2020
Gang -1 GANG-4
SR. NO Name Desig WORK AREA SR. NO Name
1 Kashinath F 1 NANDALAL
2 DINESH MEENA R
3 BABULAL MEENA R U BEAM HOPPER PANEL
TOP PART ALIGNMENT
4 RADHESHYAM YOGI R COMPLETED .
5 RAMKHILADI PRAJAPATI R INSPECTION U/P
6 PARESHRAM w
7 BALCHAND G/M
GANG -2
1 DEVISHANKAR F
2 MASTRAM MEENA R
3 RAMESH MEENA R
4 MANOJ MEENA R RISER ERECTION &FITUP
5 BUDHURAM MEENA R
6 MANOJ KUMAR W
7 JASVIR SINGH G/M
GANG-3
1 HARDEV SINGH F
2 DHANRAJ GUJAR R
3 HARIRAM MEENA R
4 VINOD KUMAR R
5 RAKESH R
6 RAMPRATAP W RISER ERECTION & FITUP
GANG-4
Desig WORK AREA
IBR
ECONOMIZER TOP HDR WELDING
COMPLETED BOTTOM HDR
WELDING U/P
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :7.6.2020
Gang -1 GANG-4
SR. NO Name Desig WORK AREA SR. NO Name
1 Kashinath F 1 NANDALAL
2 DINESH MEENA R
3 BABULAL MEENA R U BEAM HOPPER PANEL
TOP PART ALIGNMENT
4 RADHESHYAM YOGI R COMPLETED .
5 RAMKHILADI PRAJAPATI R INSPECTION U/P
6 PARESHRAM w
7 BALCHAND G/M
GANG -2
1 DEVISHANKAR F
2 MASTRAM MEENA R
3 RAMESH MEENA R
4 MANOJ MEENA R RISER ERECTION &FITUP
5 BUDHURAM MEENA R
6 MANOJ KUMAR W
7 JASVIR SINGH G/M
GANG-3
1 HARDEV SINGH F
2 DHANRAJ GUJAR R
3 HARIRAM MEENA R
4 VINOD KUMAR R
5 RAKESH R
6 RAMPRATAP W RISER ERECTION & FITUP
GANG-4
Desig WORK AREA
IBR
ECONOMIZER TOP HDR WELDING
COMPLETED BOTTOM HDR
WELDING U/P
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :8.6.2020
Gang -1 GANG-4
SR. NO Name Desig WORK AREA SR. NO Name
1 Kashinath F 1 NANDALAL
2 DINESH MEENA R
U BEAM HOPPER PANEL
3 BABULAL MEENA R TOP PART ALIGNMENT
4 RADHESHYAM YOGI R COMPLETED .
5 RAMKHILADI PRAJAPATI R INSPECTION U/P &
LOCKING ARRNGEMENT
6 PARESHRAM w
7 BALCHAND G/M
GANG -2
1 DEVISHANKAR F
2 MASTRAM MEENA R
3 RAMESH MEENA R
4 MANOJ MEENA R RISER ERECTION &FITUP
5 BUDHURAM MEENA R
6 MANOJ KUMAR W
7 JASVIR SINGH G/M
GANG-3
1 HARDEV SINGH F
2 DHANRAJ GUJAR R
3 HARIRAM MEENA R
4 VINOD KUMAR R
5 RAKESH R
6 RAMPRATAP W RISER ERECTION & FITUP
GANG-4
Desig WORK AREA
IBR
SAT. SUPPLY PIPE WELDING
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :8.6.2020
Gang -1 GANG-4
SR. NO Name Desig WORK AREA SR. NO Name
1 Kashinath F 1 NANDALAL
2 DINESH MEENA R U BEAM HOPPER PANEL
TOP PART ALIGNMENT
3 BABULAL MEENA R COMPLETED .
4 RADHESHYAM YOGI R INSPECTION U/P &
5 RAMKHILADI PRAJAPATI R LOCKING ARRNGEMENT
& ATTEMPRETOR HDR
6 PARESHRAM w ALIGNMENT
7 BALCHAND G/M
GANG -2
1 DEVISHANKAR F
2 MASTRAM MEENA R
3 RAMESH MEENA R
4 MANOJ MEENA R RISER ERECTION &FITUP
5 BUDHURAM MEENA R
6 MANOJ KUMAR W
7 JASVIR SINGH G/M
GANG-3
1 SOHANLAL F
2 RATIVAN F
3 HARIRAM MEENA R FRONT PANEL
4 VINOD KUMAR R ALIGNMENT
5 RAKESH R
6 RAMPRATAP W
GANG-4
Desig WORK AREA
IBR
SAT. SUPPLY PIPE WELDING
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :10.6.2020
Gang -1 GANG-4
SR. NO Name Desig WORK AREA SR. NO Name
1 Kashinath F 1 NANDALAL
2 DINESH MEENA R U BEAM HOPPER PANEL
TOP PART ALIGNMENT
3 BABULAL MEENA R COMPLETED . INSPECTION
4 RADHESHYAM YOGI R U/P & LOCKING
5 RAMKHILADI PRAJAPATI R ARRNGEMENT &
ATTEMPRETOR HDR
6 PARESHRAM w ALIGNMENT
7 BALCHAND G/M
GANG -2
1 DEVISHANKAR F
2 MASTRAM MEENA R
3 RAMESH MEENA R
4 MANOJ MEENA R RISER ERECTION &FITUP
5 BUDHURAM MEENA R
6 MANOJ KUMAR W
7 JASVIR SINGH G/M
GANG-3
1 SOHANLAL F
2 RATIVAN F
3 HARIRAM MEENA R SSH COIL ERECTION
4 VINOD KUMAR R ARRANGEMENT
5 RAKESH R
6 RAMPRATAP W
GANG-4
1 RATIVAN FITTER GATE PASS FORMALTIES
GANG-6
NAME Desig WORK AREA
RATIVAN F
BHUPENDAR R FRONT PANEL
NILESH R
NATHUNI R
GANG-7
NAME Desig WORK AREA
JASVIR/VIJAY W/H
PINTU W/H
MUSTAQ/BITTU W/H
RAJU/DAYANAND W/H
NANDALAL/RAMESH W/H
STRUCTURE WELDER
SAMBHU YADAV W
RAJESH KUMAR W
POLICERAAM W
RAMPRATAP YOGI W
SAILESH W
GANG -8
NAME DESI
HARIRAM FOREMAN
MASTRAM R
RAMKHILADI R RIGGING GANG
RAKESH R
SANJAY NISAD R
BHARAT YADAV R
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :12.6.2020
MANPOWER SUMMARY
SR DESIGNATION NO OF PERSON REMARKS
1 FITTER 6
2 IBR 1
3 FOREMAN 1
4 WELDER 10
5 RIGGER 22
6 HELPER 5
7 ELECTRICIAN 1
8 HYDRA OPERATOR 1
9 G/M 4
TOTAL 51
GANG WISE MANPOWER JOB ALLOCATED
GANG -1 GANG-5
SR. NO Name Desig WORK AREA SR. NO
1 Kashinath F 1
2 BUDHURAM R 2
SONU HELPER
GANG-6
NAME Desig WORK AREA
RATIVAN F
BHUPENDAR R RHS PANEL ALIGNMENT
NILESH R
NATHUNI R
GANG-7
NAME Desig WORK AREA
JASVIR/VIJAY W/H
PINTU W/H
MUSTAQ/BITTU W/H
RAJU/DAYANAND W/H
NANDALAL/RAMESH W/H
STRUCTURE WELDER
SAMBHU YADAV W
RAJESH KUMAR W
POLICERAAM W
RAMPRATAP YOGI W
SAILESH W
GANG -8
NAME DESI
HARIRAM FOREMAN
MASTRAM R RIGGING
GANG/MATERIAL
RAMKHILADI R UNLOADING /HOPPER
RAKESH R ERECTION
SANJAY NISAD R
BHARAT YADAV R
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :13.6.2020
MANPOWER SUMMARY (BOILER)
SR DESIGNATION NO OF PERSON REMARKS
1 FITTER 6
2 IBR 1
3 FOREMAN 1
4 WELDER 10
5 RIGGER 22
6 HELPER 5
7 ELECTRICIAN 1
8 HYDRA OPERATOR 1
9 G/M 4
TOTAL 51
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 61
GANG WISE MANPOWER JOB ALLOCATED
GANG -1 GANG-5
SR. NO Name Desig WORK AREA SR. NO
1 Kashinath F 1
2 BUDHURAM R 2
4 SASIBHUSAN R
SONU HELPER
GANG-6
NAME Desig WORK AREA
RATIVAN F
BHUPENDAR R RHS PANEL ALIGNMENT
NILESH R
NATHUNI R
GANG-7
NAME Desig WORK AREA
JASVIR/VIJAY W/H
PINTU W/H
MUSTAQ/BITTU W/H
RAJU/DAYANAND W/H
NANDALAL/RAMESH W/H
STRUCTURE WELDER
SAMBHU YADAV W
RAJESH KUMAR W
POLICERAAM W
RAMPRATAP YOGI W
SAILESH W
GANG -8
NAME DESI
HARIRAM FOREMAN
MASTRAM R RIGGING
GANG/MATERIAL
RAMKHILADI R UNLOADING /HOPPER
ERECTION
GANG -9
1 KAMLESH F
2 RAKESH R ARRANGEMENT FOR
COAL HOPPER
3 SANJAY NISAR ERECTION
4 BHARAT YADR
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :15.6.2020
MANPOWER SUMMARY (BOILER)
SR DESIGNATION NO OF PERSON REMARKS
1 FITTER 6
2 IBR 1
3 FOREMAN 1
4 WELDER 10
5 RIGGER 22
6 HELPER 5
7 ELECTRICIAN 1
8 HYDRA OPERATOR 1
9 G/M 4
TOTAL 51
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 61
GANG WISE MANPOWER JOB ALLOCATED
GANG -1 GANG-5
SR. NO Name Desig WORK AREA SR. NO
1 Kashinath F 1
2 BUDHURAM R 2
4 SASIBHUSAN R
SONU HELPER
GANG-6
NAME Desig WORK AREA
RATIVAN F
BHUPENDAR R RHS PANEL ALIGNMENT
NILESH R
NATHUNI R
GANG-7
NAME Desig WORK AREA
JASVIR/VIJAY W/H
PINTU W/H
MUSTAQ/BITTU W/H
RAJU/DAYANAND W/H
NANDALAL/RAMESH W/H
STRUCTURE WELDER
SAMBHU YADAV W
RAJESH KUMAR W
POLICERAAM W
RAMPRATAP YOGI W
SAILESH W
GANG -8
NAME DESI
HARIRAM FOREMAN
MASTRAM R RIGGING
GANG/MATERIAL
RAMKHILADI R UNLOADING /HOPPER
ERECTION
GANG -9
1 KAMLESH F
2 RAKESH R ARRANGEMENT FOR
COAL HOPPER
3 SANJAY NISAR ERECTION
4 BHARAT YADR
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :15.6.2020
MANPOWER SUMMARY (BOILER)
SR DESIGNATION NO OF PERSON REMARKS
1 FITTER 6
2 IBR 1
3 FOREMAN 1
4 WELDER 10
5 RIGGER 22
6 HELPER 5
7 ELECTRICIAN 1
8 HYDRA OPERATOR 1
9 G/M 4
TOTAL 51
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 61
GANG WISE MANPOWER JOB ALLOCATED
GANG -1 GANG-5
SR. NO Name Desig WORK AREA SR. NO
1 Kashinath F 1
2 BUDHURAM R 2
4 SASIBHUSAN R
SONU HELPER
GANG-6
NAME Desig WORK AREA
RATIVAN F
BHUPENDAR R LHS PANEL ALIGNMENT
NILESH R
NATHUNI R
GANG-7
NAME Desig WORK AREA
JASVIR/VIJAY W/H
PINTU W/H
MUSTAQ/BITTU W/H
RAJU/DAYANAND W/H
NANDALAL/RAMESH W/H
STRUCTURE WELDER
SAMBHU YADAV W
RAJESH KUMAR W
POLICERAAM W
RAMPRATAP YOGI W
SAILESH W
GANG -8
NAME DESI
HARIRAM FOREMAN
MASTRAM R RIGGING
GANG/MATERIAL
RAMKHILADI R UNLOADING /HOPPER
ERECTION
GANG -9
1 KAMLESH F
2 RAKESH R ARRANGEMENT FOR
COAL HOPPER
3 SANJAY NISAR ERECTION
4 BHARAT YADR
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :16.6.2020
MANPOWER SUMMARY (BOILER)
SR DESIGNATION NO OF PERSON REMARKS
1 FITTER 6
2 IBR 1
3 FOREMAN 1
4 WELDER 10
5 RIGGER 22
6 HELPER 5
7 ELECTRICIAN 1
8 HYDRA OPERATOR 1
9 G/M 4
TOTAL 51
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 61
3 BABULAL MEENA R 3
RISER
4 BANAWARILAL R
5 RAMKHILADI PRAJAPATI R GANG-6
6 PARESHRAM R SR. NO
7 BALCHAND G/M 1
GANG -2 2
1 DEVISHANKAR F 3
2 DINESH MEENA R 4
3 VINOD R
4 RADHESHYAMMEENA R DEAERATOR
5 RAJU G/M GANG-7
SR. NO
1
GANG-3 2
1 SOHANLAL F 3
2 LAXMAN R 4
3 ANIL R LHS PANEL TO FRONT 5
PANEL CORNER JOINT FITUP
4 ASHOK R ALIGNMENT 6
5 RAMPRATAP W 7
6 MANOJ G/M 8
GANG-4 9
1 JITENDAR FITTER 10
2 PREMCHAND R GANG -8
3 RAVINDAR R SR. NO
4 SAILESH R BUNKER HOPPER ERCTION 1
5 KAMLESH F 2
3
4 SASIBHUSAN R
SONU HELPER
GANG-6
NAME Desig WORK AREA
RATIVAN F
RHS PANEL TO FRONT
BHUPENDAR R PANEL CORNER JOINT
NILESH R FITUP
NATHUNI R
GANG-7
NAME Desig WORK AREA
JASVIR/VIJAY W/H
PINTU W/H
MUSTAQ/BITTU W/H
RAJU/DAYANAND W/H
NANDALAL/RAMESH W/H
STRUCTURE WELDER
SAMBHU YADAV W
RAJESH KUMAR W
POLICERAAM W
RAMPRATAP YOGI W
SAILESH W
GANG -8
NAME DESI
HARIRAM FOREMAN
MASTRAM R RIGGING
GANG/MATERIAL
RAMKHILADI R UNLOADING /HOPPER
ERECTION
GANG -9
1 KAMLESH F
2 RAKESH R BUNKER HOPPER
3 SANJAY NISAR ERECTION
4 BHARAT YADR
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :17.6.2020
MANPOWER SUMMARY (BOILER)
SR DESIGNATION NO OF PERSON REMARKS
1 FITTER 6
2 IBR 2
3 FOREMAN 1
4 WELDER 10
5 RIGGER 22
6 HELPER 5
7 ELECTRICIAN 1
8 HYDRA OPERATOR 1
9 G/M 4
TOTAL 52
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 62
3 BABULAL MEENA R 3
RISER
4 BANAWARILAL R
5 RAMKHILADI PRAJAPATI R GANG-6
6 PARESHRAM R SR. NO
7 BALCHAND G/M 1
GANG -2 2
1 DEVISHANKAR F 3
2 DINESH MEENA R 4
3 VINOD R
4 RADHESHYAMMEENA R DEAERATOR
5 RAJU G/M GANG-7
SR. NO
1
GANG-3 2
1 SOHANLAL F 3
2 LAXMAN R 4
3 ANIL R LHS PANEL TO FRONT 5
PANEL CORNER JOINT FITUP
4 ASHOK R ALIGNMENT 6
5 RAMPRATAP W 7
6 MANOJ G/M 8
GANG-4 9
1 JITENDAR FITTER 10
2 PREMCHAND R GANG -8
3 RAVINDAR R SR. NO
4 SAILESH R BUNKER HOPPER ERCTION 1
5 KAMLESH F 2
3
4 SASIBHUSAN R
SONU HELPER
GANG-6
NAME Desig WORK AREA
RATIVAN F
RHS PANEL TO FRONT
BHUPENDAR R PANEL CORNER JOINT
NILESH R FITUP
NATHUNI R
GANG-7
NAME Desig WORK AREA
JASVIR/VIJAY W/H
PINTU W/H
MUSTAQ/BITTU W/H
RAJU/DAYANAND W/H
NANDALAL/RAMESH W/H
STRUCTURE WELDER
SAMBHU YADAV W
RAJESH KUMAR W
POLICERAAM W
RAMPRATAP YOGI W
SAILESH W
GANG -8
NAME DESI
HARIRAM FOREMAN
MASTRAM R RIGGING
GANG/MATERIAL
RAMKHILADI R UNLOADING /HOPPER
ERECTION
GANG -9
1 KAMLESH F
2 RAKESH R BUNKER HOPPER
3 SANJAY NISAR ERECTION
4 BHARAT YADR
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :18.6.2020
MANPOWER SUMMARY (BOILER)
SR DESIGNATION NO OF PERSON REMARKS
1 FITTER 7
2 IBR 2
3 FOREMAN 1
4 WELDER 10
5 RIGGER 22
6 HELPER 5
7 ELECTRICIAN 1
8 HYDRA/CRANE OPERATOR 2
9 G/M 4
TOTAL 54
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 64
GANG-6
NAME Desig WORK AREA
RATIVAN F
RHS PANEL TO FRONT
BHUPENDAR R PANEL CORNER JOINT
NILESH R FITUP
NATHUNI R
GANG-7
NAME Desig WORK AREA
JASVIR/VIJAY W/H
PINTU W/H
MUSTAQ/BITTU W/H
RAJU/DAYANAND W/H
NANDALAL/RAMESH W/H
STRUCTURE WELDER
SAMBHU YADAV W
RAJESH KUMAR W
POLICERAAM W
RAMPRATAP YOGI W
SAILESH W
GANG -8
NAME DESI
HARIRAM FOREMAN
RIGGING
MASTRAM R
GANG/MATERIAL
RAMKHILADI R UNLOADING /HOPPER
ERECTION
GANG -9
1 KAMLESH F
2 RAKESH R BUNKER HOPPER
3 SANJAY NISAR ERECTION
4 BHARAT YADR
DAILY MANPOWER REPORT ,WONDER CEMENT LTD DATE :19.6.2020
MANPOWER SUMMARY (BOILER)
SR DESIGNATION NO OF PERSON REMARKS
1 FITTER 9
2 IBR 2
3 FOREMAN 2
4 WELDER 11
5 RIGGER 31
6 HELPER 8
7 ELECTRICIAN 1
8 HYDRA/CRANE OPERATOR 2
9 G/M 4
TOTAL 70
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 80
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 80
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 84
1 FITTER 2
2 RIGGER 7
3 WELDER 1
TOTAL 10
BOILER +ESP 85