You are on page 1of 17

RENCANA ANGGARAN BIAYA

PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

NO URAIAN PEKERJAAN VOLUME SAT

IV.X PEKERJAAN FIRE ALARM


a INSTALASI
a.1 Peralatan Utama

1 Fire alarm control panel (FACP) kap.10 zone 1.00 unit


lengkap dengan battery charger dan battery
untuk 20 jam operasi.
2 Annouciator Panel 1.00 unit
3 MDF 1.00 unit

a.2 Instalasi Detektor, Horn dan Lamp

2 Ground floor
- ROR & fixed temperature detector 8.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 10.00 ttk
- Instalasi alarm dan bell 1.00 ttk

3 Lantai 1
- ROR & fixed temperature detector 6.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 9.00 ttk
- Instalasi alarm dan bell 2.00 ttk
- ROR & fixed temperature detector 4.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Instalasi detektor dan MCP 5.00 ttk
- Instalasi alarm dan bell 2.00 ttk

4 Lantai 2
- ROR & fixed temperature detector 9.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 12.00 ttk
- Instalasi alarm dan bell 2.00 ttk

5 Lantai 3
- ROR & fixed temperature detector 10.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 3.00 bh
- Manual call point / MCP 2.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 16.00 ttk
- Instalasi alarm dan bell 2.00 ttk

6 Lantai 4
- ROR & fixed temperature detector 9.00 bh
- Fixed temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 11.00 ttk
- Instalasi alarm dan bell 2.00 ttk

a.3 Instalasi Kabel Penghubung

1 Dari FACP ke MDF


- NYA 20 x 1 x 2,5 sqmm 5.00 m
- NYA 20x 1 x 1,5 sqmm 5.00 m
2 Dari MDF ke TB-FA-B
- NYY 4 x 2,5 sqmm 18.00 m
- NYY 4 x 1,5 sqmm 18.00 m
3 Dari MDF ke TB-FA-GF
- NYY 4 x 2,5 sqmm 11.00 m

- NYY 4 x 1,5 sqmm 11.00 m


4 Dari MDF ke TB-FA-1
- NYY 4 x 2,5 sqmm 10.00 m
- NYY 4 x 1,5 sqmm 10.00 m
4 Dari MDF ke TB-FA-2
- NYY 4 x 2,5 sqmm 11.00 m
- NYY 4 x 1,5 sqmm 11.00 m
3 Dari MDF ke TB-FA-3
- NYY 4 x 2,5 sqmm 12.00 m
- NYY 4 x 1,5 sqmm 12.00 m
4 Dari MDF ke TB-FA-4
- NYY 4 x 2,5 sqmm 22.00 m
- NYY 4 x 1,5 sqmm 22.00 m

b TESTING & COMMISSIONING 1.00 ls


HARGA JUMLAH
SATUAN (Rp) HARGA (Rp)
Sub Total

Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN FRE HYDRANT
PEMBANGUNAN GEDUNG PUSBINDIKLATR
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIO
Jl. Proklamasi No 70, Jakarta

NO. URAIAN PEKERJAAN

V.IV. PEKERJAAN FIRE HYDRANT

PERALATAN UTAMA DI RUANG POMPA


1.1 Electric Main Pump
a Pompa
Jenis

Debit
Head
Efisiensi
Kecepatan putar
b Motor Penggerak
Jenis
Tegangan
Starter
Daya poros
Kopling
Kecepatan putar
1.2 Electric Jockey Pump
a Pompa
Jenis

Debit
Head
Efisiensi
Kecepatan putar
b Motor Penggerak
Jenis
Tegangan
Starter
Daya poros
Kopling
Kecepatan putar
1.3 Diesel Main Pump

II INSTALASI PEMIPAAN

2.1 Pemipaan di Ruang Pompa

Pemipaan menggunakan BSP sch. 40, ASTM A-120


di cat warna merah.

a Header dia. 8"


b Pipa
- dia. 6"
- dia. 5"
- dia. 4"
- dia. 3"
- dia. 2 1/2"
- dia. 2"
c Tee
- dia 8" x 6" x 8"
- dia 8" x 5" x 8"
- dia 8" x 4" x 8"
- dia 8" x 3" x 8"
- dia 8" x 2 1/2" x 8"
- dia 8" x 2" x 8"
d Elbow
- dia. 6"
- dia. 4"
- dia. 3"
- dia. 2"
e Gate Valve
- dia. 6" (150 psi-flanged)
- dia. 5" (150 psi-flanged)
- dia. 4" (150 psi-flanged)
- dia. 3" (125 psi-flanged)
- dia. 2 1/2" (150 psi-flanged)
- dia. 2" (125 psi-screwed)

f Check Valve
- dia. 4" (150 psi - flanged)
- dia. 2 1/2" (150 psi-flanged)
g Double Sphere Flexible Joint
- dia. 5" (flanged)
- dia. 4" (flanged)
- dia. 2 1/2" (flanged)
- dia. 2" (flanged)
h Strainer
- dia. 5" (flanged)
- dia. 2 1/2" (flanged)
i Foot valve dia. 6" (flanged)
j Pressure gauge 0 - 15 kg/cm2
k Pressure switch
l Savety valve 12 kg/cm2 dia. 2" (flanged)
m Pressure tank 1000 lt, 15 kg/cm2 lengkap dgn.
accessories
n Air Relase Valve (ARV) dia. 2"
o Material bantu (mur-baut,flens,support,klem ,
fitting dll)

2.2 Ground floor


Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 6" (Pipa Tegak)
- dia. 2 1/2"
b Elbow
- dia 2 1/2"
c Tee
- dia 6" x 2 1/2" x 6"
c Indoor hydrant box lengkap
f Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.)

2.3 Lantai 1
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 6" (Pipa Tegak)
- dia. 2 1/2"
b Elbow
- dia 2 1/2"
c Tee
- dia 6" x 2 1/2" x 6"
e Indoor hydrant box lengkap
f Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.)

2.4 Lantai 2
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 6" (Pipa Tegak)
- dia. 2 1/2"
b Elbow
- dia 2 1/2"
c Tee
- dia 6" x 2 1/2" x 6"
e Indoor hydrant box lengkap
f Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.)

2.5 Lantai 3
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 4" (Pipa Tegak)
- dia. 2 1/2"
b Elbow
- dia 2 1/2"
c Tee
- dia 4" x 2 1/2" x 4"
d Reducer dia 6" x 4"
e Indoor hydrant box lengkap
f Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.)

2.6 Lantai 4
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 2 1/2"
b Elbow
- dia. 4"
- dia 2 1/2"
c Tee
- dia 4" x 2 1/2" x 4"
e Air release valve dia. 4"
f Indoor hydrant box lengkap
g Multipurpose dry chemical fire extinguisher
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
h Material bantu (mur-baut, flange, socket dll.)

III TESTING & COMMISSIONING


RENCANA ANGGARAN BIAYA
PEKERJAAN FRE HYDRANT
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
RIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN JUMLAH HARGA


PEKERJAAN VOLUME SAT
(Rp) (Rp)

1.00 unit

: horizontal single/multi stage


centrifugal pump, self priming.
: 500 USGPM
: 60 m
: 70 % minimum
: 2900 rpm

: 3 phase TEFC induction


: 380/660 V
: wye-delta
: 35.000 VA (min)
: direct, base skid mounted
: 2900 rpm
1.00 unit

: multi stage
centrifugal pump, self priming
: 50 USGPM
: 60 m
: 70 % minimum
: 1450 rpm

: 3 phase TEFC induction


: 380/660 V
: wye-delta
: 3.500 (min)
direct, base skid mounted
: 1450 rpm
1.00 unit

SUB TOTAL I

6.00 m

16.00 m
6.00 m
6.00 m
6.00 m
6.00 m
6.00 m

3.00 bh
1.00 bh
2.00 bh
2.00 bh
1.00 bh
3.00 bh

4.00 bh
2.00 bh
2.00 bh
4.00 bh

3.00 bh
2.00 bh
2.00 bh
2.00 bh
1.00 bh
2.00 bh

2.00 bh
1.00 bh

2.00 bh
2.00 bh
1.00 bh
1.00 bh

2.00 bh
1.00 bh
2.00 bh
4.00 bh
3.00 bh
1.00 bh
1.00 unit

1.00 bh
1.00 ls

4.00 m
24.00 m

3.00 bh

1.00 bh
1.00 bh
4.00 bh

1.00 ls

4.00 m
18.00 m

3.00 bh

1.00 bh
1.00 bh
4.00 bh
1.00 ls

4.00 m
24.00 m

3.00 bh

1.00 bh
1.00 bh
4.00 bh

1.00 ls

4.00 m
22.00 m

3.00 bh

1.00 bh
1.00 bh
1.00 bh
4.00 bh

1.00 ls

22.00 m
1.00 bh
10.00 bh

1.00 bh
1.00 bh
1.00 bh
4.00 bh

1.00 ls

SUB TOTAL II

1.00 ls

SUB TOTAL III


TOTAL

You might also like