You are on page 1of 1

HAZARD AND RISK ASSESSMENT (HIRA)

OHS-PR-09-03-F11 (A) RISK ASSESSMENT & JOB SAFE


PROCEDURE DAILY BRIEFING / TOOLBOX TALK RECORD
Operating Area: Department:
Project Name:
Contractor Name: Project Type: Contract No.:

SITE MANAGER NAME : SIGNATURE:

SUPERVISOR/FOREMAN : DATE :

SPEAKER : SIGNATURE :

☐ Excavation, ☐ Concrete Works, ☐ Formworks and Steel Works ☐ Work @ Heights, ☐ Lifting and
Erection, ☐ Equipment Installation, ☐ Loading and Unloading, ☐ Hot Work, ☐ Electrical Works, ☐
Specific Task/Activity:
Painting, ☐ Cold Work, ☐ Testing and Commisioning, ☐ Confined Space, ☐ Others To be
Specify:_____________________________________________
Description of Topics :

(ATTACHED TYPE / WRITTEN COPY OF TOPIC POINTS DISCUSSED)


NAME COMPANY NO. SIGNATURE NAME COMPANY NO. SIGNATURE

OHS Forms  Procedure Reference Revision Number Revision Date Approved By


RA & JOB SAFE PROCEDURE TOOLBOX TALK RECORD OHS-PR-09-03-F11 (A) 0 MAY 2021 OHSMS