Project Parameters
Land
Acres 1000 sft 1000 sqm
Land Area 150 6,534 607
Leasable Area 58.6% 87.84 3,826 355
Land required for Standard Factory Buildings (SFB) 2.76% 4.14 180 17
Land required for Warehouses 1.17% 1.76 76 7
Land Offtake
Construction
Construction Cost Escalation Rate 7%
Contingency 10%
Years till Construction 3 years
Concession Period 25 years
Road Road
Tk / sqm Area (sqm) Maintenance
Internal Roads 2000 140,255 1.0% (of Capex)
2
Parameters
Infrastructure
Land Compacting, Leveling & Landscaping 10 m Tk
Street & Security Lighting 47 m Tk
Storm Channels 19 m Tk
3
Parameters
Lease Structure
Collection rate of accounts 100%
Land Sale price 12 times rent
Real annual appreciation in value of land/buildings 2.5%
Royalty to Government
Royalty Rate 1.00% of Land Lease Revenue
4
Parameters
3
Site Development Cost 150 Tk / m
2
Area of Land 606,900 m
Height of land fill 3 meters
270 m Tk
Total including Cost Escalation & Contingency 326 m Tk
Boundary Wall 25 m Tk
Total including Cost Escalation & Contingency 38 m Tk
Social Cost 71 m Tk (0.1 x Land Price)
Total including Cost Escalation & Contingency 108 m Tk
Total 1672 m Tk
Total including Cost Escalation & Contingency 2436 m Tk
5
Parameters
Capital Structure
Grant Lever 100%
Maximum Grant m Tk -
Grant Share of Financing 0%
Capital Cost Lever 100%
Debt share of capex (Debt/equity) 70%
Equity/Cash Share of capex 30%
Initial Dividend Payout 100%
Source of Debt
A Participating Financial Institution (PFI) of Investment
Promotion and Financing Facility (IPFF)
Interest Rates
PFI loan share of debt 20% 13% As the project requires loan disbursements each year upto
4th year from first disbursment, the grace period should be
counted from 4th year for component from PFI: 13% as
prescribed by BB
IPFF loan share of debt 80% 10% for component from IPFF: Considering 1 yr Govt T-bill
rate (4.5%) + 50 basis point + margin of PFI (5%)
Nominal Interest Rate 10.6%
Conversion Factors
1 sqm = 10.76 sft
1 Acre = 43,560 sft
1 Acre = 4,046 sqm
2 Acre = 100 decimal
Exchange Rate Tk 70 per US $
6
Demand.Cal
Base Case
Sector
Year 1 2 3 4 5 6 7
Sector 1 Total
A Industry 150 17 18 20 23 23 27 17
B Industry 27 3 3 4 4 4 5 3
C Industry 40 4 5 5 6 6 7 4
D Industry 30 3 4 4 5 5 5 3
E Industry 15 2 2 2 2 2 3 2
F Industry 2 0 0 0 1 0 1 0
G Industry 2 1 0 1 0 0 0 0
Sub Total 256 30 32 36 41 40 48 29
Sector 2
Number of Units
A Industry 115 16 20 20 18 17 15 3
B Industry 40 6 7 7 6 6 5 1
C Industry 40 6 7 7 6 6 5 1
Sub Total 185 28 34 34 30 29 25 5
Sector 3
A Industry 20 2 2 3 3 3 3 2
B Industry 20 2 2 3 3 3 3 2
C Industry 12 1 1 2 2 2 2 1
D Industry 45 5 5 6 6 7 7 5
E Industry 30 4 4 4 4 5 5 3
F Industry 10 1 1 1 1 2 2 1
G Industry 20 2 2 3 3 3 3 2
H Industry 10 1 1 1 1 2 2 1
I Industry 10 1 1 1 1 2 2 1
J Industry 29 3 3 4 4 5 5 3
Sub Total 189 22 22 28 28 34 34 21
7
Demand.Cal
Base Case
Sector
Year 8 9 10 11 12 13 14 15 16 17 18
Sector 1
A Industry 0 0 0 0 0 0 0 0 0 0 0
B Industry 0 0 0 0 0 0 0 0 0 0 0
C Industry 0 0 0 0 0 0 0 0 0 0 0
D Industry 0 0 0 0 0 0 0 0 0 0 0
E Industry 0 0 0 0 0 0 0 0 0 0 0
F Industry 0 0 0 0 0 0 0 0 0 0 0
G Industry 0 0 0 0 0 0 0 0 0 0 0
Sub Total 0 0 0 0 0 0 0 0 0 0 0
Sector 2
Number of Units
A Industry 0 0 0 0 0 0 0 0 0 0 0
B Industry 0 0 0 0 0 0 0 0 0 0 0
C Industry 0 0 0 0 0 0 0 0 0 0 0
Sub Total 0 0 0 0 0 0 0 0 0 0 0
Sector 3
A Industry 0 0 0 0 0 0 0 0 0 0 0
B Industry 0 0 0 0 0 0 0 0 0 0 0
C Industry 0 0 0 0 0 0 0 0 0 0 0
D Industry 0 0 0 0 0 0 0 0 0 0 0
E Industry 0 0 0 0 0 0 0 0 0 0 0
F Industry 0 0 0 0 0 0 0 0 0 0 0
G Industry 0 0 0 0 0 0 0 0 0 0 0
H Industry 0 0 0 0 0 0 0 0 0 0 0
I Industry 0 0 0 0 0 0 0 0 0 0 0
J Industry 0 0 0 0 0 0 0 0 0 0 0
Sub Total 0 0 0 0 0 0 0 0 0 0 0
Total Units 0 0 0 0 0 0 0 0 0 0 0
Sectoral Demand
8
Demand.Cal
Sector
Year 1 2 3 4 5 6 7
Sector 1
A Industry 1,087,500 127,500 135,000 150,000 172,500 172,500 202,500 127,500
B Industry 130,000 15,000 15,000 20,000 20,000 20,000 25,000 15,000
C Industry 277,500 30,000 37,500 37,500 45,000 45,000 52,500 30,000
D Industry 145,000 15,000 20,000 20,000 25,000 25,000 25,000 15,000
E Industry 75,000 10,000 10,000 10,000 10,000 10,000 15,000 10,000
F Industry 128,500 - - - 64,250 - 64,250 -
G Industry 30,000 15,000 - 15,000 - - - -
Sectoral Demand
Sector 3
A Industry 135,000 15,000 15,000 22,500 22,500 22,500 22,500 15,000
B Industry 180,000 20,000 20,000 30,000 30,000 30,000 30,000 20,000
C Industry 110,000 10,000 10,000 20,000 20,000 20,000 20,000 10,000
D Industry 102,500 12,500 12,500 15,000 15,000 17,500 17,500 12,500
E Industry 72,500 10,000 10,000 10,000 10,000 12,500 12,500 7,500
F Industry 135,000 15,000 15,000 15,000 15,000 30,000 30,000 15,000
G Industry 45,000 5,000 5,000 7,500 7,500 7,500 7,500 5,000
H Industry 22,500 2,500 2,500 2,500 2,500 5,000 5,000 2,500
I Industry 22,500 2,500 2,500 2,500 2,500 5,000 5,000 2,500
J Industry 67,500 7,500 7,500 10,000 10,000 12,500 12,500 7,500
9
Demand.Cal
Sector
Year 8 9 10 11 12 13 14 15 16 17 18
Sector 1
A Industry - - - - - - - - - - -
B Industry - - - - - - - - - - -
C Industry - - - - - - - - - - -
D Industry - - - - - - - - - - -
E Industry - - - - - - - - - - -
F Industry - - - - - - - - - - -
G Industry - - - - - - - - - - -
Sectoral Demand
Sector 3
A Industry - - - - - - - - - - -
B Industry - - - - - - - - - - -
C Industry - - - - - - - - - - -
D Industry - - - - - - - - - - -
E Industry - - - - - - - - - - -
F Industry - - - - - - - - - - -
G Industry - - - - - - - - - - -
H Industry - - - - - - - - - - -
I Industry - - - - - - - - - - -
J Industry - - - - - - - - - - -
10
Demand.Cal
Sector
Year 1 2 3 4 5 6 7
Sector 1
A Industry 26.19 3.07 3.25 3.61 4.15 4.15 4.88 3.07
B Industry 2.98 0.34 0.34 0.46 0.46 0.46 0.57 0.34
C Industry 6.53 0.71 0.88 0.88 1.06 1.06 1.24 0.71
D Industry 3.33 0.34 0.46 0.46 0.57 0.57 0.57 0.34
E Industry 1.72 0.23 0.23 0.23 0.23 0.23 0.34 0.23
F Industry 2.95 0.00 0.00 0.00 1.47 0.00 1.47 0.00
Land Demand (acres) G Industry 0.72 0.36 0.00 0.36 0.00 0.00 0.00 0.00
Sector 2
A Industry 18.77 2.75 3.44 3.44 3.10 2.93 2.58 0.52
B Industry 4.36 0.69 0.80 0.80 0.69 0.69 0.57 0.11
C Industry 4.36 0.69 0.80 0.80 0.69 0.69 0.57 0.11
Sector 3
A Industry 3.10 0.34 0.34 0.52 0.52 0.52 0.52 0.34
B Industry 4.24 0.47 0.47 0.71 0.71 0.71 0.71 0.47
C Industry 2.59 0.24 0.24 0.47 0.47 0.47 0.47 0.24
D Industry 1.18 0.14 0.14 0.17 0.17 0.20 0.20 0.14
E Industry 0.83 0.11 0.11 0.11 0.11 0.14 0.14 0.09
F Industry 3.19 0.35 0.35 0.35 0.35 0.71 0.71 0.35
G Industry 0.52 0.06 0.06 0.09 0.09 0.09 0.09 0.06
H Industry 0.26 0.03 0.03 0.03 0.03 0.06 0.06 0.03
I Industry 0.26 0.03 0.03 0.03 0.03 0.06 0.06 0.03
J Industry 0.77 0.09 0.09 0.11 0.11 0.14 0.14 0.09
11
Demand.Cal
Sector
Year 8 9 10 11 12 13 14 15 16 17 18
Sector 1
A Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
C Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
D Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
E Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
F Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Land Demand (acres) G Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sector 2
A Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
C Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sector 3
A Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
C Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
D Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
E Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
F Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
G Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
H Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
J Industry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12
Demand.Cal
Building Type
Year Sub-total 1 2 3 4 5 6 7
No. of SME
Standard Factory Building 133 16 16 19 19 24 24 15
Units (new)
Warehouse 18 2 2 3 3 3 3 2
Serviced Land - Type A 497 64 72 79 80 79 83 40
Serviced Land - Type B 0 0 0 0 0 0 0 0
Unserviced Land 0 0 0 0 0 0 0 0
(cumulative Warehouse 2 4 7 10 13 16 18
Units
Serviced Land - Type A 64 136 215 295 374 457 497
)
Plot/Floor Space Demand
Building Type
Year Sub-total (sft) 1 2 3 4 5 6 7
Standard Factory Building 166,250 20,000 20,000 23,750 23,750 30,000 30,000 18,750
Land/Floor
(new) (sft)
Demand
Serviced Land - Type A 3,631,000 452,500 497,500 560,000 619,250 562,500 649,250 290,000
Serviced Land - Type B 0 0 0 0 0 0 0 0
Unserviced Land 0 0 0 0 0 0 0 0
Standard Factory Building 20,000 40,000 63,750 87,500 117,500 147,500 166,250
(cumulative)
Land/Floors
Demand
(sft)
Serviced Land - Type A 452,500 950,000 1,510,000 2,129,250 2,691,750 3,341,000 3,631,000
Serviced Land - Type B 0 0 0 0 0 0 0
Unserviced Land 0 0 0 0 0 0 0
Sub-total (acres)
Standard Factory Building 3.82 0.5 0.5 0.5 0.5 0.7 0.7 0.4
Consumption
Serviced Land - Type A 83.36 10.4 11.4 12.9 14.2 12.9 14.9 6.7
Net
Serviced Land - Type B 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Unserviced Land 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Land (acres) 88.85
Land Type
Demand
for Land
(Acres)
Types
Year 1 2 3 4 5 6 7
Type A 11.05 12.08 13.65 15.02 13.87 15.90 7.28
Type B 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cumula
13
Demand.Cal
Building Type
Year 8 9 10 11 12 13 14 15 16 17 18
No. of SME
Standard Factory Building 0 0 0 0 0 0 0 0 0 0 0
Units (new)
Warehouse 0 0 0 0 0 0 0 0 0 0 0
Serviced Land - Type A 0 0 0 0 0 0 0 0 0 0 0
Serviced Land - Type B 0 0 0 0 0 0 0 0 0 0 0
Unserviced Land 0 0 0 0 0 0 0 0 0 0 0
Standard Factory Building 133 133 133 133 133 133 133 133 133 133 133
No. of SME
(cumulative Warehouse 18 18 18 18 18 18 18 18 18 18 18
Units
Serviced Land - Type A 497 497 497 497 497 497 497 497 497 497 497
)
Plot/Floor Space Demand
Building Type
Year 8 9 10 11 12 13 14 15 16 17 18
Standard Factory Building 0 0 0 0 0 0 0 0 0 0 0
Land/Floor
(new) (sft)
Demand
Warehouse 0 0 0 0 0 0 0 0 0 0 0
Space
Standard Factory Building 166,250 166,250 166,250 166,250 166,250 166,250 166,250 166,250 166,250 166,250 166,250
(cumulative)
Land/Floors
Demand
Warehouse 73,066 73,066 73,066 73,066 73,066 73,066 73,066 73,066 73,066 73,066 73,066
pace
(sft)
Serviced Land - Type A 3,631,000 3,631,000 3,631,000 3,631,000 3,631,000 3,631,000 3,631,000 3,631,000 3,631,000 3,631,000 3,631,000
Serviced Land - Type B 0 0 0 0 0 0 0 0 0 0 0
Unserviced Land 0 0 0 0 0 0 0 0 0 0 0
Standard Factory Building 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Consumption
Warehouse 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
of Land
(acres)
Serviced Land - Type A 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Net
Serviced Land - Type B 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Unserviced Land 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Land (acres)
Land Type
Demand
for Land
(Acres)
Types
Year 8 9 10 11 12 13 14 15 16 17 18
Type A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Type B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cumula
Acres 88.85 88.85 88.85 88.85 88.85 88.85 88.85 88.85 88.85 88.85 88.85
14
Demand.Cal
E Industry 5,000 15 0 15 0 0 0
F Industry 64,250 2 0 0 0 0 0
G Industry 15,000 2 0 0 0 0 2
Sub-Total 266
Sector 2
A Industry 7,500 115 0 0 115 0 0
B Industry 5,000 40 0 40 0 0 0
C Industry 5,000 40 0 40 0 0 0
Sub-Total 195
Sector 3
A Industry 7,500 20 0 0 20 0 0
B Industry 10,000 20 0 0 0 20 0
C Industry 10,000 12 0 0 0 12 0
D Industry 2,500 45 45 0 0 0 0
E Industry 2,500 30 30 0 0 0 0
F Industry 15,000 10 0 0 0 0 10
G Industry 2,500 20 20 0 0 0 0
H Industry 2,500 10 10 0 0 0 0
I Industry 2,500 10 10 0 0 0 0
J Industry 2,500 29 29 0 0 0 0
Sub-Total 206
144 152 325 32 12
SFB Units 523 Plot Units
15
Demand.Cal
A Industry 7,500
B Industry 5,000
C Industry 7,500
D Industry 5,000
Sector Constraints
E Industry 5,000
F Industry 64,250
G Industry 15,000
Sub-Total
Sector 2
A Industry 7,500
B Industry 5,000
C Industry 5,000
Sub-Total
Sector 3
A Industry 7,500
B Industry 10,000
C Industry 10,000
D Industry 2,500
E Industry 2,500
F Industry 15,000
G Industry 2,500
H Industry 2,500
I Industry 2,500
J Industry 2,500
Sub-Total
16
Demand.Cal
A B C D E F G A B
A B C D E F G A B
Type A 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Type B 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Completeness 1 1 1 1 1 1 1 1 1
Development Specifications
Unit Cutoff
Constraints
Maximum Floorspace
Building
17
Demand.Cal
A C A B C D E F G H I J
A C A B C D E F G H I J
Type A 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Type B 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Completeness 1 1 1 1 1 1 1 1 1 1 1 1
Development Specifications
Constraints
Building
18
Demand.Cal
Land offtake
Yearly percentage of SME Units moving in
1st yr 2nd yr 3rd yr 4th yr 5th yr 6th yr 7th yr 8th yr
period (yrs)
Optimistic Case 5 0% 0% 0%
Sector 1 95% 18% 19% 20% 22% 16%
Sector 2 95% 19% 22% 22% 20% 12%
Sector 3 95% 19% 19% 20% 20% 17%
Average 19% 20% 21% 21% 15%
SME Park
Base Case 7 0%
Sector 1 95% 11% 12% 13% 15% 15% 18% 11%
Sector 2 95% 14% 17% 17% 16% 15% 13% 3%
Sector 3 95% 12% 12% 14% 14% 16% 16% 11%
Average 12% 14% 15% 15% 15% 16% 8%
Conservative Case 12
Sector 1 95% 5% 6% 7% 9% 9% 12% 11% 11%
Sector 2 95% 10% 14% 14% 12% 10% 10% 5% 5%
Sector 3 95% 5% 5% 7% 7% 10% 10% 12% 12%
Average 7% 8% 9% 9% 10% 11% 9% 9%
19
Demand.Cal
Land offtake
Yearly percentage of SME Units moving in
9th yr 10th yr 11th yr 12th yr
period (yrs)
Optimistic Case 5 0% 0% 0% 0%
Sector 1 95%
Sector 2 95%
Sector 3 95%
Average
SME Park
Base Case 7 0% 0% 0% 0%
Sector 1 95%
Sector 2 95%
Sector 3 95%
Average
Conservative Case 12
Sector 1 95% 9% 9% 6% 1%
Sector 2 95% 5% 5% 3% 2%
Sector 3 95% 10% 10% 4% 3%
Average 8% 8% 4% 2%
20
Land&Bldg Supply
Net Land added this Phase Type A 46.7 46.7 46.7 46.7 47.1 47.1 47.1 47.1 47.1
Net Land added this Phase Type B - - - - - - - - -
Gross Acres
From (acre) To (acre) Added Net:Gross Type A Type B Total net
Phase 1 0.00 81.00 81.00 0.58 46.68 46.68
Phase 2 81.00 150.00 69.00 0.68 47.06 47.06
Phase 3 150.00 150.00 0.00 0.00 0.00
21
Land&Bldg Supply
Additional Land leased to investor this year (Type A) 10.39 11.42 12.86 14.22 12.91 14.90 6.66 0.00
Cumulative land leased (Type A) 10.39 21.81 34.66 48.88 61.79 76.70 83.36 83.36
Land sold to investor this year (Type A) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cumulative land sold to investor (Type A) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Land reserved for buildings leased to firms 0.66 0.66 0.79 0.80 0.96 1.00 0.62 0.00
Cumulative land reserved for buildings leased to firms 0.66 1.32 2.12 2.92 3.88 4.88 5.49 5.49
Building Account (1000 sft) YR0 YR1 YR2 YR3 YR4 YR5 YR6 YR7 YR8
Standard Factory Building 20.00 20.00 23.75 23.75 30.00 30.00 18.75 -
Warehouse 8.95 8.76 10.74 11.29 11.73 13.39 8.20 -
Serviced Land - Type A 452.50 497.50 560.00 619.25 562.50 649.25 290.00 -
Serviced Land - Type B - - - - - - - -
Unserviced Land - - - - - - - -
Standard Factory Building 20.00 40.00 63.75 87.50 117.50 147.50 166.25 166.25
Warehouse 8.95 17.71 28.45 39.74 51.47 64.86 73.07 73.07
Serviced Land - Type A 452.50 950.00 1,510.00 2,129.25 2,691.75 3,341.00 3,631.00 3,631.00
Serviced Land - Type B - - - - - - - -
Unserviced Land - - - - - - - -
Standard Factory Building 20.00 20.00 23.75 23.75 30.00 30.00 18.75 -
Warehouse 8.95 8.76 10.74 11.29 11.73 13.39 8.20 -
Serviced Land - Type A - - - - - - - -
Serviced Land - Type B - - - - - - - -
Unserviced Land - - - - - - - -
22
Land&Bldg Supply
Standard Factory Building 20.00 40.00 63.75 87.50 117.50 147.50 166.25 166.25
Warehouse 8.95 17.71 28.45 39.74 51.47 64.86 73.07 73.07
Serviced Land - Type A - - - - - - - -
Serviced Land - Type B - - - - - - - -
Unserviced Land - - - - - - - -
Building Stock
Standard Factory Building - 58.19 58.19 116.38 116.38 174.56 174.56 174.56 174.56
Warehouse - 38.36 38.36 38.36 38.36 76.72 76.72 76.72 76.72
Serviced Land - Type A - - - - - - - - -
Serviced Land - Type B - - - - - - - - -
Unserviced Land - - - - - - - - -
Standard Factory Building - 20.00 40.00 63.75 87.50 117.50 147.50 166.25 166.25
Warehouse - 8.95 17.71 28.45 38.36 51.47 64.86 73.07 73.07
Serviced Land - Type A - - - - - - - - -
Serviced Land - Type B - - - - - - - - -
Unserviced Land - - - - - - - - -
23
Capex.sum
Capex Summary
YR0 YR1 YR2 YR3 YR4 YR5 YR6 YR7 YR8 YR9
Capital Expenditures Financed by Grants Year Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
24
Component Businesses
Component Businesses
y0 y1 y2 y3 y4 y5 y6 y7 y8 y9 y10
Maintenance Expense Escalation Factor 2.5% 1.00 1.03 1.05 1.08 1.10 1.13 1.16 1.19 1.22 1.25 1.28
Capacity Utilization 0 12% 14% 15% 15% 15% 16% 8% 0% 0% 0%
Cumulative Capacity Utilization 0 12% 26% 41% 56% 71% 87% 95% 95% 95% 95%
Tariff Esclation Factor 2.5% 1.00 1.03 1.05 1.08 1.10 1.13 1.16 1.19 1.22 1.25 1.28
Warehouse Tk m
Revenue @ Tk.sft/mon 18.3 0.00 4.03 8.17 13.45 18.59 25.56 33.02 38.12 39.08 40.05 41.06
O&M cost Tk m 5.76 0.00 0.73 1.57 2.52 3.54 4.63 5.79 6.50 6.67 6.83 7.00
Land Lease Cost Tk m 1.49 0.00 1.53 1.57 1.61 1.65 1.69 1.73 1.77 1.82 1.86 1.91
Total Expense Tk m 0.00 2.26 3.14 4.13 5.19 6.31 7.52 8.28 8.48 8.70 8.91
Power
Capacity MW 10
kWh 43,800,000
Plant Factor 50%
Tariff @ Tk/kWh 4.56
Revenue Tk m 0 25.25 54.56 87.47 122.72 160.44 200.74 225.54 231.18 236.96 242.89
O&M cost Tk m 73.20 0 9.25 20.00 32.06 44.98 58.80 73.57 82.66 84.73 86.85 89.02
Land Lease Cost Tk m 1.90 0.00 1.94 1.99 2.04 2.09 2.14 2.20 2.25 2.31 2.37 2.43
Total Expense Tk m 0.00 11.20 21.99 34.10 47.07 60.95 75.77 84.91 87.04 89.21 91.44
25
Component Businesses
Component Businesses
y11 y12 y13 y14 y15 y16 y17 y18 y19 y20 y21 y22 y23 y24 y25
Maintenance Expense Escalation Factor 1.31 1.34 1.38 1.41 1.45 1.48 1.52 1.56 1.60 1.64 1.68 1.72 1.76 1.81 1.85
Capacity Utilization 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Cumulative Capacity Utilization 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
Tariff Esclation Factor 1.31 1.34 1.38 1.41 1.45 1.48 1.52 1.56 1.60 1.64 1.68 1.72 1.76 1.81 1.85
Warehouse
Revenue @ 42.08 43.13 44.21 45.32 46.45 47.61 48.80 50.02 51.27 52.56 53.87 55.22 56.60 58.01 59.46
O&M cost 7.18 7.36 7.54 7.73 7.93 8.12 8.33 8.53 8.75 8.97 9.19 9.42 9.66 9.90 10.14
Land Lease Cost 1.96 2.01 2.06 2.11 2.16 2.21 2.27 2.33 2.38 2.44 2.51 2.57 2.63 2.70 2.77
Total Expense 9.14 9.37 9.60 9.84 10.09 10.34 10.60 10.86 11.13 11.41 11.70 11.99 12.29 12.60 12.91
Power
Capacity
Plant Factor
Tariff @
Revenue 248.96 255.18 261.56 268.10 274.80 281.67 288.71 295.93 303.33 310.91 318.69 326.65 334.82 343.19 351.77
O&M cost 91.24 93.52 95.86 98.26 100.71 103.23 105.81 108.46 111.17 113.95 116.80 119.72 122.71 125.78 128.92
Land Lease Cost 2.49 2.55 2.61 2.68 2.74 2.81 2.88 2.96 3.03 3.11 3.18 3.26 3.34 3.43 3.51
Total Expense 93.73 96.07 98.47 100.94 103.46 106.05 108.70 111.41 114.20 117.05 119.98 122.98 126.06 129.21 132.44
26
Component Businesses
y0 y1 y2 y3 y4 y5 y6 y7 y8 y9 y10
Operation & Maintenance
Capacity sft 4,000,000
Tariff @ Tk/sft/mon 0.56
Revenue Tk m 0 3.42 7.39 11.85 16.62 21.73 27.19 30.55 31.32 32.10 32.90
O&M cost Tk m 24.56 0 3.10 6.71 10.76 15.09 19.73 24.68 27.73 28.43 29.14 29.87
Total Expense Tk m 0.00 3.10 6.71 10.76 15.09 19.73 24.68 27.73 28.43 29.14 29.87
R&D Center
Capacity SME Units 667
Tariff @ Tk/SME Unit/mon 1,500
Revenue Tk m 0 1.52 3.28 5.26 7.38 9.64 12.07 13.56 13.90 14.24 14.60
O&M cost Tk m 5.62 0 0.71 1.54 2.46 3.45 4.51 5.65 6.35 6.51 6.67 6.83
Land Lease Cost Tk m 0.13 0.00 0.13 0.13 0.14 0.14 0.14 0.15 0.15 0.16 0.16 0.16
Total Expense Tk m 0.00 0.84 1.67 2.60 3.59 4.66 5.80 6.50 6.66 6.83 7.00
Exhibition Center
Capacity sft 5,000
Tariff @ Tk/sft/mon 59
Revenue Tk m 0 0.44 0.96 1.54 2.16 2.83 3.54 3.97 4.07 4.18 4.28
O&M cost Tk m 2.62 0 0.33 0.72 1.15 1.61 2.10 2.63 2.96 3.03 3.11 3.19
Land Lease Cost Tk m 0.06 0.00 0.06 0.00 0.06 0.00 0.07 0.00 0.09 0.00 0.11 0.00
Total Expense Tk m 0.00 0.39 0.72 1.21 1.61 2.18 2.63 3.05 3.03 3.22 3.19
Commercial Facilities
Capacity sft 170,000
Tariff @ Tk/sft/mon 70
Revenue Tk m 0 18.05 39.01 62.54 87.74 114.71 143.52 161.26 165.29 169.42 173.66
O&M cost Tk m 5.32 0 0.67 1.45 2.33 3.27 4.27 5.35 6.01 6.16 6.31 6.47
Land Lease Cost Tk m 1.66 0.00 1.70 1.74 1.79 1.83 1.88 1.92 1.97 2.02 2.07 2.12
Total Expense Tk m 0.00 2.37 3.20 4.12 5.10 6.15 7.27 7.98 8.18 8.38 8.59
27
Component Businesses
y11 y12 y13 y14 y15 y16 y17 y18 y19 y20 y21 y22 y23 y24 y25
Operation & Maintenance
Capacity
Tariff @
Revenue 33.72 34.57 35.43 36.32 37.23 38.16 39.11 40.09 41.09 42.12 43.17 44.25 45.36 46.49 47.65
O&M cost 30.61 31.38 32.16 32.97 33.79 34.64 35.50 36.39 37.30 38.23 39.19 40.17 41.17 42.20 43.26
Total Expense 30.61 31.38 32.16 32.97 33.79 34.64 35.50 36.39 37.30 38.23 39.19 40.17 41.17 42.20 43.26
R&D Center
Capacity
Tariff @
Revenue 14.97 15.34 15.72 16.12 16.52 16.93 17.36 17.79 18.23 18.69 19.16 19.64 20.13 20.63 21.15
O&M cost 7.01 7.18 7.36 7.54 7.73 7.93 8.12 8.33 8.54 8.75 8.97 9.19 9.42 9.66 9.90
Land Lease Cost 0.17 0.17 0.18 0.18 0.18 0.19 0.19 0.20 0.20 0.21 0.21 0.22 0.22 0.23 0.24
Total Expense 7.17 7.35 7.54 7.72 7.92 8.12 8.32 8.53 8.74 8.96 9.18 9.41 9.65 9.89 10.13
Exhibition Center
Capacity
Tariff @
Revenue 4.39 4.50 4.61 4.72 4.84 4.96 5.09 5.22 5.35 5.48 5.62 5.76 5.90 6.05 6.20
O&M cost 3.27 3.35 3.43 3.52 3.60 3.69 3.79 3.88 3.98 4.08 4.18 4.28 4.39 4.50 4.61
Land Lease Cost 0.14 0.00 0.20 0.00 0.28 0.00 0.43 0.00 0.69 0.00 1.16 0.00 2.05 0.00 3.80
Total Expense 3.41 3.35 3.63 3.52 3.89 3.69 4.22 3.88 4.67 4.08 5.34 4.28 6.44 4.50 8.41
Commercial Facilities
Capacity
Tariff @
Revenue 178.00 182.45 187.01 191.68 196.48 201.39 206.42 211.58 216.87 222.29 227.85 233.55 239.39 245.37 251.51
O&M cost 6.63 6.80 6.97 7.14 7.32 7.50 7.69 7.88 8.08 8.28 8.49 8.70 8.92 9.14 9.37
Land Lease Cost 2.18 2.23 2.29 2.34 2.40 2.46 2.52 2.59 2.65 2.72 2.79 2.85 2.93 3.00 3.07
Total Expense 8.81 9.03 9.25 9.48 9.72 9.96 10.21 10.47 10.73 11.00 11.27 11.56 11.84 12.14 12.44
28
Revenue
Revenue
YR 0 1 2 3 4 5 6 7 8 9 10
---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ----------
Sub-total land service and rent m Tk 9.05 19.47 31.73 45.85 59.42 75.59 84.21 86.31 88.47 90.68
Water & Sewerage m Tk 0.00 2.73 5.89 9.45 13.26 17.33 21.68 24.36 24.97 25.59 26.23
Power " 0.00 25.25 54.56 87.47 122.72 160.44 200.74 225.54 231.18 236.96 242.89
Operation & Maintenance " 0.00 3.42 7.39 11.85 16.62 21.73 27.19 30.55 31.32 32.10 32.90
R&D Center " 0.00 1.52 3.28 5.26 7.38 9.64 12.07 13.56 13.90 14.24 14.60
Exhibition Center " 0.00 0.44 0.96 1.54 2.16 2.83 3.54 3.97 4.07 4.18 4.28
Commercial Facilities " 0.00 18.05 39.01 62.54 87.74 114.71 143.52 161.26 165.29 169.42 173.66
Total Annual Revenue 0.00 72.91 155.99 251.47 353.99 466.26 587.60 662.73 679.30 696.28 713.69
29
Revenue
Revenue
YR 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- ----------
Sub-total land service and rent m Tk 92.95 95.27 97.65 100.10 102.60 105.16 107.79 110.49 113.25 116.08 118.98 121.96 125.01 128.13 131.33
Water & Sewerage m Tk 26.89 27.56 28.25 28.96 29.68 30.42 31.18 31.96 32.76 33.58 34.42 35.28 36.16 37.07 38.00
Power " 248.96 255.18 261.56 268.10 274.80 281.67 288.71 295.93 303.33 310.91 318.69 326.65 334.82 343.19 351.77
Operation & Maintenance " 33.72 34.57 35.43 36.32 37.23 38.16 39.11 40.09 41.09 42.12 43.17 44.25 45.36 46.49 47.65
R&D Center " 14.97 15.34 15.72 16.12 16.52 16.93 17.36 17.79 18.23 18.69 19.16 19.64 20.13 20.63 21.15
Exhibition Center " 4.39 4.50 4.61 4.72 4.84 4.96 5.09 5.22 5.35 5.48 5.62 5.76 5.90 6.05 6.20
Commercial Facilities " 178.00 182.45 187.01 191.68 196.48 201.39 206.42 211.58 216.87 222.29 227.85 233.55 239.39 245.37 251.51
Total Annual Revenue 731.53 749.82 768.56 787.78 807.47 827.66 848.35 869.56 891.30 913.58 936.42 959.83 983.83 1,008.42 1,033.63
30
Opex
Opex
YR0 YR1 YR2 YR3 YR4 YR5 YR6 YR7 YR8 YR9 YR10 YR11 YR12
SFB m Tk 0.00 4.20 4.98 5.84 6.77 7.75 8.79 9.48 9.72 9.96 10.21 10.46 10.72
Warehouse " 0.00 2.26 3.14 4.13 5.19 6.31 7.52 8.28 8.48 8.70 8.91 9.14 9.37
Water & Sewerage " 0.00 1.53 2.10 2.73 3.40 4.12 4.89 5.38 5.51 5.65 5.79 5.93 6.08
Power " 0.00 11.20 21.99 34.10 47.07 60.95 75.77 84.91 87.04 89.21 91.44 93.73 96.07
Park O&M Expenses " 0.00 3.10 6.71 10.76 15.09 19.73 24.68 27.73 28.43 29.14 29.87 30.61 31.38
R&D Center " 0.00 0.84 1.67 2.60 3.59 4.66 5.80 6.50 6.66 6.83 7.00 7.17 7.35
Exhibition Center " 0.00 0.39 0.72 1.21 1.61 2.18 2.63 3.05 3.03 3.22 3.19 3.41 3.35
Commercial Facilities " 0.00 2.37 3.20 4.12 5.10 6.15 7.27 7.98 8.18 8.38 8.59 8.81 9.03
Internal Roads " 0.00 4.18 4.28 4.39 4.50 4.61 4.73 4.85 4.97 5.09 5.22 5.35 5.48
Common Zone Facilities " 0.00 1.33 1.37 1.40 1.43 1.47 1.51 1.55 1.58 1.62 1.66 1.71 1.75
Royalty m Tk 0.00 0.09 0.19 0.32 0.46 0.59 0.76 0.84 0.86 0.88 0.91 0.93 0.95
Total: m Tk 0.00 31.50 50.34 71.59 94.21 118.52 144.35 160.54 164.46 168.68 172.79 177.25 181.53
31
Opex
Opex
YR13 YR14 YR15 YR16 YR17 YR18 YR19 YR20 YR21 YR22 YR23 YR24 YR25
SFB m Tk 10.99 11.27 11.55 11.84 12.13 12.44 12.75 13.07 13.39 13.73 14.07 14.42 14.78
Warehouse " 9.60 9.84 10.09 10.34 10.60 10.86 11.13 11.41 11.70 11.99 12.29 12.60 12.91
Water & Sewerage " 6.23 6.39 6.55 6.71 6.88 7.05 7.23 7.41 7.60 7.79 7.98 8.18 8.38
Power " 98.47 100.94 103.46 106.05 108.70 111.41 114.20 117.05 119.98 122.98 126.06 129.21 132.44
Park O&M Expenses " 32.16 32.97 33.79 34.64 35.50 36.39 37.30 38.23 39.19 40.17 41.17 42.20 43.26
R&D Center " 7.54 7.72 7.92 8.12 8.32 8.53 8.74 8.96 9.18 9.41 9.65 9.89 10.13
Exhibition Center " 3.63 3.52 3.89 3.69 4.22 3.88 4.67 4.08 5.34 4.28 6.44 4.50 8.41
Commercial Facilities " 9.25 9.48 9.72 9.96 10.21 10.47 10.73 11.00 11.27 11.56 11.84 12.14 12.44
Internal Roads " 5.62 5.76 5.90 6.05 6.20 6.36 6.52 6.68 6.85 7.02 7.19 7.37 7.56
Common Zone Facilities " 1.79 1.84 1.88 1.93 1.98 2.03 2.08 2.13 2.18 2.24 2.29 2.35 2.41
Royalty m Tk 0.98 1.00 1.03 1.05 1.08 1.10 1.13 1.16 1.19 1.22 1.25 1.28 1.31
Total: m Tk 186.27 190.72 195.78 200.38 205.82 210.52 216.48 221.18 227.87 232.38 240.24 244.14 254.04
32
Dep
Depreciation
Depreciation Schedule
YR0 YR1 YR2 YR3 YR4 YR5 YR6 YR7 YR8 YR9
Capex (m Tk):
Land Development (Infrastrucure) 408 - - - - - - - - -
Buildings (Common & Commercial) 531 - - - - - - - - -
Factory Building (SFB, Warehouse) 210 - 145 - 276 - - - - -
Equipment (W&S, Power) 273 101 86 98 107 118 129 73 0 0
Depreciation Rate
Land Development (Infrastrucure) 2% 8 8 8 8 8 8 7 7 7
Buildings (Common & Commercial) 10% 53 53 48 42 38 33 30 26 23
Factory Building (SFB, Warehouse) 20% 42 42 63 54 97 86 67 49 36
Equipment (W&S, Power) 20% 55 75 81 86 91 97 105 100 79
Total: - 158 178 200 190 233 224 209 183 146
33
Dep
Depreciation
Depreciation Schedule
YR10 YR11 YR12 YR13 YR14 YR15 YR16 YR17 YR18 YR19 YR20 YR21 YR22 YR23 YR24 YR25
Capex (m Tk):
Land Development (Infrastrucure) - - - - - - - - - - - - - - - -
Buildings (Common & Commercial) - - - - - - - - - - - - - - - -
Factory Building (SFB, Warehouse) - - - - - - - - - - - - - - - -
Equipment (W&S, Power) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Depreciation
Land Development (Infrastrucure) 7 7 7 7 6 6 6 6 6 6 6 6 5 5 5 5
Buildings (Common & Commercial) 21 18 16 14 13 11 10 9 8 7 6 6 5 4 4 3
Factory Building (SFB, Warehouse) 26 19 14 10 7 5 4 3 2 1 1 1 1 0 0 0
Equipment (W&S, Power) 59 43 31 23 16 12 9 6 5 3 2 2 1 1 1 0
113 87 68 54 43 35 29 24 20 18 15 14 12 11 10 9
34
Fin
Capital Cost Spread Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20
SFB Tk m 438 127 0 145 0 166 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Warehouse " 193 84 0 0 0 110 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Power " 894 182 101 86 98 107 118 129 73 0 0 0 0 0 0 0 0 0 0 0 0 0
Water and Sewerage " 91 91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Common Zone Facilities " 121 121 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Detailed Master Plan " 11 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Internal Roads " 408 408 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R&D Center " 28 28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Exhibition Center " 11 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Commercial Facilities " 370 370 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Equity Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Debt
Source of Debt A Participating Financial Institution (PFI) of Investment Promotion and Financing Facility (IPFF)
Mode of Repayment Quarterly after grace period 100%
Percent of Loan Interest Rate
Nominal Interest Rate 10.6% 80% 10% for component from IPFF: Considering 1 yr Govt T-bill rate (4.5%) + 50 basis point + margin of PFI (5%)
20% 13% for component from PFI: 13% as prescribed by BB
Note1: Bangladesh Bank has issued a circular to restrict interest rate for infrastructure projects upto 13%.
Loan Tenure 12 yr
Grace Period 5 yr
(after first loan disbursement)
35
Fin
Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20
4 .1 Quarter 1
Beginning Balance Tk m 0 1,085 1,040 1,083 1,036 1,178 1,134 936 723 484 270 77 0 0 0 0 0 0 0 0 0
Interest Accrued " 0 29 28 29 27 31 30 25 19 13 7 2 0 0 0 0 0 0 0 0 0
Interest Paid " 0 29 28 29 27 31 30 25 19 13 7 2 0 0 0 0 0 0 0 0 0
Drawdown from Loan " 1,003 71 161 69 268 82 90 51 0 0 0 0 0 0 0 0 0 0 0 0 0
Loan Repayment " 0 0 0 0 0 0 42 42 42 42 42 42 0 0 0 0 0 0 0 0 0
Ending Balance " 1,003 1,127 1,174 1,123 1,277 1,229 1,152 921 662 429 221 33 0 0 0 0 0 0 0 0 0
4 .2 Quarter 2
Beginning Balance Tk m 1,003 1,127 1,174 1,123 1,277 1,229 1,152 921 662 429 221 33 0 0 0 0 0 0 0 0 0
Interest Accrued " 27 30 31 30 34 33 31 24 18 11 6 1 0 0 0 0 0 0 0 0 0
Interest Paid " 0 30 31 30 34 33 31 24 18 11 6 1 0 0 0 0 0 0 0 0 0
Drawdown from Loan " 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Loan Repayment " 0 0 0 0 0 0 42 42 42 42 42 33 0 0 0 0 0 0 0 0 0
Ending Balance " 1,030 1,097 1,143 1,093 1,243 1,196 1,079 854 602 376 173 0 0 0 0 0 0 0 0 0 0
4 .3 Quarter 3
Beginning Balance Tk m 1,030 1,097 1,143 1,093 1,243 1,196 1,079 854 602 376 173 0 0 0 0 0 0 0 0 0 0
Interest Accrued " 27 29 30 29 33 32 29 23 16 10 5 0 0 0 0 0 0 0 0 0 0
Interest Paid " 0 29 30 29 33 32 29 23 16 10 5 0 0 0 0 0 0 0 0 0 0
Drawdown from Loan " 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Loan Repayment " 0 0 0 0 0 0 46 46 46 46 46 0 0 0 0 0 0 0 0 0 0
Ending Balance " 1,057 1,068 1,112 1,064 1,210 1,165 1,005 786 541 320 122 0 0 0 0 0 0 0 0 0 0
4 .4 Quarter 4
Beginning Balance Tk m 1,057 1,068 1,112 1,064 1,210 1,165 1,005 786 541 320 122 0 0 0 0 0 0 0 0 0 0
Interest Accrued " 28 28 29 28 32 31 27 21 14 8 3 0 0 0 0 0 0 0 0 0 0
Interest Paid " 0 28 29 28 32 31 27 21 14 8 3 0 0 0 0 0 0 0 0 0 0
Drawdown from Loan " 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Loan Repayment " 0 0 0 0 0 0 42 42 42 42 42 0 0 0 0 0 0 0 0 0 0
Ending Balance " 1,085 1,040 1,083 1,036 1,178 1,134 936 723 484 270 77 0 0 0 0 0 0 0 0 0 0
IDC Accrued during the Year 82 116 118 116 126 126 116 93 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Interest Accrued during the year 82 116 118 116 126 126 116 93 67 43 21 3 0 0 0 0 0 0 0 0 0
Total Interest Payment 0 116 118 116 126 126 116 93 67 43 21 3 0 0 0 0 0 0 0 0 0
Total Debt Servicing 0 116 118 116 126 126 288 264 239 214 193 78 0 0 0 0 0 0 0 0 0
Cash Flow wrt Debt -1,003 45 -43 47 -142 44 198 213 239 214 193 78 0 0 0 0 0 0 0 0 0
36
IS
Income Statement
YR0 YR1 YR2 YR3 YR4 YR5 YR6 YR7 YR8 YR9 YR10
Total Revenue m Tk 0.00 72.91 155.99 251.47 353.99 466.26 587.60 662.73 679.30 696.28 713.69
O& M Expenses
SFB m Tk 0.00 4.20 4.98 5.84 6.77 7.75 8.79 9.48 9.72 9.96 10.21
Warehouse " 0.00 2.26 3.14 4.13 5.19 6.31 7.52 8.28 8.48 8.70 8.91
Water & Sewerage " 0.00 1.53 2.10 2.73 3.40 4.12 4.89 5.38 5.51 5.65 5.79
Power " 0.00 11.20 21.99 34.10 47.07 60.95 75.77 84.91 87.04 89.21 91.44
Park O&M Expenses " 0.00 3.10 6.71 10.76 15.09 19.73 24.68 27.73 28.43 29.14 29.87
R&D Center " 0.00 0.84 1.67 2.60 3.59 4.66 5.80 6.50 6.66 6.83 7.00
Exhibition Center " 0.00 0.39 0.72 1.21 1.61 2.18 2.63 3.05 3.03 3.22 3.19
Commercial Facilities " 0.00 2.37 3.20 4.12 5.10 6.15 7.27 7.98 8.18 8.38 8.59
Total O&M Expenses m Tk 0.00 25.90 44.49 65.48 87.82 111.85 137.36 153.30 157.05 161.08 165.00
Earnings Before Depreciation m Tk 0.00 47.01 111.50 185.99 266.17 354.41 450.24 509.43 522.25 535.20 548.69
Depreciation " 0.00 157.93 178.21 199.52 190.30 233.23 224.33 208.54 183.00 145.58 112.91
Interest Expense 81.87 116.00 118.42 115.62 126.29 126.35 115.79 92.66 66.98 42.65 20.81
Profit before taxes 0.00 -192.79 -182.71 -131.95 -39.75 -5.10 99.56 185.09 246.59 322.64 393.13
Applicable Tax Exemption 1.00 1.00 0.50 0.50 0.25 0.00 0.00 0.00 0.00 0.00
Company Income Tax 37.5% 0.00 0.00 0.00 0.00 0.00 0.00 37.33 69.41 92.47 120.99 147.42
Net Income After Tax m Tk 0.00 -192.79 -182.71 -131.95 -39.75 -5.10 62.22 115.68 154.12 201.65 245.70
37
IS
Income Statement
YR11 YR12 YR13 YR14 YR15 YR16 YR17 YR18 YR19 YR20 YR21 YR22 YR23 YR24 YR25
Total Revenue 731.53 749.82 768.56 787.78 807.47 827.66 848.35 869.56 891.30 913.58 936.42 959.83 983.83 1,008.42 1,033.63
O& M Expenses
SFB 10.46 10.72 10.99 11.27 11.55 11.84 12.13 12.44 12.75 13.07 13.39 13.73 14.07 14.42 14.78
Warehouse 9.14 9.37 9.60 9.84 10.09 10.34 10.60 10.86 11.13 11.41 11.70 11.99 12.29 12.60 12.91
Water & Sewerage 5.93 6.08 6.23 6.39 6.55 6.71 6.88 7.05 7.23 7.41 7.60 7.79 7.98 8.18 8.38
Power 93.73 96.07 98.47 100.94 103.46 106.05 108.70 111.41 114.20 117.05 119.98 122.98 126.06 129.21 132.44
Park O&M Expenses 30.61 31.38 32.16 32.97 33.79 34.64 35.50 36.39 37.30 38.23 39.19 40.17 41.17 42.20 43.26
R&D Center 7.17 7.35 7.54 7.72 7.92 8.12 8.32 8.53 8.74 8.96 9.18 9.41 9.65 9.89 10.13
Exhibition Center 3.41 3.35 3.63 3.52 3.89 3.69 4.22 3.88 4.67 4.08 5.34 4.28 6.44 4.50 8.41
Commercial Facilities 8.81 9.03 9.25 9.48 9.72 9.96 10.21 10.47 10.73 11.00 11.27 11.56 11.84 12.14 12.44
Total O&M Expenses 169.26 173.35 177.88 182.12 186.96 191.34 196.56 201.03 206.75 211.21 217.65 221.90 229.50 233.14 242.76
Earnings Before Depreciation 562.27 576.47 590.68 605.65 620.51 636.31 651.79 668.53 684.55 702.37 718.77 737.93 754.33 775.29 790.87
Depreciation 87.40 68.14 53.71 42.91 34.79 28.64 23.94 20.32 17.51 15.30 13.54 12.12 10.96 10.00 9.20
Interest Expense 2.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Profit before taxes 454.06 505.41 536.97 562.74 585.72 607.68 627.85 648.20 667.04 687.07 705.23 725.81 743.37 765.29 781.67
Applicable Tax Exemption 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Company Income Tax 170.27 189.53 201.36 211.03 219.65 227.88 235.44 243.08 250.14 257.65 264.46 272.18 278.76 286.98 293.13
Net Income After Tax 283.78 315.88 335.61 351.71 366.08 379.80 392.41 405.13 416.90 429.42 440.77 453.63 464.61 478.30 488.54
38
C_F
Cash Flow
Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12
1 Cash flow from Operations
1.1 Revenue Tk m 73 156 251 354 466 588 663 679 696 714 732 750
1.2 Less: O&M Expense Tk m 31 50 72 94 119 144 161 164 169 173 177 182
2 Cash Generated by the Project Note 1 Tk m 41 106 180 260 348 443 502 515 528 541 554 568
4 Cash Flow wrt the Project (before tax) Tk m (1,433) (60) (125) 82 (123) 230 315 429 515 528 541 554 568
(2-3)
8 Cash flow wrt the Project (after tax) Tk m (1,433) (60) (125) 59 (145) 195 230 316 388 381 377 376 378
(4-6-7)
10 Cash generated during the year for Debt Servicing Tk m 41 106 180 260 348 406 433 422 407 393 384 379
(after tax)
(2-6)
11 Less: Debt Servicing Tk m 0 116 118 116 126 126 288 264 239 214 193 78 0
12 Retained Earning in the year Note2 Tk m (75) (13) 64 133 221 118 168 184 192 201 306 379
after debt servicing and tax
(10-11)
13 Retained Earning (Begining Balance) 0 0 0 64 198 390 393 526 671 841 1,042 1,348 1,727
14 Cash Needed from Equity in the Year for Capex Tk m 430 30 69 29 115 35 39 22 0 0 0 0 0
16 Retained Earning (Ending Balance) Tk m 0 0 0 64 168 275 358 488 649 841 1,042 1,348 1,727
17 Cash flow wrt Equity Tk m (430) (105) (82) 35 19 186 80 146 184 192 201 306 379
(12-14)
39
C_F
Cash Flow
Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20 Y21 Y22 Y23 Y24 Y25
1 Cash flow from Operations
1.1 Revenue Tk m 769 788 807 828 848 870 891 914 936 960 984 1,008 1,034
1.2 Less: O&M Expense Tk m 186 191 196 200 206 211 216 221 228 232 240 244 254
2 Cash Generated by the Project Note 1 Tk m 582 597 612 627 643 659 675 692 709 727 744 764 780
3 Capital Expenditure Tk m 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Cash Flow wrt the Project (before tax) Tk m 582 597 612 627 643 659 675 692 709 727 744 764 780
(2-3)
6 Less: Tax 37.5% Tk m 201 211 220 228 235 243 250 258 264 272 279 287 293
(of Net Income)
7 Less: Adjustment for Tax Saving from Interest Expense 0 0 0 0 0 0 0 0 0 0 0 0 0
8 Cash flow wrt the Project (after tax) Tk m 381 386 392 399 407 416 425 435 444 455 465 477 486
(4-6-7)
10 Cash generated during the year for Debt Servicing Tk m 381 386 392 399 407 416 425 435 444 455 465 477 486
(after tax)
(2-6)
12 Retained Earning in the year Note2 Tk m 381 386 392 399 407 416 425 435 444 455 465 477 486
after debt servicing and tax
(10-11)
13 Retained Earning (Begining Balance) 2,108 2,494 2,886 3,285 3,692 4,108 4,533 4,968 5,412 5,867 6,332 6,809 7,296
16 Retained Earning (Ending Balance) Tk m 2,108 2,494 2,886 3,285 3,692 4,108 4,533 4,968 5,412 5,867 6,332 6,809 7,296
17 Cash flow wrt Equity Tk m 381 386 392 399 407 416 425 435 444 455 465 477 486
(12-14)
40
Financial Results
Financials
Year 0 1 2 3 4 5 6
Total Annual Capital Expenditure from all funding sources m Tk 1,433 101 231 98 383 118 129
Cumulative Capex from all funding sources " 1,433 1,534 1,765 1,863 2,246 2,364 2,492
Revenue " 0 73 156 251 354 466 588
Cumulative Revenue " 0 73 229 480 834 1,301 1,888
Equity Invested " 430 30 69 29 115 35 39
Profits Reinvested " 0 0 0 29 115 35 39
Total Equity " 430 460 529 559 674 709 748
Total Profits Reinvested " 0 0 0 29 144 180 218
Cumulative Debt " 1,003 1,127 1,174 1,123 1,277 1,229 1,152
Income (after Tax) " 0 (193) (183) (132) (40) (5) 62
41
Project NPV (Tk m)
42
-20% -10% 0% 10% 20%
80% 90% 100% 110% 120%
Capex 20% 26% 23% 20% 18% 16%
80% 90% 100% 110% 120%
Opex 20% 22% 21% 20% 19% 18%
80% 90% 100% 110% 120%
Power tariff 20% 18% 19% 20% 21% 22%
80% 90% 100% 110% 120%
Lease Rate 20% 19% 20% 20% 20% 21%
80% 90% 100% 110% 120%
Interest Rate 20% 21% 20% 20% 20% 19%
22%
Equity IRR
20%
18%
16%
14%
-25% -20% -15% -10% -5% 0% 5% 10% 15% 20% 25%
43
Sources of Capital Funding (Base Case)
2,500
Cumulative Debt
Total Profits Reinvested
2,000 Total Equity
Million Taka
1,500
1,000
500
0
0 5 10 15 20 25
Year
45
Project NPV
5,000
4,000
3,000
Million Taka
2,000 0%
10%
1,000
15%
0
20%
-1,000
-2,000
5 Year NPV 10 Year NPV 15 Year NPV 20 Year NPV
Equity NPV
2,500
2,000
1,500
Million Taka
1,000
0%
10%
500
15%
0 20%
-500
46
Expected Revenue and Income (Base Case)
1,200
Revenue
1,000
1 6 11 16 21 26
(200)
(400)
Year
48
Land & Supply Demand (Base Case)
100
90
80
Cumulative Net Land (Acres)
70
60
50
Total Cumulative Net Land Developed
40
Occupied Developed Land
30
20
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Year
90
80
Cumulative Net Land (Acres)
70
60
50
Total Cumulative Net
Land Developed
40
Occupied Developed
30 Land
20
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Year
52
Year 0 1 2
Cumulative Cash flow wrt the Project (after tax) -1,433 -1,493 -1,618
1 1 1
Year Tk m
Cumulative Cash Flow during years 9 -193
where payback occurs 10 184
Tk m
Total External Equity Required 529
Maximum Debt Balance 1,178
Average Debt Balance 431
Balance Sheet Value at Year 20 6,113
Undistributed Distributable
Reserves at Year 20 4,881
Conservative
Base Case Optimistic Case
Case
2 1 3
Project IRR 12% 14% 10%
Project NPV (0%) 4,179 4,669 3,359
Project NPV (10%) 173 415 -192
Project NPV (15%) -429 -258 -673
Project NPV (20%) -727 -607 -890
Project Payback in Year 10 8 12
Equity IRR 20% 24% 15%
Equity NPV (0%) 4,351 4,833 3,495
Equity NPV (10%) 760 1,020 353
Equity NPV (15%) 233 432 -58
Equity NPV (20%) -30 125 -243
54
Equity Payback in Year 8 5 11
Total External Equity Required 529 541 514
Maximum Debt Balance 1,178 1,261 1,089
Average Debt Balance 431 435 421
Balance Sheet Value at Year 20 6,113 6,454 5,377
Undistributed Distributable
Reserves at Year 20 4,881 5,374 4,009
Year 0 1 2 3
0.36 0.89 1.56
Debt Service Coverage Ratio Base Case 2 0.36 0.89 1.56
(10 /11) Optimistic Case 1 0.58 1.32 2.04
Average 1.64 Conservative Case 3 0.14 0.50 0.99
Max 2.75
Min 0.36
55
Amount of Land Leased
100
90
57
SFB Floorspace Supply & Demand
(Base case)
200,000
150,000
Floorspace (sft)
100,000
0 2 4 6 8 10 12 14 16 18 20
Year
Warehouse Floorspace
40,000
Constructed
0 2 4 6 8 10 12 14 16 18 20
Year
70
Debt Service Coverage Ratio
4.00
Base Case
3.50
Optimistic Case
3.00
Conservative Case
2.50
Ratio
2.00
1.50
1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 10 11 12
Year