Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

PC-CL-10
Rev. 0
Date
Received
Ref. RFI.
Checklist for : PQC LAYING
No:

Chainage/ Location : Other Information:


From To (RHS/LHS)
Width (Mt.)

Date of Concreting:

Item Description CON CON SC Remarks


Yes No Y N

A AVAILABILITY OF DIFFERENT
ITEMS :
a) Is following items available?

1. Survey Team :
2. Centre Points Marking by Surveyor :
3. Straight Edge :
4. Thermometer :
5. Anemometer :
6. Slip From Paver :
7. Concrete Placer :
8. Texture & Curring Machine :
9. Working Platform For Mason :
10. Excavator :
11. Sensor / No. :
12. Sensor Wire For Both Side / One Side :
13. Sensor Shoe :
14. Sufficient No. of Dowel Bars :
15. Sufficient No. of Tie Rods :
16. Sufficient Qty. of Plastic Sheet :
17. Sufficient Qty. of Curing Compound :
18. Water Tanker :
19. Needle / Vibrator :
20. D. G. for Vibrator to Fill Cubes :
21. Slump Cone :
22. Lighting mast :
23. Workman in Nos. : a) Mason b) Khalasi: c) Unskilled :

B) No. of Tatras/ Tippers Engaged :


C) Temperature of Concrete measured °C
before Pouring :
D) Pouring : Start Time : Completion Time :
F) Quantity Received (M3) Theo. Consumption (M3) :
G) No. of Cubes Taken : No. of Beams Taken :
H) End Ch. : Start Ch. :

I) FINAL INSPECTION WITH COMMENTS P F Date:

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :

Please  off where appropriate