PART A – CONTRACTOR:
As per approved drawing UG FWN pipe loop running on Rack, south side of SMR shelter. Support missing.
GV-03 UG / AG Tie-in Transition Spool dimension was changed due to structure foundation issue.
FH-17 Near by loop dimension changed due to not possible to install the pipes as per given dimension.
DESCRIPTION OF CHANGE:
GV-03 location transition spool modified as per site condition to match the FGL.
List Design Document(s) Affected by FCN (Include documents noted above and additional documents, as required.)
SIGNATURE: SIGNATURE:
NAME: NAME:
DATE: DATE: