AREA COVERED
• BILL ANALYSIS
• HVAC PUMP`S
• AIR COMPRESSOR
• KITCHEN
• LIFT
INTRODUCTION
EXECUTIVE SUMMARY
2,45,000
5 19.11 - Immediate
Extra line of hot water use in dishwasher kWh
2,26,800
7 Lift power generation system 18.14 28 1.5 year
kWh
OPTIMIZE CONTRACT DEMAND
• Historical data of electricity bills for 12 months was analyzed.
Contract demand is 3200 kVA and Billing demand is 2063 kVA
and rate charge is 160 Rs./kVA. Over the 12 month billing
demand has always been below the contract demand shown
on below graph.
Unit Consumption & Demand
2500 1200000
2000 1000000
800000
1500
600000
kWh
kVA
1000
400000
500 200000
0 0
14-Jan 14-Feb 14-Apr 14- 14-Jun 14-Jul 14-Aug 14-Sep 14-Oct 14-Nov 15-Jan 15-Mar 15-Apr
May
Power saving 21 – 11 = 10 kW
improvement 8%
Power saving 1 kW
Energy Saved 24 kWh/Day i.e. 3,600 kWh Annually (150 days)
Saving Rs. 28,800 per annum @ Rs. 8/kWh
Investment Nil
Payback Immediate
AIR COMPRESSOR
• Lifts are used in hotel for the guests and staff conveying in the
hotel. There are 7 lifts, 2 for staff and 5 for guests. Lift are powered
by 25 kW motor for 12 floor conveying.
• Energy Conservation Opportunity: Installation regenerative Drives
system
Energy saving Calculation
No. of lifts 7
Size of motors 25 kW
Total power 175 kW
Power generation 30% of saving i.e. 52.5 kW
Energy saving 630 kWh/day for 12 hrs. running
Annual Energy saving 2,26,800 kWh
Electricity charge 8 Rs./kWh
potential saving 18,14,400 Rs./year
investment Rs. 4 Lakhs (Total =28 lakhs)
Payback period 1.5 year
CONCLUSION
• The detailed energy audits conducted jointly by the plant
and energy team have identified an annual energy saving
potential of Rs. 68.99 Lakhs, based on the present energy
cost.
• The summary of annual savings identified