You are on page 1of 30

BILL of QUANTITY

PEKERJAAN INSTALASI AIR BERSIH

PROJECT RUMAH SAKIT PONDOK INDAH - PONDOK INDAH

SATUAN HARGA TOTAL HARGA


NO. DESCRIPTIONS QTY UNIT TOTAL
MATERIAL UPAH MATERIAL UPAH

I PRELIMINARIES
1 Managemen Proyek 1.00 ls
2 Mobilisasi dan demobilisasi 1.00 ls
3 Alat bantu dan operasional kerja 1.00 ls
Sub Total Preliminaries
CONTROL SYSTEM - AIR BERSIH
PERALATAN UTAMA
PC lengkap dengan Monitor 32", CPU Keyboard dan Software Programming 1.00 unit
UPS 1 KVA, kapasitas 15 menit 1.00 unit
HMI Display 10 Inch at Pump Room 2.00 unit

PANEL DDC
Panel Control Plumbing Lt. Basement-1 Gedung Lama 1.00 unit
Panel Control Plumbing Lt. Basement-3 Gedung Baru 1.00 unit

SENSOR-SENSOR
Water Level Switch 8.00 no
Water Meter dia 80 mm (Totalizer) 12.00 no
Water Pressure Sensor 4.00 no
Relay 44.00 no
Dry Contact 64.00 no
Selector Switch 28.00 no
Variable Speed Drive c/w accessories no
Motorized Valve Dia 100 mm 3.00 no
Motorized Valve Dia 80 mm 5.00 no
Motorized Valve Dia 40 mm 2.00 no

INSTALLASI KABEL KOMUNIKASI


Kabel Fiber Optic + NYM 3 x 1,5 mm² dalam PVC Conduit Ø20 mm²
DDC PLUMBING BASEMENT 1 Gedung Lama 1.00 no
DDC PLUMBING BASEMENT 3 Gedung Baru 1.00 no

INSTALLASI KABEL I/O FIELD POINT


Instalasi Digital Point ITC 0,6 mm, 2 Pair Included PVC High Impact Ø, 20 mm 130.00 no
Instalasi Analog Point AWG 18 2 PR Included PVC High Impact Ø, 20 mm 38.00 no

JASA
Engineering, Programming & Test Commissioning 1.00 no

Sub Total Control Panel


II RUANG POMPA
A FLUSHING WATER PUMP (Gedung Baru)
Pengadaan, Pemasangan, Pengetesan Valve & Perlengkapan
1 Motorized Valve diameter 100 mm /10K (Supply Pompa) 2.00 bh 443,190.00 886,380.00 886,380.00
2 Gate Valve diameter 110 mm /10K 2.00 bh 400,906.00 801,812.00 801,812.00
3 Flexible Joint diameter 110 mm /10K 4.00 bh 379,500.00 1,518,000.00 1,518,000.00
4 Strainer diameter 110 mm /10K 2.00 bh 419,705.00 839,410.00 839,410.00
5 Check Valve diameter 110 mm /10K 2.00 bh 437,525.00 875,050.00 875,050.00
6 Gate Valve diameter 63 mm /10K (by pass Filter) 3.00 bh 140,800.00 422,400.00 422,400.00
7 Gate Valve diameter 50 mm /10K (Pressure Tank) 3.00 bh 116,820.00 350,460.00 350,460.00
8 Ball Valve diameter 32 mm /10K 5.00 bh 71,181.00 355,905.00 355,905.00
9 Gate Valve diameter 110 mm /10K (By Pass ke GWT baru) 3.00 bh 400,906.00 1,202,718.00 1,202,718.00
10 Motorized Valve diameter 100 mm /10K (By Pass ke GWT baru) 1.00 bh 343,860.00 343,860.00 343,860.00
11 Pressure gauge 3.00 bh 156,750.00 470,250.00 470,250.00

Pengadaan dan pemasangan Instalasi Pipa Air Bersih di Ruang Pompa dengan pipa PPR PN 16
1 Pipa diameter 110 mm 20.00 m 114,180.00 2,283,600.00 2,283,600.00
2 Pipa diameter 110 mm (By Pass ke GWT baru) 350.00 m 114,180.00 39,963,000.00 39,963,000.00
3 Pipa diameter 50 mm 10.00 m 111,716.00 1,117,160.00 1,117,160.00
4 Pipa diameter 63 mm 10.00 m 115,258.00 1,152,580.00 1,152,580.00
5 Pipa diameter 20 mm 6.00 m 84,216.00 505,296.00 505,296.00
6 Flange diameter 110 /10K 20.00 bh
7 Stub end diameter 110 /10K /include flangs 12.00 bh
8 Blank Flange diameter 110 4.00 bh
9 Elbow diameter 110 mm 8.00 bh
10 Elbow diameter 110 mm (By pass ke GWT bar) 25.00 bh
11 Coupling diameter 110 mm 65.00 bh
12 Sock drat luar diameter 63 mm /10K 6.00 bh
13 Sock drat luar diameter 50 mm /10K 6.00 bh
14 Sock drat luar diameter 20 mm /10K 5.00 bh
15 Tee diameter 110 mm 5.00 bh
16 Tee diameter 63 mm 1.00 bh
17 Tee diameter 110x63mm 3.00 bh
18 Tee diameter 110x50mm 3.00 bh
19 Elbow diameter 63 mm 4.00 bh
20 Elbow diameter 50 mm 9.00 bh
B COLD WATER PUMP (Gedung Baru)

Pengadaan, Pemasangan, Pengetesan Valve & Perlengkapan


1 Motorized Valve diameter 80 mm /10K (Supply Pompa) 2.00 bh
2 Gate Valve diameter 80 mm /10K 2.00 bh
3 Flexible Joint diameter 80 mm /10K 4.00 bh
4 StrainerJoint diameter 80 mm /10K 2.00 bh
5 Check Valve diameter 80 mm /10K 2.00 bh
6 Gate Valve diameter 40 mm /10K (Pressure Tank) 3.00 bh
7 Ball Valve diameter 15 mm /10K 5.00 bh
8 Gate Valve diameter 80 mm /10K (By Pass ke GWT baru) 3.00 bh
9 Motorized Valve diameter 80 mm /10K (By Pass ke GWT baru) 1.00 bh
10 Pressure gauge 3.00 bh

Pengadaan dan pemasangan Instalasi Pipa Air Bersih di Ruang Pompa dengan pipa PPR PN 16
1 Pipa diameter 110 mm (Header) 3.00 m
2 Pipa diameter 90 mm 16.00 m
3 Pipa diameter 90 mm (By Pass ke GWT baru) 350.00 m
4 Pipa diameter 50 mm 6.00 m
5 Pipa diameter 63 mm 6.00 m
6 Pipa diameter 20 mm 10.00 m
7 Flange diameter 110 mm 4.00 bh
8 Blank Flange diameter 100 mm 2.00 bh
9 Flange diameter 90 mm 16.00 bh
10 Stub end diameter 90 mm /10K /include flangs 12.00 bh
11 Blank Flange diameter 90 mm 2.00 bh
12 Elbow diameter 90 mm (By pass ke GWT bar) 25.00 bh
13 Coupling diameter 90 mm 65.00 bh
14 Tee diameter 110 mm 2.00 bh
15 Tee diameter 90 mm 2.00 bh
16 Tee diameter 110x90mm 2.00 bh
17 Tee diameter 90x50mm 3.00 bh
18 Tee diameter 110x63mm 1.00 bh
19 Elbow diameter 90 mm 8.00 bh
20 Elbow diameter 63 mm 2.00 bh
21 Sock drat luar diameter 50 mm /10K 6.00 bh
22 Sock drat luar diameter 20 mm /10K 5.00 bh

C FILTER WATER PUMP (Gedung Baru)


GWT Air bersih
Pengadaan, Pemasangan, Pengetesan Valve & Perlengkapan
1 Gate Valve diameter 63 mm /10K 6.00 bh
2 Gate Valve diameter 50 mm /10K 12.00 bh
3 Flexible Joint diameter 50 mm /10K 6.00 bh
4 StrainerJoint diameter 50 mm /10K 6.00 bh
5 Check Valve diameter 50 mm /10K 3.00 bh
6 Ball Valve diameter 20 mm /10K 4.00 bh
7 Pressure gauge 4.00 bh
8 Water mur diameter 50 mm 4.00 bh

Pengadaan dan pemasangan Instalasi Pipa Air Bersih di Ruang Pompa dengan pipa PPR PN 16
1 Pipa diameter 50 mm 28.00 m
2 Pipa diameter 63 mm 9.00 m
3 Pipa diameter 20 mm 6.00 m
4 Sock drat luar diameter 63 mm /10K 12.00 bh
5 Sock drat luar diameter 50 mm /10K 54.00 bh
6 Sock drat luar diameter 20 mm /10K 4.00 bh
7 Flange diameter 63 mm /10K 2.00 bh
8 Blank Flange diameter 63 mm 1.00 bh
9 Elbow diameter 50 mm 1.00 bh
10 Tee diameter 63 mm 8.00 bh
11 Tee diameter 50 mm 5.00 bh
12 Tee diameter 63x50mm 3.00 bh
13 Elbow diameter 63 mm 6.00 bh
14 Elbow diameter 50 mm 18.00 bh

D FILTER WATER PUMP (Gedung Baru)


GWT Pemadam kebakaran
Pengadaan, Pemasangan, Pengetesan Valve & Perlengkapan
1 Gate Valve diameter 50 mm /10K 8.00 bh
2 Flexible Joint diameter 50 mm /10K 6.00 bh
3 StrainerJoint diameter 50 mm /10K 6.00 bh
4 Check Valve diameter 50 mm /10K 3.00 bh
5 Ball Valve diameter 20 mm /10K 4.00 bh
6 Pressure gauge 4.00 bh
7 Water mur diameter 50 mm 4.00 bh

Pengadaan dan pemasangan Instalasi Pipa Air Bersih di Ruang Pompa dengan pipa PPR PN 16
1 Pipa diameter 50 mm 31.00 m
2 Pipa diameter 63 mm 15.00 m
3 Pipa diameter 20 mm 6.00 m
4 Elbow diameter 50 mm 24.00 bh
5 Tee diameter 63 mm 3.00 bh
6 Tee diameter 50 mm 5.00 bh
7 Tee diameter 63x50mm 3.00 bh
8 Elbow diameter 63 mm 5.00 bh
9 Elbow diameter 50 mm 0.00 bh
10 Sock drat luar diameter 50 mm /10K 46.00 bh
11 Sock drat luar diameter 20 mm /10K 4.00 bh

E FLUSHING WATER PUMP (Gedung Lama)

Pengadaan, Pemasangan, Pengetesan Valve & Perlengkapan


1 Gate Valve diameter 90 mm /10K 3.00 bh
2 Flexible Joint diameter 90 mm /10K 4.00 bh
3 StrainerJoint diameter 90 mm /10K 2.00 bh
4 Check Valve diameter 90 mm /10K 2.00 bh
5 Gate Valve diameter 50 mm /10K 2.00 bh
6 Motorized Valve diameter 40 mm /10K (Supply Pompa) 2.00 bh
7 Ball Valve diameter 20 mm /10K 4.00 bh
8 Pressure gauge 3.00 bh

Pengadaan dan pemasangan Instalasi Pipa Air Bersih di Ruang Pompa dengan pipa PPR PN 16
1 Pipa diameter 110 mm (Header) 4.00 m
2 Pipa diameter 90 mm 40.00 m
3 Pipa diameter 20 mm 6.00 m
4 Flange diameter 110 mm /10K 2.00 bh
5 Blank Flange diameter 110 mm 2.00 bh
6 Flange diameter 90 mm /10K 15.00 bh
7 Blank Flange diameter 90 mm 2.00 bh
8 Tee diameter 90 mm 5.00 bh
9 Tee diameter 110x90mm 2.00 bh
10 Elbow diameter 90 mm 14.00 bh
11 Sock drat luar diameter 20 mm /10K 4.00 bh

F COLD WATER PUMP (Gedung Lama)

Pengadaan, Pemasangan, Pengetesan Valve & Perlengkapan


1 Motorized Valve diameter 80 mm /10K (Supply Pompa) 2.00 bh
2 Gate Valve diameter 90 mm /10K 5.00 bh
3 Flexible Joint diameter 90 mm /10K 4.00 bh
4 StrainerJoint diameter 90 mm /10K 2.00 bh
5 Check Valve diameter 90 mm /10K 2.00 bh
6 Ball Valve diameter 20 mm /10K 3.00 bh
7 Pressure gauge 3.00 bh

Pengadaan dan pemasangan Instalasi Pipa Air Bersih di Ruang Pompa dengan pipa PPR PN 16
1 Pipa diameter 90 mm 40.00 m
2 Pipa diameter 20 mm 6.00 m
3 Flange diameter 90 mm /10K 15.00 bh
4 Blank Flange diameter 90 mm 2.00 bh
5 Tee diameter 90 mm 5.00 bh
6 Elbow diameter 90 mm 12.00 bh

G FILTER WATER PUMP (Gedung Lama)


GWT Air bersih
Pengadaan, Pemasangan, Pengetesan Valve & Perlengkapan
1 Gate Valve diameter 90 mm /10K 5.00 bh
2 Gate Valve diameter 63 mm /10K 4.00 bh
3 Flexible Joint diameter 63 mm /10K 4.00 bh
4 StrainerJoint diameter 63 mm /10K 2.00 bh
5 Check Valve diameter 63 mm /10K 2.00 bh
6 Ball Valve diameter 20 mm /10K 3.00 bh
7 Pressure gauge 3.00 bh
8 Water mur diameter 63 mm 4.00 bh

Pengadaan dan pemasangan Instalasi Pipa Air Bersih di Ruang Pompa dengan pipa PPR PN 16
1 Pipa diameter 110 mm (Header) 3.00 m
2 Pipa diameter 90 mm 6.00 m
3 Pipa diameter 63 mm 6.00 m
4 Pipa diameter 20 mm 6.00 m
5 Flange diameter 110 mm /10K 2.00 bh
6 Blank Flange diameter 110 mm 2.00 bh
7 Flange diameter 90 mm /10K 6.00 bh
8 Tee diameter 110x63 mm 2.00 bh
9 Tee diameter 110x90 mm 3.00 bh
10 Elbow diameter 63 mm 6.00 bh
11 Elbow diameter 90 mm 3.00 bh
12 Sock drat luar diameter 63 mm /10K 24.00 bh
13 Sock drat luar diameter 20 mm /10K 3.00 bh

H FILTER WATER PUMP (Gedung Lama)


GWT Air bersih
Pengadaan, Pemasangan, Pengetesan Valve & Perlengkapan
1 Gate Valve diameter 90 mm /10K 3.00 bh
2 Gate Valve diameter 63 mm /10K 8.00 bh
3 Flexible Joint diameter 63 mm /10K 4.00 bh
4 StrainerJoint diameter 63 mm /10K 2.00 bh
5 Check Valve diameter 63 mm /10K 2.00 bh
6 Ball Valve diameter 20 mm /10K 2.00 bh
7 Pressure gauge 2.00 bh

Pengadaan dan pemasangan Instalasi Pipa Air Bersih di Ruang Pompa dengan pipa PPR PN 16
1 Pipa diameter 110 mm (Header) 3.00 m
2 Pipa diameter 90 mm 12.00 m
3 Pipa diameter 63 mm 6.00 m
4 Pipa diameter 20 mm 6.00 m
5 Flange diameter 110 mm /10K 2.00 bh
6 Blank Flange diameter 110 mm 2.00 bh
7 Flange diameter 90 mm /10K 2.00 bh
8 Tee diameter 110x63 mm 2.00 bh
9 Tee diameter 110x90 mm 4.00 bh
10 Tee diameter 90 mm 1.00 bh
11 Elbow diameter 63 mm 7.00 bh
12 Elbow diameter 90 mm 3.00 bh
13 Sock drat luar diameter 63 mm /10K 32.00 bh
14 Sock drat luar diameter 20 mm /10K 2.00 bh

Pengadaan dan pemasangan Instalasi Pipa drain di Ruang Pompa geedung baru dengan pipa PPR PN 16
1 Pipa diameter 110 mm 10.00 m
2 Pipa diameter 63 mm 6.00 m
3 Pipa diameter 50 mm 8.00 m
4 Tee diameter 110 mm 2.00 bh
5 Tee diameter 63 mm 3.00 bh
6 Tee diameter 50 mm 2.00 bh
7 Elbow diameter 110 mm 2.00 bh
8 Elbow diameter 63 mm 7.00 bh
9 Flange diameter 110 mm /10K 2.00 bh
10 Blank Flange diameter 110 mm 2.00 bh

Pengadaan dan pemasangan Instalasi Pipa drain di Ruang Pompa geedung lama dengan pipa PPR PN 16
1 Pipa diameter 90 mm 12.00 m
2 Pipa diameter 63 mm 10.00 m
3 Tee diameter 90 mm 1.00 bh
4 Elbow diameter 90 mm 6.00 bh
5 Tee diameter 63 mm 1.00 bh
6 Elbow diameter 63 mm 6.00 bh

Penetrasi dinding untuk jalur pipa dari Ruang pompa gedung lama ke gedung baru
1 Ruang pompa gedung Lama ke Ruang pompa gedung Baru 1.00 ls
Sub Total Ruang Pompa 53,087,881.00 53,087,881.00

III INSTALASI AIR BERSIH


LANTAI BASEMENT 1 ( Gedung Baru )
Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 63mm 82.50 m'
2 Pipa PPr Ø 50mm 26.64 m'
3 Pipa PPr Ø 40mm 34.03 m'
4 Pipa PPr Ø 32mm 61.53 m'
5 Pipa PPr Ø 25mm 28.36 m'
6 Pipa PPr Ø 20mm 19.80 m'
7 Pekerjaan coring dan grouting 4.00 bh
8 Fitting dan Material Bantu 1.00 lot

9 Gate Valve Ø2" 4.00 unit


9 Gate Valve Ø1" 5.00 unit
10 Butterfly Valve Ø2" + Flange 3.00 set
11 Water Meter Ø2" + Flange 1.00 set
12 Water Meter Ø1" + Flange 1.00 set
13 Pressure Reducer Valve (PRV) Ø2" + Flange 1.00 set
14 Pressure Gauge + Valve 2.00 set
15 Material Bantu 1.00 lot

Sub Total Lantai Basement 1 - -

LANTAI 1 ( Gedung Baru )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 90mm 16.05 m'
2 Pipa PPr Ø 63mm 37.56 m'
3 Pipa PPr Ø 50mm 48.69 m'
4 Pipa PPr Ø 40mm 123.05 m'
5 Pipa PPr Ø 32mm 70.19 m'
6 Pipa PPr Ø 25mm 44.08 m'
7 Pipa PPr Ø 20mm 91.49 m'
8 Pekerjaan coring dan grouting 4.00 bh
9 Fitting dan Material Bantu 1.00 lot

9 Gate Valve Ø2" 4.00 unit


10 Gate Valve Ø1" 11.00 unit
11 Butterfly Valve Ø3" + Flange 3.00 set
12 Water Meter Ø3" + Flange 1.00 set
13 Water Meter Ø1" + Valve 2.00 set
14 Pressure Reducer Valve (PRV) Ø3" + Flange 1.00 set
15 Pressure Gauge + Valve 2.00 set
16 Material Bantu 1.00 lot

Sub Total Lantai 1

LANTAI 2 ( Gedung Baru )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 110mm 19.26 m'
2 Pipa PPr Ø 63mm 262.15 m'
3 Pipa PPr Ø 40mm 109.14 m'
4 Pekerjaan coring dan grouting 4.00 bh
5 Fitting dan Material Bantu 1.00 lot

6 Gate Valve Ø2" 4.00 unit


7 Gate Valve Ø3" 1.00 unit
8 Gate Valve Ø4" 1.00 unit
9 Gate Valve Ø1" 41.00 unit
10 Butterfly Valve Ø4" + Flange 3.00 set
11 Water Meter Ø4" + Flange 2.00 set
12 Water Meter Ø1" 13.00 set
13 Pressure Reducer Valve (PRV) Ø4" + Flange 2.00 set
14 Pressure Gauge + Valve 4.00 set
15 Material Bantu 1.00 lot

LANTAI 2 ( Gedung Lama )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 110mm 16.05 m'
2 Pipa PPr Ø 63mm 240.75 m'
3 Pipa PPr Ø 40mm 101.65 m'
4 Pekerjaan coring dan grouting 4.00 bh
5 Fitting dan Material Bantu 1.00 lot

6 Gate Valve Ø2" 4.00 unit


7 Gate Valve Ø1 1/4" 16.00 unit
8 Gate Valve Ø1 1/2" 3.00 unit
9 Butterfly Valve Ø4" + Flange 6.00 set
10 Water Meter Ø4" + Flange 2.00 set
10 Pressure Reducer Valve (PRV) Ø4" + Flange 2.00 set
11 Pressure Gauge + Valve 5.00 set
12 Material Bantu 1.00 lot

Sub Total Lantai 2

LANTAI 3 ( Gedung Baru )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 110mm 19.26 m'
2 Pipa PPr Ø 63mm 375.57 m'
3 Pipa PPr Ø 40mm 151.94 m'
4 Pekerjaan coring dan grouting 4.00 bh
5 Fitting dan Material Bantu 1.00 lot

6 Gate Valve Ø2" 2.00 unit


7 Gate Valve Ø1 1/4" 52.00 unit
8 Gate Valve Ø1 1/2" 10.00 unit
8 Gate Valve Ø4" 1.00 unit
9 Butterfly Valve Ø4" + Flange 6.00 set
10 Water Meter Ø4" + Flange 2.00 set
11 Pressure Reducer Valve (PRV) Ø4" + Flange 2.00 set
12 Pressure Gauge + Valve 4.00 set
13 Material Bantu 1.00 lot

LANTAI 3 ( Gedung Lama )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 110mm 16.05 m'
2 Pipa PPr Ø 63mm 350.96 m'
3 Pipa PPr Ø 40mm 141.24 m'
4 Pekerjaan coring dan grouting 4.00 bh
5 Fitting dan Material Bantu 1.00 lot

6 Gate Valve Ø2" 2.00 unit


7 Gate Valve Ø1 1/4" 36.00 unit
8 Gate Valve Ø1 1/2" 7.00 unit
8 Gate Valve Ø4" 1.00 unit
9 Butterfly Valve Ø4" + Flange 7.00 set
10 Water Meter Ø4" + Flange 2.00 set
11 Pressure Reducer Valve (PRV) Ø4" + Flange 2.00 set
12 Pressure Gauge + Valve 4.00 set
13 Material Bantu 1.00 lot

Sub Total Lantai 3

LANTAI 4 ( Gedung Baru )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 110mm 19.26 m'
2 Pipa PPr Ø 63mm 515.74 m'
3 Pipa PPr Ø 40mm 204.37 m'
4 Pekerjaan coring dan grouting 4.00 bh
5 Fitting dan Material Bantu 1.00 lot

6 Gate Valve Ø2" 2.00 unit


7 Gate Valve Ø1 1/4" 63.00 unit
8 Gate Valve Ø1 1/2" 11.00 unit
8 Gate Valve Ø4" 1.00 unit
9 Butterfly Valve Ø4" + Flange 6.00 set
10 Water Meter Ø4" + Flange 2.00 set
11 Pressure Reducer Valve (PRV) Ø4" + Flange 2.00 set
12 Pressure Gauge + Valve 4.00 set
13 Material Bantu 1.00 lot
LANTAI 4 ( Gedung Lama )
Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 110mm 16.05 m'
2 Pipa PPr Ø 63mm 461.17 m'
3 Pipa PPr Ø 40mm 187.25 m'
4 Pekerjaan coring dan grouting 4.00 bh
5 Fitting dan Material Bantu 1.00 lot

6 Gate Valve Ø2" 2.00 unit


7 Gate Valve Ø1 1/4" 46.00 unit
8 Gate Valve Ø1 1/2" 10.00 unit
8 Gate Valve Ø4" 1.00 unit
9 Butterfly Valve Ø4" + Flange 6.00 set
10 Water Meter Ø4" + Flange 2.00 set
11 Pressure Reducer Valve (PRV) Ø4" + Flange 2.00 set
12 Pressure Gauge + Valve 4.00 set
13 Material Bantu 1.00 lot

Sub Total Lantai 4

LANTAI 5 ( Gedung Baru )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 110mm 19.26 m'
2 Pipa PPr Ø 63mm 633.44 m'
3 Pipa PPr Ø 40mm 253.59 m'
4 Pekerjaan coring dan grouting 4.00 bh
5 Fitting dan Material Bantu 1.00 lot

6 Gate Valve Ø2" 2.00 unit


7 Gate Valve Ø1 1/4" 56.00 unit
8 Gate Valve Ø1 1/2" 11.00 unit
8 Gate Valve Ø4" 1.00 unit
9 Butterfly Valve Ø4" + Flange 6.00 set
10 Water Meter Ø4" + Flange 2.00 set
11 Pressure Reducer Valve (PRV) Ø4" + Flange 2.00 set
12 Pressure Gauge + Valve 4.00 set
13 Material Bantu 1.00 lot

LANTAI 5 ( Gedung Lama )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 110mm 16.05 m'
2 Pipa PPr Ø 63mm 604.79 m'
3 Pipa PPr Ø 40mm 248.72 m'
4 Pekerjaan coring dan grouting 4.00 bh
5 Fitting dan Material Bantu 1.00 lot

6 Gate Valve Ø2" 2.00 unit


7 Gate Valve Ø1 1/4" 72.00 unit
8 Gate Valve Ø1 1/2" 16.00 unit
8 Gate Valve Ø4" 1.00 unit
9 Butterfly Valve Ø4" + Flange 6.00 set
10 Water Meter Ø4" + Flange 2.00 set
11 Pressure Reducer Valve (PRV) Ø4" + Flange 2.00 set
12 Pressure Gauge + Valve 4.00 set
13 Material Bantu 1.00 lot

Sub Total Lantai 5

LANTAI 6 ( Gedung Baru )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 63mm 146.59 m'
2 Pipa PPr Ø 32mm 90.95 m'
3 Pekerjaan coring dan grouting 4.00 bh
4 Fitting dan Material Bantu 1.00 lot

5 Gate Valve Ø2" 3.00 unit


6 Gate Valve Ø1" 31.00 unit
7 Water Meter Ø2" 1.00 unit
8 Water Meter Ø1" 9.00 unit
9 Material Bantu 1.00 lot

LANTAI 6 ( Gedung Lama )


Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 63mm 119.84 m'
2 Pipa PPr Ø 32mm 68.48 m'
3 Pekerjaan coring dan grouting 4.00 bh
4 Fitting dan Material Bantu 1.00 lot

5 Gate Valve Ø2" 1.07 unit


6 Gate Valve Ø1" 3.00 unit
7 Water Meter Ø2" 1.00 unit
8 Material Bantu 1.00 lot

Sub Total Lantai 6

LANTAI 7 ( Gedung Baru )


A Pekerjaan Instalasi Air Bersih
1 Pipa PPr Ø 63mm 126.26 m'
2 Pipa PPr Ø 32mm 69.55 m'
3 Fitting dan Material Bantu 1.00 lot

4 Gate Valve Ø2" 3.00 unit


5 Gate Valve Ø1" 1.00 unit
6 Water Meter Ø2" 1.00 unit
7 Material Bantu 1.00 lot

Sub Total Lantai 7

LANTAI Top Roof ( Gedung Baru )


1 Automatic Air Ven (AAV) Ø2" 1.00 set
2 Material Bantu 1.00 lot

LANTAI Top Roof ( Gedung Baru )


1 Automatic Air Ven (AAV) Ø2" 1.00 set
2 Material Bantu 1.00 lot

Sub Total Lantai Top Roof -

SUB TOTAL INSTALASI AIR BERSIH

PARTIAL TEST AND COMMITIONING 1.00 ls

TOTAL INSTALASI AIR BERSIH DAN POMPA

GRAND TOTAL
NO KETERANGAN SPESIFIKASI TEKNIS
1 Motorized actuator Pressure. 10K ,220Volt
2 Gate Valve Pressure. 10K
3 Ball Valve 10K Pressure. 10K
4 Butterfly Valve Pressure. 10K
5 Flexible Joint 10K Pressure. 10K
6 Strainer 10K Pressure. 10K
7 Check Valve 10K Pressure. 10K
8 Pressure gauge diameter 4" , Pressure. 0~16K
9 Water Meter Analog
10 Pressure Reducer Valve (PRV) Pressure. Ring 0~ 20K
11 Pipa PPR PN 16 Pn16
MEREK
Honeywell
FiValco / Onda
FiValco / Onda
FiValco / Onda
FiValco / Onda
FiValco / Onda
FiValco / Onda
FiValco / Onda
FiValco / Onda
FiValco / Onda
Toro
A FLUSHING WATER PUMP (Gedung Baru)

No. SNI KODE KOEF SAT.

I FLUSHING WATER PUMP (Gedung Baru)


1 2.000 bh
A
L.01 1.429 OH
L.02 0.850 OH
L.04 0.250 OH
B
0.018 Hari

2 2.000 bh
A
L.01 1.429 OH
L.02 0.715 OH
L.04 0.143 OH
B
0.018 Hari

3 4.000 bh
A
L.01 1.320 OH
L.02 0.650 OH
L.04 0.150 OH
B
0.018 Hari

4 2.000 bh
A
L.01 1.450 OH
L.02 0.756 OH
L.04 0.195 OH
B
0.018 Hari
5 2.000 bh
A
L.01 1.550 OH
L.02 0.820 OH
L.04 0.175 OH
B
0.018 Hari

6 3.000 bh
A
L.01 0.500 OH
L.02 0.350 OH
L.04 0.150 OH
B

7 3.000 bh
A
L.01 0.450 OH
L.02 0.255 OH
L.04 0.135 OH
B

8 5.000 bh
A
L.01 0.400 OH
L.02 0.150 OH
L.04 0.013 OH
B

9 3.000 bh
A
L.01 1.429 OH
L.02 0.715 OH
L.04 0.143 OH
B
0.018 Hari

10 1.000 bh
A
L.01 1.350 OH
L.02 0.550 OH
L.04 0.030 OH
B
0.018 Hari

11 1.000 BH
A
L.01 0.550 OH
L.02 0.450 OH
B
1.000 Ls
0.150 Ls

12 20.000 m
A
L.01 0.045 OH
L.02 0.023 OH
L.04 0.005 OH
B
0.019 Ls

13 350.000 m
A
L.01 0.045 OH
L.02 0.023 OH
L.04 0.005 OH
B
0.019 Ls
14 10.000 m
A
L.01 0.035 OH
L.02 0.017 OH
L.04 0.003 OH
B
0.019 Ls

15 10.000 m
A
L.01 0.045 OH
L.02 0.025 OH
L.04 0.009 OH
B
0.019 Ls

16 6.000 m
A
L.01 0.003 OH
L.02 0.005 OH
L.04 0.003 OH
B
0.015 Ls

17 20.000 m
A
L.01 0.003 OH
L.02 0.005 OH
L.04 0.003 OH
B
0.015 Ls

13 20.000 bh
A
L.01 0.003 OH
L.02 0.005 OH
L.04 0.003 OH
B
0.015 Ls
HARGA BAHAN/UPAH JUMLAH

URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM

FLUSHING WATER PUMP (Gedung Baru)


Motorized Valve diameter 100 mm /10K (Supply Pompa)
Tenaga
Pekerja 90,000 100,000 128,610
Tukang pipa 130,000 150,000 110,500
Mandor 150,000 170,000 37,500
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 72,000
Jumlah A + B 348,610.00
Overhead & Profit (contah 10%) 34,861.00
Harga Satuan Pekerjaan (A+B) 383,471.00
Gate Valve diameter 110 mm /10K
Tenaga
Pekerja 90,000 100,000 128,610
Tukang pipa 130,000 150,000 92,950
Mandor 150,000 170,000 21,450
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 72,000
Jumlah A + B 315,010.00
Overhead & Profit (contah 10%) 31,501.00
Harga Satuan Pekerjaan (A+B) 346,511.00
Flexible Joint diameter 110 mm /10K
Tenaga
Pekerja 90,000 100,000 118,800
Tukang pipa 130,000 150,000 84,500
Mandor 150,000 170,000 22,500
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 72,000
Jumlah A + B 297,800.00
Overhead & Profit (contah 10%) 29,780.00
Harga Satuan Pekerjaan (A+B) 327,580.00
Strainer diameter 110 mm /10K
Tenaga
Pekerja 90,000 100,000 130,500
Tukang pipa 130,000 150,000 98,280
Mandor 150,000 170,000 29,250
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 72,000
Jumlah A + B 330,030.00
Overhead & Profit (contah 10%) 33,003.00
Harga Satuan Pekerjaan (A+B) 363,033.00
Check Valve diameter 110 mm /10K
Tenaga
Pekerja 90,000 100,000 139,500
Tukang pipa 130,000 150,000 106,600
Mandor 150,000 170,000 26,250
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 72,000
Jumlah A + B 344,350.00
Overhead & Profit (contah 10%) 34,435.00
Harga Satuan Pekerjaan (A+B) 378,785.00
Gate Valve diameter 63 mm /10K (by pass Filter)
Tenaga
Pekerja 90,000 100,000 45,000
Tukang pipa 130,000 150,000 45,500
Mandor 150,000 170,000 22,500
PERALATAN

Jumlah A + B 113,000.00
Overhead & Profit (contah 10%) 11,300.00
Harga Satuan Pekerjaan (A+B) 124,300.00
Gate Valve diameter 50 mm /10K (Pressure Tank)
Tenaga
Pekerja 90,000 100,000 40,500
Tukang pipa 130,000 150,000 33,150
Mandor 150,000 170,000 20,250
PERALATAN

Jumlah A + B 93,900.00
Overhead & Profit (contah 10%) 9,390.00
Harga Satuan Pekerjaan (A+B) 103,290.00
Ball Valve diameter 32 mm /10K
Tenaga
Pekerja 90,000 100,000 36,000
Tukang pipa 130,000 150,000 19,500
Mandor 150,000 170,000 1,950
PERALATAN

Jumlah A + B 57,450.00
Overhead & Profit (contah 10%) 5,745.00
Harga Satuan Pekerjaan (A+B) 63,195.00
Gate Valve diameter 110 mm /10K (By Pass ke GWT baru)
Tenaga
Pekerja 90,000 100,000 128,610
Tukang pipa 130,000 150,000 92,950
Mandor 150,000 170,000 21,450
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 72,000
Jumlah A + B 315,010.00
Overhead & Profit (contah 10%) 31,501.00
Harga Satuan Pekerjaan (A+B) 346,511.00
Motorized Valve diameter 100 mm /10K (By Pass ke GWT baru)
Tenaga
Pekerja 90,000 100,000 121,500
Tukang pipa 130,000 150,000 71,500
Mandor 150,000 170,000 4,500
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 72,000
Jumlah A + B 269,500.00
Overhead & Profit (contah 10%) 26,950.00
Harga Satuan Pekerjaan (A+B) 296,450.00
Pressure gauge
Tenaga
Pekerja 90,000 100,000 49,500
Tukang pipa 130,000 150,000 58,500
PERALATAN
Seal tape 20,000 20,000 20,000
Perlengkapan 150,000 200,000 22,500
Jumlah A + B 128,000.00
Overhead & Profit (contah 10%) 12,800.00
Harga Satuan Pekerjaan (A+B) 140,800.00
Pipa diameter 110 mm
Tenaga
Pekerja 90,000 100,000 4,050
Tukang pipa 130,000 150,000 2,990
Mandor 150,000 170,000 750
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 76,000
Jumlah A + B 83,790.00
Overhead & Profit (contah 10%) 8,379.00
Harga Satuan Pekerjaan (A+B) 92,169.00
Pipa diameter 110 mm (By Pass ke GWT baru)
Tenaga
Pekerja 90,000 100,000 4,050
Tukang pipa 130,000 150,000 2,990
Mandor 150,000 170,000 750
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 76,000
Jumlah A + B 83,790.00
Overhead & Profit (contah 10%) 8,379.00
Harga Satuan Pekerjaan (A+B) 92,169.00
Pipa diameter 50 mm
Tenaga
Pekerja 90,000 100,000 3,150
Tukang pipa 130,000 150,000 2,210
Mandor 150,000 170,000 450
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 76,000
Jumlah A + B 81,810.00
Overhead & Profit (contah 10%) 8,181.00
Harga Satuan Pekerjaan (A+B) 89,991.00
Pipa diameter 63 mm
Tenaga
Pekerja 90,000 100,000 4,050
Tukang pipa 130,000 150,000 3,250
Mandor 150,000 170,000 1,350
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 76,000
Jumlah A + B 84,650.00
Overhead & Profit (contah 10%) 8,465.00
Harga Satuan Pekerjaan (A+B) 93,115.00
Pipa diameter 20 mm
Tenaga
Pekerja 90,000 100,000 270
Tukang pipa 130,000 150,000 650
Mandor 150,000 170,000 450
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 60,000
Jumlah A + B 61,370.00
Overhead & Profit (contah 10%) 6,137.00
Harga Satuan Pekerjaan (A+B) 67,507.00
Flange diameter 110 /10K
Tenaga
Pekerja 90,000 100,000 270
Tukang pipa 130,000 150,000 650
Mandor 150,000 170,000 450
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 60,000
Jumlah A + B 61,370.00
Overhead & Profit (contah 10%) 6,137.00
Harga Satuan Pekerjaan (A+B) 67,507.00
Flange diameter 110 /10K
Tenaga
Pekerja 90,000 100,000 270
Tukang pipa 130,000 150,000 650
Mandor 150,000 170,000 450
PERALATAN
Sewa tripot dan handel crane 2T 4,000,000 5,000,000 60,000
Jumlah A + B 61,370.00
Overhead & Profit (contah 10%) 6,137.00
Harga Satuan Pekerjaan (A+B) 67,507.00
JUMLAH

MAKSIMUM

142,900
127,500
42,500

90,000
402,900.00
40,290.00
443,190.00

142,900
107,250
24,310

90,000
364,460.00
36,446.00
400,906.00

132,000
97,500
25,500

90,000
345,000.00
34,500.00
379,500.00

145,000
113,400
33,150

90,000
381,550.00
38,155.00
419,705.00

155,000
123,000
29,750

90,000
397,750.00
39,775.00
437,525.00

50,000
52,500
25,500

128,000.00
12,800.00
140,800.00

45,000
38,250
22,950

106,200.00
10,620.00
116,820.00

40,000
22,500
2,210

64,710.00
6,471.00
71,181.00

142,900
107,250
24,310

90,000
364,460.00
36,446.00
400,906.00

135,000
82,500
5,100

90,000
312,600.00
31,260.00
343,860.00

55,000
67,500

20,000
30,000
142,500.00
14,250.00
156,750.00

4,500
3,450
850

95,000
103,800.00
10,380.00
114,180.00

4,500
3,450
850

95,000
103,800.00
10,380.00
114,180.00

3,500
2,550
510

95,000
101,560.00
10,156.00
111,716.00

4,500
3,750
1,530

95,000
104,780.00
10,478.00
115,258.00

300
750
510

75,000
76,560.00
7,656.00
84,216.00

300
750
510

75,000
76,560.00
7,656.00
84,216.00

300
750
510

75,000
76,560.00
7,656.00
84,216.00