Request For Information

(RFI)

Consultant :- CAPACIT’E INFRAPROJECTS LIMITED


Contract Ref.No. :- SBUT/TEC/CO/SC04/CIL-CSFMEPFW/042-2023
Project Name :- SAIFEE BURHANI UPLIFTMENT PROJECT
AN NASR SECTOR - 4
RFI no. :- CIL/90361/RFI/137 Date: 2-Apr-2024
Dwg / Document Ref no. :-

Type of RFI: 5 Contractual / Commercial 5 Technical


Discipline
5 Architectural 5 Electrical 5 Façade

5 Structural 5 PHE - Plumbing 5 Others (Please specify): Payment term

5 HVAC 5 Fire Fighting


We request clarification of the following:
As per Drawing No. 261_S_4NT_07, the beam schedule indicates that MB(+10.308M) should be partially cranked. However, Drawing No.
261_S_4NT_03 contains no indication of a beam crank. Kindly confirm.

Contractor's Authorized Signature:


Engineer's / Design Team's Comments

5 Design Team 5 Construction Management (CM-Civil) 5 Contracts & Procurement Team

5 Construction Management (CM-MEP&F) 5 Construction Management (CM-Facade) 5 QA / QC

Engineer's Signature:
Consultants Comments:
5 Architect 5 Structure 5 MEP&F 5 Infrastructure 5 Others (_________)
WWP Response-- As per ARCH. Intent , we are OK with Crank beam (MB +10.308). Accordingly RC pardi is not required.

Consultant's Signature:

Authorized Signatory

Name:

Signature:

Date:

Important: Permission to proceed does not relieve contractor from full compliance with contractual obligations