PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
A1.2.2.1 (i) Site Offices and storage area Sum 1 8,000.00 8,000.00
A.1.2.2.6 (vi) Water supplies, electrical power and communications Sum 1 6,000.00 6,000.00
8.3.3 A1.3 General Responsibilities and Other Fixed Charge Sum 1 2,500.00 2,500.00
Obligations
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
A2.2.2.6 (vi) Water supplies, electrical power and communications Sum 1 3,000.00 3,000.00
8.4.4 A2.4 Company and Head Office Overhead Costs Sum 1 3,000.00 3,000.00
8.4.5 A2.5 General Responsibilities and Other Time Sum 1 3,000.00 3,000.00
Related Obligations
A3.2 (ii) Charge required on item (i) above: % 25,000.00 10.0% 2,500.00
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
8.9 A6. Employer's share of DAB fees services Prov. Sum 25,000.00
8.10 A7. PROVISIONAL SUM FOR AUXILIARY WORK Prov. Sum 10,000.00
(Required to private properties as instructed by the
Engineer)
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
A2.3 (a) Transport all redundant materials to approved t.km 50 120 6,000.00
municipal dumpsite
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
A.2.3 (c) by importation from commercial or off site sources m³ Rate Only
selected by the Contractor
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
B1.1 (a) Selected granular material (bedding cradle) m³ 450 85.00 38,250.00
B1.2 (b) Selected fill material (selected fill blanket) m³ 180 85.00 15,300.00
PSLB 8.2.5 B2.4 Overhaul of Material for bedding cradle and km.m³ Rate Only
selected fill blanket
PSDB 3.5 B2.5 Soilcrete Backfilling (5% cement) (Provisional) m³ 20 340.00 6,800.00
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
8.2.1 C2. Supply, lay, joint, and disinfect uPVC class 9 pipes (SABS
966) socketed for mechanical jointing complete with rubber
ring sealers:
8.2.1 C3. Supply, lay, joint, and disinfect HDPE class 10 pipes (SABS
966) socketed for mechanical jointing complete with
couplings and test:
8.2.5 C4. Supply, lay, joint, and disinfect uPVC class 16 bends
socketed for mechanical jointing complete with with rubber
ring sealers:
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
Brought Forward 156,675.00
8.2.5 C6. SGI Equal Tee socketed for mechanical jointing complete
with rubber ring sealers:
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
Brought Forward 157,115.00
8.2.5 C8. Supply & Install Resilient Seal Gate Valve spigot with
complete valvebox as per the typical drawing, (AVK or
similar approved), inclusive of all nuts, bolts & gasket
seals:
C8.1 (a) 50mm Nominal Bore PN10 No Rate Only
8.2.5 C9. Supply & Install Full-Bore Ball Valve, both ends BSP
Female Threaded, (Cobra ITAP or similar approved),
inclusive of all nuts, bolts & gasket seals:
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
Brought Forward 180,305.00
8.2.5 C10. Supply & Install Free Shaft Swing Check Valve, (AVK or
similar approved), inclusive of all nuts, bolts & gasket
seals:
8.2.5 C11. Supply & Install Double - Orifice Air Valve, inclusive of all
nuts, bolts & gasket seals:
8.2.5 C12. SGI End Caps socketed for mechanical jointing complete
with rubber ring sealers:
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
Brought Forward 180,305.00
8.2.11 C15. Grade 15/19 Concrete for Thrustblocks, to be cast into open
trench and against undisturbed soil, inclusive of formwork
as required:
C15.5 (e) For T-pieces and End Caps, Other sizes as may be specified in writing
m³ 5 850.00 4,250.00
8.2.14 C16. Construct new Fire Hydrant complete as specified in No. 6 2,500.00 15,000.00
drawings, inclusive of excavation, concrete, brickwork,
valves and pipework as indicated in drawings:
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
D2. Cleaning & Finishing of entire pipeline route m 2080 15.00 31,200.00
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
8.2.1 A1.1 (a) Clear and grub Rising Main Route m 3,200 12.00 38,400.00
A1.2 (b) Clear and grub area as per Engineers indication ha Rate Only
8.2.3 A2. REMOVE AND GRUB ALL TREES AND TREES STUMPS
REGARDLESS OF GRITH:
Rate shall cover all operations No 15 750.00 11,250.00
A3.1 (a) Transport all redundant materials to approved t.km Rate Only
municipal dumpsite
A3.2 (b) Remove redundant pipe material and building material t.km Rate Only
that remain on site from construction activities to a
municipal activities to a municipal dumpsite of the
contractor's choice, approved by the Engineer
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
A1.2.3 (c) Extra-over items (a) and (b) above for disposal of m³ Rate Only
materials off-site, unlimited distance
8.3.2 A1.2.4 (d) Extra-over items (a) above for the hand excavation and m³ Rate Only
back fill where ordered by the Engineer
PSDB 8.3.2 B2.1 (a) from other necessary excavations on site m³ 200 80.00 16,000.00
B.2.3 (c) by importation from commercial or off site sources m³ Rate Only
selected by the Contractor
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
B1.1 (a) Selected granular material (bedding cradle) m³ 930 85.00 79,050.00
B1.2 (b) Selected fill material (selected fill blanket) m³ 520 85.00 44,200.00
PSLB 8.2.5 B2.4 Overhaul of Material for bedding cradle and km.m³ Rate Only
selected fill blanket
PSDB 3.5 B2.5 Soilcrete Backfilling (5% cement) (Provisional) m³ 20 320.00 6,400.00
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
8.2.1 D2. Supply, lay, joint, and disinfect uPVC class 12 pipes
(SABS 966) socketed for mechanical jointing complete
with rubber ring sealers:
8.2.5 D3. Supply, lay, joint, and disinfect uPVC class 16 pipes
(SABS966) bends socketed for mechanical jointing
complete with with rubber ring sealers:
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
E1.1 Supply and install Non-Return Valve (AVK or approved No. 1 4,500.00 4,500.00
similar) inclusive of all specials, pipework, nuts, bolts,
gasket seals& manhole complete as indicated on the
drawing
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
8.3.1.1 A1.2 Clear and strip site and conserve topsoil of quantity ha 0.5 750.00 375.00
specified in item no.A8.1
8.3.3 A4 EXCAVATION
A5.1 (a) Rip and Recompact insitu material to a density of 95% m³ 400 250.00 100,000.00
Mod. AASHTO density
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
A7.1 G7 selected material for embankment wall, imported m³ 2300 55.00 126,500.00
material and compacted to 95% MOD AASHTO Density
A7.2 G6 material for embankment wall, imported material and m³ 450 55.00 24,750.00
compacted to 95% MOD AASHTO Density
8.3.9 A8 TOPSOILING
PAY ITEM
REFERS ITEM NO DESCRIPTION UNIT QUANTITY RATE (N$) AMOUNT (N$)
TO
B3 MISCELANEOUS ITEMS
B3.1 Supply & install razor fence wire as detailed on drawings m 280 30.76 8,612.80
B3.2 Supply, install & commission Index Testudo waterproofing m² 3,000 30.76 92,280.00
membrane as detailed on drawings (Installation by Specialist)
B3.3 Construction of inlet box with concrete manhole in accordance Sum 1 3,700.00 3,700.00
with the issued construction drawings, complete with inlet
screen, drio tray (stainless steel)-200 bar spacing
SUMMARY OF SCHEDULES
CONTINGENCIES (C = 10% of B)
230,264.35
The sum provided here is under the sole control of the Engineer and may be deducted in whole or in part (10%)
SUB-TOTAL (D = B + C) 2,532,907.85
BID SUM CARRIED FORWARD TO BID OFFER, APPENDIX TO TENDER AND COVER PAGE 2,912,844.03