SOUTH DHAHRAN HOME OWNERSHIP PROJECT

Request For Information (RFI)

RFI #: 01/16/00014/RFI/0185 Rev #:00 Date: 20-Nov-19

Contractor: Ashi and Bushnag Co. Ltd Contract No.: 6600042949


Contract Title: SDHO Private School
Stru Plu HVA Infr LndSc Other
✘ Arch. FF Elec.
Disipline: c. mb. C a. p. ____________

RFI Title: DOORS TYPE D2


RFI Description:

According to IFC drawing for boys & girls school (HA-176388-001, HA-176389-001, HA-176413-001, 176431-001, HA-176432-001, HA-
176456-001)

We have a conflict in door type D2 which is located in second floor both school as highlighted in attached (HA-176389-001, HA-176432-001,
A4 plan), its shown that the door type D2 have a glass sides, but in the doors schedule drawing (HA-176413-001, HA-176456-001) its shown
the door without any glass sides.

ABC propose to follow the regular door type D2 as IFC door schedule (HA-176413-001, HA-176456-001), without glass sides.

Note: first floor for both schools shown the same door without glass sides as attached.

HA-176388-001, HA-176389-001, HA-176413-001, 176431-001, HA-176432-001, HA-176456-001,


Attachements:

Initiator: Tech. Engineer - Abdulmohsin.A.Sanki Signature: Date: 11/20/2019

11/20/2019
Engineering Manager - Engr.Mohammed Rassem Signature: Date:

For Contractor:
Project Manager - Engr.Ahmad Farouk Signature: Date: 11/20/2019

Distribution: ✘ SAPMT ✘ PMT / CMT

Reviewed for General Acceptance. This review does not relieve the Contractor of his responsibility for making the work conform to the requirements of the Contract

Response:

For PMT/CMT
Name: Signature: Date:
For SAPMT
Name: Signature: Date:

Note: This form cannot modify contract cost or time, if contractor belives that response creates a change in scope and effecting cost and/or time, contractor should submit a "Request for Change"

Response Received:
For Contractor:
Name: Signature: Date:

Distribution: ✘ SAPMT ✘ PMT / CMT

540244292.xlsx Saudi Aramco: Company General Use