Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

EW-CL-07
Rev. 0
Date
Received
Ref. RFI.
Checklist for : Earthworks ( Final Trimming To Formation Level )
No:

Location : Other Information:

Item Description CON CON SC Remarks


Yes No Y N

1 Field Density Test carried out to formation

2 Preparation of formation as per requirement?

3 Before Laying Of Subbase


Underground drains and services
completed For:

a) Subgrade drainage
b) Table drains
c) Piped drains
d) Culverts
e) Services and Ducts

4 Survey control Levels


a) Specified tolerances ……………………..
b) Formation level completed acceptable?

5 FINAL INSPECTION P F Date:


(with comments)

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :

Please  off where appropriate