Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

EW-CL-04
Rev. 0
Date
Received
Ref. RFI.
Checklist for : Earthworks ( Filling Of Pond )
No.

Location : Other Information:

Item Description Con Con SC Remarks


Yes No Y N

1 Dewatering of pond carried out to the


required depth as outlined in Method
Statement?

2 Cross-section survey of OGL before


filling of pond

3 Filling Material Used


a) sand
b) Granular material not exceeding 75
mm
c) rock

4 Filling material from approved source


( Location of source)

5 FINAL INSPECTION WITH COMMENTS P F

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :

Please  off where appropriate