12 MW Task completed in yr.

20-21
Details Target Achieved
Gross Generation 34,636,800 29,469,755
Auxiliary Consumption 4.58% 4.22%
Boiler Eff
PLF 98.000 85.080
Saving with aux Power Reduction (Rs.)
Saving in SHR ( Kcal/Kwh) 4445.000
Saving with Maint Cost reduction
Repair Maint
Subbordinates Training (With hard Copy) 50 Nos in yr 40 Nos.
SOP making 12 Nos in yr 7 Nos.
Zero Accident 0 0

Attended area
housekeeping
Area House keeping
meeting as per
schedule.

As per requirement in the


plant, as well as direction
Availability in plant during emergency handling
given by Seniors followed
20799: the
instructions. Considering 10 days
of Line #03 Kiln
12 MW Target for Yr. 21-22 Shutdown
12 MW Q-1 Q-2
Gross Generation 74,304,000 16,512,000 20,640,000
Auxiliary Consumption 3.50% 4.00% 3.50%
Boiler Eff 90.000 85.000 90.000
PLF 98.000 98.000 98.000

1. Operating equipment close to design efficiency to a


maximum load output.
Saving with aux Power Reduction (Rs.)
2. Minimise system drop (flue gas side , steam and w
without affecting the Boiler performance.
Saving in SHR ( Kcal/Kwh) 3700.000 3700.000 3700.000
saving with Maint Cost reduction
Repair Maint
Subbordinates Training (With hard Copy) 50 Nos in yr 12 Nos 13 Nos
SOP making 12 Nos in yr 3 Nos 3 Nos
Zero Accident 0 0 0
Area House keeping YES YES YES
Availability in plant during emergency handling YES YES YES
20799: 20799:
Considering 10 days Considering 10 days
of Line #03 Kiln of Line #03 Kiln
Shutdown Shutdown
Q-3 Q-4
16,512,000 20,640,000 Depends upon Kiln Feed
3.00% 3.50%
95.000 90.000 Depends upon Kiln Feed
98.000 98.000 Depends upon Kiln Feed
ment close to design efficiency to attain
put.
drop (flue gas side , steam and water side)
e Boiler performance.
3700.000 3700.000 Depends upon Kiln Feed

13 Nos 12 Nos
3 Nos 3 Nos
0 0
YES YES
YES YES