SOUTH DHAHRAN HOME OWNERSHIP PROJECT

Request For Information (RFI)

RFI #: 01/16/00014/RFI/0212 Rev #:00 Date: 26-Dec-19

Contractor: Ashi and Bushnag Co. Ltd Contract No.: 6600042949


Contract Title: SDHO Private School
Stru Plu HVA Infr LndSc Other
✘ Arch. FF Elec.
Disipline: c. mb. C a. p. ____________

RFI Title: WINDOWS MISSING IN ADMIN STAFF & L.R.C ROOM


RFI Description:

According to IFC drawings for boys & girls schools HA-176431-001, HA-176432-001, HA-176434-001, HA-176388-001, HA-176389-001, HA-
176391-001

We have a conflicts between the plans and elevations windows:


1- In first floor plans (HA-176431-001, HA-176388-001) it’s shown in the Admin staff room #118 that there is window W2, but in the
elevations “B” (HA-176434-001, HA-176391-001) it’s missing.
2- In second floor plans (HA-176432-001, HA-176389-001) it’s shown in the L.R.C room #207 that there are two windows W2, but in the
elevations “A” (HA-176434-001, HA-176391-001) it’s shown only one.

ABC propose to follow IFC plans windows.

HA-176431-001, HA-176432-001, HA-176434-001, HA-176388-001, HA-176389-001, HA-176391-001


Attachements:

Initiator: Tech. Engineer - Abdulmohsin.A.Sanki Signature: Date: 12/26/2019

12/26/2019
Engineering Manager - Engr.Mohammed Rassem Signature: Date:

For Contractor:
Project Manager - Engr.Ahmad Farouk Signature: Date: 12/26/2019

Distribution: ✘ SAPMT ✘ PMT / CMT

Reviewed for General Acceptance. This review does not relieve the Contractor of his responsibility for making the work conform to the requirements of the Contract

Response:

For PMT/CMT
Name: Signature: Date:
For SAPMT
Name: Signature: Date:

Note: This form cannot modify contract cost or time, if contractor belives that response creates a change in scope and effecting cost and/or time, contractor should submit a "Request for Change"

Response Received:
For Contractor:
Name: Signature: Date:

Distribution: ✘ SAPMT ✘ PMT / CMT