150,000.00 150,000.00
Jumlah Bahan 236,650.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Kayu 2.0000 Oh 127,512.00 255,024.00
Kepala Tukang 0.2000 Oh 136,620.00 27,324.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 350,658.00
Jumlah Bahan + Pekerja 587,308.00
A001 Dibulatkan 587,300.00
A.06.21 1 BH PASANGAN DAUN PINTU TRIPLEKS P3
BAHAN :
Pintu Tripleks P3 1.2600 m2 587,300.00 739,998.00
Jumlah Bahan 739,998.00
A001 Dibulatkan 739,990.00
A.06.22 1 M2 PEKERJAAN DAUN JENDELA + KACA
BAHAN :
Kayu Kelas II Papan 0.1000 m³ 4,000,000.00 400,000.00
Kaca Polos 5 mm 1.1000 m2 227,700.00 250,470.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Jumlah Bahan 657,970.00
UPAH :
Pekerja 0.8000 Oh 113,850.00 91,080.00
Tukang Kayu 2.0000 Oh 127,512.00 255,024.00
Kepala Tukang 0.2000 Oh 136,620.00 27,324.00
P PK05 Mandor 0.0300 Oh - -
Jumlah Pekerja 373,428.00
Jumlah Bahan + Pekerja 1,031,398.00
A001 Dibulatkan 1,031,390.00
A.06.23 1 BH PASANGAN DAUN JENDELA + KACA (PJ1 dan PJ2)
BAHAN :
Daun Jendela + Kaca (PJ1 dan PJ2) 0.5070 m2 1,031,390.00 522,914.73
Jumlah Bahan 522,914.73
A001 Dibulatkan 522,910.00
A.06.24 1 BH PASANGAN DAUN JENDELA + KACA PJ3
BAHAN :
Daun Jendela + Kaca PJ3 1.2480 m2 1,031,390.00 1,287,174.72
Jumlah Bahan 1,287,174.72
A001 Dibulatkan 1,287,170.00
A.06.25 1 BH PASANGAN DAUN PINTU + KACA PJ3
BAHAN :
Daun Pintu + Kaca PJ3 1.6800 m2 1,031,390.00 1,732,735.20
Jumlah Bahan 1,732,735.20
A001 Dibulatkan 1,732,730.00
A.06.26 1 BH PASANGAN DAUN JENDELA + KACA J2
BAHAN :
Daun Jendela + Kaca J2 0.5070 m2 1,031,390.00 522,914.73
Jumlah Bahan 522,914.73
A001 Dibulatkan 522,910.00
A.06.27 1 BH PASANGAN DAUN JENDELA + KACA J3
BAHAN :
Daun Jendela + Kaca J3 0.5915 m2 1,031,390.00 610,067.19
Jumlah Bahan 610,067.19
Dibulatkan 610,060.00
A.06.28 1 BH PASANGAN DAUN JENDELA + KACA J4
BAHAN :
Daun Jendela + Kaca J4 1.2480 m2 1,031,390.00 1,287,174.72
Jumlah Bahan 1,287,174.72
Dibulatkan 1,287,170.00
Pekerjaan 1 2 3 4 5 6=(3x5)
A.06.29 1 BH PASANGAN DAUN JENDELA + KACA J5
BAHAN :
Daun Jendela + Kaca J5 0.8050 m2 1,031,390.00 830,268.95
Jumlah Bahan 830,268.95
Dibulatkan 830,260.00
A.06.30 1 BH PASANGAN DAUN JENDELA + KACA J6
BAHAN :
Daun Jendela + Kaca J6 0.5980 m2 1,031,390.00 616,771.22
Jumlah Bahan 616,771.22
Dibulatkan 616,770.00
A.06.31 1 UNIT PEK. KUSEN JENDELA J5
BAHAN :
Kusen Jendela J5 0.0310 m³ 7,405,640.00 229,574.84
Jumlah Bahan 229,574.84
Dibulatkan 229,570.00
A.06.32 1 UNIT PEK. KUSEN JENDELA J6
BAHAN :
Kusen Jendela J6 0.0490 m³ 7,405,640.00 362,876.36
Jumlah Bahan 362,876.36
Dibulatkan 362,870.00
A.06.32.a 1 M2 PASANG KACA TEBAL 5 MM
BAHAN :
- m³ 4,000,000.00 -
Kaca Polos 5 mm 1.1000 m2 227,700.00 250,470.00
Paku Biasa Tripleks 0.0300 kg 25,000.00 750.00
Jumlah Bahan 251,220.00
UPAH :
Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 - Oh - -
Jumlah Pekerja 22,883.85
Jumlah Bahan + Pekerja 274,103.85
A001 Dibulatkan 274,100.00
A.06.33 1 M1 PASANG KONSTRUKSI NOK BUBUNGAN 6/12 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 1.1000 m³ 4,000,000.00 4,400,000.00
Paku Biasa 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 4,401,250.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 49,638.60
Jumlah Bahan + Pekerja 4,450,888.60
A001 Dibulatkan 4,450,880.00
A.06.34 1 M3 PASANG KONSTRUKSI SKOOR ANGIN 6/12 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.6000 m³ 4,000,000.00 2,400,000.00
Paku Biasa 1.2540 kg 25,000.00 31,350.00
Jumlah Bahan 2,431,350.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.2600 Oh 127,512.00 33,153.12
Kepala Tukang 0.0260 Oh 136,620.00 3,552.12
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 70,860.24
Jumlah Bahan + Pekerja 2,502,210.24
A001 Dibulatkan 2,502,210.00
A.06.35 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA 8/12 KAYU KAYU LOKAL KLS II
BAHAN :
Kayu Kls. II Balok 1.2000 m³ 4,000,000.00 4,800,000.00
Paku Biasa 1.2500 kg 25,000.00 31,250.00
Jumlah Bahan 4,831,250.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.2600 Oh 127,512.00 33,153.12
Kepala Tukang 0.0260 Oh 136,620.00 3,552.12
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 70,860.24
Jumlah Bahan + Pekerja 4,902,110.24
A001 Dibulatkan 4,902,110.00
A.06.36 1 M3 PASANG KONSTRUKSI GORDING 5/10 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 1.1000 m³ 4,000,000.00 4,400,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Jumlah Bahan 4,403,750.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 4,429,252.40
A001 Dibulatkan 4,429,250.00
A.06.37 1 M3 PASANG KASO 5/7 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0120 m³ 4,000,000.00 48,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Jumlah Bahan 51,750.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Pekerjaan 1 2 3 4 5 6=(3x5)
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 77,252.40
A001 Dibulatkan 77,250.00
A.06.38 1 M3 PASANG RENG 3/4 KAYU KLS II
BAHAN :
Kayu Kls. II Balok 0.0120 m³ 4,000,000.00 48,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Jumlah Bahan 51,750.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 77,252.40
A001 Dibulatkan 77,250.00
A.06.39 1 M1 PASANG KONSTRUKSI NOK TEPI PAPAN 6/12 KAYU KLS II
BAHAN :
Kayu Kelas II Papan 1.0000 m³ 4,000,000.00 4,000,000.00
Paku Biasa 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 4,001,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 49,638.60
Jumlah Bahan + Pekerja 4,050,763.60
A001 Dibulatkan 4,050,760.00
A.06.44 1 M2 PASANG RANGKA PLAFOND BALOK 5/7 KAYU LOKAL KLS II
BAHAN :
Kayu Kls II, Kaso 5/7 Rangka Plafon 0.0155 m³ 4,000,000.00 62,000.00
Paku Biasa 0.2000 kg 25,000.00 5,000.00
Jumlah Bahan 62,000.00
UPAH :
Pekerja 0.1500 Oh 113,850.00 17,077.50
Tukang Kayu 0.3000 Oh 127,512.00 38,253.60
Kepala Tukang 0.0300 Oh 136,620.00 4,098.60
P PK05 Mandor 0.0100 Oh - -
Jumlah Pekerja 59,429.70
Jumlah Bahan + Pekerja 121,429.70
A001 Dibulatkan 121,420.00
A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 25) cm, KAYU LOKAL KLS II
BAHAN :
Kayu Kelas II Papan 0.0110 m³ 4,000,000.00 44,000.00
Paku Biasa 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 45,250.00
UPAH :
Pekerja 0.1100 Oh 113,850.00 12,523.50
Tukang Kayu 0.0100 Oh 127,512.00 1,275.12
Kepala Tukang 0.0220 Oh 136,620.00 3,005.64
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 16,804.26
Jumlah Bahan + Pekerja 62,054.26
A001 Dibulatkan 62,050.00
A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 3/3
BAHAN :
List Plafond 3/3 1.0500 m' 5,000.00 5,250.00
Paku Biasa 0.0100 kg 25,000.00 250.00
Jumlah Bahan 5,500.00
UPAH :
Pekerja 0.0500 Oh 113,850.00 5,692.50
Tukang Kayu 0.0500 Oh 127,512.00 6,375.60
Kepala Tukang 0.0050 Oh 136,620.00 683.10
P PK05 Mandor Oh - -
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 18,251.20
A001 Dibulatkan 18,250.00
A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen PC (50 kg) 218.0000 kg 1,900.00 414,200.00
Pasir Beton 0.5200 M3 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.8700 m³ 250,000.00 217,500.00
Jumlah Bahan 735,700.00
UPAH :
Pekerja 1.6500 Oh 113,850.00 187,852.50
Tukang Batu 0.2500 Oh 127,512.00 31,878.00
Kepala Tukang 0.0250 Oh 136,620.00 3,415.50
P PK05 Mandor 0.0800 Oh - -
Jumlah Pekerja 223,146.00
Jumlah Bahan + Pekerja 958,846.00
A001 Dibulatkan 958,840.00
A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr
BAHAN :
Semen PC (50 kg) 336.0000 kg 1,900.00 638,400.00
Pasir Beton 0.5400 m3 200,000.00 108,000.00
Batu Kerikil / Split 2/3 cm 0.8100 m³ 250,000.00 202,500.00
Jumlah Bahan 948,900.00
UPAH :
Pekerja 2.0000 Oh 113,850.00 227,700.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Pekerjaan 1 2 3 4 5 6=(3x5)
P PK05 Mandor 1.0000 Oh - -
Jumlah Pekerja 277,110.90
Jumlah Bahan + Pekerja 1,226,010.90
A001 Dibulatkan 1,226,010.00
A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
BAHAN :
Besi Beton Polos 1.0500 kg 35,430.00 37,201.50
Kawat Beton 0.0150 kg 26,000.00 390.00
Jumlah Bahan 37,591.50
UPAH :
Pekerja 0.0070 Oh 113,850.00 796.95
Tukang Besi 0.0070 Oh 127,512.00 892.58
P PK05 Kepala Tukang 0.0007 Oh 136,620.00 95.63
P PK05 Mandor 0.0003 Oh - -
Jumlah Pekerja 1,785.17
Jumlah Bahan + Pekerja 39,376.67
A001 Dibulatkan 39,370.00
A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASI
BAHAN :
Kayu Kelas III Papan 0.0400 m³ 3,000,000.00 120,000.00
Paku Biasa 0.3000 m³ 25,000.00 7,500.00
Minyak Bekisting 0.1000 ltr - -
Jumlah Bahan 127,500.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.2600 Oh 127,512.00 33,153.12
P PK05 Kepala Tukang 0.0260 Oh 136,620.00 3,552.12
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 70,860.24
Jumlah Bahan + Pekerja 198,360.24
A001 Dibulatkan 198,360.00
A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOF
BAHAN :
Kayu Kelas III Papan 0.0044 m³ 3,000,000.00 13,200.00
Paku Biasa 0.3000 m³ 25,000.00 7,500.00
Minyak Bekisting 0.1000 m³ - -
Jumlah Bahan 20,700.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.2600 Oh 127,512.00 33,153.12
P PK05 Kepala Tukang 0.0260 Oh 136,620.00 3,552.12
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 70,860.24
Jumlah Bahan + Pekerja 91,560.24
A001 Dibulatkan 91,560.00
A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM
BAHAN :
Kayu Kelas III Papan 0.0040 m³ 3,000,000.00 12,000.00
Paku Biasa 0.4000 kg 25,000.00 10,000.00
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0015 m³ 3,000,000.00 4,500.00
Jumlah Bahan 26,500.00
UPAH :
Pekerja 0.3000 Oh 113,850.00 34,155.00
Tukang Kayu 0.3300 Oh 127,512.00 42,078.96
P PK05 Kepala Tukang 0.0330 Oh 136,620.00 4,508.46
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 80,742.42
Jumlah Bahan + Pekerja 107,242.42
A001 Dibulatkan 107,240.00
A.07.31 1 m2 PASANG BEKISTING UNTUK BALOK
BAHAN :
Kayu Kelas III Papan 0.0040 m³ 3,000,000.00 12,000.00
Paku Biasa 0.4000 kg 25,000.00 10,000.00
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0018 m³ 3,000,000.00 5,400.00
Kayu Dolken 2.0000 btg 30,000.00 60,000.00
Jumlah Bahan 87,400.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Kayu 0.3300 Oh 127,512.00 42,078.96
P PK05 Kepala Tukang 0.0330 Oh 136,620.00 4,508.46
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 83,019.42
Jumlah Bahan + Pekerja 170,419.42
A001 Dibulatkan 170,410.00
A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAI
BAHAN :
Kayu Kelas III Papan 0.0020 m³ 3,000,000.00 6,000.00
Paku Biasa 0.4000 kg 25,000.00 10,000.00
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0015 m³ 3,000,000.00 4,500.00
Polywood tebal 9 mm 0.3500 lbr - -
Kayu Dolken 4.0000 btg 30,000.00 120,000.00
Jumlah Bahan 140,500.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Kayu 0.3300 Oh 127,512.00 42,078.96
P PK05 Kepala Tukang 0.0330 Oh 136,620.00 4,508.46
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 83,019.42
Jumlah Bahan + Pekerja 223,519.42
A001 Dibulatkan 223,510.00
A.07.33 1 m2 PASANG BEKISTING UNTUK DINDING
Pekerjaan 1 2 3 4 5 6=(3x5)
BAHAN :
Kayu Kelas III Papan 0.0300 m³ 3,000,000.00 90,000.00
Paku Biasa 0.4000 kg 25,000.00 10,000.00
Minyak Bekisting 0.2000 ltr - -
Kayu Kelas III Balok 0.0200 m³ 4,000,000.00 80,000.00
Polywood tebal 9 mm 0.3500 lbr - -
Kayu Dolken 3.0000 btg 30,000.00 90,000.00
Formtie / Penjaga Jarak Berkisar / Spacer 4.0000 bh -
Jumlah Bahan 270,000.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Kayu 0.3300 Oh 127,512.00 42,078.96
P PK05 Kepala Tukang 0.0330 Oh 136,620.00 4,508.46
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 83,019.42
Jumlah Bahan + Pekerja 353,019.42
A001 Dibulatkan 353,010.00
A.07.47 1 M3 MEMBUAT SOFI-SOFI 12/15 (220,80 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM 190.1393
BAHAN :
Kayu Kelas III Papan 0.3700 m³ 3,000,000.00 1,110,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
Besi Beton Polos Dia. 10 mm 152.6578 kg 35,430.00 5,408,665.07
Besi Beton Polos Dia. 8 mm 37.4815 kg 35,430.00 1,327,968.89
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 8,855,333.96
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,541,485.14
Dibulatkan 9,541,480.00
A.07.48 1 M3 MEMBUAT RING BALOK 15/20 (145,92 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Papan 0.3700 m³ 3,000,000.00 1,110,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
Besi Beton Polos Dia. 10 mm 92.5867 kg 35,430.00 3,280,345.60
Besi Beton Polos Dia. 8 mm 53.3333 kg 35,430.00 1,889,600.00
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 7,288,645.60
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 7,974,796.78
Dibulatkan 7,974,790.00
A.07.48'' 1 M3 MEMBUAT RING BALOK 12/20 (177,9556 Kg Besi + Bekesting) 177.9556
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Papan 0.3700 m³ 3000000 1,110,000.00
Paku Biasa 1.5000 kg 25000 37,500.00
Pelumas Bekesting 0.4000 lt 0 -
Besi Beton Polos Dia. 10 mm 115.7333 kg 35430 4,100,432.00
Besi Beton Polos Dia. 8 mm 62.2222 kg 35430 2,204,533.33
Kawat Beton 2.2500 kg 26000 58,500.00
Semen PC (50 kg) 6.4600 zak 95000 613,700.00
Pasir Beton 0.5200 m³ 200000 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250000 195,000.00
Jumlah Bahan 8,423,665.33
UPAH :
Tukang Batu 0.3500 org 127512 44,629.20
Tukang Kayu 1.0400 org 127512 132,612.48
Tukang Besi 1.0500 org 127512 133,887.60
Kepala Tukang 0.2450 org 136620 33,471.90
Pekerja 3.0000 org 113850 341,550.00
Mandor 0.1225 org 0 -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,109,816.51
Dibulatkan 9,109,810.00
A.07.49 1 M3 MEMBUAT KOLOM 20/25 (169,67 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.3700 m³ 3,000,000.00 1,110,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
5.88 Besi Beton Polos Dia. 12 mm 122.8200 kg 35,430.00 4,351,512.60
4.19 Besi Beton Polos Dia. 8 mm 42.6667 kg 35,430.00 1,511,680.00
Pekerjaan 1 2 3 4 5 6=(3x5)
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 7,981,892.60
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 8,668,043.78
Dibulatkan 8,668,040.00
A.07.50 1 M3 MEMBUAT SLOOF SELASAR 15/20 (188,88 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.2900 m³ 3,000,000.00 870,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
3.70 Besi Beton Polos Dia. 12 mm 132.9067 kg 35,430.00 4,708,883.20
2.64 Besi Beton Polos Dia. 8 mm 53.3333 kg 35,430.00 1,889,600.00
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 8,477,183.20
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,163,334.38
Jumlah 9,163,334.38
Dibulatkan 9,163,330.00
A.07.51 1 M3 PEK. BETON BERTULANG PLAT MEJA, adukan 1 : 2 : 3
BAHAN :
Kayu Kelas III Bekesting 0.3300 m3 3,000,000.00 990,000.00
Paku Biasa 3.0000 kg 25,000.00 75,000.00
Besi Beton Polos Dia. 10 mm 110.0000 kg 35,430.00 3,897,300.00
Kawat Beton 3.0000 kg 26,000.00 78,000.00
Semen PC (50 kg) 6.4600 Zak 95,000.00 613,700.00
Pasir Beton 0.5200 m3 200,000.00 104,000.00
Kerikil beton 0.7800 m3 450,000.00 351,000.00
Jumlah Bahan 6,109,000.00
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 6,795,151.18
Jumlah 6,795,151.18
Dibulatkan 6,795,150.00
A.07.52 1 M3 MEMBUAT KOLOM 12/15 (197 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM 190.1393
BAHAN :
Kayu Kelas III Bekesting 0.4000 m³ 3,000,000.00 1,200,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
20.42 Besi Beton Polos Dia. 10 mm 152.6578 kg 35,430.00 5,408,665.07
10.13 Besi Beton Polos Dia. 6 mm 37.4815 kg 35,430.00 1,327,968.89
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 8,945,333.96
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,631,485.14
Dibulatkan 9,631,480.00
A.07.60 1 M3 MEMBUAT KOLOM SELASAR 15/15 (181,88 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Kayu Kelas III Bekesting 0.4400 m³ 3,000,000.00 1,320,000.00
Paku Biasa 1.5000 kg 25,000.00 37,500.00
Pelumas Bekesting 0.4000 lt - -
8.33 Besi Beton Polos Dia. 10 mm 122.6222 kg 35,430.00 4,344,505.33
4.13 Besi Beton Polos Dia. 8 mm 59.2593 kg 35,430.00 2,099,555.56
Kawat Beton 2.2500 kg 26,000.00 58,500.00
Semen PC (50 kg) 6.4600 zak 95,000.00 613,700.00
Pasir Beton 0.5200 m³ 200,000.00 104,000.00
Pekerjaan 1 2 3 4 5 6=(3x5)
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Jumlah Bahan 8,772,760.89
UPAH :
Tukang Batu 0.3500 org 127,512.00 44,629.20
Tukang Kayu 1.0400 org 127,512.00 132,612.48
Tukang Besi 1.0500 org 127,512.00 133,887.60
Kepala Tukang 0.2450 org 136,620.00 33,471.90
Pekerja 3.0000 org 113,850.00 341,550.00
Mandor 0.1225 org - -
Jumlah Pekerja 686,151.18
Jumlah Bahan + Pekerja 9,458,912.07
Dibulatkan 9,458,910.00
A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen PC (50 kg) 232.0000 kg 1,900.00 440,800.00
Pasir Beton 0.5200 lbr 200,000.00 104,000.00
Batu Kerikil / Split 2/3 cm 0.7800 m³ 250,000.00 195,000.00
Besi Beton Polos Dia. 10 mm 137.3610 Kg 35,430.00 4,866,700.23
Kawat Beton 1.9623 Kg 26,000.00 51,019.80
Kayu Kelas III Bekesting 0.2450 m³ 3,000,000.00 735,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Minyak Bekisting 1.4000 Ltr - -
Kayu Kelas III Balok 0.0700 m³ 3,000,000.00 210,000.00
Jumlah Bahan 6,606,270.03
UPAH :
Pekerja 6.4697 Oh 113,850.00 736,579.90
Tukang Batu 0.2500 Oh 127,512.00 31,878.00
Tukang Kayu 4.0260 Oh 127,512.00 513,363.31
Tukang Besi 1.0073 Oh 127,512.00 128,444.62
Kepala Tukang 0.5192 Oh 136,620.00 70,929.55
Mandor 0.1924 Oh - -
Jumlah Pekerja 1,481,195.39
Jumlah Bahan + Pekerja 8,087,465.42
Dibulatkan 8,087,460.00
A.08.02 1 M2 PASANG ATAP GENTENG TANAH
BAHAN :
Genteng Tanah 25.0000 buah - -
Jumlah Bahan -
UPAH :
Pekerja 0.1500 Oh 113,850.00 17,077.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 27,733.86
Jumlah Bahan + Pekerja 27,733.86
A001 Dibulatkan 27,730.00
A.08.03 1 M2 PASANG ATAP SPANDEK / GALVALYUM 0,3mm
BAHAN :
Atap Spandek/Galvalyum 1.0200 Lbr 128,000.00 130,560.00
Paku Seng +seal 0.2000 Kg 25,000.00 5,000.00
Jumlah Bahan 135,560.00
UPAH :
Pekerja 0.1200 Oh 113,850.00 13,662.00
Tukang Kayu 0.0600 Oh 127,512.00 7,650.72
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 22,132.44
Jumlah Bahan + Pekerja 157,692.44
A001 Dibulatkan 157,690.00
A.08.05 1 M2 PASANG NOK BUBUNGAN GENTENG TANAH
BAHAN :
Bubungan Genteng Tanah 5.0000 Bh - -
Semen PC (50 kg) 0.1600 zak 95,000.00 15,200.00
Pasir Pasang 0.0320 m3 150,000.00 4,800.00
Jumlah Bahan 20,000.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
P PK05 Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 49,638.60
Jumlah Bahan + Pekerja 69,638.60
A001 Dibulatkan 69,630.00
A.08.06 1 M2 PASANG NOK BUBUNGAN GENTENG METAL
BAHAN :
Nok Genteng Metal 1.1000 buah - -
Paku Seng + karet seal 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 1,250.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
P PK05 Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0130 Oh - -
Jumlah Pekerja 49,638.60
Jumlah Bahan + Pekerja 50,888.60
A001 Dibulatkan 50,880.00
A.08.11 1 M2 PASANG ATAP SENG GELOMBANG BJLS 0,3 mm
BAHAN :
Seng Gelombang BJLS 0,3 0.7000 lbr 87,000.00 60,900.00
Paku Seng 0.0200 kg 25,000.00 500.00
Jumlah Bahan 61,400.00
UPAH :
Pekerja 0.1200 Oh 113,850.00 13,662.00
Tukang Kayu 0.0600 Oh 127,512.00 7,650.72
Pekerjaan 1 2 3 4 5 6=(3x5)
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 22,132.44
Jumlah Bahan + Pekerja 83,532.44
A001 Dibulatkan 83,530.00
A.08.12 1 M2 PASANG ATAP ZYNCALUM 0,3 mm
BAHAN :
Atap Spandex Zyncalum 1.0200 lbr 128,000.00 130,560.00
Paku Seng + karet seal 0.2000 kg 25,000.00 5,000.00
Jumlah Bahan 135,560.00
UPAH :
Pekerja 0.1200 Oh 113,850.00 13,662.00
Tukang Kayu 0.0600 Oh 127,512.00 7,650.72
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 22,132.44
Jumlah Bahan + Pekerja 157,692.44
A001 Dibulatkan 157,690.00
A.08.13 1 M2 PASANG ATAP GENTENG METAL 0,3 mm
BAHAN :
Genteng Metal/metal roof 1.6200 lbr - -
Paku Seng + karet seal 0.2000 kg 25,000.00 5,000.00
Jumlah Bahan 5,000.00
UPAH :
Pekerja 0.1200 Oh 113,850.00 13,662.00
Tukang Kayu 0.0600 Oh 127,512.00 7,650.72
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 22,132.44
Jumlah Bahan + Pekerja 27,132.44
A001 Dibulatkan 27,130.00
A.08.14 1 M' PASANG NOK SENG POLOS 0,3 mm
BAHAN :
Seng Plat Polos 0.3000 lbr - -
Paku Seng + karet seal 0.0400 kg 25,000.00 1,000.00
Jumlah Bahan 1,000.00
UPAH :
Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.0700 Oh 127,512.00 8,925.84
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0060 Oh - -
Jumlah Pekerja 11,726.55
Jumlah Bahan + Pekerja 12,726.55
A001 Dibulatkan 12,720.00
A.08.30 1 M1 PASANG NOK TEPI SENG GELOMBANG
BAHAN :
Nok Tepi Seng Gelombang 1.0000 m¹ 30,000.00 30,000.00
Paku Seng + karet seal 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 31,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 70,243.86
A001 Dibulatkan 70,240.00
A.08.31 1 M1 PASANG NOK TEPI ZYNCALUM
BAHAN :
Nok Tepi Zyncalum 1.0000 Bh 50,000.00 50,000.00
Paku Seng + karet seal 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 51,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 90,243.86
A001 Dibulatkan 90,240.00
A.08.32 1 M1 PASANG NOK TEPI GENTENG METAL
BAHAN :
Nok Tepi Genteng Metal 1.0000 Bh - -
Paku Seng + karet seal 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 1,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 40,243.86
A001 Dibulatkan 40,240.00
A.08.33 1 M1 PASANG NOK TEPI GENTENG TANAH
BAHAN :
Nok Tepi Genteng Metal 1.0000 Bh - -
Semen PC (50 kg) 0.1600 zak 95,000.00 15,200.00
Pasir Pasang 0.0320 m3 150,000.00 4,800.00
Jumlah Bahan 20,000.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 59,118.86
A001 Dibulatkan 59,110.00
A.08.34 1 M1 PASANG NOK TEPI ATAP SPANDEK/GALVALYUM
BAHAN :
Nok Tepi Atap Spandek 1.0000 Bh - -
Paku Seng 0.0450 kg 25,000.00 1,125.00
Jumlah Bahan 1,125.00
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Kayu 0.0750 Oh 127,512.00 9,563.40
P PK05 Kepala Tukang 0.0080 Oh 136,620.00 1,092.96
P PK05 Mandor 0.0080 Oh - -
Jumlah Pekerja 39,118.86
Jumlah Bahan + Pekerja 40,243.86
A001 Dibulatkan 40,240.00
A.09.02 1 M2 PASANG PLAFOND TRIPLEKS , TEBAL 3 mm
BAHAN :
Tripleks 3 mm 0.3750 lbr 85,000.00 31,875.00
Paku Biasa 0.0300 kg 25,000.00 750.00
Jumlah Bahan 32,625.00
UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
P PK05 Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
P PK05 Mandor 0.0050 Oh - -
Jumlah Pekerja 25,502.40
Jumlah Bahan + Pekerja 58,127.40
A001 Dibulatkan 58,120.00
A.10.01 MEMASANG 1 BUAH KLOSET DUDUK
BAHAN :
Kloset Duduk 1.0000 bh 2,656,500.00 2,656,500.00
Perlengkapan 0.0600 harga kloset 2,656,500.00 159,390.00
Jumlah Bahan 2,815,890.00
UPAH :
P PK05 Pekerja 2.1000 Oh 113,850.00 239,085.00
P PK05 Tukang Batu 0.9600 Oh 127,512.00 122,411.52
Kepala Tukang 0.0010 Oh 136,620.00 136.62
Mandor 0.1600 Oh - -
Jumlah Pekerja 361,633.14
Jumlah Bahan + Pekerja 3,177,523.14
Dibulatkan 3,177,520.00
A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN
BAHAN :
Kloset Jongkok 1.0000 bh 607,200.00 607,200.00
Semen PC (50 kg) 6.0000 kg 1,900.00 11,400.00
Pasir Pasang 0.0100 m³ 150,000.00 1,500.00
Jumlah Bahan 620,100.00
P PK05 UPAH :
P PK05 Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.3000 Oh 127,512.00 38,253.60
Kepala Tukang 0.1500 Oh 136,620.00 20,493.00
Mandor 0.0800 Oh - -
Jumlah Pekerja 127,056.60
A001 Jumlah Bahan + Pekerja 747,156.60
Dibulatkan 747,150.00
A.10.04 MEMASANG 1 BUAH URINOIR
BAHAN :
Urinoir 1.0000 bh - -
P PK05 Perlengkapan 0.3000 hrg urinoir - -
P PK05 Semen PC (50 kg) 6.0000 kg 1,900.00 11,400.00
Pasir Pasang 0.0100 m³ 150,000.00 1,500.00
Jumlah Bahan 12,900.00
UPAH :
Pekerja 1.0000 Oh 113,850.00 113,850.00
A001 Tukang Batu 0.9000 Oh 127,512.00 114,760.80
Kepala Tukang 0.1000 Oh 136,620.00 13,662.00
Mandor 0.1000 Oh - -
Jumlah Pekerja 242,272.80
Jumlah Bahan + Pekerja 255,172.80
Dibulatkan 255,170.00
A.10.05 MEMASANG 1 BUAH WASTAFEL
P PK05 BAHAN :
P PK05 Wastafel 1.0000 bh 2,277,000.00 2,277,000.00
Perlengkapan 0.1200 hrg kloset 2,277,000.00 273,240.00
Semen PC (50 kg) 6.0000 kg 1,900.00 11,400.00
Pasir Pasang 0.0100 m³ 150,000.00 1,500.00
Jumlah Bahan 2,563,140.00
A001 UPAH :
Pekerja 1.2000 Oh 113,850.00 136,620.00
Tukang Batu 1.4500 Oh 127,512.00 184,892.40
Kepala Tukang 0.1500 Oh 136,620.00 20,493.00
Mandor 0.1000 Oh - -
Jumlah Pekerja 342,005.40
Jumlah Bahan + Pekerja 2,905,145.40
P PK05 Dibulatkan 2,905,140.00
A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3
BAHAN :
Bak Fibreglass 1.0000 bh - -
Perlengkapan 0.1800 hrg bak - -
A001 Jumlah Bahan -
UPAH :
Pekerja 1.8000 Oh 113,850.00 204,930.00
Tukang Batu 0.6000 Oh 127,512.00 76,507.20
Pekerjaan 1 2 3 4 5 6=(3x5)
Kepala Tukang 0.5400 Oh 136,620.00 73,774.80
Mandor 0.1100 Oh - -
Jumlah Pekerja 355,212.00
Jumlah Bahan + Pekerja 355,212.00
P PK05 Dibulatkan 355,210.00
A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3
BAHAN :
Bata Merah Bakar Kelas I 110.0000 bh 700.00 77,000.00
Semen PC (50 kg) 80.0000 kg 1,900.00 152,000.00
A001 Pasir Pasang 0.3000 m³ 150,000.00 45,000.00
Keramik 20 x 20 cm 216.0000 bh - -
Semen Warna 6.0000 kg 2,000.00 12,000.00
Jumlah Bahan 286,000.00
UPAH :
Pekerja 2.0000 Oh 113,850.00 227,700.00
Tukang Batu 1.0000 Oh 127,512.00 127,512.00
Kepala Tukang 0.3000 Oh 136,620.00 40,986.00
Mandor 0.1500 Oh - -
P PK05 Jumlah Pekerja 396,198.00
P PK05 Jumlah Bahan + Pekerja 682,198.00
Dibulatkan 682,190.00
A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM
BAHAN :
Bata Merah Bakar Kelas I 0.1450 bh 700.00 101.50
P PK05 Semen PC (50 kg) 44.0000 kg 1,900.00 83,600.00
P PK05 Pasir Pasang 0.0700 m3 150,000.00 10,500.00
Batu Kerikil / Split 2/3 cm 0.0700 m³ 250,000.00 17,500.00
Besi Beton Polos Dia. 10 mm 1.6000 kg 35,430.00 56,688.00
Pasir Beton 0.0600 m3 200,000.00 12,000.00
Jumlah Bahan 180,389.50
A001 UPAH :
Pekerja 3.2000 Oh 113,850.00 364,320.00
Tukang Batu 1.0150 Oh 127,512.00 129,424.68
Kepala Tukang 0.0015 Oh 136,620.00 204.93
Mandor 0.0160 Oh - -
Jumlah Pekerja 493,949.61
Jumlah Bahan + Pekerja 674,339.11
Dibulatkan 674,330.00
P PK05 A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM
P PK05 BAHAN :
Bata Merah Bakar Kelas I 0.2500 m3 700.00 175.00
Semen PC (50 kg) 77.0000 kg 1,900.00 146,300.00
Pasir Pasang 0.1300 m3 150,000.00 19,500.00
Batu Kerikil / Split 2/3 cm 0.0200 m³ 250,000.00 5,000.00
A001 Besi Beton Polos Dia. 10 mm 2.6000 kg 35,430.00 92,118.00
Pasir Beton 0.0900 m3 200,000.00 18,000.00
Jumlah Bahan 281,093.00
UPAH :
Pekerja 1.4200 Oh 113,850.00 161,667.00
Tukang Batu 0.4730 Oh 127,512.00 60,313.18
Kepala Tukang 0.0470 Oh 136,620.00 6,421.14
Mandor 0.0710 Oh - -
Jumlah Pekerja 228,401.32
Jumlah Bahan + Pekerja 509,494.32
Dibulatkan - 509,490.00
A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM
BAHAN :
Bata Merah Bakar Kelas I 0.3710 m3 700.00 259.70
A001 Semen PC (50 kg) 114.0000 kg 1,900.00 216,600.00
Pasir Pasang 0.1840 m3 150,000.00 27,600.00
Batu Kerikil / Split 2/3 cm 0.0330 m³ 250,000.00 8,250.00
Besi Beton Polos Dia. 10 mm 4.8500 kg 35,430.00 171,835.50
Pasir Beton 0.1200 m3 200,000.00 24,000.00
Jumlah Bahan 448,545.20
UPAH :
Pekerja 2.1600 Oh 113,850.00 245,916.00
Tukang 0.1000 Oh 127,512.00 12,751.20
Tukang Batu 0.7200 Oh 127,512.00 91,808.64
P PK05 Kepala Tukang 0.0720 Oh 136,620.00 9,836.64
P PK05 Mandor 0.1080 Oh - -
Jumlah Pekerja 360,312.48
Jumlah Bahan + Pekerja 808,857.68
A001 Dibulatkan 808,850.00
A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"
BAHAN :
Pipa Galvanis 0,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 113,850.00 6,147.90
Tukang Batu 0.0900 Oh 127,512.00 11,476.08
P PK05 Kepala Tukang 0.0090 Oh 136,620.00 1,229.58
P PK05 Mandor 0.0270 Oh - -
Jumlah Pekerja 18,853.56
Jumlah Bahan + Pekerja 18,853.56
A001 Dibulatkan 18,850.00
A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"
BAHAN :
Pipa Galvanis 0,75" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 113,850.00 6,147.90
Tukang Batu 0.0900 Oh 127,512.00 11,476.08
Pekerjaan 1 2 3 4 5 6=(3x5)
Kepala Tukang 0.0090 Oh 136,620.00 1,229.58
P PK05 Mandor 0.0270 Oh - -
Jumlah Pekerja 18,853.56
Jumlah Bahan + Pekerja 18,853.56
A001 Dibulatkan 18,850.00
A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"
BAHAN :
Pipa Galvanis 1" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0540 Oh 113,850.00 6,147.90
Tukang Batu 0.0900 Oh 127,512.00 11,476.08
Kepala Tukang 0.0090 Oh 136,620.00 1,229.58
Mandor 0.0270 Oh - -
P PK05 Jumlah Pekerja 18,853.56
Jumlah Bahan + Pekerja 18,853.56
Dibulatkan 18,850.00
A001 A.10.22.a MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5"
BAHAN :
Pipa Galvanis 1,5" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 113,850.00 12,295.80
Tukang Batu 0.1800 Oh 127,512.00 22,952.16
Kepala Tukang 0.0180 Oh 136,620.00 2,459.16
Mandor 0.0054 Oh - -
Jumlah Pekerja 37,707.12
Jumlah Bahan + Pekerja 37,707.12
Dibulatkan 37,700.00
A001 A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 2"
BAHAN :
Pipa Galvanis 2" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 113,850.00 12,295.80
Tukang Batu 0.1800 Oh 127,512.00 22,952.16
Kepala Tukang 0.0180 Oh 136,620.00 2,459.16
Mandor 0.0054 Oh - -
Jumlah Pekerja 37,707.12
Jumlah Bahan + Pekerja 37,707.12
Dibulatkan 37,700.00
A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3"
BAHAN :
A001 Pipa Galvanis 3" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.1080 Oh 113,850.00 12,295.80
Tukang Batu 0.1800 Oh 127,512.00 22,952.16
Kepala Tukang 0.0180 Oh 136,620.00 2,459.16
Mandor 0.0054 Oh - -
Jumlah Pekerja 37,707.12
Jumlah Bahan + Pekerja 37,707.12
P PK05 Dibulatkan 37,700.00
A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4"
BAHAN :
Pipa Galvanis 4" 1.0000 1,2 m' - -
Perlengkapan 0.3500 hrg pipa - -
A001 Jumlah Bahan -
UPAH :
Pekerja 0.1350 Oh 113,850.00 15,369.75
Tukang Batu 0.2250 Oh 127,512.00 28,690.20
Kepala Tukang 0.0225 Oh 136,620.00 3,073.95
Mandor 0.0068 Oh - -
Jumlah Pekerja 47,133.90
Jumlah Bahan + Pekerja 47,133.90
Dibulatkan 47,130.00
A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"
P PK05 BAHAN :
Pipa PVC AW 0,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0360 Oh 113,850.00 4,098.60
Tukang Batu 0.0600 Oh 127,512.00 7,650.72
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
Jumlah Pekerja 12,569.04
Jumlah Bahan + Pekerja 12,569.04
Dibulatkan 12,560.00
A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"
BAHAN :
P PK05 Pipa PVC AW 0,75" 1.0000 m' 14,250.00 14,250.00
Perlengkapan 0.3500 hrg pipa 14,250.00 4,987.50
Jumlah Bahan 19,237.50
UPAH :
Pekerja 0.0360 Oh 113,850.00 4,098.60
A001 Tukang Batu 0.0600 Oh 127,512.00 7,650.72
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
Jumlah Pekerja 12,569.04
Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan + Pekerja 31,806.54
Dibulatkan 31,800.00
A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1"
BAHAN :
P PK05 Pipa PVC AW 1" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0360 Oh 113,850.00 4,098.60
A001 Tukang Batu 0.0600 Oh 127,512.00 7,650.72
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
Jumlah Pekerja 12,569.04
Jumlah Bahan + Pekerja 12,569.04
Dibulatkan 12,560.00
A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5"
BAHAN :
Pipa PVC AW 1,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 0.0360 Oh 113,850.00 4,098.60
Tukang Batu 0.0600 Oh 127,512.00 7,650.72
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
A001 Jumlah Pekerja 12,569.04
Jumlah Bahan + Pekerja 12,569.04
Dibulatkan 12,560.00
A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2"
BAHAN :
Pipa PVC AW 2" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 0.0540 Oh 113,850.00 6,147.90
Tukang Batu 0.0900 Oh 127,512.00 11,476.08
Kepala Tukang 0.0090 Oh 136,620.00 1,229.58
Mandor 0.0027 Oh - -
A001 Jumlah Pekerja 18,853.56
Jumlah Bahan + Pekerja 18,853.56
Dibulatkan 18,850.00
A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5"
BAHAN :
Pipa PVC AW 2,5" 1.0000 m' - -
Perlengkapan 0.3500 hrg pipa - -
Jumlah Bahan -
UPAH :
Pekerja 0.0360 Oh 113,850.00 4,098.60
Tukang Batu 0.0600 Oh 127,512.00 7,650.72
P PK05 Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0018 Oh - -
Jumlah Pekerja 12,569.04
Jumlah Bahan + Pekerja 12,569.04
Dibulatkan 12,560.00
A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"
BAHAN :
Pipa PVC AW 3" 1.0000 m' 36,250.00 36,250.00
Perlengkapan 0.3500 hrg pipa 36,250.00 12,687.50
Jumlah Bahan 48,937.50
UPAH :
Pekerja 0.0810 Oh 113,850.00 9,221.85
Tukang Batu 0.1350 Oh 127,512.00 17,214.12
P PK05 Kepala Tukang 0.0135 Oh 136,620.00 1,844.37
Mandor 0.0041 Oh - -
Jumlah Pekerja 28,280.34
Jumlah Bahan + Pekerja 77,217.84
Dibulatkan 77,210.00
A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"
BAHAN :
Pipa PVC AW 4" 1.0000 m' 75,000.00 75,000.00
Perlengkapan 0.3500 hrg pipa 75,000.00 26,250.00
Jumlah Bahan 101,250.00
UPAH :
Pekerja 0.0810 Oh 113,850.00 9,221.85
Tukang Batu 0.1350 Oh 127,512.00 17,214.12
Kepala Tukang 0.0135 Oh 136,620.00 1,844.37
Mandor 0.0041 Oh - -
P PK05 Jumlah Pekerja 28,280.34
Jumlah Bahan + Pekerja 129,530.34
Dibulatkan 129,530.00
A001 A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL
BAHAN :
Bak Cuci Stainless Steel 1.0000 bh - -
Water Drain + asesories 1.0000 Set - -
Jumlah Bahan -
UPAH :
Pekerja 0.0300 Oh 113,850.00 3,415.50
Tukang Batu 0.3000 Oh 127,512.00 38,253.60
Kepala Tukang 0.0300 Oh 136,620.00 4,098.60
Mandor 0.0015 Oh - -
Jumlah Pekerja 45,767.70
Jumlah Bahan + Pekerja 45,767.70
Dibulatkan 45,760.00
A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"
Pekerjaan 1 2 3 4 5 6=(3x5)
BAHAN :
Kran Air 1.0000 bh - -
A001 Seal tape 0.0250 bh 15,000.00 375.00
Jumlah Bahan 375.00
UPAH :
Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Batu - Oh 127,512.00 -
Kepala Tukang 0.0010 Oh 136,620.00 136.62
Mandor 0.0005 Oh - -
Jumlah Pekerja 1,275.12
Jumlah Bahan + Pekerja 1,650.12
Dibulatkan 1,650.00
A.10.36 MEMASANG 1 BH FLOOR DRAIN
P PK05 BAHAN :
Floor Drain 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Batu - Oh 127,512.00 -
Kepala Tukang 0.0010 Oh 136,620.00 136.62
Mandor 0.0005 Oh - -
Jumlah Pekerja 1,275.12
Jumlah Bahan + Pekerja 1,275.12
Dibulatkan 1,270.00
A.10.37 1 UNIT SEPTICTANK 4,8 X 2,1 X 2,4 M + REMBESANNYA
Galian tanah 17.1360 m³ 59,885.10 1,026,191.07
Pasir Urug 0.5600 m³ 125,000.00 70,000.00
Lantai kerja 3.7500 m³ 958,846.00 3,595,672.50
Pas. bata 1 PC : 2 PS + Plesteran 60.0000 m² 141,250.00 8,475,000.00
Plasteran Dinding 60.0000 m² 93,780.00 5,626,800.00
P PK05 Plat beton penutup 0.5000 m³ 8,087,460.00 4,043,730.00
Pipa PVC AW 4" 9.0000 m' 75,000.00 675,000.00
Pipa GIP 2" 2.0000 m1 - -
Galian tanah untuk rembesan 5.6250 m³ 59,885.10 336,853.69
Pas. injuk 20.0000 m² - -
A001 Urugan kerikil 3,5 cm 2.5000 m³ 250,000.00 625,000.00
Pipa PVC AW 4" 10.0000 m' 75,000.00 750,000.00
Urugan kembali perataan tanah 1.8750 m³ 21,859.20 40,986.00
Jumlah Bahan 25,265,233.26
UPAH :
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Jumlah -
Jumlah 25,265,233.26
Dibulatkan 25,265,230.00
A.11.01 1 M2 PASANG RANGKA ATAP BAJA RINGAN
BAHAN :
A001 Baja Ringan 1.1000 m2 - -
Jumlah Bahan -
UPAH :
Pekerja 0.0600 Oh 113,850.00 6,831.00
Tukang Besi 0.0060 Oh 127,512.00 765.07
Kepala Tukang 0.0060 Oh 136,620.00 819.72
Mandor 0.0003 Oh - -
Jumlah Pekerja 8,415.79
Jumlah Bahan + Pekerja 8,415.79
Dibulatkan 8,410.00
A.11.09 1 M2 PASANG PINTU ALUMINIUM
BAHAN :
Pintu Alluminium 1.0000 m2 - -
Jumlah Bahan -
P PK05 UPAH :
Pekerja 1.0500 Oh 113,850.00 119,542.50
Tukang Besi 1.0500 Oh 127,512.00 133,887.60
Kepala Tukang 0.1050 Oh 136,620.00 14,345.10
Mandor 0.0052 Oh - -
A001 Jumlah Pekerja 267,775.20
Jumlah Bahan + Pekerja 267,775.20
Dibulatkan 267,770.00
A.11.12 1 M2 PASANG TERALIS BESI
BAHAN :
Besi Plat 2x3 1.0000 m2 - -
Jumlah Bahan -
UPAH :
Pekerja 1.2000 Oh 113,850.00 136,620.00
Tukang Kayu 1.2000 Oh 127,512.00 153,014.40
P PK05 Kepala Tukang 0.0120 Oh 136,620.00 1,639.44
Mandor 0.0006 Oh - -
Jumlah Pekerja 291,273.84
Jumlah Bahan + Pekerja 291,273.84
Dibulatkan 291,270.00
A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 30
LL64 BAHAN :
BT64 Seng Plat 3 x 6 bjls 28 0.5000 lbr - -
BT18 Paku Biasa Tripleks 0.0150 kg 25,000.00 375.00
Kayu Kelas II Papan 0.0096 m3 4,000,000.00 38,400.00
LL65 Meni Besi/Flincote 0.2500 kg 7,000.00 1,750.00
LL66 Jumlah Bahan 40,525.00
BT67 UPAH :
Pekerja 0.1500 Oh 113,850.00 17,077.50
Tukang Kayu 0.4000 Oh 127,512.00 51,004.80
Pekerjaan 1 2 3 4 5 6=(3x5)
Kepala Tukang 0.0250 Oh 136,620.00 3,415.50
Mandor 0.0013 Oh - -
A080 Jumlah Pekerja 71,497.80
Jumlah Bahan + Pekerja 112,022.80
Dibulatkan 112,020.00
A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28
BAHAN :
BT64 Seng Plat 3 x 6 bjls 28 0.5000 lbr - -
BT18 Paku Biasa Tripleks 0.0150 kg 25,000.00 375.00
Kayu Kelas II Papan 0.0190 m3 4,000,000.00 76,000.00
Meni Besi/Flincote 0.3000 kg 7,000.00 2,100.00
Jumlah Bahan 78,475.00
BT67 UPAH :
Pekerja 0.0400 Oh 113,850.00 4,554.00
Tukang Kayu 0.4000 Oh 127,512.00 51,004.80
Kepala Tukang 0.0250 Oh 136,620.00 3,415.50
Mandor 0.0013 Oh - -
A081 Jumlah Pekerja 58,974.30
Jumlah Bahan + Pekerja 137,449.30
Dibulatkan 137,440.00
A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28
BAHAN :
BT64 Seng Plat 3 x 6 bjls 28 0.3000 lbr - -
BT18 Paku Biasa Tripleks 0.1000 kg 25,000.00 2,500.00
Kayu Kelas II Papan 0.0190 m3 4,000,000.00 76,000.00
Besi Strip 0.5000 kg - -
Jumlah Bahan 78,500.00
BT67 UPAH :
Pekerja 0.1500 Oh 113,850.00 17,077.50
Tukang Kayu 0.2500 Oh 127,512.00 31,878.00
Kepala Tukang 0.0250 Oh 136,620.00 3,415.50
Mandor 0.0013 Oh - -
A082 Jumlah Pekerja 52,371.00
Jumlah Bahan + Pekerja 130,871.00
Dibulatkan 130,870.00
A.11.22 1 M2 PEK. RESIDU/TEER RANGKA ATAP/KUDA-KUDA/GORDING
BAHAN :
Teer/residu 0.0300 ltr 13,000.00 390.00
Jumlah Bahan 390.00
UPAH :
A001 Pekerja 0.0080 Oh 113,850.00 910.80
Tukang Kayu 0.0060 Oh 127,512.00 765.07
LL99 Kepala Tukang 0.0120 Oh 136,620.00 1,639.44
BN02 Mandor 0.0060 Oh - -
Jumlah Pekerja 3,315.31
Jumlah Bahan + Pekerja 3,705.31
LLL01 Dibulatkan 3,700.00
P PK05 A.12.02 1 BUAH PASANG KUNCI TANAM BIASA
BAHAN :
Kunci Tanam biasa 1.0000 bh 90,000.00 90,000.00
Jumlah Bahan 90,000.00
UPAH :
A001 Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
Mandor 0.0050 Oh - -
Jumlah Pekerja 66,260.70
Jumlah Bahan + Pekerja 156,260.70
Dibulatkan 156,260.00
P PK05 A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI
BAHAN :
Kunci Tanam Kamar Mandi 1.0000 bh 88,000.00 88,000.00
Jumlah Bahan 88,000.00
UPAH :
A001 Pekerja 0.0050 Oh 113,850.00 569.25
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0050 Oh 136,620.00 683.10
Mandor 0.0025 Oh - -
Jumlah Pekerja 65,008.35
Jumlah Bahan + Pekerja 153,008.35
Dibulatkan 153,000.00
P PK05 A.12.04 1 BUAH PASANG KUNCI BULAT
BAHAN :
Kunci Bulat 1.0000 bh 92,000.00 92,000.00
Jumlah Bahan 92,000.00
UPAH :
A001 Pekerja 0.0050 Oh 113,850.00 569.25
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0050 Oh 136,620.00 683.10
Mandor 0.0003 Oh - -
Jumlah Pekerja 65,008.35
Jumlah Bahan + Pekerja 157,008.35
Dibulatkan 157,000.00
P PK05 A.12.05 1 BUAH PASANG ENGSEL PINTU
BAHAN :
Engsel Pintu 1.0000 bh 35,000.00 35,000.00
Jumlah Bahan 35,000.00
UPAH :
A001 Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
Mandor 0.0008 Oh - -
Jumlah Pekerja 16,508.25
Jumlah Bahan + Pekerja 51,508.25
Pekerjaan 1 2 3 4 5 6=(3x5)
Dibulatkan 51,500.00
P PK05 A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
BAHAN :
Engsel Jendela 1.0000 bh 32,000.00 32,000.00
Jumlah Bahan 32,000.00
UPAH :
A001 Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Kayu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00 1,366.20
Mandor 0.0005 Oh - -
Jumlah Pekerja 15,255.90
Jumlah Bahan + Pekerja 47,255.90
Dibulatkan 47,250.00
P PK05 A.12.09 1 BUAH PASANG KAIT ANGIN
BAHAN :
Kait Angin 1.0000 ps 16,000.00 16,000.00
Jumlah Bahan 16,000.00
UPAH :
A001 Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
Mandor 0.0008 Oh - -
Jumlah Pekerja 22,883.85
Jumlah Bahan + Pekerja 38,883.85
Dibulatkan 38,880.00
P PK05 A.12.10 1 BUAH PASANG SLOOT TANAM
BAHAN :
Sloot Tanam 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0200 Oh 113,850.00 2,277.00
Tukang Kayu 0.2000 Oh 127,512.00 25,502.40
Kepala Tukang 0.0500 Oh 136,620.00 6,831.00
Mandor 0.0025 Oh - -
Jumlah Pekerja 34,610.40
Jumlah Bahan + Pekerja 34,610.40
Dibulatkan 34,610.00
P PK05 A.12.11 1 BUAH PASANG GRENDEL JENDELA
BAHAN :
Grendel Jendela/Spring Knob 1.0000 bh 12,000.00 12,000.00
Jumlah Bahan 12,000.00
UPAH :
A001 Pekerja 0.0200 Oh 113,850.00 2,277.00
Tukang Kayu 0.2000 Oh 127,512.00 25,502.40
Kepala Tukang 0.0200 Oh 136,620.00 2,732.40
Mandor 0.0010 Oh - -
Jumlah Pekerja 30,511.80
Jumlah Bahan + Pekerja 42,511.80
Dibulatkan 42,510.00
P PK05 A.12.12 1 BUAH PASANG PEGANGAN PINTU + KUNCI PINTU 2 X PUTAR
BAHAN :
Kunci Tanam 2 x Putar 1.0000 bh 120,000.00 120,000.00
Pegangan/Handle Pintu 1.0000 bh - -
Jumlah Bahan -
UPAH :
A001 Pekerja 0.0500 Oh 113,850.00 5,692.50
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0500 Oh 136,620.00 6,831.00
Mandor 0.0025 Oh - -
Jumlah Pekerja 76,279.50
Jumlah Bahan + Pekerja 76,279.50
Dibulatkan 76,270.00
A.12.14 1 BUAH PASANG KUNCI PINTU 2 X PUTAR ( lever handle )
BAHAN :
P PK05 Kunci Pintu 2 x Putar ( lever handle ) 1.0000 bh 120,000.00 120,000.00
Jumlah Bahan 120,000.00
UPAH :
Pekerja 0.0100 Oh 113,850.00 1,138.50
Tukang Kayu 0.5000 Oh 127,512.00 63,756.00
A001 Kepala Tukang 0.0600 Oh 136,620.00 8,197.20
Mandor 0.0030 Oh - -
Jumlah Pekerja 73,091.70
Jumlah Bahan + Pekerja 193,091.70
Dibulatkan 193,090.00
A.12.17 1 M2 PASANG KACA, TEBAL 5 MM
BAHAN :
Kaca Polos 5 mm 1.1000 m2 227,700.00 250,470.00
Jumlah Bahan 250,470.00
UPAH :
Pekerja 0.0150 Oh 113,850.00 1,707.75
Tukang Kayu 0.1500 Oh 127,512.00 19,126.80
Kepala Tukang 0.0150 Oh 136,620.00 2,049.30
P PK05 Mandor 0.0008 Oh - -
Jumlah Pekerja 22,883.85
Jumlah Bahan + Pekerja 273,353.85
A001 Dibulatkan 273,350.00
A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU
BAHAN :
P PK05 Besi Siku 50.50.5 panjang 6 m 1.0000 kg - -
Jumlah Bahan -
UPAH :
Pekerja 0.0600 Oh 113,850.00 6,831.00
A001 Tukang Besi 0.0040 org 127,512.00 510.05
Kepala tukang besi profil 0.0010 org 136,620.00 136.62
Pekerjaan 1 2 3 4 5 6=(3x5)
Mandor 0.0002 org - -
Peralatan ( Alat las, dll) 0.1250 lot 7,477.67 934.71
Jumlah Pekerja 8,412.38
Jumlah Bahan + Pekerja 8,412.38
Dibulatkan 8,410.00
A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPING KAWAT DURI
Galian Tanah 0.4500 m³ 96,770.00 43,546.50
P PK05 Urugan Pasir 10 cm' 0.0080 m³ 184,150.00 1,473.20
Jumlah 57,469.65
Dibulatkan 57,460.00
Pekerjaan 1 2 3 4 5 6=(3x5)
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A.13.48 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ANTISLIP
BAHAN :
P PK05 Ubin Keramik 30 x 30 cm Antislip 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH
BAHAN :
Keramik Porselen 11 x 11 cm 83.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 19,660.00
UPAH :
P PK05 Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0500 Oh 136,620.00 6,831.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 141,174.00
A001 Jumlah Bahan + Pekerja 160,834.00
Dibulatkan 160,830.00
A.13.59 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA
BAHAN :
Keramik Porselen 11 x 11 cm, Warna 83.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 19,660.00
UPAH :
P PK05 Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.5000 Oh 127,512.00 63,756.00
Kepala Tukang 0.0500 Oh 136,620.00 6,831.00
Mandor 0.0030 Oh - -
Jumlah Pekerja 141,174.00
A001 Jumlah Bahan + Pekerja 160,834.00
Dibulatkan 160,830.00
A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA
BAHAN :
Keramik Porselen 10 x 20 cm, Warna 50.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.4500 Oh 127,512.00 57,380.40
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 131,838.30
Jumlah Bahan + Pekerja 151,498.30
Dibulatkan 151,490.00
A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA
BAHAN :
Keramik Porselen 20 x 20 cm, Warna 25.0000 bh - -
Semen Abu-abu 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.4500 Oh 127,512.00 57,380.40
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
A001 Mandor 0.0300 Oh - -
Jumlah Pekerja 131,838.30
Jumlah Bahan + Pekerja 151,498.30
Dibulatkan 151,490.00
A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM,
BAHAN :
Keramik 10 x 20 cm 50.0000 bh - -
Semen Abu-abu 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Pekerjaan 1 2 3 4 5 6=(3x5)
Tukang Batu 0.4500 Oh 127,512.00 57,380.40
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 131,838.30
Jumlah Bahan + Pekerja 151,498.30
Dibulatkan 151,490.00
A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM,
BAHAN :
Keramik 20 x 20 cm 25.0000 bh - -
Semen Abu-abu 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 87,209.10
Jumlah Bahan + Pekerja 106,869.10
Dibulatkan 106,860.00
A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM,
BAHAN :
Keramik 10 x 20 cm 50.0000 bh - -
Semen Abu-abu 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
P PK05 Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.1250 Oh 127,512.00 15,939.00
Kepala Tukang 0.0125 Oh 136,620.00 1,707.75
A001 Mandor 0.0030 Oh - -
Jumlah Pekerja 85,956.75
Jumlah Bahan + Pekerja 105,616.75
Dibulatkan 105,610.00
A.13.74 1 M2 PASANG DINDING BATU TEMPEL
P PK05 BAHAN :
Batu Tempel 1.0500 m2 - -
Semen Abu-abu 11.7500 kg 1,900.00 22,325.00
Pasir Pasang 0.0350 m3 150,000.00 5,250.00
Jumlah Bahan 27,575.00
A001 UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 147,572.90
Dibulatkan 147,570.00
A001 A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS
BAHAN :
Lantai Keramik 30 x 30 cm 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A001 A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP
BAHAN :
Lantai Keramik 30 x 30 cm Warna/Corak/Anti Slip 11.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 23,260.00
UPAH :
Pekerja 0.6200 Oh 113,850.00 70,587.00
Tukang Batu 0.3500 Oh 127,512.00 44,629.20
Kepala Tukang 0.0350 Oh 136,620.00 4,781.70
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 119,997.90
Jumlah Bahan + Pekerja 143,257.90
Dibulatkan 143,250.00
A001 A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
BAHAN :
Keramik 40 x 40 cm 4.0000 bh 11,666.67 46,666.67
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0420 m3 150,000.00 6,300.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 69,926.67
UPAH :
Pekerja 0.2500 Oh 113,850.00 28,462.50
Tukang Batu 0.1250 Oh 127,512.00 15,939.00
Kepala Tukang 0.0130 Oh 136,620.00 1,776.06
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 46,177.56
Jumlah Bahan + Pekerja 116,104.23
Pekerjaan 1 2 3 4 5 6=(3x5)
Dibulatkan 116,100.00
A001 A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM,
BAHAN :
Keramik 20 x 25 cm 20.0000 bh - -
Semen PC (50 kg) 8.4000 kg 1,900.00 15,960.00
Pasir Pasang 0.0180 m3 150,000.00 2,700.00
Semen Warna 0.5000 kg 2,000.00 1,000.00
Jumlah Bahan 19,660.00
UPAH :
Pekerja 0.6000 Oh 113,850.00 68,310.00
Tukang Batu 0.4500 Oh 127,512.00 57,380.40
Kepala Tukang 0.0450 Oh 136,620.00 6,147.90
Mandor 0.0030 Oh - -
P PK05 Jumlah Pekerja 131,838.30
Jumlah Bahan + Pekerja 151,498.30
Dibulatkan 151,490.00
P PK05 A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM)
BAHAN :
Paving Block Warna 6 cm 1.0100 m2 138,000.00 139,380.00
Pasir Beton 0.1000 m³ 200,000.00 20,000.00
Jumlah Bahan 159,380.00
A001 UPAH :
Pekerja 0.2500 org 113,850.00 28,462.50
Tukang Batu 0.5000 org 127,512.00 63,756.00
Kepala Tukang Batu 0.0250 org 136,620.00 3,415.50
Mandor 0.0030 org - -
Jumlah Pekerja 95,634.00
Jumlah Bahan + Pekerja 255,014.00
Jumlah 255,014.00
Dibulatkan 255,010.00
A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM)
BAHAN :
P PK05 Paving Block Warna 8 cm 1.0100 m2 49,000.00 49,490.00
Pasir Beton 0.1000 m³ 200,000.00 20,000.00
Jumlah Bahan 69,490.00
UPAH :
Pekerja 0.2500 org 113,850.00 28,462.50
A001 Tukang Batu 0.5000 org 127,512.00 63,756.00
Kepala Tukang Batu 0.0250 org 136,620.00 3,415.50
Mandor 0.0030 org - -
Jumlah Pekerja 95,634.00
Jumlah Bahan + Pekerja 165,124.00
Jumlah 165,124.00
Dibulatkan 165,120.00
A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM)
BAHAN :
Paving Block Natural 6 cm 1.0100 m² 138,000.00 139,380.00
Pasir Beton 0.1000 m³ 200,000.00 20,000.00
Jumlah Bahan 159,380.00
UPAH :
Pekerja 0.2500 org 113,850.00 28,462.50
P PK05 Tukang Batu 0.5000 org 127,512.00 63,756.00
Kepala Tukang Batu 0.0250 org 136,620.00 3,415.50
Mandor 0.0030 org - -
Jumlah Pekerja 95,634.00
Jumlah Bahan + Pekerja 255,014.00
Jumlah 255,014.00
Dibulatkan 255,010.00
A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM)
BAHAN :
Paving Block Natural 8 cm 1.0100 m² - -
Pasir Beton 0.1000 m³ 200,000.00 20,000.00
Jumlah Bahan 20,000.00
UPAH :
Pekerja 0.2500 org 113,850.00 28,462.50
Tukang Batu 0.5000 org 127,512.00 63,756.00
P PK05 Kepala Tukang Batu 0.0250 org 136,620.00 3,415.50
Mandor 0.0030 org - -
Jumlah Pekerja 95,634.00
Jumlah Bahan + Pekerja 115,634.00
A001 Jumlah 115,634.00
Dibulatkan 115,630.00
A.14.12 1 M2 MENI KAYU
BAHAN :
Cat Meni Kayu 0.3500 Kg 34,000.00 11,900.00
Jumlah Bahan 11,900.00
P PK05 UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Cat - Oh 127,512.00 -
Kepala Tukang - Oh 136,620.00 -
Mandor 0.0060 Oh - -
A001 Jumlah Pekerja 11,385.00
Jumlah Bahan + Pekerja 23,285.00
Dibulatkan 23,280.00
A.14.13 1 M2 MENI BESI
BAHAN :
Cat Meni BESI 0.3500 Kg 7,000.00 2,450.00
Jumlah Bahan 2,450.00
P PK05 UPAH :
Pekerja 0.1000 Oh 113,850.00 11,385.00
Tukang Cat - Oh 127,512.00 -
Kepala Tukang - Oh 136,620.00 -
Mandor 0.0060 Oh - -
A001 Jumlah Pekerja 11,385.00
Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan + Pekerja 13,835.00
Dibulatkan 13,830.00
A.14.14 1 M2 PLAMUR TEMBOK
BAHAN :
Plamir Tembok 0.1000 ltr 9,000.00 900.00
Jumlah Bahan 900.00
UPAH :
P PK05 Pekerja 0.0200 Oh 113,850.00 2,277.00
Tukang Cat 0.0630 Oh 127,512.00 8,033.26
Kepala Tukang 0.0063 Oh 136,620.00 860.71
Mandor 0.0025 Oh - -
Jumlah Pekerja 11,170.96
A001 Jumlah Bahan + Pekerja 12,070.96
Dibulatkan 12,070.00
A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)
BAHAN :
P PK05 Cat Tembok 0.1750 kg 7,000.00 1,225.00
Plamir Tembok 0.1600 kg 9,000.00 1,440.00
Kuas Roll 0.0100 bh 34,000.00 340.00
Ampelas 0.5000 lbr 7,000.00 3,500.00
Jumlah Bahan 6,505.00
A001 UPAH :
Pekerja 0.1040 org 113,850.00 11,840.40
Tukang Cat 0.0182 org 127,512.00 2,320.72
Kepala Tukang cat 0.0090 org 136,620.00 1,229.58
Mandor 0.0045 org - -
Jumlah Pekerja 15,390.70
Jumlah Bahan + Pekerja 21,895.70
Jumlah 21,895.70
Dibulatkan 21,890.00
P PK05 A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)
BAHAN :
Cat Tembok 0.2000 kg 7,000.00 1,400.00
Plamir Tembok 0.1600 kg 9,000.00 1,440.00
Kuas Roll 0.0100 bh 34,000.00 340.00
A001 Ampelas 0.5000 lbr 7,000.00 3,500.00
Jumlah Bahan 6,680.00
UPAH :
Pekerja 0.2000 org 113,850.00 22,770.00
Tukang Cat 0.0280 org 127,512.00 3,570.34
Kepala Tukang cat 0.0150 org 136,620.00 2,049.30
Mandor 0.0090 org - -
Jumlah Pekerja 28,389.64
P PK05 Jumlah Bahan + Pekerja 35,069.64
Jumlah 35,069.64
Dibulatkan 35,060.00
A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI
BAHAN :
Meni kayu 0.1670 kg 34,000.00 5,678.00
Plamir kayu 0.0830 kg 9,000.00 747.00
P PK05 Cat Kayu 0.2000 kg 25,000.00 5,000.00
Ampelas 0.4000 lbr 7,000.00 2,800.00
Minyak cat / Thinner 0.1500 ltr 13,876.00 2,081.40
Kwas 0.0500 bh 18,000.00 900.00
Jumlah Bahan 17,206.40
A001 UPAH :
Pekerja 0.2000 org 113,850.00 22,770.00
Tukang Cat 0.0600 org 127,512.00 7,650.72
Kepala Tukang cat 0.0300 org 136,620.00 4,098.60
Mandor 0.0100 org - -
Jumlah Pekerja 34,519.32
Jumlah Bahan + Pekerja 51,725.72
Jumlah 51,725.72
Dibulatkan 51,720.00
A.14.30'' 1 M2 PENGECATAN BIDANG DINDING ( PLINT )
BAHAN :
Cat Kayu / Besi / Cat minyak 0.2000 kg 25000 5,000.00
Ampelas 0.4000 lbr 7000 2,800.00
Minyak Thinner 0.1500 ltr 13876 2,081.40
Kwas 0.0500 bh 18000 900.00
Jumlah Bahan 10,781.40
UPAH :
Pekerja 0.2000 org 113850 22,770.00
Tukang Cat 0.0600 org 127512 7,650.72
Kepala Tukang cat 0.0300 org 136620 4,098.60
Mandor 0.0100 org 0 -
Jumlah Pekerja 34,519.32
Jumlah Bahan + Pekerja 45,300.72
Jumlah 45,300.72
Dibulatkan 45,300.00
A.14.31 1 M2 PENGECATAN BESI (3X)
BAHAN :
P PK05 Meni Besi/Flincote 0.1670 kg 34,000.00 5,678.00
Cat Besi 0.2000 kg 7,000.00 1,400.00
Ampelas 0.4000 lbr 7,000.00 2,800.00
Minyak cat / Thinner 0.1500 ltr 13,876.00 2,081.40
Kwas 0.0500 bh 18,000.00 900.00
A001 Jumlah Bahan 12,859.40
UPAH :
Pekerja 0.2000 org 113,850.00 22,770.00
Tukang Cat 0.0600 org 127,512.00 7,650.72
Kepala Tukang cat 0.0300 org 136,620.00 4,098.60
Mandor 0.0100 org - -
Jumlah Pekerja 34,519.32
Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Bahan + Pekerja 47,378.72
Jumlah 47,378.72
P PK05 Dibulatkan 47,370.00
B6 MENANAM 1 BATANG TANAMAN BERIKUT PELINDUNGNYA
Tanaman Keras 1.0000 btg - -
Bambu 1.0000 btg - -
Pekerja 0.4000 org 113,850.00 45,540.00
Mandor 0.0050 org - -
Jumlah 45,540.00
Jumlah 45,540.00
Dibulatkan 45,540.00
E 13 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK
Tukang Kayu 0.0400 org 127,512.00 5,100.48
Kepala Tukang 0.0040 org 136,620.00 546.48
Pekerja 1.8000 org 113,850.00 204,930.00
Mandor 0.0430 org - -
Untuk tanah biasa dihitung = 1, 25 x analis E. 13
Untuk tanah biasa dihitung = 1, 50x analis E. 13
Untuk tanah biasa dihitung = 2, 00 x analis E. 13
Jumlah -
Jumlah -
Dibulatkan -
M.01 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 3M' ( ASUMSI LEBAR JEMBATAN 3M' & TANPA TIANG)
Kayu Bulat f 30 cm 7.5000 btg -
Paku Biasa 0.5600 kg 25,000.00 14,000.00
Pasak Besi f 12 mm 2.8000 kg - -
Tukang Kayu 1.2000 org 127,512.00 153,014.40
Kepala Tukang Kayu 0.1200 org 136,620.00 16,394.40
Pekerja 4.8000 org 113,850.00 546,480.00
Mandor 0.0120 org - -
Alat Bantu 0.0100 ls 4,029.82 40.30
Jumlah 40.30
Jumlah 40.30
Dibulatkan 40.00
M.02 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 6M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 18.0000 btg -
Paku Biasa 1.1200 kg 25,000.00 28,000.00
Pasak Besi f 12 mm 5.6000 kg - -
Tukang Kayu 1.4000 org 127,512.00 178,516.80
Kepala Tukang Kayu 0.1400 org 136,620.00 19,126.80
Pekerja 5.3000 org 113,850.00 603,405.00
Mandor 0.0140 org - -
Alat Bantu 0.0100 ls 4,029.82 40.30
Jumlah 40.30
Jumlah 40.30
Dibulatkan 40.00
M.03 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 9M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 28.5000 btg -
Paku Biasa 1.6800 kg 25,000.00 42,000.00
Pasak Besi f 12 mm 8.4000 kg - -
Tukang Kayu 1.7000 org 127,512.00 216,770.40
Kepala Tukang Kayu 7.0000 org 136,620.00 956,340.00
Pekerja 5.9000 org 113,850.00 671,715.00
Mandor 0.0170 org - -
Alat Bantu 0.0100 ls 4,029.82 40.30
Jumlah 40.30
Jumlah 40.30
Dibulatkan 40.00
M.04 1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 12M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat f 30 cm 39.0000 btg -
Paku Biasa 1.6800 kg 25,000.00 42,000.00
Pasak Besi f 12 mm 11.2000 kg - -
Tukang Kayu 2.1000 org 127,512.00 267,775.20
Kepala Tukang Kayu 0.2100 org 136,620.00 28,690.20
Pekerja 6.3000 org 113,850.00 717,255.00
Mandor 0.0210 org - -
Alat Bantu 0.0100 ls 4,029.82 40.30
Jumlah 40.30
Jumlah 40.30
Dibulatkan 40.00
A7.R. UPAH ANGKUTAN 1 ZAK SEMEN PC ( BID. PENGAIRAN )
Jumlah -
Jumlah -
Dibulatkan -
A6 ONGKOS ANGKUT 1 M3 TANAH ( BID. PENGAIRAN )
Sejauh 30 meter
Pekerja 0.3300 org 113,850.00 37,570.50
Mandor 0.0100 org -
Lebih dari 30 meter
Jumlah -
Jumlah -
Dibulatkan -
A. R 1 M2 PEK. ANTI RAYAP
BAHAN :
Bahan Anti Rayap 0.0900 Ltr - -
Alat Semprot 0.0500 lsm - -
Jumlah Bahan -
UPAH :
Pekerja 0.0100 Oh 113,850.00 1,138.50
Jumlah Pekerja 1,138.50
Jumlah Bahan + Pekerja 1,138.50
A001 Dibulatkan 1,130.00
Pekerjaan 1 2 3 4 5 6=(3x5)
A. B 1 M1 PEK. ANGKUR BESI Dia. 10 - 45 cm
BAHAN :
Besi Beton Polos Dia. 10 mm 0.2667 M1 2,952.50 787.33
Jumlah Bahan 787.33
UPAH :
Pekerja 0.0100 Oh 113,850.00 1,138.50
Jumlah Pekerja 1,138.50
Jumlah Bahan + Pekerja 1,925.83
Dibulatkan 1,920.00
A. B 1 M2 PEKERJAAN SALURAN AIR PASANGAN BT BATA ad 1 : 4
BAHAN :
Bata Merah Bakar Kelas I 70.0000 bh 700.00 49,000.00
Semen PC (50 kg) 18.9500 kg 1,900.00 36,005.00
Pasir Pasang 0.0430 m3 150,000.00
Jumlah Bahan 85,005.00
UPAH :
Pekerja 0.3200 Oh 113,850.00 36,432.00
Tukang Batu 0.1000 Oh 127,512.00 12,751.20
Kepala Tukang 0.0100 Oh 136,620.00
Mandor 0.0050 Oh -
Jumlah Pekerja 49,183.20
Jumlah Bahan + Pekerja 134,188.20
Dibulatkan 134,180.00
L. 01. 01 1 M1 PAS. INSTALASI LISTRIK KABEL UTAMA 3x2,5 NYM
BAHAN :
Kabel 3x2,5mm NYM 1.0000 m' 13,000.00 13,000.00
Pipa konduit dia 5/8 inch 1.0000 m' 2,000.00 2,000.00
Klem kabel 3.0000 bh 100.00 300.00
Isolasi 0.0500 bh 15,000.00 750.00
Jumlah Bahan 16,050.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 36,451.92
Dibulatkan 36,450.00
L. 01. 02 1 TITIK INSTALASI TITIK LAMPU 2x2,5 NYM
BAHAN :
Kabel 2x2,5mm NYM 3.5000 m' 12,000.00 42,000.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Klem kabel 16.0000 bh 100.00 1,600.00
Isolasi 0.0500 bh 15,000.00 750.00
Tedoos 1.0000 bh 3,000.00 3,000.00
Jumlah Bahan 55,350.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 75,751.92
Dibulatkan 75,750.00
L. 01. 03 1 Titik Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM
BAHAN :
Saklar Tunggal 1.0000 bh 37,950.00 37,950.00
Kabel 2x2,5mm NYM 2.5000 m' 12,000.00 30,000.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Inbouwdoos 1.0000 bh 1,500.00 1,500.00
Jumlah Bahan 78,200.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 98,601.92
Dibulatkan 98,600.00
L. 01. 04 1 Titik Instalasi Titik Saklar Double 3x2,5 NYM
BAHAN :
Saklar Double 1.0000 bh 53,130.00 53,130.00
Kabel 3x2,5mm NYM 1.5000 m' 13,000.00 19,500.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Inbouwdoos 1.0000 bh 1,500.00 1,500.00
Jumlah Bahan 82,880.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 103,281.92
Dibulatkan 103,280.00
L. 01. 05 1 Titik Pas. Instalasi Titik Stop Kontak 3x2,5 NYM
BAHAN :
Stop Kontak 1.0000 bh 37,950.00 37,950.00
Kabel 3x2,5mm NYM 1.5000 m' 13,000.00 19,500.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Inbouwdoos 1.0000 bh 1,500.00 1,500.00
Jumlah Bahan 67,700.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 88,101.92
Dibulatkan 88,100.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 58 w
BAHAN :
Lampu Pijar 58 w 1.0000 bh 140,000.00 140,000.00
Kabel 1x2,5mm NYM 6.5000 m' 11,000.00 71,500.00
Pipa konduit dia 5/8 inch 6.0000 m' 2,000.00 12,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Klem kabel 3.0000 bh 100.00 300.00
Pekerjaan 1 2 3 4 5 6=(3x5)
Tedoos 1.0000 bh 3,000.00 3,000.00
Jumlah Bahan 227,550.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 247,951.92
Dibulatkan 247,950.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 58 w
BAHAN :
Lampu Pijar 58 w 1.0000 bh 140,000.00 140,000.00
Kabel 1x2,5mm NYM 6.5000 m' 11,000.00 71,500.00
Pipa konduit dia 5/8 inch 6.0000 m' 2,000.00 12,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Klem kabel 3.0000 bh 100.00 300.00
Tedoos 1.0000 bh 3,000.00 3,000.00
Jumlah Bahan 227,550.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 247,951.92
Dibulatkan 247,950.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 15 w
BAHAN :
Lampu Pijar 15 w 1.0000 bh 50,000.00 50,000.00
Kabel 1x2,5mm NYM 6.5000 m' 11,000.00 71,500.00
Pipa konduit dia 5/8 inch 6.0000 m' 2,000.00 12,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Klem kabel 3.0000 bh 100.00 300.00
Tedoos 1.0000 bh -
Jumlah Bahan 134,550.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 154,951.92
Dibulatkan 154,950.00
L. 01. 07 1 Titik Pas. Instalasi Lampu TL 2x40 Watt + fitting
BAHAN :
Lampu TL 2x40 Watt + fitting 1.0000 bh 140,000.00 140,000.00
Kabel 1x2,5mm NYM 4.5000 m' 11,000.00 49,500.00
Pipa konduit dia 5/8 inch 4.0000 m' 2,000.00 8,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Klem kabel 3.0000 bh 100.00 300.00
Tedoos 1.0000 bh 3,000.00 3,000.00
Jumlah Bahan 201,550.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 221,951.92
Dibulatkan 221,950.00
L. 01. 08 1 Titik Pas. MCB + Box Sekring
BAHAN :
MCB 4.0000 bh 50,000.00 200,000.00
Kabel 1x2,5mm NYM 4.5000 m' 11,000.00 49,500.00
Pipa konduit dia 5/8 inch 10.0000 m' 2,000.00 20,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Box Sekring 1.0000 bh 325,000.00 325,000.00
Jumlah Bahan 595,250.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 615,651.92
Dibulatkan 615,650.00
L. 01. 09 1 M1 Pas. Kabel Antar Bangunan 3x4mm NYY
BAHAN :
Kabel 3x4mm NYY 10.0000 m' 16,000.00 160,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Jumlah Bahan 160,750.00
UPAH :
Tukang 0.8000 Oh 127,512.00 102,009.60
Jumlah Pekerja 102,009.60
Jumlah Bahan + Pekerja 262,759.60
Dibulatkan 262,750.00
L. 01. 10 1 Bh pasang Panel Box Utama +MCB
BAHAN :
Panel Box Utama 1.0000 bh - -
MCB 6.0000 bh 50,000.00 300,000.00
Kabel 3x2,5mm NYM 5.0000 m' 13,000.00 65,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Jumlah Bahan 65,750.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Jumlah Pekerja 20,401.92
Jumlah Bahan + Pekerja 86,151.92
Dibulatkan 86,150.00
S.D.U 1 M' PAS. SALURAN DRAINASE UTAMA
BAHAN :
Batu kali 0.5000 m3 235,000.00 117,500.00
Plesteran 3.0000 m² 93,780.00 281,340.00
Kabel 3x2,5mm NYM 5.0000 m' 13,000.00 65,000.00
Isolasi 0.0500 bh 15,000.00 750.00
Jumlah Bahan 464,590.00
UPAH :
Tukang 0.1600 Oh 127,512.00 20,401.92
Pekerja 0.2500 Oh 113,850.00 28,462.50
Pekerjaan 1 2 3 4 5 6=(3x5)
Jumlah Pekerja 48,864.42
Jumlah Bahan + Pekerja 513,454.42
Dibulatkan 513,450.00
A.02.23 1 M2 PASANG GEBALAN RUMPUT
BAHAN :
LL42 Lempengan Rumput 1.0000 m² - -
Pupuk Kandang 1.0000 ls - -
Tanah Urug (Tebal 20 cm) 0.2000 m3 - -
Jumlah Bahan -
UPAH :
P PK02 Upah Pasang 1.0000 org 113,850.00 113,850.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 113,850.00
A052 Dibulatkan 113,850.00
A.01.P.01 1 BH TANAM POHON PELINDUNG
BAHAN :
LL42 Pohon Pelindung 1.0000 btg - -
Pupuk kandang 1.0000 ls - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 113,850.00 113,850.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 113,850.00
A052 Dibulatkan 113,850.00
A.01.P.02 1 M2 PEMBUATAN TAMAN
BAHAN :
LL42 Pembentukan Lahan Taman 1.0000 Unit - -
Pupuk Kandang 1.0000 ls - -
Pohon Perdu/Bunga dll 1.0000 btg - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 113,850.00 113,850.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 113,850.00
A052 Dibulatkan 113,850.00
A.01.P.03 1 BH PENANAMAN POHON HIAS
BAHAN :
LL42 Pohon Hias 1.0000 btg - -
Pupuk Kandang 1.0000 krg - -
Jumlah Bahan -
UPAH :
P PK02 Upah Tanam 1.0000 org 113,850.00 113,850.00
P PK19 Mandor 0.0100 org - -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 113,850.00
A052 Dibulatkan 113,850.00
A.01.P.04 1 M' SELASAR PENGHUBUNG BANGUNAN DENGAN ATAP
BAHAN :
LL42 Kayu Kelas II Balok (Selasar Penghubung) 0.0459 m3 4,000,000.00 183,600.00
Seng Gelombang BJLS 0,3 3.3000 lbr 87,000.00 287,100.00
Seng Plat BJLS 30 lebar 90 cm 0.3000 lbr - -
Rabat Beton 0.0230 m3 958,840.00 22,053.32
Paku Seng 0.0200 kg 25,000.00 500.00
Mur - Baut dia 10 mm panjang 30 cm 1.6700 bh - -
Jumlah Bahan 493,253.32
UPAH :
P PK02 Pekerja 0.7500 oh 113,850.00 85,387.50
P PK19 Tukang Kayu 0.5000 oh 127,512.00 63,756.00
Jumlah Pekerja 149,143.50
Jumlah Bahan + Pekerja 642,396.82
A052 Dibulatkan 642,390.00
A.01.P.05 1 M' PEKERJAAN PANCANG CERUCUK BAMBU
BAHAN :
LL42 Bambu 1.0000 m¹ - -
-
-
-
-
-
Jumlah Bahan -
UPAH :
P PK02 Pekerja 1.4286 oh 113,850.00 162,646.11
P PK19 Tukang Kayu oh -
Jumlah Pekerja 162,646.11
Jumlah Bahan + Pekerja 162,646.11
A052 Dibulatkan 162,640.00
A.01.P.06 1 BTG (pj = 45cm) PEKERJAAN PEMASANGAN ANGKUR BESI DIA. 10mm
BAHAN :
LL42 Besi Beton Polos Dia. 10 mm 0.3085 kg 35,430.00 10,930.16
Jumlah Bahan 10,930.16
UPAH :
P PK02 Pekerja 0.1000 oh 113,850.00 11,385.00
P PK19 Tukang Kayu oh -
Jumlah Pekerja 11,385.00
Jumlah Bahan + Pekerja 22,315.16
A052 Dibulatkan 22,310.00
A.01.P.07 1 BH PEKERJAAN BEGHEL U POJOK (BESI POLOS 12MM) + BAUT DIA.10
BAHAN :
LL42 Beghel U Besi Polos Dia. 12mm 1.0000 bh 15,000.00 15,000.00
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan 15,000.00
Pekerjaan 1 2 3 4 5 6=(3x5)
UPAH :
P PK02 Pekerja oh 113,850.00 -
P PK19 Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 27,751.20
A052 Dibulatkan 27,750.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10
BAHAN :
LL42 Beghel U Besi Plat Baja U 4.40mm 1.0000 bh - -
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja oh 113,850.00 -
P PK19 Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 12,751.20
A052 Dibulatkan 12,750.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10
BAHAN :
Beghel U Besi Plat Baja U 4.40mm 1.0000 bh - -
Baut Dia. 10mm 1.0000 bh - -
Jumlah Bahan -
UPAH :
Pekerja oh 113,850.00 -
Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 12,751.20
Dibulatkan 12,750.00
A.01.P.08" 2 BH PEKERJAAN BAUT DIA.10 mm Sambungan gording 5/10 atau 6/12 cm per titik
BAHAN :
Baut Dia. 10mm 2.0000 bh - -
Jumlah Bahan -
UPAH :
P PK02 Pekerja oh 113,850.00 -
P PK19 Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 12,751.20
A052 Dibulatkan 12,750.00
A.01.P.09 1 SET PEK BEGHEL, BEGHEL U, PLAT BAJA, BAUT UNTUK 1 BH KUDA2-KUDA
BAHAN :
LL42 Beghel U (Plat Baja U 4.40mm) 3.0000 bh - -
Beghel U (Besi Polos 12mm) 2.0000 bh 15,000.00 30,000.00
Plat Baja 4.40mm 8.0000 bh - -
Baut Dia. 10mm (25-30cm) 22.0000 bh - -
Jumlah Bahan 30,000.00
UPAH :
P PK02 Pekerja oh 113,850.00 -
P PK19 Tukang Kayu 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 42,751.20
A052 Dibulatkan 42,750.00
A.01.P.10 1 BH PEKERJAAN TIANG DAN RING BASKET BALL KOMPLIT
BAHAN :
Galian tanah 1.2000 m3 96,770.00 116,124.00
Cor beton tumbuk Ad 1:3:5 0.5000 m3 958,840.00 479,420.00
Tiang pipa galvanis dia 3" 1.0000 btg - -
Papan plank komplit rangka 1.0000 bh - -
Ring Basket 1.0000 Set - -
Jumlah Bahan 595,544.00
UPAH :
Pekerja oh 113,850.00 -
Tukang 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 608,295.20
Dibulatkan 608,290.00
A.01.P.11 1 M1 PEKERJAAN HAND RAILING
BAHAN :
Cor beton tumbuk Ad 1:3:5 0.0120 m3 1,226,010.00 14,712.12
Pipa Stainless Steel Dia. 1,5" 1.3200 m¹ - -
Jumlah Bahan 14,712.12
UPAH :
Pekerja 1.0000 oh 113,850.00 113,850.00
Tukang oh 127,512.00 -
Jumlah Pekerja 113,850.00
Jumlah Bahan + Pekerja 128,562.12
Dibulatkan 128,560.00
A.01.P.12 1 TITIK PEKERJAAN PANCANG CERUCUK BAMBU
BAHAN :
Bambu 0.5000 btg - -
Kayu Kelas III Papan 0.0033 m3 3,000,000.00 10,000.00
Kawat Beton (Pengikat) 0.0150 kg 26,000.00 390.00
Jumlah Bahan 10,390.00
UPAH :
Pekerja 0.1000 oh 113,850.00 11,385.00
Tukang oh 127,512.00 -
Jumlah Pekerja 11,385.00
Jumlah Bahan + Pekerja 21,775.00
Dibulatkan 21,770.00
A.01.P.13 1 TITIK PEKERJAAN PANCANG CERUCUK KAYU DOLKEN
BAHAN :
Kayu Dolken Dia. 8 cm 0.5000 btg 30,000.00 15,000.00
Kayu Kelas III Papan 0.0033 m3 3,000,000.00 10,000.00
Kawat Beton (Pengikat) 0.0150 kg 26,000.00 390.00
Jumlah Bahan 25,390.00
Pekerjaan 1 2 3 4 5 6=(3x5)
UPAH :
Pekerja 0.1000 oh 113,850.00 11,385.00
Tukang oh 127,512.00 -
Jumlah Pekerja 11,385.00
Jumlah Bahan + Pekerja 36,775.00
Dibulatkan 36,770.00
A.01.P.14 1 M³ PEKERJAAN BALOK GAPIT
BAHAN :
Kayu Kls. II Balok 1.2000 m³ 4,000,000.00 4,800,000.00
Jumlah Bahan 4,800,000.00
UPAH :
Pekerja oh 113,850.00 -
Tukang 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 4,812,751.20
Dibulatkan 4,812,750.00
A.01.P.15 1 M³ PEKERJAAN TATAKAN GORDING/KLOS KAYU
BAHAN :
Kayu Kls. II Balok 1.1000 m³ 4,000,000.00 4,400,000.00
Paku Biasa 0.0500 kg 25,000.00 1,250.00
Jumlah Bahan 4,401,250.00
UPAH :
Pekerja oh 113,850.00 -
Tukang 0.1000 oh 127,512.00 12,751.20
Jumlah Pekerja 12,751.20
Jumlah Bahan + Pekerja 4,414,001.20
Dibulatkan 4,414,000.00
A.01.P.16 1 M1 PEKERJAAN PINTU GERBANG BESI
BAHAN :
Pintu Gerbang Besi 1.0000 m1 - -
Jumlah Bahan -
UPAH :
Pekerja oh 113,850.00 -
Tukang oh 127,512.00 -
Jumlah Pekerja -
Jumlah Bahan + Pekerja -
Dibulatkan -
Bahan
Upah
0.3 Org/Mandor Rp Rp -
Alat bantu Rp -
Total Rp 8,080,482.00
Dibulatkan 899,580.00
BAHAN :
UPAH :
Mandor 0.03 Oh 0 0
Jumlah Pekerja 323,334.00
Pekerjaan 1 2 3 4 5 6=(3x5)
BAHAN :
Dibulatkan 1,331,920.00
1 M2 MENGECAT KAYU
BAHAN :
UPAH :
Jumlah 51,725.72
Dibulatkan 51,720.00
1 2 3 4 5 6=(3x5)
M-1 1 UNIT MEJA SISWA TUNGGAL
BAHAN :
Kayu Kelas II 0.0500 m3 4,000,000.00 200,000.00
Paku Ulir 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.0500 kg 25,000.00 1,250.00
Politur 0.5000 kg 41,000.00 20,500.00
Jumlah Bahan 229,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 357,162.00
Dibulatkan 357,160.00
M-3 1 UNIT MEJA BACA INDIVIDU
BAHAN :
Kayu Kelas II 0.0708 m3 4,000,000.00 283,280.00
Paku Ulir 36.0000 bh - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1500 kg 25,000.00 3,750.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 340,580.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 468,092.00
Dibulatkan 468,090.00
M-4 1 UNIT MEJA BACA KELOMPOK
BAHAN :
Kayu Kelas II 0.0263 m3 4,000,000.00 105,280.00
Paku Ulir 24.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 154,330.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 281,842.00
Dibulatkan 281,840.00
M-5 1 UNIT MEJA BACA SERBAGUNA
BAHAN :
Kayu Kelas II 0.0312 m3 4,000,000.00 124,960.00
Paku Ulir 24.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 174,010.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 301,522.00
Dibulatkan 301,520.00
M-6 1 UNIT MEJA PIMPINAN
BAHAN :
Kayu Kelas II 0.1700 m3 4,000,000.00 680,000.00
Knop Tarikan 1.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 729,050.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 856,562.00
Dibulatkan 856,560.00
1 2 3 4 5 6=(3x5)
M-7 1 UNIT MEJA KERJA
BAHAN :
Kayu Kelas II 0.1200 m3 4,000,000.00 480,000.00
Paku Ulir 20.0000 bh - -
Amplas 4.0000 lbr 7,000.00 28,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.0500 kg 25,000.00 1,250.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 552,950.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 680,462.00
Dibulatkan 680,460.00
M-8 1 UNIT MEJA GURU
BAHAN :
Kayu Kelas II 0.0432 m3 4,000,000.00 172,800.00
Paku Ulir 12.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.0500 kg 25,000.00 1,250.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 219,700.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 347,212.00
Dibulatkan 347,210.00
M-10 1 UNIT MEJA SIRKULASI
BAHAN :
Kayu Kelas II 0.1800 m3 4,000,000.00 720,000.00
Knop Tarikan 1.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 779,300.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 906,812.00
Dibulatkan 906,810.00
M-11 1 UNIT MEJA PERAGA / DEMONSTRASI
BAHAN :
Kayu Kelas II 0.1720 m3 4,000,000.00 688,000.00
Knop Tarikan 3.0000 bh - -
Paku Ulir 48.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.2000 kg 9,000.00 1,800.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 747,300.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 874,812.00
Dibulatkan 874,810.00
M-12 1 UNIT MEJA KETIK
BAHAN :
Kayu Kelas II 0.0500 m3 4,000,000.00 200,000.00
Knop Tarikan 1.0000 bh - -
Paku Ulir 24.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1500 kg 25,000.00 3,750.00
Politur 0.5000 kg 41,000.00 20,500.00
Jumlah Bahan 232,150.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 359,662.00
Dibulatkan 359,660.00
1 2 3 4 5 6=(3x5)
K-1 1 UNIT KURSI SISWA TUNGGAL
BAHAN :
Kayu Kelas II 0.0200 m3 4,000,000.00 80,000.00
Paku Ulir 25.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.0300 kg 25,000.00 750.00
Politur 0.5000 kg 41,000.00 20,500.00
Jumlah Bahan 116,150.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 243,662.00
Dibulatkan 243,660.00
K-2 1 UNIT KURSI BULAT TINGGI
BAHAN :
Kayu Kelas II 0.0027 m3 4,000,000.00 10,800.00
Besi Pipa Galvanis 1/2" 4.5000 m' - -
Baut dia.10 cm 4.0000 bh - -
Amplas 0.5000 lbr 7,000.00 3,500.00
Dempul besi 0.0500 kg 7,000.00 350.00
Lem Kayu 0.0200 kg 25,000.00 500.00
Politur 0.1000 kg 41,000.00 4,100.00
Cat besi 0.2000 kg Err:509 Err:509
Jumlah Bahan Err:509
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah Err:509
Dibulatkan Err:509
K-3 1 UNIT KURSI BULAT PENDEK
BAHAN :
Kayu Kelas II 0.0027 m3 4,000,000.00 10,800.00
Besi Pipa Galvanis 1/2" 3.5000 m' - -
Baut dia.10 cm 4.0000 bh - -
Amplas 0.5000 lbr 7,000.00 3,500.00
Dempul besi 0.0500 kg 7,000.00 350.00
Lem Kayu 0.0200 kg 25,000.00 500.00
Politur 0.1000 kg 41,000.00 4,100.00
Cat besi 0.2000 kg Err:509 Err:509
Jumlah Bahan Err:509
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah Err:509
Dibulatkan Err:509
K-5 1 UNIT KURSI KERJA
BAHAN :
Kayu Kelas II 0.0134 m3 4,000,000.00 53,760.00
Paku Ulir 20.0000 bh - -
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.0300 kg 25,000.00 750.00
Politur 0.2500 kg 41,000.00 10,250.00
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Karet Busa 1.0000 bh - -
Imitatie Lear 1.0000 unit - -
Jumlah Bahan 122,160.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 249,672.00
Dibulatkan 249,670.00
1 2 3 4 5 6=(3x5)
L-1 1 UNIT LEMARI BUKU
BAHAN :
Kayu Kelas II 0.1190 m3 4,000,000.00 476,000.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.3200 m2 187,750.00 247,830.00
Engsel Pita 4.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 901,530.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,029,042.00
Dibulatkan 1,029,040.00
L-2 1 UNIT LEMARI KACA GESER
BAHAN :
Kayu Kelas II 0.2176 m3 4,000,000.00 870,400.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.7000 m2 187,750.00 319,175.00
Rel Pita 4.8000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,367,275.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,494,787.00
Dibulatkan 1,494,780.00
L-3 1 UNIT LEMARI ARSIP
BAHAN :
Kayu Kelas II 0.1800 m3 4,000,000.00 720,000.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Grendel 2.0000 bh 12,000.00 24,000.00
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 921,700.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,049,212.00
Dibulatkan 1,049,210.00
L-4 1 UNIT LEMARI PEMBATAS
BAHAN :
Kayu Kelas II 0.1048 m3 4,000,000.00 419,200.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Engsel Pita 4.0000 psg - -
Grendel 2.0000 bh 12,000.00 24,000.00
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 620,900.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
1 2 3 4 5 6=(3x5)
Jumlah Bahan + Upah 748,412.00
Dibulatkan 748,410.00
L-5 1 UNIT LEMARI ADMINISTRASI
BAHAN :
Kayu Kelas II 0.1190 m3 4,000,000.00 476,000.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 2.0000 bh - -
Kaca 3mm 1.3200 m2 187,750.00 247,830.00
Engsel Pita 4.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 901,530.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,029,042.00
Dibulatkan 1,029,040.00
L-6 1 UNIT LEMARI ALAT PERAGA
BAHAN :
Kayu Kelas II 0.2925 m3 4,000,000.00 1,170,176.00
Knop Tarikan 3.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 50.0000 bh - -
Besi dia 8 mm 15.0000 m1 35,430.00 531,450.00
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,836,826.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,964,338.00
Dibulatkan 1,964,330.00
L-7 1 UNIT LEMARI OBAT
BAHAN :
Kayu Kelas II 0.2788 m3 4,000,000.00 1,115,200.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 1.3200 m2 187,750.00 247,830.00
Engsel Pita 4.0000 psg - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,498,230.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,625,742.00
Dibulatkan 1,625,740.00
L-10 1 UNIT LEMARI KERTAS KERJA
BAHAN :
Kayu Kelas II 0.2925 m3 4,000,000.00 1,170,176.00
Knop Tarikan 30.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 100.0000 bh - -
Besi dia 8 mm 15.0000 m1 35,430.00 531,450.00
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,836,826.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
1 2 3 4 5 6=(3x5)
Jumlah Bahan + Upah 1,964,338.00
Dibulatkan 1,964,330.00
1 2 3 4 5 6=(3x5)
L-11 1 UNIT LEMARI KATALOK
BAHAN :
Kayu Kelas II 0.2925 m3 4,000,000.00 1,170,176.00
Knop Tarikan 30.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 80.0000 bh - -
Besi dia 8 mm 15.0000 m1 35,430.00 531,450.00
Promika 0.2352 lbr - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,836,826.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,964,338.00
Dibulatkan 1,964,330.00
L-12 1 UNIT LEMARI KARDEK
BAHAN :
Kayu Kelas II 0.1000 m3 4,000,000.00 400,000.00
Knop Tarikan 8.0000 bh - -
Paku Ulir 25.0000 bh - -
sekrup 5 cm 25.0000 bh - -
Tripleks 4mm 0.5000 lbr 85,000.00 42,500.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.0500 kg 9,000.00 450.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.5000 kg 41,000.00 20,500.00
Jumlah Bahan 486,950.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 614,462.00
Dibulatkan 614,460.00
L-13 1 UNIT LEMARI KACA TINGGI
BAHAN :
Kayu Kelas II 0.2588 m3 4,000,000.00 1,035,200.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 1.5300 m2 187,750.00 287,257.50
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,500,157.50
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,627,669.50
Dibulatkan 1,627,660.00
L-14 1 UNIT LEMARI GANTUNG/P3K
BAHAN :
Kayu Kelas II 0.1075 m3 4,000,000.00 430,080.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kaca 3mm 0.4800 m2 187,750.00 90,120.00
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 683,900.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 811,412.00
Dibulatkan 811,410.00
1 2 3 4 5 6=(3x5)
L-15 1 UNIT LEMARI KUNCI
BAHAN :
Kayu Kelas II 0.1075 m3 4,000,000.00 430,080.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 10.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Sekrup Penggantung 12.0000 bh - -
Kaca 3mm 0.4800 m2 187,750.00 90,120.00
Engsel Pita 6.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 683,900.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 811,412.00
Dibulatkan 811,410.00
L-16 1 UNIT LEMARI LOCKER
BAHAN :
Kayu Kelas II 0.1392 m3 4,000,000.00 556,800.00
Knop Tarikan 12.0000 bh - -
Paku Ulir 48.0000 bh - -
sekrup 5 cm 24.0000 bh - -
Kunci Lemari 2.0000 bh - -
Engsel Pita 24.0000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 734,500.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 862,012.00
Dibulatkan 862,010.00
L-17/19 1 UNIT LEMARI PAKAIAN
BAHAN :
Kayu Kelas II 0.1800 m3 4,000,000.00 720,000.00
Knop Tarikan 2.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Kunci Lemari 1.0000 bh - -
Grendel 2.0000 bh 12,000.00 24,000.00
Tripleks 4mm 2.0000 lbr 85,000.00 170,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,006,700.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,134,212.00
Dibulatkan 1,134,210.00
L-20 1 UNIT LEMARI ASAM
BAHAN :
Kayu Kelas II 0.1075 m3 4,000,000.00 430,080.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Pipa PVC AW 4" 1.0000 m1 75,000.00 75,000.00
Elbow PVC 4" 1.0000 bh - -
Engsel pita 4.0000 psg - -
Aluminium 1.0000 m2 - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 597,780.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 725,292.00
1 2 3 4 5 6=(3x5)
Dibulatkan 725,290.00
1 2 3 4 5 6=(3x5)
P-1 1 UNIT PAPAN TULIS GANTUNG
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.2500 kg 25,000.00 6,250.00
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Multiplex 9 mm 1.0000 lbr - -
Jumlah Bahan 156,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 284,162.00
Dibulatkan 284,160.00
P-4 1 UNIT WHITE BOARD GANTUNG/STANDAR
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.2500 kg 25,000.00 6,250.00
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 156,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 284,162.00
Dibulatkan 284,160.00
P-6 1 UNIT PAPAN STATISTIK
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.2000 kg 25,000.00 5,000.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 148,400.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 275,912.00
Dibulatkan 275,910.00
P-7 1 UNIT PAPAN JADWAL
BAHAN :
Kayu Kelas II 0.0250 m3 4,000,000.00 100,000.00
Paku Biasa 0.1500 kg 25,000.00 3,750.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 127,150.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 254,662.00
Dibulatkan 254,660.00
P-8 1 UNIT PAPAN PAMERAN
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.2200 kg 25,000.00 5,500.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Multiplex 9 mm 1.0000 lbr - -
Jumlah Bahan 148,900.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 276,412.00
Dibulatkan 276,410.00
1 2 3 4 5 6=(3x5)
P-9 1 UNIT PAPAN JADWAL
BAHAN :
Kayu Kelas II 0.0220 m3 4,000,000.00 88,000.00
Paku Biasa 0.1300 kg 25,000.00 3,250.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 114,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 242,162.00
Dibulatkan 242,160.00
P-10 1 UNIT PAPAN ABSENSI
BAHAN :
Kayu Kelas II 0.0230 m3 4,000,000.00 92,000.00
Paku Biasa 0.1250 kg 25,000.00 3,125.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Cat Minyak 1.0000 kg 13,000.00 13,000.00
Jabarwood 4 mm 1.0000 lbr - -
Jumlah Bahan 118,525.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 246,037.00
Dibulatkan 246,030.00
R-1 1 UNIT RAK TAS DAN BUKU
BAHAN :
Kayu Kelas II 0.1256 m3 4,000,000.00 502,400.00
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 680,100.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 807,612.00
Dibulatkan 807,610.00
R-2 1 UNIT RAK BUKU SATU MUKA
BAHAN :
Kayu Kelas II 0.1072 m3 4,000,000.00 428,800.00
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 606,500.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 734,012.00
Dibulatkan 734,010.00
R-3 1 UNIT RAK BUKU DUA MUKA
BAHAN :
Kayu Kelas II 0.1504 m3 4,000,000.00 601,600.00
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 bh - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 2.0000 lbr 7,000.00 14,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 772,300.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 899,812.00
1 2 3 4 5 6=(3x5)
Dibulatkan 899,810.00
1 2 3 4 5 6=(3x5)
R-4 1 UNIT RAK GUDANG
BAHAN :
Kayu Kelas II 0.1504 m3 4,000,000.00 601,600.00
Paku Ulir 48.0000 bh - -
sekrup 5 cm 48.0000 lbr - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 2.0000 kg 7,000.00 14,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 772,300.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 899,812.00
Dibulatkan 899,810.00
R-6 1 UNIT RAK MAJALAH
BAHAN :
Kayu Kelas II 0.0780 m3 4,000,000.00 311,960.00
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1500 kg 25,000.00 3,750.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 364,610.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 492,122.00
Dibulatkan 492,120.00
R-7 1 UNIT RAK ATLAS
BAHAN :
Kayu Kelas II 0.1100 m3 4,000,000.00 440,000.00
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1500 kg 25,000.00 3,750.00
Politur 1.0000 kg 41,000.00 41,000.00
Jumlah Bahan 492,650.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 620,162.00
Dibulatkan 620,160.00
R-8 1 UNIT RAK ENSIKLOPEDIA
BAHAN :
Kayu Kelas II 0.0273 m3 4,000,000.00 109,296.00
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Jumlah Bahan 150,446.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 277,958.00
Dibulatkan 277,950.00
R-9 1 UNIT RAK KORAN
BAHAN :
Kayu Kelas II 0.0528 m3 4,000,000.00 211,200.00
Baut dia.10 cm 1.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.7500 kg 41,000.00 30,750.00
Cat besi 0.1500 kg Err:509 Err:509
Jumlah Bahan Err:509
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah Err:509
1 2 3 4 5 6=(3x5)
Dibulatkan Err:509
1 2 3 4 5 6=(3x5)
R-10 1 UNIT RAK DORONG
BAHAN :
Kayu Kelas II 0.2176 m3 4,000,000.00 870,400.00
Knop Tarikan 4.0000 bh - -
Paku Ulir 24.0000 bh - -
sekrup 5 cm 12.0000 bh - -
Rel Pita 4.8000 psg - -
Tripleks 4mm 1.0000 lbr 85,000.00 85,000.00
Amplas 3.0000 lbr 7,000.00 21,000.00
Dempul kayu 0.3000 kg 9,000.00 2,700.00
Lem Kayu 0.3000 kg 25,000.00 7,500.00
Politur 1.5000 kg 41,000.00 61,500.00
Jumlah Bahan 1,048,100.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,175,612.00
Dibulatkan 1,175,610.00
U-6 1 UNIT DIPAN DIPERIKSA
BAHAN :
Besi Pipa Galvanis dia. 1" 4.5000 m' - -
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Cat besi 1.0000 kg Err:509 Err:509
Jumlah Bahan Err:509
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah Err:509
Dibulatkan Err:509
U-7 1 UNIT DIPAN TIDUR TUNGGAL
BAHAN :
Kayu Kelas II 0.2176 m3 4,000,000.00 870,400.00
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Cat Kayu 1.0000 kg 25,000.00 25,000.00
Jumlah Bahan 916,400.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,043,912.00
Dibulatkan 1,043,910.00
U-8 1 UNIT DIPAN TIDUR GANDA
BAHAN :
Kayu Kelas II 0.4352 m3 4,000,000.00 1,740,800.00
Multiplex 12 mm 1.0000 lbr - -
Kasur Busa 1.0000 bh - -
Amplas 3.0000 lbr 7,000.00 21,000.00
Cat Kayu 1.0000 kg 25,000.00 25,000.00
Jumlah Bahan 1,786,800.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 1,914,312.00
Dibulatkan 1,914,310.00
1 2 3 4 5 6=(3x5)
U-9 1 UNIT DIPAN TIDUR TINGKAT
BAHAN :
Kayu Kelas II 0.6000 m3 4,000,000.00 2,400,000.00
Multiplex 12 mm 2.0000 lbr - -
Kasur Busa 2.0000 bh - -
Amplas 5.0000 lbr 7,000.00 35,000.00
Cat Kayu 2.0000 kg 25,000.00 50,000.00
Jumlah Bahan 2,485,000.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 2,612,512.00
Dibulatkan 2,612,510.00
KS 1 UNIT KOTAK SAMPAH
BAHAN :
Kayu Kelas II 0.0300 m3 4,000,000.00 120,000.00
Paku Biasa 0.1000 kg 25,000.00 2,500.00
Amplas 1.0000 lbr 7,000.00 7,000.00
Dempul kayu 0.1000 kg 9,000.00 900.00
Lem Kayu 0.1000 kg 25,000.00 2,500.00
Politur 0.3000 kg 41,000.00 12,300.00
Cat Kayu 1.0000 kg 25,000.00 25,000.00
Jumlah Bahan 170,200.00
UPAH :
Tukang Kayu 1.0000 Oh 127,512.00 127,512.00
Jumlah Upah 127,512.00
Jumlah Bahan + Upah 297,712.00
Dibulatkan 297,710.00
1 2 3
1 2 3
A.06.34 1 M3 PASANG KONSTRUKSI SKOOR ANGIN 6/12 KAYU KLS II 2,502,210.00
A.06.35 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA 8/12 KAYU KAYU LOKAL KLS II 4,902,110.00
A.06.36 1 M3 PASANG KONSTRUKSI GORDING 5/10 KAYU KLS II 4,429,250.00
1 2 3
A.06.37 1 M3 PASANG KASO 5/7 KAYU KLS II 77,250.00
A.06.38 1 M3 PASANG RENG 3/4 KAYU KLS II 77,250.00
A.06.39 1 M1 PASANG KONSTRUKSI NOK TEPI PAPAN 6/12 KAYU KLS II 4,050,760.00
A.06.44 1 M2 PASANG RANGKA PLAFOND BALOK 5/7 KAYU LOKAL KLS II 121,420.00
A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU LOKAL KLS II 62,050.00
A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4 18,250.00
A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr 958,840.00
A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr 1,226,010.00
A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR 39,370.00
A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASI 198,360.00
A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOF 91,560.00
A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM 107,240.00
A.07.31 1 m2 PASANG BEKISTING UNTUK BALOK 170,410.00
A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAI 223,510.00
A.07.33 1 m2 PASANG BEKISTING UNTUK DINDING 353,010.00
A.07.47 1 M3 MEMBUAT SOFI-SOFI 12/15 (220,80 Kg Besi + Bekesting) 9,541,480.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.07.48 1 M3 MEMBUAT RING BALOK 15/20 (145,92 Kg Besi + Bekesting) 7,974,790.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
A.07.49 1 M3 MEMBUAT KOLOM 20/25 (169,67 Kg Besi + Bekesting) 8,668,040.00
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.07.50 1 M3 MEMBUAT SLOOF 15/20 (274,22 Kg Besi + Bekesting) 9,163,330.00
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
A.07.51 1 M3 PEK. BETON BERTULANG PLAT MEJA, adukan 1 : 2 : 3 6,795,150.00
A.07.52 1 M3 MEMBUAT KOLOM 12/15 (197 Kg Besi + Bekesting) 9,631,480.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
A.07.60 1 M3 MEMBUAT KOLOM SELASAR 15/15 (181,88 Kg Besi + Bekesting) 9,458,910.00
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 8 JARAK 15 CM
A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm 8,087,460.00
A.08.02 1 M2 PASANG ATAP GENTENG TANAH 27,730.00
A.08.03 1 M2 PASANG ATAP SPANDEK / GALVALYUM 0,3mm 157,690.00
A.08.05 1 M2 PASANG NOK BUBUNGAN GENTENG TANAH 69,630.00
A.08.06 1 M2 PASANG NOK BUBUNGAN GENTENG METAL 50,880.00
A.08.11 1 M2 PASANG ATAP SENG GELOMBANG BJLS 0,3 mm 83,530.00
A.08.12 1 M2 PASANG ATAP ZYNCALUM 0,3 mm 157,690.00
A.08.13 1 M2 PASANG ATAP GENTENG METAL 0,3 mm 27,130.00
A.08.14 1 M' PASANG NOK SENG POLOS 0,3 mm 12,720.00
A.08.30 1 M1 PASANG NOK TEPI SENG GELOMBANG 70,240.00
A.08.31 1 M1 PASANG NOK TEPI ZYNCALUM 90,240.00
A.08.32 1 M1 PASANG NOK TEPI GENTENG METAL 40,240.00
A.08.33 1 M1 PASANG NOK TEPI GENTENG TANAH 59,110.00
A.08.34 1 M1 PASANG NOK TEPI ATAP SPANDEK/GALVALYUM 40,240.00
A.09.02 1 M2 PASANG PLAFOND TRIPLEKS , TEBAL 3 mm 58,120.00
A.10.01 MEMASANG 1 BUAH KLOSET DUDUK 3,177,520.00
A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN 747,150.00
A.10.04 MEMASANG 1 BUAH URINOIR 255,170.00
A.10.05 MEMASANG 1 BUAH WASTAFEL 2,905,140.00
A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3 355,210.00
A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3 682,190.00
A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM 674,330.00
A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM 509,490.00
A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM 808,850.00
A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5" -
A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75" 18,850.00
A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1" 18,850.00
A.10.22.a MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5" 37,700.00
A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 2" 37,700.00
A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3" 37,700.00
A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4" 47,130.00
A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" 12,560.00
A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75" 31,800.00
A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1" 12,560.00
A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5" 12,560.00
1 2 3
A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2" 18,850.00
A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5" 12,560.00
A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" 77,210.00
A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" 129,530.00
A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL 45,760.00
A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" 1,650.00
A.10.36 MEMASANG 1 BH FLOOR DRAIN 1,270.00
A.10.37 1 UNIT SEPTICTANK 4,8 X 2,1 X 2,4 M + REMBESANNYA 25,265,230.00
A.11.01 1 M2 PASANG RANGKA ATAP BAJA RINGAN 8,410.00
A.11.09 1 M2 PASANG PINTU ALUMINIUM 267,770.00
A.11.12 1 M2 PASANG TERALIS BESI 291,270.00
A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 28 112,020.00
A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28 137,440.00
A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28 130,870.00
A.11.22 1 M2 PEK. RESIDU/TEER RANGKA ATAP/KUDA-KUDA/GORDING 3,700.00
A.12.02 1 BUAH PASANG KUNCI TANAM BIASA 156,260.00
A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI 153,000.00
A.12.04 1 BUAH PASANG KUNCI BULAT 157,000.00
A.12.05 1 BUAH PASANG ENGSEL PINTU 51,500.00
A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU 47,250.00
A.12.09 1 BUAH PASANG KAIT ANGIN 38,880.00
A.12.10 1 BUAH PASANG SLOOT TANAM 34,610.00
A.12.11 1 BUAH PASANG GRENDEL JENDELA 42,510.00
A.12.12 1 BUAH PASANG PEGANGAN PINTU + KUNCI PINTU 2 X PUTAR 76,270.00
A.12.14 1 BUAH PASANG KUNCI PINTU 2 X PUTAR ( lever handle ) 193,090.00
A.12.17 1 M2 PASANG KACA, TEBAL 5 MM 273,350.00
A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU 8,410.00
A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPING KAWAT DURI 102,350.00
A.12.34a 1 M1 PEK.PAGAR BRC Ø 6 mm 57,460.00
A.13.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM 143,250.00
A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 143,250.00
A.13.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM 143,250.00
A.13.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM 143,250.00
A.13.47 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM 143,250.00
A.13.48 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ANTISLIP 143,250.00
A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH 160,830.00
A.13.59 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA 160,830.00
A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA 151,490.00
A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA 151,490.00
A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, 151,490.00
A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, 106,860.00
A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, 105,610.00
A.13.74 1 M2 PASANG DINDING BATU TEMPEL 147,570.00
A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS 143,250.00
A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP 143,250.00
A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM 116,100.00
A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, 151,490.00
A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM) 255,010.00
A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM) 165,120.00
A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM) 255,010.00
A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM) 115,630.00
A.14.12 1 M2 MENI KAYU 23,280.00
A.14.13 1 M2 MENI BESI 13,830.00
A.14.14 1 M2 PLAMUR TEMBOK 12,070.00
A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x) 35,060.00
A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x) 35,060.00
A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI 51,720.00
A.14.31 1 M2 PENGECATAN BESI (2X) 47,370.00
A. R 1 M2 PEK. ANTI RAYAP 1,130.00
1 2 3
A. B 1 M2 PEKERJAAN SALURAN AIR PASANGAN BT BATA ad 1 : 4 134,180.00
L. 01. 01 1 M1 PAS. INSTALASI LISTRIK KABEL UTAMA 3x2,5 NYM 36,450.00
L. 01. 02 1 TITIK INSTALASI TITIK LAMPU 2x2,5 NYM 75,750.00
L. 01. 03 1 Titik Pas. Instalasi Titik Saklar Tunggal 2x2,5 NYM 98,600.00
L. 01. 04 1 Titik Instalasi Titik Saklar Double 3x2,5 NYM 103,280.00
L. 01. 05 1 Titik Pas. Instalasi Titik Stop Kontak 3x2,5 NYM 88,100.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 58 w 247,950.00
L. 01. 06 1 Titik Pas. Instalasi Lampu Pijar 15 w 154,950.00
L. 01. 07 1 Titik Pas. Instalasi Lampu TL 2x40 Watt + fitting 221,950.00
L. 01. 08 1 Titik Pas. MCB + Box Sekring 615,650.00
L. 01. 09 1 M1 Pas. Kabel Antar Bangunan 3x4mm NYY 262,750.00
L. 01. 10 1 Bh pasang Panel Box Utama +MCB 86,150.00
S.D.U 1 M' PAS. SALURAN DRAINASE UTAMA 513,450.00
A.01.P.01 1 BH TANAM POHON PELINDUNG 113,850.00
A.01.P.02 1 M2 PEMBUATAN TAMAN 113,850.00
A.01.P.03 1 BH PENANAMAN POHON HIAS 113,850.00
A.01.P.04 1 M' SELASAR PENGHUBUNG BANGUNAN DENGAN ATAP 642,390.00
A.01.P.06 1 BTG (pj = 45cm) PEKERJAAN PEMASANGAN ANGKUR BESI DIA. 10mm 22,310.00
A.01.P.07 1 BH PEKERJAAN BEGHEL U POJOK (BESI POLOS 12MM) + BAUT DIA.10 27,750.00
A.01.P.08 1 BH PEKERJAAN BEGHEL U ALAS KUDA-KUDA (PLAT BAJA 4.40 MM) + BAUT DIA.10 12,750.00
A.01.P.08" 2 BH PEKERJAAN BAUT DIA.10 mm Sambungan gording 5/10 atau 6/12 cm per titik 12,750.00
A.01.P.09 1 SET PEK BEGHEL, BEGHEL U, PLAT BAJA, BAUT UNTUK 1 BH KUDA2-KUDA 42,750.00
A.01.P.10 1 BH PEKERJAAN TIANG DAN RING BASKET BALL KOMPLIT ### 608,290.00
A.01.P.11 1 M1 PEKERJAAN HAND RAILING 128,560.00
A.01.P.12 1 TITIK PEKERJAAN PANCANG CERUCUK BAMBU 21,770.00
A.01.P.13 1 TITIK PEKERJAAN PANCANG CERUCUK KAYU DOLKEN 36,770.00
A.01.P.14 1 M³ PEKERJAAN BALOK GAPIT 4,812,750.00
A.01.P.15 1 M³ PEKERJAAN TATAKAN GORDING/KLOS KAYU 4,414,000.00
A.01.P.16 1 M1 PEKERJAAN PINTU GERBANG BESI -
Kode Sekolah :
Sekolah : 0.000
Desa : 0.000
Kecamatan : SPNF SKB BUTON UTARA
Kabupaten : Kab. Buton Utara
Propinsi : Sulawesi Tenggara
No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1
1. Beton Kolom Praktis 12 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 6 jarak 15 cm
2. Beton Kolom Selasar 15 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 15 cm = ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 10 = 4 x 44,44 x 0,62 kg = 122.62 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 44,44 : 0,15 ) x( ( 4 x 0,10 )+0,1) x 0, 40 kg = 59.26 kg ( B )
3. Beton Sloof Selasar 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm = ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 132.91 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,10 ) + ( 2 x 0,15 ) x 0, 40 kg = 53.33 kg ( B )
4. Beton Sloof Utama 20 X 25 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 25 cm = ( 1 : 0.20 : 0.25 ) = 20.00 m1
Besi 6 batang dia. 12 = 6 x 20,00 x 0,89 kg = 122.82 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 20,00 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,20 ) x 0, 40 kg = 42.67 kg ( B )
5. Beton Kolom Utama 20 X 25 cm' pakai tulangan 6 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 25 cm = ( 1 : 0.20 : 0.25 ) = 20.00 m1
Besi 6 batang dia. 12 = 6 x 20,00 x 0,89 kg = 122.82 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 20,00 : 0.15 ) x (( 2 x 0.15 ) + ( 2 X 0,20 )) X 0,40 kg = 42.67 kg ( C )
6. Beton Balok Linetel 12 X 20 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 12 x 20 cm = ( 1 : 0.12 : 0.20 ) = 41.67 m1
Besi 4 batang dia. 10 = 4 x 41,67 x 0,62 kg = 115.73 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 41,67 : 0.15 ) x (( 2 x 0.08 ) + ( 2 X 0,15 )+0,1) X 0,40 kg = 62.22 kg ( C )
BERAT BESI BETON UNTUK UKURAN 12 x 20 CM DALAM 1 M3 = 177.96 kg/m3 ( A + B + C )
7. Beton Ring Balok 15 X 20 cm' pakai tulangan 4 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm = ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 10 = 4 x 33,33 x 0,62 kg = 92.59 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0.15 ) x (( 2 x 0.1 ) + ( 2 X 0,15 )+0,1) X 0,40 kg = 53.33 kg ( C )
8. Beton Sofi-Sofi 12 X 15 cm' pakai tulangan 4 batang dia. 10 beugel dia. 6 jarak 15 cm
Panjang 1 m3 ukuran 12 x 15 cm = ( 1 : 0.12 : 0.15 ) = 55.56 m1
Besi 4 batang dia. 10 = 4 x 55,56 x 0,62 kg = 152.66 kg ( A)
Besi beugel dia. 6 jarak 15 mm = ( 55,56 : 0.15 ) x (( 2 x 0.08 ) + ( 2 X 0,10 )+0,1) X 0,22 kg = 37.48 kg ( C )
R
7 TO
Kusen Pintu P3 5.00 Unit 7
N
8 Daun Pintu P3 5.00 Buah 8
A
K