Excavation
Excavating material within the following depth
ranges below ground level for the exposing of or
searching for services 0 to 2m
1.4.3 Take down existing fences, protect and store and m 0 77.85 -
re-erect on completion
CCECC RELOCATION AND PROTECTION OF WUC EXISTING SERVICES
CLUSTERS 5 AND 6- MAINLINE AND INTERSECTIONS
1.4.6 Remove and replace Grouted stone pitching m² 150 85.55 12,832.50
COLLECTION
PRELIMINARY AND GENERAL ITEMS
3 Design -
2 ACCOMMODATION OF TRAFFIC
(ii) Rectangular:
3 DAYWORKS
Note:
i) All rates to be gross (Mark-up, P & G's,
administration costs included)
Plant
3.1 Excavator (Caterpillar 325 or similar) Hour 0 785.20 -
3.2 Bulldozer D6 Hour 0 925.55 -
3.3 Grader (110 kw 12t) Hour 0 820.25 -
3.4 Front end loader (minimum 2 m³ bucket) Hour 0 685.55 -
3.5 Vibrating self-propelled roller (270kg) Hour 0 565.85 -
3.6 Plate Compactor Hour 0 165.55 -
3.7 Compressor (300 cfm) Hour 0 295.55 -
3.8 Dumper (0.75 t) Hour 0 450.00 -
3.9 Truck (3 t) Hour 0 395.55 -
3.10 Tip truck (12m3) Hour 0 465.85 -
3.11 Water pump 3" Hour 0 102.55 -
3.12 water pump 4" Hour 0 142.65 -
3.13 Concrete mixer (400R) Hour 0 255.65 -
3.14 Water Truck (18,000L) Hour 0 685.00 -
3.15 Tyre loaded backactor (TLB) Hour 0 525.00 -
3.16 Self-Propelled Vibrating roller (7.4 - 18.6 t) Hour 0 625.00 -
Labour
3.17 Foreman Hour 0 57.50 -
3.18 Artisan Hour 0 32.50 -
3.19 Operator Hour 0 38.95 -
3.20 Gang boss Hour 0 21.55 -
3.21 Leading hand Hour 0 16.55 -
3.22 Labourer Hour 0 10.65 -
Carried to summary -
Site Clearance
4.1.1 Clearing pipeline route m2 14,100 9.50 133,950.00
CCECC RELOCATION AND PROTECTION OF WUC EXISTING SERVICES
CLUSTERS 5 AND 6- MAINLINE AND INTERSECTIONS
4.1.2 Excavate in normal material 1.7m wide x 2.0m m3 16,320 48.50 791,520.00
deep x 4800m trench
4.1.3 Ditto but hard and pickable material m3 1,000 65.25 65,250.00
4.1.6 Trim, level and compact base of trench m2 7,200 44.65 321,480.00
4.1.7 Pipe Jacking across all roads for 700mm DI pipe m 108 25,579.25 2,762,559.00
4.1.8 Concrete Cradle and hold down bolts through pipe m 108 285.65 30,850.20
jacking
4.1.12 Supply and Lay 700mm Ductile iron pipe class K9 m 4,650 1,000.75 4,653,487.50
including all lifting equipment
4.1.17 Ditto but imported material from offsite m3 170 162.50 27,625.00
Concrete Works
4.1.32 Sluice Valve Chamber as per the design drawing No 8 30,850.00 246,800.00
4.1.34 Air valve Chambers as per the design drawing No 6 27,550.00 165,300.00
4.1.36 Pipeline Marker posts as per the WUC standard No 40 75.55 3,022.00
CCECC RELOCATION AND PROTECTION OF WUC EXISTING SERVICES
CLUSTERS 5 AND 6- MAINLINE AND INTERSECTIONS
River Crossing
Extra Over
-
Main Line Total Carried to Summary 11,225,528.55
Pipe Laying
5.1.1.8 Lay 250mm dia uPVC pipe class 9 m 30 185.00 5,550.00
-
5.1.1.10 Ditto imported material m3 4 62.50 250.00
Fittings
5.1.1.13 Supply and install 250mm dia AC to 250mm dia No 4 550.00 2,200.00
uPVC VJ couplings or similar approved
Concrete Works
Place 150mm thick 25Mpa precast reinforced with 15,187.50
5.1.1.20 mesh Ref 211 concrete slab as specified above m2 45 337.50
pipe
CCECC RELOCATION AND PROTECTION OF WUC EXISTING SERVICES
CLUSTERS 5 AND 6- MAINLINE AND INTERSECTIONS
-
5.1.1.21 Backfill and compact to a density of 90% MOD m3 20 55.50 1,110.00
AASHTO in layers of 150mm
5.1.1.22 Supply and install pipeline marker posts as per the No 3 315.55 946.65
WUC standard
5.1.1.28 Ditto but imported material from off site m3 2 162.50 325.00
-
Pipe Laying - 350mm uPVC -
5.1.1.29 Lay 350mm dia uPVC pipe class 9 m 20 190.65 3,813.00
13,822.20
5.1.1.36 Tie in new 350mm uPVC pipe line to existing AC No 4 3,455.55
pipeline
-
5.1.1.38 Supply and install 350mm CI flanged adapters No 2 550.00 1,100.00
Concrete Works
5.1.1.42 Place concrete thrust blocks at Tee No 1 1,156.55 1,156.55
5,500.00
Place 150mm thick 25Mpa reinforced with mesh
5.1.1.44 m2 40 137.50
Ref 211 concrete slab above pipelines as specified
5.1.1.45 Supply and install pipeline marker posts as per the No 4 115.55 462.20
WUC standards
999.00
5.1.1.46 Backfill and compact to a density of 90% MOD m3 18 55.50
AASHTO in layers of 150mm
7,639.95
5.1.2.5 Construct manholes to flash with proposed No 3 2,546.65
finished walk way level
451.50
Supply and install heavy duty concrete manhole
5.1.2.6 No 3 150.50
covers to flash with walkway finished level
14,400.00
5.1.2.8 Clean and Flush sewer line to the nearest manhole m 240 60.00
5.2 NODE 25 -
-
5.2.1 Potable water -
-
Excavations on 250mm AC Pipe -
5,820.00
Excavate 1500mm wide x 1.4m x 140m length
trench up to 1400mm deep and carefully expose
5.2.1.2 existing 150mm dia AC pipeline,and prepare m3 120 48.50
trench to receive 250mm dia uPVC as per the
methodology
5.2.1.10 Supply and lay 160mm dia uPVC pipe class 9 m 60 160.00 9,600.00
5.2.1.13 Pressure test pipe and flush x 2 parallel pipelines m 260 42.65 11,089.00
7,000.00
5.2.1.18 Remove from trench 250mm and 160mm AC m 20 350.00
pipelines by expert AC handlers for disposal
5.2.1.27 Supply and install flanged 250 to 160 reducing tee No 1 450.00 450.00
Concrete Works
5.2.1.30 Place concrete thrust blocks at Tee No 1 1,156.55 1,156.55
89,941.50
5.2.1.32 Place 150mm thick 25Mpa reinforced with mesh m2 330 272.55
Ref 211 concrete slab above pipelines as specified
528.85
5.2.1.33 Supply and install pipeline marker posts as per the No 7 75.55
WUC standards
6,508.00
Supply and install heavy duty concrete manhole
5.2.2.6 No 2 3,254.00
covers to flash with walkway finished level
14,400.00
5.2.2.8 Clean and Flush sewer line to the nearest manhole m 240 60.00
5.3 NODE 24 -
-
5.3.1 Potable water -
-
Excavations - 400mm AC Main pipeline -
5.3.1.6 Ditto but imported material from off site m3 6 162.50 975.00
5.3.1.7 Lay 400mm dia uPVC pipe class 9 m 140 285.55 39,977.00
CCECC RELOCATION AND PROTECTION OF WUC EXISTING SERVICES
CLUSTERS 5 AND 6- MAINLINE AND INTERSECTIONS
5.3.1.10 Pressure test new 400mm dia uPVC pipe line and m 120 25.55 3,066.00
flush
5.3.1.17 Supply and install 400mm uPVC 45 deg bend No 2 755.55 1,511.10
5.3.1.19 Supply and install reducing Tee 400 to 250mm No 1 755.55 755.55
Concrete Works
Place concrete thrust blocks on the 45 deg bends
5.3.1.20 No 4 1,155.65 4,622.60
and Tee
5.3.1.23 Backfill and compact to a density of 90% MOD m3 168 58.50 9,828.00
AASHTO in layers of 150mm
5.3.1.29 Ditto but imported material from off site m3 6 182.50 1,095.00
5.3.1.37 Remove from trench AC pipeline from trench m 140 32.50 4,550.00
5.3.1.38 Tie in new uPVC pipe line to existing AC pipeline No 4 4,652.55 18,610.20
Fittings
Supply and install 250mm AC to uPVC VJ couplings
5.3.1.39 No 4 450.00 1,800.00
or similar approved
5.3.1.42 Supply and install 250mm uPVC 90 deg. bend No 2 450.00 900.00
CCECC RELOCATION AND PROTECTION OF WUC EXISTING SERVICES
CLUSTERS 5 AND 6- MAINLINE AND INTERSECTIONS
5.3.1.44 Supply and install fire hydrant with all fittings No 1 1,655.55 1,655.55
Concrete Works
5.3.1.46 Place thrust blocks on 90 deg bends and on tee No 2 1,156.55 2,313.10
5.3.1.50 Backfill and compact to a density of 90% MOD m3 196 58.50 11,466.00
AASHTO in layers of 150mm
5.3.1.52 Place thrust blocks and anchor blocks at tees and No 4 1,156.55 4,626.20
valves
5.3.2.3 Remove Existing cover slab and manhole cover Sum 1 1,000.00 1,000.00
5.3.2.8 Clean and Flush sewer line to the nearest manhole m 5 60.00 300.00
-
Node 24 Total Carried to Collction 628,788.90
COLLECTION
CLUSTER 5 NODES
1 Node 70 273,195.08
2 Node 25 620,180.73
3 Node 24 628,788.90
6.1 NODE 26
6.1.1.6 Ditto but imported material from off site m3 5 162.50 812.50
Pipe Laying -
6.1.1.8 Lay 250mm dia uPVC pipe class 9 m 100 180.00 18,000.00
6.1.1.14 Remove from trench AC pipeline from trench m 100 25.65 2,565.00
6.1.1.15 Tie in new uPVC pipe line to existing AC pipeline No 2 3,150.55 6,301.10
Concrete Works
Demolish Existing concrete chambers and remove
6.1.1.21 rubble to spoil No 1 7,500.00 7,500.00
6.1.2.3 Remove existing cover slab and manhole cover Sum 1 1,000.00 1,000.00
6.1.2.8 Clean and Flush sewer line to the nearest manhole m 140 60.00 8,400.00
-
Node 26 TotalCarried to summary 347,328.10
SUMMARY
3. DAY WORKS -
4. MAINLINE 11,225,528.55